CN104574214A - Grid power distribution network emergency repair displaying method and system - Google Patents

Grid power distribution network emergency repair displaying method and system Download PDF

Info

Publication number
CN104574214A
CN104574214A CN201510023868.8A CN201510023868A CN104574214A CN 104574214 A CN104574214 A CN 104574214A CN 201510023868 A CN201510023868 A CN 201510023868A CN 104574214 A CN104574214 A CN 104574214A
Authority
CN
China
Prior art keywords
power distribution
distribution network
grid
repairing
color
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510023868.8A
Other languages
Chinese (zh)
Inventor
毛南平
戴晓红
陈蕾
潘杰
方云辉
孙珑
朱振洪
姜春莹
秦如意
杨晓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510023868.8A priority Critical patent/CN104574214A/en
Publication of CN104574214A publication Critical patent/CN104574214A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a grid power distribution network emergency repair displaying method. Grid partitioning is carried out on a power distribution network according to a pre-established grid model, and a power distribution network overhauling grid picture is obtained; state labeling is carried out on all boxes in the power distribution network overhauling grid picture according to collected external factor values; the power distribution network overhauling grid picture subjected to state labeling is displayed. According to the grid power distribution network emergency repair displaying method, grid partitioning is carried out on the power distribution network, the power distribution network overhauling grid picture is obtained, state labeling is carried out on all the boxes, the power distribution network overhauling grid picture is displayed, the disaster situations of the areas corresponding to the boxes can be obtained, and the worst-hit areas can be repaired in time.

