Prior art keywords
phase
prime
unit
loop
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510031532.6A
Other languages
English (en)
Inventor
冯超
康钧
张海宁
杨小库
廖鹏
马丽山
李高峰
李玉海
周瑜
王志惠
王煜杰
谢鹏盛
王鹏飞
王生杰
李后顺
曲全磊
周尚虎
陈文强
包正红
朱爱珍
马奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Priority to CN201510031532.6A priority Critical patent/CN104597308A/zh
Publication of CN104597308A publication Critical patent/CN104597308A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

本发明涉及高压测量领域,特明涉及一种预测交叉互联式单芯四回路高压电缆护套环流的方法。本发明先求解各相护套上负载电流产生的感应电压源及各相护套环流产生的感应电压源,进而求解出每一相电缆护套环流的大小。

Description

一种预测交叉互联式单芯四回路高压电缆护套环流的方法
技术领域:
本发明涉及高压测量领域,特明涉及一种预测交叉互联式单芯四回路高压电缆护套环流的方法。
背景技术:
要计算金属护套环流,就必须计算引起金属护套环流的感应电压。电缆金属护套的感应电压与电缆线芯的负载电流和各相电缆的间距有关,目前对计算电缆护套感应电压的研究主要有两种方法:电感求感应电势法和磁通求感应电势法,其中电感求感应电势是指,每一相电缆护套的电感包含自感和互感,所以护套上产生的感应电压是由护套自感和互感共同造成的。目前利用这种方法计算感应电势的最高回路为三回路。当用此方法计算四回路护套感应电势时,需要求出的12×12=144个自感值和互感值,所以本方法不适用多回路电缆护套感应电压的计算。
发明内容
针对背景技术的不足,本发明采用磁通求感应电势方法来实现四回路电力电缆护套环流的计算,当两导体平行且接近时,当一导体上通过交变电流时,会在两导体之间产生磁通量,这个磁通量与通电导体的电流、导体的尺寸和两导体的距离有关。产生的磁通量又造成了导体上的感应电势,所以可以通过磁通量来求解护套上的感应电势。本发明先求解各相护套上负载电流产生的感应电压源及各相护套环流产生的感应电压源,进而求解出每一相电缆护套环流的大小。
本发明的技术方案是:1、一种预测交叉互联式单芯四回路高压电缆护套环流的方法,其特征在于:包括以下步骤:
第一步,根据线芯电流I,求解出每一相得自感电压UX和互感电压U’X
第二步,测量护套的电阻R、护套的电抗X,分别为电缆两端接地电阻R1和R2,大地电阻R3
第三步,根据方程式
Is 1 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 1 ′ = U 1 Is 2 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 2 ′ = U 2 Is 3 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 3 ′ = U 3 Is 4 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 4 ′ = U 4 Is 5 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 5 ′ = U 5 Is 6 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 6 ′ = U 6 Is 7 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 7 ′ = U 7 Is 8 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 8 ′ = U 8 Is 9 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 9 ′ = U 9 Is 10 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 10 ′ = U 10 Is 11 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 11 ′ = U 11 Is 12 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 12 ′ = U 12
