CN104573319B CN201410723487.6A CN201410723487A CN104573319B CN 104573319 B CN104573319 B CN 104573319B CN 201410723487 A CN201410723487 A CN 201410723487A CN 104573319 B CN104573319 B CN 104573319B
Authority
CN
China
Prior art keywords
msub
mrow
slide mass
calculating
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410723487.6A
Other languages
English (en)
Other versions
CN104573319A (zh
Inventor
雷明锋
彭立敏
曹成勇
施成华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201410723487.6A priority Critical patent/CN104573319B/zh
Publication of CN104573319A publication Critical patent/CN104573319A/zh
Application granted granted Critical
Publication of CN104573319B publication Critical patent/CN104573319B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种基于槽壁整体失稳的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法,其特征在于,包括以下步骤:首先根据工程实际的地质、水文条件,建立富水砂卵地层地下连续墙槽壁整体失稳模型,并计算滑动体的下滑力以及抗滑力;然后,基于极限平衡理论,计算得到保证富水砂卵层地下连续墙槽壁整体稳定的最小泥浆重度。本发明考虑了富水砂卵地层的地质、水文特征,特别是考虑了基坑周边的建筑物荷载对槽壁的稳定性影响,建立的分析模型更为贴近工程实际,计算的结果更为可靠,实现了复杂周边条件下富水砂卵地层地下连续墙成槽施工泥浆参数的定量设计。

