CN104573965A - Front and rear relation circulation method and device based on parallel connection - Google Patents

Front and rear relation circulation method and device based on parallel connection Download PDF

Info

Publication number
CN104573965A
CN104573965A CN201510025942.XA CN201510025942A CN104573965A CN 104573965 A CN104573965 A CN 104573965A CN 201510025942 A CN201510025942 A CN 201510025942A CN 104573965 A CN104573965 A CN 104573965A
Authority
CN
China
Prior art keywords
node
relation
parallel relationship
approval
peer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510025942.XA
Other languages
Chinese (zh)
Inventor
王昌山
陈兆亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Software Co Ltd
Original Assignee
Inspur Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Software Co Ltd filed Critical Inspur Software Co Ltd
Priority to CN201510025942.XA priority Critical patent/CN104573965A/en
Publication of CN104573965A publication Critical patent/CN104573965A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a front and rear relation circulation method and device based on parallel connection. The method includes the steps that a local end system acquires nodes approved by a project; an approval relation is configured for the acquired nodes, wherein the nodes to which the approval relation is configured comprise front nodes and rear nodes to which a parallel connection relation and a front and rear relation are configured at the same time; according to the configured approval relation, the approval flow chart of the nodes is drawn; circulation is performed according to the drawn approval flow chart, when the nodes with the parallel connection relation are circulated, whether the nodes with the parallel connection relation has the front and rear relation or not is judged, if yes, the front nodes and the rear nodes run, and when running of the front nodes does not end, running of the rear nodes is controlled not to end either; if not, the circulated nodes with the parallel connection relation run at the same time. According to the scheme, the project approval efficiency is improved.