计算出Is1、Is2、至Is12共12路电缆护套环流;
其中U1~U3、U4~U6、U7~U9、U10~U12分别为四回路12相电缆线芯的感应电压;U1′~U3′、U4′~U6′、U7′~U9′、U10′~U12′分别为四回路12相电缆护套上产生的感应电压。
如上所述的预测电缆护套环流的方法,其特征在于:所述第一步具体计算方法为:A1相自感电压U1为感应电势为ESA1,其计算方法为:
GMRs为护套的几何平均半径;ma、mb、mc分别代表A相、B相、C相和屏蔽层的距离系数;I为A相线芯电流(在实际运行中三相电流相等);S为两导线之间的距离。
A1相互感电压U1′计算方法为:
U1′=jIs2(X1L1+X2L2+X3L3)+.....+jIs9(X22L1+X23L2+X24L3)
X1—Is2与Is1在L1段的单位互感值,单位为H/km;
X2—Is2与Is1在L2段的单位互感值,单位为H/km;
X3—Is2与Is1在L3段的单位互感值,单位为H/km;
X22—Is9与Is1在L1段的单位互感值,单位为H/km;
X23—Is9与Is1在L2段的单位互感值,单位为H/km;
X24—Is9与Is1在L3段的单位互感值,单位为H/km;
B1相、C1相、A2相至C4相得自感电压与互感电压与A1相计算方法相同。
附图说明
图1:本发明是电力电缆在交叉互联连线方式的示意图
图2a为第一回路环流等值线路图;
图2b为第二回路环流等值线路图;
图2c为第三回路环流等值线路图;
图2d为第四回路环流等值线路图;
图3:为四回路电缆直线排列截面图。
具体实施方式
以下结合附图对本发明作进一步说明。
本发明是针对110kV及以上等级单芯电力电缆长距离传输时,在考虑交叉互联段情况下,以一个完整的交叉互联段为单位,进行计算电缆护套环流值,如图1所示。如果在理想情况下,三相的三段长度及其他参数绝对相等时,三相达到绝对平衡的状态,那么在两端的直接接地处的感应电势为零,接地电流也为零。但是受现场的施工、加工工艺的影响等因素,常常三相很难达到绝对平衡,所以三相叠加后在两端就形成了感应电势,并与大地共同形成接地环流。本发明从电缆的本身特性出发,在已知负载下,考虑在同沟道各个回路之间的影响,建立计算模型,并用MATLAB软件实现算法。
首先,求解负载电流产生的感应电势ES,单位为V/km,根据磁通求感应电势原理,设第一回路的A相感应电势为ESA1,可列出方程:
E SA 1 = 2 ωI × 10 - 4 [ 3 2 ln Π 1 n m c Π 1 n - 1 m b + j 1 2 ln Π 1 n - 1 m b × Π 1 n m c S 2 ( Π 1 n - 1 m a ) 2 GMR S 2 ] V / km
ESA1—A相电缆护套的单位感应电压,单位为V/km;
GMRs—三相护套的几何平均半径单位与S相同;
ma、mb、mc分别代表A相、B相、C相和屏蔽层的距离系数;
I为A相线芯电流(在实际运行中三相电流相等)。
S为两导线之间的距离,如图3所示。
以此类推求出其他相位的感应电势,由于感应电势可以理解成在单位长度的上电压,所以可等效于感应电压UX
接下来说明互感电压的求解过程。U1′~U9′为各相环流在每一相护套上产生的感应电势,其大小与环流及护套之间的互感有关。由于护套交叉互联,环流在三小段中流过的路径各不相同。所以护套之间的互感也随之变化。以护套环流Is2(从B相起始)对环流Is1(从A相起始)流经线路产生的感应电压为例:在交叉互联L1段时,Is2流过B相,Is1流过A相,此时两线路间互感为A、B相互感,设为X1。所以在交叉互联L1段Is2在Is1流经回路上产生的感应电压为jIs2X1L1;在交叉互联L2段时,Is2流过C相,Is1流过B相,此时两线路间互感为B、C相互感,设为X2。所以在交叉互联L2段Is2在Is1流经回路上产生的感应电压为jIs2X2L2;在交叉互联L3段时,Is2流过A相,Is1流过C相,此时两线路间互感为A、C相互感,设为X3。所以在交叉互联L3段Is2在Is1流经回路上产生的感应电压为jIs2X3L3。将以上三个感应电压的值相加,就得到护套环流Is2在Is1流经回路上产生的感应电势。同理可以求出Is3~Is9在Is1流经回路上产生的感应电势。由此可以得到各相护套环流在Is1流经回路上产生的感应电压之和U1′:
U1′=jIs2(X1L1+X2L2+X3L3)+.....+jIs9(X22L1+X23L2+X24L3)
式中:
X1—Is2与Is1在L1段的单位互感值,单位为H/km;
X2—Is2与Is1在L2段的单位互感值,单位为H/km;
X3—Is2与Is1在L3段的单位互感值,单位为H/km;
X22—Is9与Is1在L1段的单位互感值,单位为H/km;
X23—Is9与Is1在L2段的单位互感值,单位为H/km;
X24—Is9与Is1在L3段的单位互感值,单位为H/km。
然后,根据等效电路图2a至图2d,可罗列如下方程组,其中每一回路的自感为UX互感为U’X,R为护套的电阻、X为护套的电抗,R1、R2分别为电缆两端接地电阻,R3分别为大地电阻。R、X、R1、R2、R3均是可以在具体线路中,通过测量仪器测试出来,并且每个环路的数量相同。U1~U3、U4~U6、U7~U9、U10~U12分别为四回路12相电缆线芯上通过的电流(三相负载电流平衡,大小均为I)在电缆A1~C1(第一回路三相)、A2~C2(第二回路三相)、A3~C3(第三回路三相)、A4~C4(第四回路三相)金属护套上产生的感应电压。而U1′~U3′、U4′~U6′、U7′~U9′、U10′~U12′分别为四回路12相电缆护套上的环流IS1~IS12在电缆A1~C1、A2~C2、A3~C3、A4~C4护套上产生的感应电压。可以列出关于12相电缆护套环流的线性方程组,如下所示:
Is 1 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 1 ′ = U 1 Is 2 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 2 ′ = U 2 Is 3 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 3 ′ = U 3 Is 4 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 4 ′ = U 4 Is 5 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 5 ′ = U 5 Is 6 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 6 ′ = U 6 Is 7 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 7 ′ = U 7 Is 8 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 8 ′ = U 8 Is 9 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 9 ′ = U 9 Is 10 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 10 ′ = U 10 Is 11 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 11 ′ = U 11 Is 12 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 12 ′ = U 12
从以上公式可以看出,求解各相护套环流IS1~IS12的关键在于求解各相护套上负载电流产生的感应电压源U1~U12及各相护套环流产生的感应电压源U1′~U12′,自感和互感具体求解方程,已经在第一步就得出,最终用MATLAB软件来实现这种算法编程。
本发明使用条件是110kV及以上等级的单芯电力电缆,并且是带有交叉互联的连接方式,考虑各个影响接地电流的参量,利用磁通求感应电势方法罗列方程组,用软件来实现对环流值的计算。此种方法,不用考虑每一相与其余所有相都有互感,不需要求出每一个自感值和互感值,整体计算量不大,适合较多回路的计算,另外本发明考虑因素全面,计算结果准确度较高,特别适合于在电缆的设计阶段使用,对于已知的条件下,计算电缆实际运行时的环流水平,为以后的维护检修有重大意义。