Description

基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥 浆参数设计方法
技术领域
本发明属于地下工程领域,具体涉及一种富水砂卵地层地下连续墙成槽施工泥浆参数设计方法。
背景技术
随着城市地铁建设的蓬勃发展,地下连续墙得到了广泛应用,并成为了重要的基坑围护手段。地下连续墙施工主要是利用成槽机械在泥浆护壁的条件下开挖一条狭长的深槽,当开挖结束后形成一个单元段,然后插入制作好的钢筋笼,以导管法灌注混凝土完成一个单元槽段,各槽段之间以特定的接口方式进行连接形成一道壁式地下连续墙。为防止富水砂卵地层地下连续墙槽壁出现突水坍塌,通常采用泥浆护壁等措施。然而,目前国内外对于泥浆参数的设计主要还是在经验的基础上按工程类比法进行,对于采用的泥浆参数是否完全能够保证地下连续墙槽壁安全施工的需要,或者是否过于保守,包括工程师自己都无法确定。总体来说,地下连续墙成槽施工泥浆参数的设计目前还停留在经验阶段,无法满足我国地下连续墙建设快速发展的需要。因此,研制一种富水砂卵地层地下连续墙成槽施工泥浆参数的设计方法是当前亟待解决的技术问题之一。
发明内容
本发明提供了一种基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法,使分析模型更加贴近实际,计算结果更加准确。
为了实现上述技术目的,本发明的技术方案是,
一种基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法,包括以下步骤:
步骤一:根据工程实际的地质、水文条件,建立富水砂卵地层地下连续墙槽壁整体失稳分析模型,以计算滑动体即槽壁失稳土体的下滑力Tg以及抗滑力Ts
步骤二:基于极限平衡理论,计算得到保证富水砂卵层地下连续墙槽壁整体稳定的最小泥浆重度即得到泥浆参数。其中泥浆参数就是泥浆重度,由于连续墙槽壁开挖稳定与否,仅取决于泥浆重度,故本发明的目的是对泥浆重度进行准确的计算。
所述的方法,所述的步骤一中,计算滑动体下滑力的步骤包括:
步骤1:首先计算滑动体体积,然后根据滑动体体积计算滑动体自重;
步骤2:计算地面超载;
步骤3:根据滑动体自重和地面超载计算地下连续墙槽壁滑动体的下滑力Tg
所述的方法,所述的步骤1中计算滑动体自重的过程为:
首先计算地下水以上部分滑动体体积Vu
Vu=BLHw
式中,L为开挖槽段的长度、Hw为地下水距离地表的距离、B为滑动体宽度,其表达式为B=(H-Ht)cotα,其中,Ht为砂卵层埋深、H为滑动体的深度、滑动面与水平面的夹角其中为土体的内摩擦角;
然后计算地下水以下部分滑动体体积Vd
则滑动体自重W为:
式中,γ为地下水以上土的平均重度、γsat为地下水以下土的饱和重度、γw为水的重度;
所述的步骤2中计算地面超载的过程为:
地面超载Q为:
Q=qL(H-Ht)cotα
式中,q为基坑周围建筑物等效荷载;
所述的步骤3中计算地下连续墙槽壁滑动体的下滑力的过程为:
地下连续墙槽壁滑动体的下滑力Tg为:
Tg=(W+Q)sinα。
所述的方法,所述的步骤一中,计算滑动体抗滑力的步骤包括:
步骤1):计算泥浆和地下水对槽壁的合力;
步骤2):计算土体的水平主动土压力;
步骤3):计算作用在滑动面上的抗剪力;
步骤4):计算作用在槽壁侧面上粘聚力;
步骤5):根据步骤1)-4)所得到的各作用力计算地下连续墙槽壁滑动体的抗滑力Ts
所述的方法,所述的步骤1)中,计算泥浆和地下水对槽壁的合力的过程为:
作用在槽壁上泥浆压力Ps和地下水压力Pw的合力ΔP为:
式中,γs为泥浆重度,Hs为泥浆液面距地表的距离,L为开挖槽段的长度,γw为水的重度,H为滑动体的深度,Hw为地下水距离地表的距离;
所述的步骤2)中,计算土体的水平主动土压力的过程为:
土体的水平主动土压力Pa,根据朗肯土压力理论计算
式中,γa为z深度范围内土的平均有效重度、c为土体的平均粘聚力、Ka为主动土压力系数,q为基坑周围建筑物等效荷载;
所述的步骤3)中,计算作用在滑动面上的抗剪力的过程为:
作用在滑动面上的抗剪力T1为:
式中,N1为滑动面法向反力,表达式为N1=(W+Q)cosα+(ΔP-Pa)sinα;S1为滑动面的面积,表达式为
所述的步骤4)中,计算作用在槽壁侧面上粘聚力的过程为:
作用在槽壁侧面上粘聚力合力T2为:
T2=cAc (8)
式中,Ac为竖向侧面acog、bdeh的面积,其表达式为Ac=(H+Ht)(H-Ht)cotα;c为土体的平均粘聚力;
所述的步骤5)中,计算地下连续墙槽壁滑动体的抗滑力的过程为:
地下连续墙槽壁滑动体的抗滑力Ts为:
Ts=(ΔP-Pa)cosα+T1+T2
所述的方法,所述的步骤二中,在计算最小泥浆重度前,首先引入并计算安全系数Fs,将安全系数Fs定义为滑动体的抗滑力与下滑力的比值,即