Description

A kind of circulation method of the pre-post relation based on parallel connection and device
Technical field
The present invention relates to field of computer technology, particularly a kind of circulation method of the pre-post relation based on parallel connection and device.
Background technology
Along with the development of computer technology, keeping reforming of E-Government examination & approval pattern, the examination & approval pattern after the project application can comprise the examination & approval pattern of sys node and the examination & approval pattern of series connection node.
At present, can examine sys node or series connection node the flowing mode that the project of declaring is examined.Such as, as shown in Figure 1, project A declare after approval process carried out to project A comprise: node A0, the node A1 of series connection and node A2.When triggering the examination & approval to project A, node A0 runs, and after node A0 end of run, circulation runs to node A1, and after node A1 end of run, circulation runs to node A2, until examination & approval terminate during node A2 end of run.
The flow process of carrying out examining for the project of declaring comprises: the relation comprising pre-post between two nodes in parallel, flowing mode cannot be examined the node of this relation so at present, be merely able to the examination & approval order manually carrying out controlling between sys node, cause the efficiency of project examination.
Summary of the invention
In view of this, the invention provides a kind of circulation method and device of the pre-post relation based on parallel connection, to solve owing to cannot examine the relation comprising pre-post between two of a parallel connection node in prior art, and the problem of the project examination efficiency caused.
The invention provides a kind of circulation method of the pre-post relation based on parallel connection, comprising:
This end system obtains each node of project examination;
To each Joint Enterprise examination & approval relation obtained; Wherein, each node configuring described examination & approval relation comprises: be configured the preposition node of parallel relationship and pre-post relation and rearmounted node simultaneously;
According to the described examination & approval relation of configuration, draw the approval process figure of each node;
Approval process figure according to drawing circulates, and circulating to when having the node of parallel relationship, judges whether the node of parallel relationship has pre-post relation, if, run preposition node and rearmounted node, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate; Otherwise this running circulation has the node of parallel relationship simultaneously.
Preferably,
Comprise further: there is attribute information at the same time that configure preposition node in the rearmounted node of parallel relationship and pre-post relation;
Describedly judge whether the node of parallel relationship has pre-post relation, comprising: judge whether a node in the node of parallel relationship comprises the attribute information of another node, and if so, the node of parallel relationship has pre-post relation; Otherwise the node of parallel relationship does not have pre-post relation.
Preferably,
Comprising further: when running present node, utilizing the method for operation of the described present node of local terminal system storage to run present node;
When this end system does not store the method for operation of described present node, comprise further: the interface calling the peer-to-peer system of the method for operation of preserving described present node, present node is pushed to peer-to-peer system, and utilizes the operation result that the interface peer-to-peer system of this end system runs described present node.
Preferably, before the approval process figure of described each node of drafting, comprise further:
Process flow diagram assembly is loaded in the project of this end system, with the approval process figure utilizing process flow diagram assembly to perform described each node of drafting.
Preferably, comprise further:
Whether the operation result of each Joint Enterprise circulation rule obtained, node time limit, this node is reported and one or more in nodename.
Present invention also offers a kind of circulation apparatus of the pre-post relation based on parallel connection, comprising:
Acquiring unit, for obtaining each node of project examination;
Dispensing unit, for examining relation to each Joint Enterprise obtained; Wherein, each node configuring described examination & approval relation comprises: be configured the preposition node of parallel relationship and pre-post relation and rearmounted node simultaneously;
Drawing unit, for the described examination & approval relation according to configuration, draws the approval process figure of each node;
Judging unit, for circulating according to the approval process figure drawn, circulating to when there is the node of parallel relationship, judge whether the node of parallel relationship has pre-post relation, if, run preposition node and rearmounted node, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate; Otherwise this running circulation has the node of parallel relationship simultaneously.
Preferably,
Described dispensing unit, for there is parallel relationship and pre-post relation at the same time rearmounted node in configure the attribute information of preposition node;
Described judging unit, for judging whether a node in the node of parallel relationship comprises the attribute information of another node, and if so, the node of parallel relationship has pre-post relation; Otherwise the node of parallel relationship does not have pre-post relation.
Preferably,
Comprising further: running unit, for when running present node, utilizing the method for operation of the described present node of local terminal system storage to run present node;
When this end system does not store the method for operation of described present node, comprise further: call unit, for calling the interface of the peer-to-peer system of the method for operation of preserving described present node, present node is pushed to peer-to-peer system, and utilizes the operation result that the interface peer-to-peer system of this end system runs described present node.
Preferably, comprise further:
Loading unit, for being loaded in the project of this end system by process flow diagram assembly, performs the approval process figure of described each node of drafting to utilize described drawing unit according to process flow diagram assembly.
Preferably, whether described dispensing unit, for reporting and one or more in nodename the operation result of each Joint Enterprise circulation rule obtained, node time limit, this node.
Embodiments provide a kind of circulation method and device of the pre-post relation based on parallel connection, by examining relation to each Joint Enterprise, especially be Joint Enterprise parallel relationship and pre-post relation, and draw approval process figure according to examination & approval relation, circulation and the operation of each node is carried out according to approval process figure, and circulating to when there is the node of parallel relationship, if the node of this parallel relationship has pre-post relation equally, then need first to run preposition node and rearmounted node according to circulation rule, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate, thus the problem solved owing to cannot examine the relation comprising pre-post between two of a parallel connection node in prior art, improve the efficiency of project examination.
Accompanying drawing explanation
Fig. 1 is the project circulation schematic diagram that prior art provides;
Fig. 2 is the method flow diagram that the embodiment of the present invention provides;