Claims (2)

1.一种预测交叉互联式单芯四回路高压电缆护套环流的方法,其特征在于:包括以下步骤:
第一步,根据线芯电流I,求解出每一相得自感电压UX和互感电压U’X
第二步,测量护套的电阻R、护套的电抗X,分别为电缆两端接地电阻R1和R2,大地电阻R3
第三步,根据方程式
Is 1 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 1 ′ = U 1 Is 2 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 2 ′ = U 2 Is 3 ( R + jX ) + ( Is 1 + Is 2 + Is 3 ) ( R 1 + R 2 + R 3 ) + U 3 ′ = U 3 Is 4 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 4 ′ = U 4 Is 5 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 5 ′ = U 5 Is 6 ( R + jX ) + ( Is 4 + Is 5 + Is 6 ) ( R 1 + R 2 + R 3 ) + U 6 ′ = U 6 Is 7 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 7 ′ = U 7 Is 8 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 8 ′ = U 8 Is 9 ( R + jX ) + ( Is 7 + Is 8 + Is 9 ) ( R 1 + R 2 + R 3 ) + U 9 ′ = U 9 Is 10 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 10 ′ = U 10 Is 11 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 11 ′ = U 11 Is 12 ( R + jX ) + ( Is 10 + Is 11 + Is 12 ) ( R 1 + R 2 + R 3 ) + U 12 ′ = U 12
计算出Is1、Is2、至Is12共12路电缆护套环流;
其中U1~U3、U4~U6、U7~U9、U10~U12分别为四回路12相电缆线芯的感应电压;U1′~U3′、U4′~U6′、U7′~U9′、U10′~U12′分别为四回路12相电缆护套上产生的感应电压。
2.如权利要求1所述的预测电缆护套环流的方法,其特征在于:所述第一步具体计算方法为:A1相自感电压U1为感应电势为ESA1,其计算方法为:
E SA 1 = 2 ωI × 10 - 4 [ 3 2 1 n Π 1 n m c Π 1 n - 1 m b + j 1 2 1 n Π 1 n - 1 m b × Π 1 n m c S 2 ( Π 1 n - 1 m a ) 2 GMR 3 2 ] V / km
GMRs为护套的几何平均半径;
ma、mb、mc分别代表A相、B相、C相和屏蔽层的距离系数;
I为A相线芯电流;
S为两导线之间的距离;
A1相互感电压U1′计算方法为:
U1′=jIs2(X1L1+X2L2+X3L3)+.....+jIs9(X22L1+X23L2+X24L3)
X1—Is2与Is1在L1段的单位互感值,单位为H/km;
X2—Is2与Is1在L2段的单位互感值,单位为H/km;
X3—Is2与Is1在L3段的单位互感值,单位为H/km;
X22—Is9与Is1在L1段的单位互感值,单位为H/km;
X23—Is9与Is1在L2段的单位互感值,单位为H/km;
X24—Is9与Is1在L3段的单位互感值,单位为H/km;
B1相、C1相、A2相至C4相得自感电压与互感电压与A1相计算方法相同。
CN201510031532.6A 2015-01-22 2015-01-22 一种预测交叉互联式单芯四回路高压电缆护套环流的方法 Pending CN104597308A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510031532.6A CN104597308A (zh) 2015-01-22 2015-01-22 一种预测交叉互联式单芯四回路高压电缆护套环流的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510031532.6A CN104597308A (zh) 2015-01-22 2015-01-22 一种预测交叉互联式单芯四回路高压电缆护套环流的方法

Publications (1)

Publication Number Publication Date
CN104597308A true CN104597308A (zh) 2015-05-06

Family

ID=53123221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510031532.6A Pending CN104597308A (zh) 2015-01-22 2015-01-22 一种预测交叉互联式单芯四回路高压电缆护套环流的方法

Country Status (1)

