CN104594150B - Structure and method for processing black cotton soil embankment with impervious geotextiles - Google Patents

Structure and method for processing black cotton soil embankment with impervious geotextiles Download PDF

Info

Publication number
CN104594150B
CN104594150B CN201410796693.XA CN201410796693A CN104594150B CN 104594150 B CN104594150 B CN 104594150B CN 201410796693 A CN201410796693 A CN 201410796693A CN 104594150 B CN104594150 B CN 104594150B
Authority
CN
China
Prior art keywords
soil
embankment
black cotton
seepage geotextile
cotton regur
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410796693.XA
Other languages
Chinese (zh)
Other versions
CN104594150A (en
Inventor
黄晓明
李昶
程永振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201410796693.XA priority Critical patent/CN104594150B/en
Publication of CN104594150A publication Critical patent/CN104594150A/en
Application granted granted Critical
Publication of CN104594150B publication Critical patent/CN104594150B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/003Foundations for pavings characterised by material or composition used, e.g. waste or recycled material
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention provides a structure and a method for processing a black cotton soil embankment with impervious geotextiles. The embankment structure comprises a geogrid gravelly soil base course, impervious geotextile edging and interlayer seepage-proofing layers, a black cotton soil fill stratum and a non-expansive clay top seal layer. The method comprises the following steps: (1) clearing a foundation; (2) setting out; (3) paving three layers of geogrid gravelly soil with the total thickness being 50cm; (4) spreading the impervious geotextiles on two sides of the road foundation, lapping the impervious geotextiles with filled soil by 250cm, turning up the impervious geotextiles on the slope of the road foundation, lapping the impervious geotextiles on the two sides in the middle of an embankment by 100cm after turning up, and bonding by using emulsified asphalt, wherein the lapping width of the adjacent impervious geotextiles is100cm and the impervious geotextiles are bonded by virtue of the emulsified asphalt; (5) spreading the soil and carrying out rolling construction; and (6) filling and rolling the top seal layer. The structure and the method disclosed by the invention are conducive to the stabilization of the embankment and are capable of preventing the embankment from deformation.