Fig. 3 is the method flow diagram that another embodiment of the present invention provides;
Fig. 4 is the loading catalogue schematic diagram that the embodiment of the present invention provides;
Fig. 5 is the approval process figure of the drafting that the embodiment of the present invention provides;
Fig. 6 is the hardware structure figure of the device place equipment that the embodiment of the present invention provides;
Fig. 7 is the apparatus structure schematic diagram that the embodiment of the present invention provides;
Fig. 8 is the apparatus structure schematic diagram that another embodiment of the present invention provides.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As shown in Figure 2, embodiments provide a kind of circulation method of the pre-post relation based on parallel connection, the method can comprise the following steps:
Step 201: this end system obtains each node of project examination row.
Step 202: to each Joint Enterprise examination & approval relation obtained; Wherein, each node configuring described examination & approval relation comprises: be configured the preposition node of parallel relationship and pre-post relation and rearmounted node simultaneously.
Step 203: according to the described examination & approval relation of configuration, draw the approval process figure of each node.
Step 204: the approval process figure according to drawing circulates, circulating to when having the node of parallel relationship, judges whether the node of parallel relationship has pre-post relation, if so, execution step 205; Otherwise, perform step 206.
Step 205: run preposition node and rearmounted node, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate, and continues circulation next node until terminate.
Step 206: this simultaneously running circulation has the node of parallel relationship, and after end of run, continues circulation next node until terminate.
According to such scheme, by examining relation to each Joint Enterprise, especially be Joint Enterprise parallel relationship and pre-post relation, and draw approval process figure according to examination & approval relation, circulation and the operation of each node is carried out according to approval process figure, and circulating to when there is the node of parallel relationship, if the node of this parallel relationship has pre-post relation equally, then need first to run preposition node and rearmounted node according to circulation rule, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate, thus the problem solved owing to cannot examine the relation comprising pre-post between two of a parallel connection node in prior art, improve the efficiency of project examination.
For making the object, technical solutions and advantages of the present invention clearly, below in conjunction with drawings and the specific embodiments, the present invention is described in further detail.
As shown in Figure 3, embodiments provide a kind of circulation method of the pre-post relation based on parallel connection, the method can comprise the following steps:
Step 301: this end system obtains each node of project examination.
In the present embodiment, this end system refers to that a department uses it to carry out the equipment of each node operation.Node refer to required for project application success each handle item.
Such as, the project of declaring is needed to comprise land use permit.Wherein, handling of land use permit needs the material to user submits to examine, and wherein, the node that the process of examination & approval comprises can be: node A: the running project of investigation user on this block soil after building constructions; Node B: the surrounding environment being investigated this block soil by Environmental Protection Agency, and the dustiness of running project determining user; Node C: the land use licence about this block soil that inspection user is submitted.
Step 302: to each Joint Enterprise examination & approval relation obtained.
Wherein, the examination & approval relation of configuration can comprise: series relationship, parallel relationship, simultaneously there are parallel relationship and front and back after one or more in relation.
Such as, according to each node obtained in step 301, examination & approval relation is configured to node A, Node B and node C, wherein, can configure parallel relationship to node A, Node B and node C, and need the item handled according to these nodes, node A is the precondition of Node B, namely need first to run node A, in operation Node B, therefore pre-post relation can be configured to node A and Node B, wherein, node A is preposition node, and Node B is rearmounted node.
Step 303: there is attribute information at the same time that configure preposition node in the rearmounted node of parallel relationship and pre-post relation.
Because prior art cannot process the node simultaneously with parallel relationship and pre-post relation, therefore, the present embodiment has the node of parallel relationship and pre-post relation simultaneously in order to process, configure the attribute information of preposition node in rearmounted node.
Such as, known according to step 302, node A and Node B have parallel relationship and pre-post relation simultaneously, and so at the attribute information of the upper configuration node A (preposition node) of Node B (rearmounted node), this attribute information can be: 4B584783-74E2-50A2-B9.
It should be noted that, if the node simultaneously with parallel relationship and pre-post relation can also correspond to multiple node, such as, the node simultaneously with parallel relationship and pre-post relation is: node 1, node 2, node 3, node 4, according to this step, need the attribute information at the upper configuration node 1 (the preposition node of node 2) of node 2 (the rearmounted node of node 1), at the attribute information of the upper configuration node 2 (the preposition node of node 3) of node 3 (the rearmounted node of node 2), at the attribute information of the upper configuration node 3 (the preposition node of node 4) of node 4 (the rearmounted node of node 3).
In the present embodiment, can also to the operation result of each Joint Enterprise circulation rule, node time limit, nodename, the present node whether information such as superior report.Wherein, the coding that circulation rule is run for writing present node; The node time limit handles duration for stating present node, such as, is limited to 3 days during node, so shows that present node can handle end within 3 working days; Nodename for state present node corresponding handle item; The end of run of present node whether report by superior, if configuration is, then represents and need the end of run of present node whether superior is reported, if configure no, then states and do not need the end of run of present node whether superior is reported.
Step 304: process flow diagram assembly is loaded in the project of this end system.
Wherein, process flow diagram assembly is used for the figure of stating each node in the approval process figure drawn.
As shown in Figure 4, for loading catalogue, wherein, the process flow diagram assembly be loaded in local terminal system item lays respectively in each file of Fig. 4.
Step 305: according to described examination & approval relation and the process flow diagram assembly of configuration, draw the approval process figure of each node.
As shown in Figure 5, according to the approval process figure that above-mentioned steps interior joint A, relation between Node B and node C are drawn.
Step 306: the approval process figure according to drawing circulates, circulating to when having the node of parallel relationship, judges whether the node of parallel relationship has pre-post relation, if so, execution step 307; Otherwise, perform step 308.