Description

A kind of gridding power distribution network repairing methods of exhibiting and system
Technical field
The application relates to power domain, particularly a kind of gridding power distribution network repairing methods of exhibiting and system.
Background technology
When disaster occurs, very large impact damage can be caused to distribution network, in the process of rushing to repair each distribution region, due to the extent of damage in each distribution region clearly can not be understood, therefore can not rush to repair impaired serious region timely.
Summary of the invention
Technical problems to be solved in this application are to provide a kind of gridding power distribution network repairing methods of exhibiting and system, to in electrical network repairing process, the extent of damage of each distribution grid shows, thus the extent of damage of each distribution net region can be got information about, take measures in time to rush to repair timely and effectively.
In order to solve the problem, this application discloses a kind of gridding power distribution network repairing methods of exhibiting, comprising:
According to pre-established mesh modeling, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart;
According to the external factor value gathered, state mark is carried out to each grid in described power distribution network maintenance grid chart;
The power distribution network marked through state maintenance grid chart is shown.
Above-mentioned method, preferably, described to power distribution network maintenance grid chart in each grid carry out state mark comprise:
Determine the external factor value that each grid is corresponding respectively;
According to described external factor value, select the pre-set color value that each grid is corresponding;
Each grid is shown as the color of its correspondence; Described different Color pair answers different alert status.
Above-mentioned method, preferably, described the power distribution network marked through state maintenance grid chart is carried out display and comprises:
Had by mark the power distribution network of different Show Color to overhaul grid chart to show.
Above-mentioned method, preferably, described color comprises:
Red, orange, yellow, blue and green;
Wherein:
Described redness represents the fault zone that the short time cannot recover;
Described orange expression restorability fault zone;
Described yellow represents compromised region;
Described blueness represents foresight region;
Described green represents normal region.
A kind of gridding power distribution network repairing display systems, comprising:
Obtain unit, for according to pre-established mesh modeling, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart;
Mark unit, for according to the external factor value gathered, carries out state mark to each grid in described power distribution network maintenance grid chart;
Display unit, for showing the power distribution network marked through state maintenance grid chart.
Above-mentioned system, preferably, described mark unit comprises: determine subelement, every for determining
The external factor value that a grid is corresponding respectively;
Chooser unit, for according to described external factor value, selects the pre-set color value that each grid is corresponding;
First display subelement, for being shown as the color of its correspondence by each grid; Described different Color pair answers different alert status.
Above-mentioned system, preferably, described display unit comprises:
Second display subelement, overhauls grid chart for mark there being the power distribution network of different Show Color and shows.
Compared with prior art, the application comprises following advantage:
Disclosed in this application a kind of gridding distribution network repairing methods of exhibiting, according to pre-established mesh modeling, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart; According to the external factor value gathered, state mark is carried out to each grid in described power distribution network maintenance grid chart; The power distribution network marked through state maintenance grid chart is shown.In the gridding power distribution network repairing methods of exhibiting that the application provides, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart, state mark is carried out to each grid and shows, according to the state of each grid of described display, the disaster-stricken situation of each grid corresponding region can be obtained, can rush to repair in time disaster-stricken serious region.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present application, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the method flow diagram of a kind of gridding power distribution network repairing methods of exhibiting of the application;
Fig. 2 is a method detailed process flow diagram of a kind of gridding power distribution network repairing methods of exhibiting of the application;
Fig. 3 is the structural representation of a kind of gridding power distribution network repairing display systems of the application;
Fig. 4 is a detailed construction schematic diagram of a kind of gridding power distribution network repairing display systems of the application.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, be clearly and completely described the technical scheme in the embodiment of the present application, obviously, described embodiment is only some embodiments of the present application, instead of whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the application's protection.
The embodiment of the present application provides a kind of gridding power distribution network to rush to repair methods of exhibiting, and its method flow diagram as shown in Figure 1, comprising:
Step S101: according to pre-established mesh modeling, carries out stress and strain model to power distribution network, obtains power distribution network maintenance grid chart;
In the embodiment of the present application, to power distribution network according to the grid model preset, dividing, is Bestgrid by distribution Region dividing corresponding for power distribution network.
Step S102: according to the external factor value gathered, carries out state mark to each grid in described power distribution network maintenance grid chart;
In the embodiment of the present application, Real-time Collection is carried out to the external environment condition value of each power supply area.
In the embodiment of the present application, the process of state mark is carried out as shown in the embodiment of the present application Fig. 2 to each grid, comprising:
Step S201: determine the external factor value that each grid is corresponding respectively;
Step S202: according to described external factor value, selects the pre-set color value that each grid is corresponding;
Step S203: the color each grid being shown as its correspondence; Described different Color pair answers different alert status.
Step S103: the power distribution network marked through state maintenance grid chart is shown.
In the embodiment of the present application, there is by mark the power distribution network of different Show Color to overhaul grid chart and show.
In the gridding power distribution network repairing methods of exhibiting that the application provides, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart, state mark is carried out to each grid and shows, according to the state of each grid of described display, the disaster-stricken situation of each grid corresponding region can be obtained, can rush to repair in time disaster-stricken serious region.
In the embodiment of the present application, described color comprises:
Red, orange, yellow, blue and green;
Wherein:
Described redness represents the fault zone that the short time cannot recover;
Described orange expression restorability fault zone;
Described yellow represents compromised region;
Described blueness represents foresight region;
Described green represents normal region.
Instantiation is below adopted to be described in detail the application's gridding power distribution network emergency repair method, repairing maneuvering platform is produced based on distribution, based on the basic framework of this platform, develop special topic commander and decision making function for flood situation, overhaul grid chart, repairing situation map by distribution, aid decision making strategy shows and the repairing processed under flood weather condition is commanded and repairing real-time status is shown.
What gridding emergency repairing system was relied on is the visual presentation application module that repairing maneuvering platform is produced in distribution, first mesh modeling is carried out according to this base application function, and successive ignition maintenance grid, form distribution maintenance grid chart, carry out 5 grades of state marks and feedback Dynamic Display according to gathering of various external factor situation to trellis state again, repairing commanding is according to the aid decision making strategy repairing commanding and decision-making preset.