Description

A kind of anti-seepage geotextile processes the structure and method of black cotton regur soil embankment
Technical field
The present invention relates to application geotechnical grid gravelly soil embankment bottom and anti-seepage geotextile in the treatment of black cotton regur soil embankment A kind of reinforcement technique.
Background technology
Black cotton regur soil is a kind of special cohesive soil, is a kind of many cracks for being formed in nature geological process and has notable swollen The geologic body of contracting, clay component is mainly made up of the mineral montmorillonite and illite of strong hydrophilicity.Black cotton regur soil have overconsolidation, The engineering properties different from normally consolidated clay such as fissurity, water-swellable, dehydration shrinkage cracking and repeated deformation, it is miscellaneous in the soil body Crack disorderly is dispersed with, often there is long-term potential danger to the deformation failure effect produced by building.Black cotton regur soil is built highway Engineering, the use of black cotton regur soil is always a problem, if embankment fill material does not use black cotton regur soil, substantial amounts of black cotton regur soil will be caused to abandon Side, on the one hand increases construction costs, on the other hand causes great harmful effect to surrounding enviroment.If filled using black cotton regur soil Embankment, rainfall side slope enters to blend to be caused inside underground water capillary rise to embankment the increase of black cotton regur soil embankment water content, occurs Embankment dilatancy, filling intensity reduction, dry season, due to evaporation, embankment dehydration will cause crack to grow.Drying and watering cycle Black cotton regur soil embankment easily come down, caved in, slip the disease such as collapse and ftracture.
If the mechanism that disease occurs from black cotton regur soil embankment can be seen that black cotton regur soil embankment and keep water content equiblibrium mass distribution, Black cotton regur soil can as embankment fill material, therefore black cotton regur soil embankment a punishment thinking be exactly carry out the waterproof of embankment, draining, every Water and hydrophobic work, while reinforcing side slope of embankment.
Before and after the fifties in last century, foreign countries start to carry out engineering reinforcement using " geosynthetics ", at present, geotechnique's synthesis Material has been widely used for the every field of Geotechnical Engineering.So-called " geosynthetics ",《Hydraulic and Hydro-Power Engineering geotechnique's synthesis Materials application technical specification》The definition for being given is " general name for being applied to the synthetic material product of civil engineering ".Anti-seepage geotextile Be one of which geosynthetics, anti-seepage geotextile be using plastic sheeting as antiseepage base material, it is and non-woven fabric compounded Seepage by geo-textile material, plastic sheeting is mainly polyvinyl chloride (PVC) and polyethylene (PE).The combination of plastic sheeting and non-woven fabrics is not The tensile strength and anti-puncture ability of plastic sheeting are only increased, and because nonwoven surface is coarse, increases contact surface Coefficient of friction, is conducive to the stabilization of geomembrane and protective layer.Anti-seepage geotextile be used in black cotton regur soil embankment structure in, can play every From the water_air exchange in embankment with the external world, it is ensured that the equilibrium of black cotton regur soil embankment interior moisture content.Simultaneously because anti-seepage geotextile has Certain tensile resistance, can reinforce black cotton regur soil embankment, improve its stability.
Geotechnical grid is a kind of novel three-dimensional geosynthetics for occurring in the world the eighties in last century, and it is a kind of The tridimensional network body that high molecular polymer band wide is formed through strength welding, capable of expansion and contraction, can be contracted during transport gathers into folds, Expansible when using, and back-up sand, rubble or clay material in cell compartment, constitute the flexible structure with powerful lateral and big rigidity Layer.
The content of the invention
Technical problem:Structure and side it is an object of the invention to provide a kind of anti-seepage geotextile treatment black cotton regur soil embankment Method.This structure collectively constituted by geotextiles and black cotton regur soil, can solve black cotton regur soil roadbed reclamation sex chromosome mosaicism, can also be rationally sharp With the black cotton regur soil side of abandoning, Stability Analysis of Structures, the purpose of economical rationality are reached.Embankment and ground have been isolated in the use of geotechnical grid gravelly soil The water_air exchange of soil, while enhancing the stability of embankment structure.
Technical scheme:The present invention provides following technical scheme:
A kind of anti-seepage geotextile processes the structure of black cotton regur soil embankment, and the embankment structure includes geotechnical grid successively from top to bottom Rubble embankment bottom, black cotton regur soil fill stratum and non-expanded clay closedtop layer.Wherein black cotton regur soil fill stratum is using antiseepage geotechnique Cloth bound edge simultaneously sets impervious barrier in interlayer.
Preferably, in the geotechnical grid gravelly soil embankment bottom, the material requirements of geotechnical grid is:
Polypropylene geotextile cell compartment;
A kind of method that anti-seepage geotextile processes black cotton regur soil embankment, the method in turn includes the following steps:
Step 1:Clear base:Excavate ground top layer planting soil or black cotton regur soil 20cm, change and fill out the good non-expansibility material of water stability, And be compacted, flatten;
Step 2:Setting-out:According to construction drawing setting-out, every layer of bound edge institute is calculated using anti-seepage geotextile size and is cut;
Step 3:Three layers of common 50cm geotechnical grids gravelly soil of laying:First geotechnical grid is launched, foundation surface is laid on, it is fixed Edge, dispense gravelly soil in geotechnical grid, then roll to regulation packing;
Step 4:Laying anti-seepage geotextile:Anti-seepage geotextile, anti-seepage geotextile and the overlap joint that bankets are laid in roadbed both sides 250cm, anti-seepage geotextile anti-package on roadbed side slope overlaps 100cm after the anti-seepage geotextile anti-package of both sides in the middle part of embankment, uses Emulsified asphalt is bonded.Adjacent anti-seepage geotextile lap width is 100cm, and is bonded using emulsified asphalt;