As shown in Figure 5, circulating to when there is the node A of parallel relationship, Node B and node C, decision node A, between Node B and node C, whether there is pre-post relation.
In the present embodiment, can by judging that the mode whether a node in the node of parallel relationship comprises the attribute information of another node judges whether the node of parallel relationship has pre-post relation.
Such as, judged result is the attribute information being configured with node A in Node B, so determines that node A and Node B have pre-post relation, and Node B is the rearmounted node of node A, and node A is the preposition node of Node B.
Step 307: run preposition node and rearmounted node, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate, and after rearmounted node end of run, continues to run to next node, until terminate.
When circulating to the node A with parallel relationship, Node B and node C, because node A and Node B have pre-post relation, therefore first run node A, after node A end of run, so Node B also can end of run.
Step 308: this simultaneously running circulation has the node of parallel relationship.
While running node A in step 307, run node C, and after Node B and the equal end of run of node C, unification is issued licence.
In the present embodiment, when running each node, need in the database of this end system, obtain each node method of operation corresponding respectively, utilize the method for operation that each node is corresponding respectively to run node.
If do not store the method for operation of certain node in the database of this end system, and in the database of the system used in another department, preserve the method for operation of this node, the system that so another department uses is referred to as peer-to-peer system, the interface of local terminal system call peer-to-peer system, this node content is pushed to peer-to-peer system, the method of operation of this node that peer-to-peer system utilizes self to store after receiving this node runs this node, and operation result returns by the interface calling this end system.
According to such scheme, by examining relation to each Joint Enterprise, especially be Joint Enterprise parallel relationship and pre-post relation, and draw approval process figure according to examination & approval relation, circulation and the operation of each node is carried out according to approval process figure, and circulating to when there is the node of parallel relationship, if the node of this parallel relationship has pre-post relation equally, then need first to run preposition node and rearmounted node according to circulation rule, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate, thus the problem solved owing to cannot examine the relation comprising pre-post between two of a parallel connection node in prior art, improve the efficiency of project examination.
As shown in Figure 6, Figure 7, a kind of circulation apparatus of the pre-post relation based on parallel connection is embodiments provided.Device embodiment can pass through software simulating, also can be realized by the mode of hardware or software and hardware combining.Say from hardware view; as shown in Figure 6; for the embodiment of the present invention is based on a kind of hardware structure diagram of the circulation apparatus place equipment of the pre-post relation of parallel connection; except the processor shown in Fig. 6, internal memory, network interface and nonvolatile memory; in embodiment, the equipment at device place can also comprise other hardware usually, as the forwarding chip etc. of responsible process message.For software simulating, as shown in Figure 7, as the device on a logical meaning, be by the CPU of its place equipment, computer program instructions corresponding in nonvolatile memory is read operation in internal memory to be formed.The circulation apparatus 70 of the pre-post relation based on parallel connection that the present embodiment provides comprises:
Acquiring unit 701, for obtaining each node of project examination;
Dispensing unit 702, for examining relation to each Joint Enterprise obtained; Wherein, each node configuring described examination & approval relation comprises: be configured the preposition node of parallel relationship and pre-post relation and rearmounted node simultaneously;
Drawing unit 703, for the described examination & approval relation according to configuration, draws the approval process figure of each node;
Judging unit 704, for circulating according to the approval process figure drawn, circulating to when there is the node of parallel relationship, judge whether the node of parallel relationship has pre-post relation, if, run preposition node and rearmounted node, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate; Otherwise this running circulation has the node of parallel relationship simultaneously.
Further,
Described dispensing unit 702, for there is parallel relationship and pre-post relation at the same time rearmounted node in configure the attribute information of preposition node;
Described judging unit 704, for judging whether a node in the node of parallel relationship comprises the attribute information of another node, and if so, the node of parallel relationship has pre-post relation; Otherwise the node of parallel relationship does not have pre-post relation.
In an embodiment of the invention, as shown in Figure 8, may further include:
Running unit 801, for when running present node, utilizes the method for operation of the described present node of local terminal system storage to run present node;
When this end system does not store the method for operation of described present node, comprise further: call unit 802, for calling the interface of the peer-to-peer system of the method for operation of preserving described present node, present node is pushed to peer-to-peer system, and utilizes the operation result that the interface peer-to-peer system of this end system runs described present node.
Comprise further:
Loading unit 803, for being loaded in the project of this end system by process flow diagram assembly, performs the approval process figure of described each node of drafting to utilize described drawing unit according to process flow diagram assembly.
Whether described dispensing unit 702 further, for reporting and one or more in nodename the operation result of each Joint Enterprise circulation rule obtained, node time limit, this node.
The content such as information interaction, implementation between each unit in the said equipment, due to the inventive method embodiment based on same design, particular content can see in the inventive method embodiment describe, repeat no more herein.
It should be noted that, in this article, the relational terms of such as first and second and so on is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element " being comprised " limited by statement, and be not precluded within process, method, article or the equipment comprising described key element and also there is other same factor.
One of ordinary skill in the art will appreciate that: all or part of step realizing said method embodiment can have been come by the hardware that programmed instruction is relevant, aforesaid program can be stored in the storage medium of embodied on computer readable, this program, when performing, performs the step comprising said method embodiment; And aforesaid storage medium comprises: ROM, RAM, magnetic disc or CD etc. various can be program code stored medium in.
Finally it should be noted that: the foregoing is only preferred embodiment of the present invention, only for illustration of technical scheme of the present invention, be not intended to limit protection scope of the present invention.All any amendments done within the spirit and principles in the present invention, equivalent replacement, improvement etc., be all included in protection scope of the present invention.