It is integrated that distribution production repairing maneuvering platform carries out loose coupling by the data interaction bus and related system of crossing over place of safety, and model and interactive standards follow IEC61970/61968 standard.Each system with SOA framework, encapsulation of data and function, and with service mode issue in bus.Adopt the resource of building in this way and can make full use of original each infosystem, reduce the construction cost that repairing maneuvering platform is produced in distribution, shorten the construction period, improve information system application comprehensive benefit.
Distribution produce repairing maneuvering platform with produce and repairing commander for application core, by information interactive bus, realize with marketing system, 95598, power distribution automation, power information collection, the related system such as PMS/GIS mutual, realize information integerated application.
Produce, dispatch, rush to repair the maneuvering platform of process towards distribution, comprise the operational management to distribution net equipment, production and the work of repairing Resource allocation and smoothing.This platform fully integrates power distribution automation information, PMS/GIS information, 95598 information, CIS information, power information Information Monitoring, GPS information, video information.For network distributing failure emergency repair realize fault analysis intellectuality, repairing process visualization, Rush Repair Scheme is scientific; Scientific evaluation is carried out to all kinds of exceptions that distribution net equipment occurs, carries out early warning prompting, and make service arrangement timely and effectively; Daily distribution is produced and realizes Comprehensive Plan Management and service closed_loop application.
The flood repairing special topic based on this platform development, overhauls grid chart by distribution, repairing situation map, aid decision making strategy shows and the repairing commander that process under flood weather condition and the displaying of repairing real-time status.
For hazard weathers such as floods, this system develops distribution maintenance grid chart specially targetedly, this thematic map carries out gridding division to distribution service work, after flood occurs, by the Message Entry System such as weather, water level that the identity and government of overhauling troop are issued, can draw a circle to approve hazard scope on maintenance grid, carry out repairing grade mark according to hazard scope grid chart, carry out repairing troop repairing grid range assignment according to above-mentioned information and this figure distributed repairing troop.
Repairing Design of State grid repairing Pyatyi division principle for distribution grid chart:
Red: in short-term cannot restorative fault zone: fault does not seriously objectively possess the region (such as water level is too high cannot be entered, and master-failure cannot be changed) of repairing condition.
Orange: restorability fault zone: fault is serious, but possesses repairing condition, repairing troop can be sent to carry out the region of breakdown repair.
Yellow: compromised region: also non-fault still enters precarious position, possible breakdown region at present.
Blue: can region to be predicted: current also non-fault still can be predicted and meeting involved area can occur.
Green: normal region: not have fault also can not involved area.
In the application, the content of showing is needed to comprise:
Repairing situation map:
Repairing situation map is the repairing situation situation map for repairing commanding provides.
Repairing situation is shown:
In real time to the timely typing grid chart of feedback information of repairing troop, display repairing state directly perceived, auxiliary repairing commanding adjusts repairing strategy, reasonable arrangement repairing goods and materials, in order commander's repairing troop in time, improves first-aid repair efficiency.
In repairing situation map, Dynamic Display to be rushed to repair task quantity today, completes repairing quantity, well afoot repairing quantity, is affected number of users, current repairing troop (Dai Ming sets out), current commanding.
In the embodiment of the present application, additionally use aid decision making strategy mode, described aid decision making strategy comprehensively judges according to various On-the-spot factor and apparatus factor, judge whether to carry out rushing to repair and carry out rushing to repair the decision-making technique of priority classification, decision-making is carried out by the various decision-making foundations of table 1, and improving decision policy by constantly improving decision parameters, accomplishing science decision.
Table 1
According to parametric classification in table 1, scorable marker is carried out to user's character, hub node equipment, when flood occurs, can the mark classification situation of relevant device in show grid easily by maintenance grid, add that power network line state mark can sort to the repairing of maintenance grid easily according to each maintenance grid mark.
Actual conditions as following table, when there being 5 grids, only have 3 rush to repair troop time, according to table 2 decision-making:
Table 2
To rush to repair methods of exhibiting corresponding with a kind of gridding power distribution network that the embodiment of the present application Fig. 1 provides, and the embodiment of the present application additionally provides a kind of gridding power distribution network repairing display systems, and its structural representation, as shown in Figure 3, comprising:
Obtain unit 301, for according to pre-established mesh modeling, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart;
Mark unit 302, for according to the external factor value gathered, carries out state mark to each grid in described power distribution network maintenance grid chart;
Display unit 303, for showing the power distribution network marked through state maintenance grid chart.
Fig. 4 shows a detailed construction schematic diagram of gridding power distribution network repairing display systems in the embodiment of the present application, and described mark unit 302 comprises:
Determine subelement 304, for determining the external factor value that each grid is corresponding respectively;
Chooser unit 305, for according to described external factor value, selects the pre-set color value that each grid is corresponding;
First display subelement 306, for being shown as the color of its correspondence by each grid; Described different Color pair answers different alert status.
7, system according to claim 5, is characterized in that, described display unit 303 comprises:
Second display subelement 307, overhauls grid chart for mark there being the power distribution network of different Show Color and shows.
It should be noted that, each embodiment in this instructions all adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar part mutually see.For device class embodiment, due to itself and embodiment of the method basic simlarity, so description is fairly simple, relevant part illustrates see the part of embodiment of the method.
Finally, also it should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
For convenience of description, various unit is divided into describe respectively with function when describing above device.Certainly, the function of each unit can be realized in same or multiple software and/or hardware when implementing the application.
As seen through the above description of the embodiments, those skilled in the art can be well understood to the mode that the application can add required general hardware platform by software and realizes.Based on such understanding, the technical scheme of the application can embody with the form of software product the part that prior art contributes in essence in other words, this computer software product can be stored in storage medium, as ROM/RAM, magnetic disc, CD etc., comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform the method described in some part of each embodiment of the application or embodiment.
Methods of exhibiting rushed to repair by a kind of gridding power distribution network provided the application above and system is described in detail, apply specific case herein to set forth the principle of the application and embodiment, the explanation of above embodiment is just for helping method and the core concept thereof of understanding the application; Meanwhile, for one of ordinary skill in the art, according to the thought of the application, all will change in specific embodiments and applications, in sum, this description should not be construed as the restriction to the application.