Step 5:Paving soil and roller compaction construction:It after grinding compacting is 20cm~25cm, making that every layer of black cotton regur soil placement thickness is It is preceding that loose laying depth and compaction technology are determined by test section;
Step 6:Closedtop layer is filled and rolled:Closedtop layer material uses the good non-black cotton regur soil material of water stability, every layer of making Thickness is 20cm, and is rolled to the packing of regulation.
Preferably, the step of described step 4 lays anti-seepage geotextile includes:
Step 1:Anti-seepage geotextile, anti-seepage geotextile and geotechnique are laid respectively in geotechnical grid crushed stone soil layer top both sides first Cell compartment gravelly soil overlaps 250cm, and anti-seepage geotextile is fixed on geotechnical grid gravelly soil surface;
Step 2:Placement in layers thickness 100cm black cotton regur soil, per thickness 20cm~25cm, then cuts slope by design side slope, cuts slope First use mechanical roughing, then artificial refine;
Step 3:Both sides anti-seepage geotextile anti-package, and form the overlap joint no less than 100cm, anti-seepage geotextile with embankment middle part Interlayer is bonded using emulsified asphalt;
Step 4:Laying second layer anti-seepage geotextile, with lower floor anti-seepage geotextile overlap joint 250cm, interlayer uses emulsified asphalt Bond;
Step 5:Repeat above construction procedure to top layer.
Preferably, the material requirements of anti-seepage geotextile is:
Beneficial effect:1. the non-deformability for causing gravelly soil bottom that uses of geotechnical grid strengthens, and is conducive to embankment Stabilization.2. the structure that anti-seepage geotextile and black cotton regur soil are collectively constituted has completely cut off influence of the extraneous aqueous vapor to black cotton regur soil embankment, it is ensured that The equilibrium of embankment interior moisture content, meanwhile, the use of anti-seepage geotextile has humidification to embankment, limit the change of embankment Shape.3. black cotton regur soil is realized as embankment fill material, the black cotton regur soil engineering side of abandoning is reduced, is conducive to water and soil conservation, saved engineering Cost, meanwhile, alleviate the environmental pressure on periphery.
Brief description of the drawings
Method below with reference to 1~5 pair of anti-seepage geotextile treatment black cotton regur soil embankment of the present invention of accompanying drawing is carried out in detail Describe in detail bright (unit is in terms of millimeter in figure).
Fig. 1 is the sectional drawing after anti-seepage geotextile treatment black cotton regur soil embankments construction;
Fig. 2~Fig. 5 is that anti-seepage geotextile processes black cotton regur soil embankments construction schematic diagram, wherein:
Fig. 2 is geotechnical grid rubble embankment bottom sectional drawing;
Fig. 3 is anti-seepage geotextile layout diagram;
Fig. 4 fills schematic diagram for black cotton regur soil;
Fig. 5 is anti-seepage geotextile anti-package schematic diagram.
1.80cm closedtops layer in figure, 2. black cotton regur soil is filled, 3.50cm geotechnical grid gravelly soils, 4. anti-seepage geotextile, 5. breast Change pitch to bond, 6. geotechnical grid, 7. " U " sprig.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, is made of the invention by illustrating Advantage will become clearer and be readily appreciated that.
The anti-seepage geotextile that the present invention is provided processes the structure of black cotton regur soil embankment, and the embankment structure includes successively from top to bottom Geotechnical grid rubble embankment bottom, black cotton regur soil fill stratum and non-expanded clay closedtop layer.Wherein black cotton regur soil fill stratum is used Anti-seepage geotextile bound edge simultaneously sets impervious barrier in interlayer.
In the geotechnical grid gravelly soil embankment bottom, the material requirements of geotechnical grid is:
Polypropylene geotextile cell compartment;
The method of anti-seepage geotextile treatment black cotton regur soil embankment comprises the following steps:
(1) clear base:Excavate ground top layer planting soil or black cotton regur soil 20cm, change and fill out the good non-expansibility material of water stability, and Compacting, leveling;
(2) setting-out:In strict accordance with construction drawing setting-out, every layer of bound edge institute is calculated using anti-seepage geotextile size and is cut out Cut;
(3) three layers of common 50cm geotechnical grids gravelly soil are laid:First geotechnical grid is launched, foundation surface, fixed edge is laid on Edge, dispense gravelly soil in geotechnical grid, then roll to regulation packing;
(4) anti-seepage geotextile is laid:Anti-seepage geotextile, anti-seepage geotextile and the overlap joint 250cm that bankets are laid in roadbed both sides, Anti-seepage geotextile anti-package on roadbed side slope, 100cm is overlapped after the anti-seepage geotextile anti-package of both sides in the middle part of embankment, is dripped using emulsification Green grass or young crops bonds.Adjacent anti-seepage geotextile lap width is 100cm, and is bonded using emulsified asphalt;
(5) soil and roller compaction construction are spread:Every layer of black cotton regur soil placement thickness leads to be 20cm~25cm after grinding compacting before making Overtesting section determines loose laying depth and compaction technology;
(6) closedtop layer is filled and rolled:Closedtop layer material uses the good non-black cotton regur soil material of water stability, every layer of placement thickness It is 20cm, and rolls to the packing of regulation.
The Specific construction step for oozing geotextile laying is as follows:
1. anti-seepage geotextile, anti-seepage geotextile and geotechnical grid are laid respectively in geotechnical grid crushed stone soil layer top both sides first Gravelly soil overlaps 250cm, and anti-seepage geotextile is fixed on geotechnical grid gravelly soil surface with U-shaped nail;
2. placement in layers thickness 100cm black cotton regur soil, per thickness 20cm~25cm, then cuts slope by design side slope, and cutting slope first makes Mechanical roughing is used, then artificial refine;
3. both sides anti-seepage geotextile anti-package, and form the overlap joint no less than 100cm, anti-seepage geotextile interlayer with embankment middle part Bonded using emulsified asphalt;
4. second layer anti-seepage geotextile is laid, with lower floor anti-seepage geotextile overlap joint 250cm, interlayer is viscous using emulsified asphalt Knot;
5. above construction procedure to top layer is repeated;
The material requirements of anti-seepage geotextile is:

Claims (3)

1. a kind of anti-seepage geotextile processes the structure of black cotton regur soil embankment, it is characterised in that the embankment structure is wrapped successively from top to bottom Geotechnical grid rubble embankment bottom, black cotton regur soil fill stratum and non-expanded clay closedtop layer are included, wherein black cotton regur soil fill stratum is adopted Anti-seepage geotextile bound edge is used, the anti-seepage geotextile that roadbed both sides are reversely wrapped up is extended in road, and is overlapped, and then is formed in interlayer Impervious barrier,
In the geotechnical grid gravelly soil embankment bottom, the material requirements of geotechnical grid is:
Polypropylene geotextile cell compartment;
2. a kind of method that anti-seepage geotextile processes black cotton regur soil embankment, it is characterised in that the method in turn includes the following steps:
Step 1:Clear base:Excavate ground top layer planting soil or black cotton regur soil 20cm, change and fill out the good non-expansibility material of water stability, and press Real, leveling;
Step 2:Setting-out:According to construction drawing setting-out, every layer of bound edge institute is calculated using anti-seepage geotextile size and is cut;
Step 3:Three layers of common 50cm geotechnical grids gravelly soil of laying:First geotechnical grid is launched, foundation surface, fixed edge is laid on Edge, dispense gravelly soil in geotechnical grid, then roll to regulation packing;
Step 4:Laying anti-seepage geotextile:In roadbed both sides, geotechnical grid crushed stone soil layer upper berth sets anti-seepage geotextile, antiseepage geotechnique Cloth overlaps 250cm with geotechnical grid crushed stone soil layer, is followed closely using " u "-shaped and for anti-seepage geotextile to be fixed on geotechnical grid crushed stone soil layer table On face;
Step 5:Paving soil and roller compaction construction:Anti-seepage geotextile lays filling for laggard walking along the street base black cotton regur soil, black cotton regur soil placement thickness By, for 20cm~25cm is controlled, determining loose laying depth and compaction technology by test section before making, then after grinding compacting Carry out cutting slope by design side slope, cut slope and first use mechanical roughing, then artificial refine;
Step 6:Interlayer impervious barrier:Black cotton regur soil fills 4~5 layers, when 100cm is thick altogether, by anti-seepage geotextile on roadbed side slope Anti-package, 100cm is overlapped after the anti-seepage geotextile anti-package of both sides in the middle part of embankment, is bonded using emulsified asphalt;
Step 7:Repeat step 4, step 5 and step 6, wherein, the neighbouring anti-seepage geotextile lap width in roadbed both sides is 250cm, and bonded using emulsified asphalt;
Step 8:Closedtop layer is filled and rolled:When black cotton regur soil is filled to closedtop layer bottom surface, stops black cotton regur soil and fill and antiseepage geotechnique Cloth is constructed, and is carried out closedtop layer and is filled and roll, and closedtop layer material uses the good non-black cotton regur soil material of water stability, every layer of placement thickness It is 20cm, and rolls to the packing of regulation.
3. the method that anti-seepage geotextile according to claim 2 processes black cotton regur soil embankment, it is characterised in that
The material requirements of anti-seepage geotextile is:
CN201410796693.XA 2014-12-18 2014-12-18 Structure and method for processing black cotton soil embankment with impervious geotextiles Expired - Fee Related CN104594150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410796693.XA CN104594150B (en) 2014-12-18 2014-12-18 Structure and method for processing black cotton soil embankment with impervious geotextiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410796693.XA CN104594150B (en) 2014-12-18 2014-12-18 Structure and method for processing black cotton soil embankment with impervious geotextiles