Claims (10)

1., based on a circulation method for the pre-post relation of parallel connection, it is characterized in that, comprising:
This end system obtains each node of project examination;
To each Joint Enterprise examination & approval relation obtained; Wherein, each node configuring described examination & approval relation comprises: be configured the preposition node of parallel relationship and pre-post relation and rearmounted node simultaneously;
According to the described examination & approval relation of configuration, draw the approval process figure of each node;
Approval process figure according to drawing circulates, and circulating to when having the node of parallel relationship, judges whether the node of parallel relationship has pre-post relation, if, run preposition node and rearmounted node, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate; Otherwise this running circulation has the node of parallel relationship simultaneously.
2. method according to claim 1, is characterized in that,
Comprise further: there is attribute information at the same time that configure preposition node in the rearmounted node of parallel relationship and pre-post relation;
Describedly judge whether the node of parallel relationship has pre-post relation, comprising: judge whether a node in the node of parallel relationship comprises the attribute information of another node, and if so, the node of parallel relationship has pre-post relation; Otherwise the node of parallel relationship does not have pre-post relation.
3. method according to claim 1, is characterized in that,
Comprising further: when running present node, utilizing the method for operation of the described present node of local terminal system storage to run present node;
When this end system does not store the method for operation of described present node, comprise further: the interface calling the peer-to-peer system of the method for operation of preserving described present node, present node is pushed to peer-to-peer system, and utilizes the operation result that the interface peer-to-peer system of this end system runs described present node.
4. method according to claim 1, is characterized in that, before the approval process figure of described each node of drafting, comprises further:
Process flow diagram assembly is loaded in the project of this end system, with the approval process figure utilizing process flow diagram assembly to perform described each node of drafting.
5., according to described method arbitrary in Claims 1-4, it is characterized in that, comprise further:
Whether the operation result of each Joint Enterprise circulation rule obtained, node time limit, this node is reported and one or more in nodename.
6., based on a circulation apparatus for the pre-post relation of parallel connection, it is characterized in that, comprising:
Acquiring unit, for obtaining each node of project examination;
Dispensing unit, for examining relation to each Joint Enterprise obtained; Wherein, each node configuring described examination & approval relation comprises: be configured the preposition node of parallel relationship and pre-post relation and rearmounted node simultaneously;
Drawing unit, for the described examination & approval relation according to configuration, draws the approval process figure of each node;
Judging unit, for circulating according to the approval process figure drawn, circulating to when there is the node of parallel relationship, judge whether the node of parallel relationship has pre-post relation, if, run preposition node and rearmounted node, at the end of preposition node off-duty, the operation controlling rearmounted node does not also terminate; Otherwise this running circulation has the node of parallel relationship simultaneously.
7. device according to claim 6, is characterized in that,
Described dispensing unit, for there is parallel relationship and pre-post relation at the same time rearmounted node in configure the attribute information of preposition node;
Described judging unit, for judging whether a node in the node of parallel relationship comprises the attribute information of another node, and if so, the node of parallel relationship has pre-post relation; Otherwise the node of parallel relationship does not have pre-post relation.
8. device according to claim 6, is characterized in that,
Comprising further: running unit, for when running present node, utilizing the method for operation of the described present node of local terminal system storage to run present node;
When this end system does not store the method for operation of described present node, comprise further: call unit, for calling the interface of the peer-to-peer system of the method for operation of preserving described present node, present node is pushed to peer-to-peer system, and utilizes the operation result that the interface peer-to-peer system of this end system runs described present node.
9. device according to claim 6, is characterized in that, comprises further:
Loading unit, for being loaded in the project of this end system by process flow diagram assembly, performs the approval process figure of described each node of drafting to utilize described drawing unit according to process flow diagram assembly.
10. according to described device arbitrary in claim 6 to 9, it is characterized in that, described dispensing unit, for whether reporting the operation result of each Joint Enterprise circulation rule obtained, node time limit, this node and one or more in nodename.
CN201510025942.XA 2015-01-19 2015-01-19 Front and rear relation circulation method and device based on parallel connection Pending CN104573965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510025942.XA CN104573965A (en) 2015-01-19 2015-01-19 Front and rear relation circulation method and device based on parallel connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510025942.XA CN104573965A (en) 2015-01-19 2015-01-19 Front and rear relation circulation method and device based on parallel connection