Claims (7)

1. a gridding power distribution network repairing methods of exhibiting, is characterized in that, comprising:
According to pre-established mesh modeling, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart;
According to the external factor value gathered, state mark is carried out to each grid in described power distribution network maintenance grid chart;
The power distribution network marked through state maintenance grid chart is shown.
2. method according to claim 1, is characterized in that, described to power distribution network maintenance grid chart in each grid carry out state mark comprise:
Determine the external factor value that each grid is corresponding respectively;
According to described external factor value, select the pre-set color value that each grid is corresponding;
Each grid is shown as the color of its correspondence; Described different Color pair answers different alert status.
3. method according to claim 1, is characterized in that, described the power distribution network marked through state maintenance grid chart is carried out display and comprises:
Had by mark the power distribution network of different Show Color to overhaul grid chart to show.
4. method according to claim 2, is characterized in that, described color comprises:
Red, orange, yellow, blue and green;
Wherein:
Described redness represents the fault zone that the short time cannot recover;
Described orange expression restorability fault zone;
Described yellow represents compromised region;
Described blueness represents foresight region;
Described green represents normal region.
5. a gridding power distribution network repairing display systems, is characterized in that, comprising:
Obtain unit, for according to pre-established mesh modeling, stress and strain model is carried out to power distribution network, obtain power distribution network maintenance grid chart;
Mark unit, for according to the external factor value gathered, carries out state mark to each grid in described power distribution network maintenance grid chart;
Display unit, for showing the power distribution network marked through state maintenance grid chart.
6. system according to claim 5, is characterized in that, described mark unit comprises:
Determine subelement, for determining the external factor value that each grid is corresponding respectively;
Chooser unit, for according to described external factor value, selects the pre-set color value that each grid is corresponding;
First display subelement, for being shown as the color of its correspondence by each grid; Described different Color pair answers different alert status.
7. system according to claim 5, is characterized in that, described display unit comprises:
Second display subelement, overhauls grid chart for mark there being the power distribution network of different Show Color and shows.
CN201510023868.8A 2015-01-19 2015-01-19 Grid power distribution network emergency repair displaying method and system Pending CN104574214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510023868.8A CN104574214A (en) 2015-01-19 2015-01-19 Grid power distribution network emergency repair displaying method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510023868.8A CN104574214A (en) 2015-01-19 2015-01-19 Grid power distribution network emergency repair displaying method and system

Publications (1)

Publication Number Publication Date
CN104574214A true CN104574214A (en) 2015-04-29

Family

ID=53090204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510023868.8A Pending CN104574214A (en) 2015-01-19 2015-01-19 Grid power distribution network emergency repair displaying method and system

Country Status (1)