Publications (2)

Publication Number Publication Date
CN104594150A CN104594150A (en) 2015-05-06
CN104594150B true CN104594150B (en) 2017-05-24

Family

ID=53120179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410796693.XA Expired - Fee Related CN104594150B (en) 2014-12-18 2014-12-18 Structure and method for processing black cotton soil embankment with impervious geotextiles

Country Status (1)

Country Link
CN (1) CN104594150B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672076B (en) * 2016-03-09 2018-05-25 中国路桥工程有限责任公司 A kind of water proof road structure
CN106677154A (en) * 2017-01-20 2017-05-17 山西省交通科学研究院 Collapsible loess foundation rubble frame structure reinforcement system and reinforcement method
CN107419732A (en) * 2017-09-13 2017-12-01 谢金钊 The bank protection earthfill structure of anti-collapse
CN108316079B (en) * 2018-04-02 2023-07-21 长沙理工大学 Pavement structure and construction method thereof
CN110041039B (en) * 2019-02-15 2020-06-30 中国科学院地质与地球物理研究所 Construction method for improving embankment by using phosphogypsum
CN111441211A (en) * 2020-04-10 2020-07-24 中铁六局集团天津铁路建设有限公司 Composite roadbed structure made of carbon soft rock and geosynthetic material
CN112144336A (en) * 2020-09-04 2020-12-29 广东同创科鑫环保有限公司 Method for preventing Bayer process red mud-based roadbed external seepage
CN113417183A (en) * 2021-07-26 2021-09-21 招商局重庆交通科研设计院有限公司 Red clay roadbed and construction method
CN113846526A (en) * 2021-11-09 2021-12-28 中交路桥建设有限公司 Soft soil roadbed disposal method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1023902C2 (en) * 2003-07-11 2005-01-12 Ooms Avenhorn Holding Bv Method for reinforcing a soil for a traffic route, such as a road or a railroad track.
CN100464034C (en) * 2005-06-17 2009-02-25 长沙理工大学 Flexible reinforced retaining structure and construction method therefor
CN101463599A (en) * 2009-01-16 2009-06-24 湖南大学 Bidirectional reinforcing and water drainage reinforcing means for highway soft soil foundation
CN202157255U (en) * 2011-07-18 2012-03-07 铁道第三勘察设计院集团有限公司 Geogrid wrapped paving structure
CN102535261A (en) * 2012-03-19 2012-07-04 中铁第四勘察设计院集团有限公司 Railway subgrade structure of seismic area

Also Published As

Publication number Publication date
CN104594150A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN104594150B (en) Structure and method for processing black cotton soil embankment with impervious geotextiles
CN103510441B (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN100464034C (en) Flexible reinforced retaining structure and construction method therefor
CN101153475B (en) Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN206928164U (en) A kind of drainage type concrete road
CN103696397B (en) A kind of anti-seepage processing method of artificial dam
CN104631254A (en) Construction method of geogrid reinforced clay edge-covered tailing subgrade
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN105297571B (en) A kind of mud stone filled-up ground structure and its construction method
CN201095717Y (en) Red beds filled high-speed railway roadbed
CN106283944B (en) Method for reinforcing shallow soft foundation by pressing and filling rubbles and/or blocks
CN202466341U (en) Inflation dirt road bed structure
CN107119505A (en) The general fast railway bed filling construction method of desert area
CN106368238A (en) Honeycomb geocell earth retaining wall with ecological restoration function and construction method thereof
CN104250946A (en) High-speed railway subgrade structure for saline soil areas
CN106351239A (en) Cement modified soil strengthened geogrid reinforced soil structure and construction method thereof
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN206529760U (en) High-speed railway embankment substrate salinized soil resists molten sunken construction
CN204112170U (en) A kind of saline soil area High Speed Railway Subgrade
CN106522244B (en) A kind of embankment combination binding structure and its construction method
CN205475261U (en) Ash dam structure of power plant
CN205399440U (en) Inflation dirt road moat structure
CN107419628A (en) A kind of construction method of the rapid build road on reclaimed ground
CN208701703U (en) A kind of expansive soil cut slope support structure of anti-row's one
CN104499397B (en) A kind of asphalt pavement structure based on coordination subgrade and pavement deformation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524