在此处引入这个安全系数Fs的原因及作用在于:1.考虑土体等计算初始参数的选取有一定的离散型;二、留出足够的安全储备。
所述的方法,计算保证富水砂卵层地下连续墙槽壁整体稳定的最小泥浆重度γs为:
式中,允许最小安全系数Fsmin取1.5,地下水距离地表的距离Hw、砂卵层埋深Ht、滑动体的深度H、地下水以上土的平均重度γ、地下水以下土的饱和重度γsat、水的重度γw、土体粘聚力c、摩擦角z深度范围内土的平均有效重度γa根据地质勘探报告得到。
本发明的技术效果在于,本发明考虑了富水砂卵地层的地质、水文特征,特别是考虑了基坑周边的建筑物荷载对槽壁的稳定性影响,建立的分析模型更为贴近工程实际,计算的结果更为可靠,实现了复杂周边条件下富水砂卵地层地下连续墙成槽施工泥浆参数的定量设计。
下面结合附图对本发明作进一步说明。
附图说明
图1为本发明富水砂卵地层地下连续墙槽壁整体稳定性分析模型;
图2为本发明富水砂卵地层地下连续墙槽壁滑动体的力学分析图。
图中,为土体的内摩擦角;L为开挖槽段长度;q为地面均布堆载;Hw为地下水距地面距离;W为滑动体重量;Ps为泥浆压力;Pw为地下水压力;Pa为滑动体受到的主动土压力;Hs为泥浆液面距地面的距离;T1和N1分别表示滑动体底斜面上受到的切向力和法向力;T2表示滑动体竖直平面上的土体粘聚力;a、b、c、d、o、e、g、h分别为滑动体的顶点。
具体实施方式
富水砂卵地层地下连续墙成槽开挖时,在土压力、水压力和泥浆压力共同作用下可能会发生整体失稳,破坏模式如图1,分别计算作用于滑动体上沿滑动面方向的下滑力和抗滑力,基于极限平衡理论,最终确定保证富水砂卵层连续墙槽壁整体稳定的最小泥浆重度γs
(1)滑动体自重W的计算
地下水以上部分滑动体体积Vu
Vu=BLHw (1)
式中,L为开挖槽段的长度;Hw为地下水距离地表的距离;B为滑动体宽度,其表达式为B=(H-Ht)cotα,其中,Ht为砂卵层埋深;H为滑动体的深度;滑动面与水平面的夹角其中为土体的内摩擦角。
地下水以下部分滑动体体积Vd
则滑动体自重W为:
式中,γ为地下水以上土的平均重度;γsat为地下水以下土的饱和重度;γw为水的重度。
(2)作用在槽壁上泥浆压力和地下水的合力ΔP计算
作用在槽壁上泥浆压力Ps和地下水压力Pw的合力为:
式中,γs为泥浆重度;Hs为泥浆液面距地表的距离;其余符号意义同上。
(3)地面超载Q的计算
地面超载Q为:
Q=qL(H-Ht)cotα (5)
式中,q为基坑周围建筑物等效荷载。
(4)土体的水平主动土压力Pa的计算
根据朗肯土压力理论,得到滑动体处于极限平衡状态时受到土体的水平主动土压力为:
式中,γa为z深度范围内土的平均有效重度;Ka为主动土压力系数,
(5)作用在滑动面上的抗剪力T1的计算
作用在滑动面上的抗剪力T1为:
式中,N1为滑动面法向反力,表达式为N1=(W+Q)cosα+(ΔP-Pa)sinα;S1为滑动面的面积,表达式为其余符号意义同上。
(6)作用在槽壁侧面上粘聚力T2的计算
作用在槽壁侧面上粘聚力合力T2为:
T2=cAc (8)
式中,Ac为竖向侧面acog、bdeh的面积,其表达式为Ac=(H+Ht)(H-Ht)cotα;c为土体的平均粘聚力。
(7)地下连续墙槽壁滑动体的下滑力Tg的计算:
地下连续墙槽壁滑动体的下滑力为:
Tg=(W+Q)sinα (9)
(8)地下连续墙槽壁滑动体的抗滑力Ts的计算:
地下连续墙槽壁滑动体的抗滑力为:
Ts=(ΔP-Pa)cosα+T1+T2 (10)
(9)地下连续墙槽壁整体稳定的安全系数Fs的计算:
考虑到一定的安全储备,引入安全系数Fs,将安全系数Fs定义为滑动体的抗滑力与下滑力的比值,即
(10)最小泥浆重度γs计算
根据极限平衡理论,计算得出保证富水砂卵层地下连续墙槽壁整体稳定的最小泥浆重度γs为:
式中,安全系数Fs可取为1.5,其余符号意义同上,土体粘聚力c、摩擦角等参数根据地质勘探报告选取。
下面结合实例对本发明进行进一步说明。
某地铁车站地下连续墙施工时,工程地处富水砂卵地层段,施工过程中槽壁极易发生突水、甚至坍塌等施工风险。泥浆液面在地表处,距离地表的距离Hs为0m,地下水液面距离地表距离Hw为5m,地下水容重γw为9.8kN/m3,埋深Ht为7m,槽段开挖长度L为6m,土体平均重度γ为18.8kN/m3,饱和重度γsat为19.4kN/m3,有效重度γa为9.6kN/m3,地面均布等效荷载q为75kPa,粘聚力c为3kPa,内摩擦角为38°,安全系数Fs取为1.5。
采用本发明的基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数的设计方法,对保证富水砂卵层地下连续墙槽壁整体稳定的最小泥浆重度进行计算,地下连续墙槽壁发生坍塌一般是在深度12m左右,将其代入式(12)计算得到,保证连续墙整体稳定最小泥浆重度γs为12.58kN/m3