Country Link
CN (1) CN104574214A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108934036A (en) * 2018-07-11 2018-12-04 中国联合网络通信集团有限公司 The acquisition methods and device of base station state information
CN110571937A (en) * 2019-10-24 2019-12-13 国网江苏省电力有限公司沭阳县供电分公司 Distribution network equipment operation monitoring management system based on internet
CN110807287A (en) * 2019-11-05 2020-02-18 广东电网有限责任公司 Construction method for dividing service grids in emergency repair point arrangement scene based on finite element grids
CN113487051A (en) * 2021-07-28 2021-10-08 武汉都梁信息技术有限责任公司 Power distribution network fault first-aid repair maintenance data processing method and equipment and computer storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065270A (en) * 2013-01-05 2013-04-24 深圳供电局有限公司 Visual monitoring system of power grid breakdown first-aid repair
CN103093310A (en) * 2013-01-05 2013-05-08 深圳供电局有限公司 Information system achieving mesh lean management
CN103530715A (en) * 2013-08-22 2014-01-22 北京交通大学 Grid management system and grid management method of high-speed railway train operation fixed equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065270A (en) * 2013-01-05 2013-04-24 深圳供电局有限公司 Visual monitoring system of power grid breakdown first-aid repair
CN103093310A (en) * 2013-01-05 2013-05-08 深圳供电局有限公司 Information system achieving mesh lean management
CN103530715A (en) * 2013-08-22 2014-01-22 北京交通大学 Grid management system and grid management method of high-speed railway train operation fixed equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
史兴华等: "《电网GIS及其应用》", 31 December 2010 *
盛万兴等: "《智能配电网自愈控制基础》", 30 June 2012 *
蒋锦霞等: "配网生产抢修指挥平台设计及应用", 《电力信息化》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108934036A (en) * 2018-07-11 2018-12-04 中国联合网络通信集团有限公司 The acquisition methods and device of base station state information
CN108934036B (en) * 2018-07-11 2021-07-20 中国联合网络通信集团有限公司 Method and device for acquiring state information of base station
CN110571937A (en) * 2019-10-24 2019-12-13 国网江苏省电力有限公司沭阳县供电分公司 Distribution network equipment operation monitoring management system based on internet
CN110807287A (en) * 2019-11-05 2020-02-18 广东电网有限责任公司 Construction method for dividing service grids in emergency repair point arrangement scene based on finite element grids
CN113487051A (en) * 2021-07-28 2021-10-08 武汉都梁信息技术有限责任公司 Power distribution network fault first-aid repair maintenance data processing method and equipment and computer storage medium

Similar Documents

Publication Publication Date Title
CN106815647A (en) A kind of high efficiency distribution network failure repairing system and method based on data analysis
CN103700210B (en) The comprehensive warning exhibiting method of a kind of sing on web GIS
CN104537573A (en) Power grid operation information panoramic visualized display system
CN106056349A (en) Province-city-county three-level power grid programming GIS drawing system and method
CN103036727B (en) Electric power communication network regional security warning method and system thereof
CN102956021A (en) Power grid comprehensive visualization method based on multi-service system information fusion
CN106651074A (en) Intelligent underground pipeline management system
CN103715767A (en) Smart power grid information integration and display platform
CN104574214A (en) Grid power distribution network emergency repair displaying method and system
CN105787827A (en) Intelligent scenic spot informationized integrated management platform
CN108806259B (en) BIM-based traffic control model construction and labeling method
CN113191687B (en) Elastic power distribution network panoramic information visualization method and system
CN107220286A (en) Emergency command information demonstrating method and emergency commading system platform and server
CN110942235B (en) Emergent evaluation system of electric power
CN110490361A (en) The digital emergency planning system and its design method of urban distribution network contingency management
CN106251240A (en) Power transmission network method for early warning based on big data
WO2021114856A1 (en) Multisource data-based uninterruptible power supply system
CN105069100A (en) Power network geographic information system (GIS) based mobile terminal collaborative plotting method
CN108717356B (en) Metering holographic visual display method and device
CN103955865A (en) Scheduled and faulted power outage range visualization method based on information interaction
CN102867232A (en) Substation comprehensive information visualization display method in energy management system
CN104951994A (en) GIS-based comprehensive display method and system of distribution network production special topic view
CN111881202A (en) Data resource visualization merging display method and system
CN104463465A (en) Real-time monitoring cluster processing method based on distributed models
CN114841662A (en) Infrastructure construction project management and control method and device, computer equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429

RJ01 Rejection of invention patent application after publication