Publications (1)

Publication Number Publication Date
CN104573965A true CN104573965A (en) 2015-04-29

Family

ID=53089974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510025942.XA Pending CN104573965A (en) 2015-01-19 2015-01-19 Front and rear relation circulation method and device based on parallel connection

Country Status (1)

Country Link
CN (1) CN104573965A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069567A (en) * 2015-08-05 2015-11-18 北京恒华伟业科技股份有限公司 Method and device for controlling engineering design process
CN109375907A (en) * 2018-10-29 2019-02-22 恒生电子股份有限公司 Auditing flow development approach, business audit method, apparatus, equipment and medium
CN110599005A (en) * 2019-08-23 2019-12-20 东软集团股份有限公司 Process analysis method and device, computer readable storage medium and electronic equipment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002203086A (en) * 2000-12-28 2002-07-19 Sumitomo Electric Ind Ltd Workflow management device and method thereof, and recording medium with workflow management program recorded thereon
JP2005327228A (en) * 2004-05-13 2005-11-24 Takatoshi Yanase Work flow system capable of specifying multiple approvers in same approval order
CN101082970A (en) * 2007-07-05 2007-12-05 山东浪潮齐鲁软件产业股份有限公司 Method for realizing government affairs examination and approval workflow engines system
CN101567068A (en) * 2009-05-18 2009-10-28 北京方正春元科技发展有限公司 Data-processing system used for financial information management
CN102063333A (en) * 2011-01-14 2011-05-18 南京莱斯信息技术股份有限公司 Recursive structure workflow model and dispatching method thereof
CN103353957A (en) * 2013-06-19 2013-10-16 浙江中烟工业有限责任公司 Realization method of human-centered cooperative workflow system and apparatus thereof
US20140025425A1 (en) * 2012-07-17 2014-01-23 Winshuttle, Llc Bulk business workflow systems and methods
CN103577906A (en) * 2012-07-20 2014-02-12 杭州勒卡斯广告策划有限公司 Workflow generation method, workflow execution method and workflow execution system
CN103700026A (en) * 2013-11-30 2014-04-02 北京科东电力控制系统有限责任公司 Free node transfer processing method for intelligent power grid dispatching