Claims (1)

1.一种基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法,其特征在于,包括以下步骤:
步骤一:根据工程实际的地质、水文条件,建立富水砂卵地层地下连续墙槽壁整体失稳分析模型,以计算滑动体即槽壁失稳土体的下滑力Tg以及抗滑力Ts
步骤二:基于极限平衡理论,计算得到保证富水砂卵层地下连续墙槽壁整体稳定的最小泥浆重度即得到泥浆参数;
所述的步骤一中,计算滑动体下滑力的步骤包括:
步骤1:首先计算滑动体体积,然后根据滑动体体积计算滑动体自重;
步骤2:计算地面超载;
步骤3:根据滑动体自重和地面超载计算地下连续墙槽壁滑动体的下滑力Tg
所述的步骤1中计算滑动体自重的过程为:
首先计算地下水以上部分滑动体体积Vu
Vu=BLHw
式中,L为开挖槽段的长度、Hw为地下水距离地表的距离、B为滑动体宽度,其表达式为B=(H-Ht)cotα,其中,Ht为砂卵层埋深、H为滑动体的深度、滑动面与水平面的夹角其中为土体的内摩擦角;
然后计算地下水以下部分滑动体体积Vd
<mrow> <msub> <mi>V</mi> <mi>d</mi> </msub> <mo>=</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <mi>B</mi> <mi>L</mi> <mrow> <mo>(</mo> <mn>2</mn> <mi>H</mi> <mo>-</mo> <mn>2</mn> <msub> <mi>H</mi> <mi>w</mi> </msub> <mo>-</mo> <mi>B</mi> <mi> </mi> <mi>t</mi> <mi>a</mi> <mi>n</mi> <mi>&amp;alpha;</mi> <mo>)</mo> </mrow> </mrow>
则滑动体自重W为:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>W</mi> <mo>=</mo> <msub> <mi>&amp;gamma;V</mi> <mi>u</mi> </msub> <mo>+</mo> <mrow> <mo>(</mo> <msub> <mi>&amp;gamma;</mi> <mrow> <mi>s</mi> <mi>a</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>&amp;gamma;</mi> <mi>w</mi> </msub> <mo>)</mo> </mrow> <msub> <mi>V</mi> <mi>d</mi> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>=</mo> <mo>&amp;lsqb;</mo> <msub> <mi>&amp;gamma;H</mi> <mi>w</mi> </msub> <mo>+</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <mrow> <mo>(</mo> <msub> <mi>&amp;gamma;</mi> <mrow> <mi>s</mi> <mi>a</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>&amp;gamma;</mi> <mi>w</mi> </msub> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <mi>H</mi> <mo>+</mo> <msub> <mi>H</mi> <mi>t</mi> </msub> <mo>-</mo> <mn>2</mn> <msub> <mi>H</mi> <mi>w</mi> </msub> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mi>L</mi> <mrow> <mo>(</mo> <mi>H</mi> <mo>-</mo> <msub> <mi>H</mi> <mi>t</mi> </msub> <mo>)</mo> </mrow> <mi>cot</mi> <mi>&amp;alpha;</mi> </mrow> </mtd> </mtr> </mtable> </mfenced>
式中,γ为地下水以上土的平均重度、γsat为地下水以下土的饱和重度、γw为水的重度;
所述的步骤2中计算地面超载的过程为:
地面超载Q为:
Q=qL(H-Ht)cotα
式中,q为基坑周围建筑物等效荷载;
所述的步骤3中计算地下连续墙槽壁滑动体的下滑力的过程为:
地下连续墙槽壁滑动体的下滑力Tg为:
Tg=(W+Q)sinα;
所述的步骤一中,计算滑动体抗滑力的步骤包括:
步骤1):计算泥浆和地下水对槽壁的合力;
步骤2):计算土体的水平主动土压力;
步骤3):计算作用在滑动面上的抗剪力;
步骤4):计算作用在槽壁侧面上粘聚力;
步骤5):根据步骤1)-4)所得到的各作用力计算地下连续墙槽壁滑动体的抗滑力Ts
所述的步骤1)中,计算泥浆和地下水对槽壁的合力的过程为:
作用在槽壁上泥浆压力Ps和地下水压力Pw的合力ΔP为:
<mrow> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>=</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <mi>L</mi> <mo>&amp;lsqb;</mo> <msub> <mi>&amp;gamma;</mi> <mi>s</mi> </msub> <msup> <mrow> <mo>(</mo> <mi>H</mi> <mo>-</mo> <msub> <mi>H</mi> <mi>s</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>-</mo> <msub> <mi>&amp;gamma;</mi> <mi>w</mi> </msub> <msup> <mrow> <mo>(</mo> <mi>H</mi> <mo>-</mo> <msub> <mi>H</mi> <mi>w</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;rsqb;</mo> </mrow>
式中,γs为泥浆重度,Hs为泥浆液面距地表的距离,L为开挖槽段的长度,γw为水的重度,H为滑动体的深度,Hw为地下水距离地表的距离;
所述的步骤2)中,计算土体的水平主动土压力的过程为:
土体的水平主动土压力Pa,根据朗肯土压力理论计算
<mrow> <mtable> <mtr> <mtd> <mrow> <msub> <mi>P</mi> <mi>a</mi> </msub> <mo>=</mo> <mi>L</mi> <msubsup> <mo>&amp;Integral;</mo> <mn>0</mn> <mi>H</mi> </msubsup> <mo>&amp;lsqb;</mo> <msub> <mi>K</mi> <mi>a</mi> </msub> <mrow> <mo>(</mo> <msub> <mi>&amp;gamma;</mi> <mi>a</mi> </msub> <mi>h</mi> <mo>+</mo> <mi>q</mi> <mo>)</mo> </mrow> <mo>-</mo> <mn>2</mn> <mi>c</mi> <msqrt> <msub> <mi>K</mi> <mi>a</mi> </msub> </msqrt> <mo>&amp;rsqb;</mo> <mi>d</mi> <mi>h</mi> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>=</mo> <mi>H</mi> <mi>L</mi> <mrow> <mo>(</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <msub> <mi>K</mi> <mi>a</mi> </msub> <msub> <mi>&amp;gamma;</mi> <mi>a</mi> </msub> <mi>H</mi> <mo>+</mo> <msub> <mi>K</mi> <mi>a</mi> </msub> <mi>q</mi> <mo>-</mo> <mn>2</mn> <mi>c</mi> <msqrt> <msub> <mi>K</mi> <mi>a</mi> </msub> </msqrt> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow>
式中,γa为z深度范围内土的平均有效重度、c为土体的平均粘聚力、Ka为主动土压力系数,q为基坑周围建筑物等效荷载;
所述的步骤3)中,计算作用在滑动面上的抗剪力的过程为:
作用在滑动面上的抗剪力T1为:
式中,N1为滑动面法向反力,表达式为N1=(W+Q)cosα+(ΔP-Pa)sinα;S1为滑动面的面积,表达式为
所述的步骤4)中,计算作用在槽壁侧面上粘聚力的过程为:
作用在槽壁侧面上粘聚力合力T2为:
T2=cAc (8)
式中,Ac为竖向侧面acog、bdeh的面积,其表达式为Ac=(H+Ht)(H-Ht)cotα;c为土体的平均粘聚力;
所述的步骤5)中,计算地下连续墙槽壁滑动体的抗滑力的过程为:
地下连续墙槽壁滑动体的抗滑力Ts为:
Ts=(ΔP-Pa)cosα+T1+T2
所述的步骤二中,在计算最小泥浆重度前,首先引入并计算安全系数Fs,将安全系数Fs定义为滑动体的抗滑力与下滑力的比值,即
<mrow> <msub> <mi>F</mi> <mi>s</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>T</mi> <mi>s</mi> </msub> <msub> <mi>T</mi> <mi>g</mi> </msub> </mfrac> <mo>;</mo> </mrow>
计算保证富水砂卵层地下连续墙槽壁整体稳定的最小泥浆重度γs为:
式中,允许最小安全系数Fsmin取1.5,地下水距离地表的距离Hw、砂卵层埋深Ht、滑动体的深度H、地下水以上土的平均重度γ、地下水以下土的饱和重度γsat、水的重度γw、土体粘聚力c、摩擦角z深度范围内土的平均有效重度γa根据地质勘探报告得到。
CN201410723487.6A 2014-12-03 2014-12-03 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法 Active CN104573319B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410723487.6A CN104573319B (zh) 2014-12-03 2014-12-03 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410723487.6A CN104573319B (zh) 2014-12-03 2014-12-03 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法