Country Link
CN (1) CN104597308A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108445342A (zh) * 2018-03-01 2018-08-24 华南理工大学 一种电缆护套单点金属性故障接地感应电流计算方法
CN108469542A (zh) * 2018-03-01 2018-08-31 华南理工大学 一种含绝缘金布的单芯电缆分布式感应电流的计算方法
CN108761167A (zh) * 2018-03-01 2018-11-06 华南理工大学 一种电缆金属护套多相多点接地下护层感应电流计算方法
CN113009215A (zh) * 2021-02-26 2021-06-22 江苏方天电力技术有限公司 一种高压电缆感应电压最大值检测方法及系统
CN114034905A (zh) * 2021-11-08 2022-02-11 浙江华云电力工程设计咨询有限公司 基于多导体传输线理论的电缆金属护套接地环流计算方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102331550A (zh) * 2011-07-18 2012-01-25 邯郸供电公司 电缆护套环流监测系统及其使用方法
CN103698653A (zh) * 2013-12-30 2014-04-02 国家电网公司 基于环流测量的单芯电力电缆护套接地故障检测系统及方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102331550A (zh) * 2011-07-18 2012-01-25 邯郸供电公司 电缆护套环流监测系统及其使用方法
CN103698653A (zh) * 2013-12-30 2014-04-02 国家电网公司 基于环流测量的单芯电力电缆护套接地故障检测系统及方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
牛海清 等: "110kV单芯电缆金属护套环流计算与试验研究", 《高电压技术》 *
罗致远 等: "多回路电缆金属护套环流计算软件的开发与应用", 《电线电缆》 *
贾欣 等: "单芯电缆计及护套环流时载流量的计算", 《高电压技术》 *
陆德綋: "多回路单芯电缆金属护层感应电压的简单计算", 《电力技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108445342A (zh) * 2018-03-01 2018-08-24 华南理工大学 一种电缆护套单点金属性故障接地感应电流计算方法
CN108469542A (zh) * 2018-03-01 2018-08-31 华南理工大学 一种含绝缘金布的单芯电缆分布式感应电流的计算方法
CN108761167A (zh) * 2018-03-01 2018-11-06 华南理工大学 一种电缆金属护套多相多点接地下护层感应电流计算方法
CN108469542B (zh) * 2018-03-01 2019-10-18 华南理工大学 一种含绝缘金布的单芯电缆分布式感应电流的计算方法
CN113009215A (zh) * 2021-02-26 2021-06-22 江苏方天电力技术有限公司 一种高压电缆感应电压最大值检测方法及系统
CN114034905A (zh) * 2021-11-08 2022-02-11 浙江华云电力工程设计咨询有限公司 基于多导体传输线理论的电缆金属护套接地环流计算方法
CN114034905B (zh) * 2021-11-08 2024-04-02 浙江华云电力工程设计咨询有限公司 基于多导体传输线理论的电缆金属护套接地环流计算方法

Similar Documents

Publication Publication Date Title
CN104597308A (zh) 一种预测交叉互联式单芯四回路高压电缆护套环流的方法
Tatematsu Development of a surge simulation code VSTL REV based on the 3D FDTD method
Park et al. Analysis of the neutral current for two-step-type poles in distribution lines
Shaalan et al. Analysis of electric field inside HV substations using charge simulation method in three dimensional
Ismail Effect of oil pipelines existing in an HVTL corridor on the electric-field distribution
Vadim et al. Features of transient research in three-phase high-voltage power transmission cable lines
CN106443334B (zh) 一种基于零序电流差分极性比较的配电网故障选线方法
CN103424627B (zh) 双端测量平行电网线路零序阻抗的方法
CN103020457B (zh) 一种降低海底电缆工程中护套损耗的方法
Demirol et al. Investigation of effect of laying and bonding parameters of high-voltage underground cables on thermal and electrical performances by multiphysics FEM analysis
CN107219420B (zh) 一种换流站短路电流分流系数仿真方法及系统
Popovic Practical methods for analysis and design of HV installation grounding systems
Popović Inductive influence of surrounding metal installations on power transfer capacity of HV cable lines with applied cross-bonding
Abouzeid et al. Induced voltages on overhead transmission lines because of nearby included lightning channel
Benato et al. HVAC single core insulated cables with steel reinforced mechanical protections: Effect on sequence impedances
Mpanga et al. Electromagnetic Field Evaluation of a 500kV High Voltage Overhead Line
Mankov et al. Ensuring electromagnetic compatibility of control and measuring cables in case of phase-shielded conductor-induced interference in non-stationary modes
Surianu Determination of the induced voltages by 220 kV electric overhead power lines working in parallel and narrow routes. Measurements on the ground and mathematical model
CN114879788A (zh) 一种确定变电站直流偏磁电流分布的方法及系统
Almeida et al. Mitigation of the magnetic field due to underground power cables using an optimized grid
Abdallah Electric fields from transmission lines nearby populated areas in Egypt: theory versus experiment
Shen et al. Study of electromagnetic interference on distribution conductors from parallel transmission line and practical mitigation solutions
De Oliveira et al. Voltage elevation analysis of overhead distribution lines using the finite element method
RU2796196C1 (ru) Стенд для определения токов короткого замыкания межподстанционной зоны тяговой сети
Belhadj et al. Electric and magnetic fields estimation for live transmission line right of way workers using artificial neural network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150506