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002203086A (en) * 2000-12-28 2002-07-19 Sumitomo Electric Ind Ltd Workflow management device and method thereof, and recording medium with workflow management program recorded thereon
JP2005327228A (en) * 2004-05-13 2005-11-24 Takatoshi Yanase Work flow system capable of specifying multiple approvers in same approval order
CN101082970A (en) * 2007-07-05 2007-12-05 山东浪潮齐鲁软件产业股份有限公司 Method for realizing government affairs examination and approval workflow engines system
CN101567068A (en) * 2009-05-18 2009-10-28 北京方正春元科技发展有限公司 Data-processing system used for financial information management
CN102063333A (en) * 2011-01-14 2011-05-18 南京莱斯信息技术股份有限公司 Recursive structure workflow model and dispatching method thereof
US20140025425A1 (en) * 2012-07-17 2014-01-23 Winshuttle, Llc Bulk business workflow systems and methods
CN103577906A (en) * 2012-07-20 2014-02-12 杭州勒卡斯广告策划有限公司 Workflow generation method, workflow execution method and workflow execution system
CN103353957A (en) * 2013-06-19 2013-10-16 浙江中烟工业有限责任公司 Realization method of human-centered cooperative workflow system and apparatus thereof
CN103700026A (en) * 2013-11-30 2014-04-02 北京科东电力控制系统有限责任公司 Free node transfer processing method for intelligent power grid dispatching

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴琦等: "基于动态工作流的电子政务审批系统设计", 《电子技术》 *
唐力等: "基于节点的工程图文档工作流模型", 《机械》 *
戴雪冰: "工作流技术在电子政务审批平台中的应用", 《中国优秀博硕士学位论文全文数据库(硕士)信息科技辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069567A (en) * 2015-08-05 2015-11-18 北京恒华伟业科技股份有限公司 Method and device for controlling engineering design process
CN109375907A (en) * 2018-10-29 2019-02-22 恒生电子股份有限公司 Auditing flow development approach, business audit method, apparatus, equipment and medium
CN110599005A (en) * 2019-08-23 2019-12-20 东软集团股份有限公司 Process analysis method and device, computer readable storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
US8751216B2 (en) Table merging with row data reduction
US10146668B1 (en) Modeling code coverage in software life cycle
EP2778929A1 (en) Test script generation system
US10089109B2 (en) System and method for evaluating human resources in a software development environment
CN109522228B (en) Interface automation test data construction method, device, platform and storage medium
CN109871308B (en) Automatic test method and device, terminal equipment and computer readable storage medium
CN112581018B (en) Method, system, device and storage medium for managing process tasks
US20220197950A1 (en) Eliminating many-to-many joins between database tables
US20170286265A1 (en) Privilege Test and Monitoring
CN104573965A (en) Front and rear relation circulation method and device based on parallel connection
CN106897858A (en) A kind of workflow processing method and system
CN107463391B (en) Task processing method, device and equipment
CN117056240B (en) Data element development and debugging method and system supporting offline Jar package
CN109241037A (en) A kind of method, apparatus that realizing database processing, equipment and storage medium
CN106294129A (en) Code coverage method of testing and device
CN104252413A (en) Automatic script generation method, device and system
WO2016165461A1 (en) Automated testing method and apparatus for network management system software of telecommunications network
CN109976725A (en) A kind of process program development approach and device based on lightweight flow engine
EP3179365A1 (en) Systems and methods for detecting matching content in code files
CN113672674A (en) Method, electronic device and storage medium for automatically arranging service flow
CN107909496A (en) User influence in social network analysis method, device and electronic equipment
CN106127026A (en) Authority configuring method and device
CN111160403B (en) API (application program interface) multiplexing discovery method and device
CN108170391A (en) Page display method, device and electronic equipment
CN111079390B (en) Method and device for determining selection state of check box list

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429