Publications (2)

Publication Number Publication Date
CN104573319A CN104573319A (zh) 2015-04-29
CN104573319B true CN104573319B (zh) 2017-11-07

Family

ID=53089366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410723487.6A Active CN104573319B (zh) 2014-12-03 2014-12-03 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法

Country Status (1)

Country Link
CN (1) CN104573319B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110824144B (zh) * 2019-11-19 2022-08-16 中国科学院、水利部成都山地灾害与环境研究所 松散堆积体内摩擦角的确定方法
CN111368358B (zh) * 2020-01-06 2024-01-19 中铁二局集团有限公司 一种有限宽土体地下连续墙槽壁稳定性计算方法
CN113673019B (zh) * 2021-09-12 2023-11-24 中铁五局集团电务工程有限责任公司 一种超深圆形地下连续墙双折角形槽段泥浆重度确定方法
CN115354650A (zh) * 2022-08-29 2022-11-18 中国土木工程集团有限公司 一种建筑地基加固方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031791A (zh) * 2010-11-30 2011-04-27 上海交通大学 地下连续墙槽壁整体稳定性及泥浆容重确定方法
CN102061686A (zh) * 2010-11-30 2011-05-18 上海交通大学 地下连续墙纯粘性槽壁局部稳定性及泥浆容重确定方法
EP2272687B1 (en) * 2002-11-01 2012-01-18 Bridgestone Americas Tire Operations, LLC Tire having a tread with a pitch sequence

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4440799B2 (ja) * 2005-02-14 2010-03-24 鹿島建設株式会社 地盤の掘削方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2272687B1 (en) * 2002-11-01 2012-01-18 Bridgestone Americas Tire Operations, LLC Tire having a tread with a pitch sequence
CN102031791A (zh) * 2010-11-30 2011-04-27 上海交通大学 地下连续墙槽壁整体稳定性及泥浆容重确定方法
CN102061686A (zh) * 2010-11-30 2011-05-18 上海交通大学 地下连续墙纯粘性槽壁局部稳定性及泥浆容重确定方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
地下连续墙成槽施工槽壁稳定机制分析;丁勇春,等;《岩石力学与工程学报》;20130131;第32卷(第增1期);第2074-2079页 *
地下连续墙泥浆槽壁稳定的三维分析;张厚美,等;《土木工程学报》;20000229;第33卷(第1期);第73-76页 *

Also Published As

Publication number Publication date
CN104573319A (zh) 2015-04-29

Similar Documents

Publication Publication Date Title
CN104573319B (zh) 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法
Zheng et al. Test and numerical research on wall deflections induced by pre-excavation dewatering
CN106381866A (zh) 一种富水软土地区超深地下连续墙施工方法
CN103744128B (zh) 一种用于地下洞室岩爆烈度等级的综合预报方法
CN103321260B (zh) 间隔钻孔截桩纠倾方法
CN107092740A (zh) 一种急倾斜特厚煤层老采空区残余变形预计方法
Li et al. Seepage analysis in a fractured rock mass: The upper reservoir of Pushihe pumped-storage power station in China
CN105696550A (zh) 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN106638537A (zh) 一种有限土体土压力计算方法
CN106149673A (zh) 湿陷性黄土深部预浸水强夯法
CN107091113B (zh) 确定不同富水程度与进尺下隧道掌子面稳定性的计算方法
CN104195956B (zh) 膺架式水域连续梁现浇支架及其搭建方法
CN102736123B (zh) 一种浅埋圆形隧道上半断面施工诱发地面坍塌的预测方法
CN105887941A (zh) 一种桩基础桩长测算方法
CN112765803B (zh) 一种基坑坑底抗隆起稳定性失效概率的评估方法及系统
CN104141294B (zh) 基坑支护止水体系缺陷引发土体渗透破坏的判断方法
CN107657092A (zh) 地基钻孔取土的建筑物纠倾方法
CN106407569A (zh) 一种厚松散层薄基岩条件下地表下沉值计算方法
CN203977433U (zh) 软土地区基坑工程复合支护结构
CN113221204B (zh) 展臂式排水抗滑桩及其结构计算方法
CN113642089B (zh) 一种盾构掘进周围地层变形及加固范围确定方法
CN113312697B (zh) 一种高压注浆对岸边挡土墙抗滑动稳定性预测方法
CN115573739A (zh) 注浆圈施工方法及环境敏感区深埋隧道涌突水段施工方法
CN108049418A (zh) 地下停车用超深沉井的抗隆起控制施工方法
CN112647515A (zh) 人工挖孔井微型灌注桩支护后开挖进尺的预测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant