CN104572371B - A kind of hard disk powered-off fault tests system - Google Patents
A kind of hard disk powered-off fault tests system Download PDFInfo
- Publication number
- CN104572371B CN104572371B CN201410827621.7A CN201410827621A CN104572371B CN 104572371 B CN104572371 B CN 104572371B CN 201410827621 A CN201410827621 A CN 201410827621A CN 104572371 B CN104572371 B CN 104572371B
- Authority
- CN
- China
- Prior art keywords
- test
- main frame
- hard disk
- pdu
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The invention discloses provide a kind of hard disk powered-off fault test system, including more test main frames, PDU, test server and to be installed to system software to be tested, the test main frame is connected with test server, the PDU is connected with test server, test main frame is powered by PDU, the test main frame is equipped with hard disk connection terminal, the test server is equipped with monitoring module and control module, the monitoring module, which is realized, records test main frame operating status, the control module realizes the control to PDU, realize the power on/off time of control test main frame.By the way that tested hard disk is placed into test main frame, testing results program, can test polylith solid state disk, and testing time can be programmed adjustment simultaneously on the server, can meet the power down test of various intensity, improve testing efficiency and test effect.
Description
Technical field
The present invention relates to hard disk test field, more particularly to a kind of test system of hard disk powered-off fault.
Background technology
Hard disk will consider performance and erasing loss of hard disk etc. when designing, and writing buffer can be used, with reduction pair
The operation of nand flash or magnetic track.During actual user's use, it is difficult to avoid exist process is being written and read to hard disk
In the operation of non-security powered-off fault.When being abnormal power down, the data in buffering area may not really be written to nand
In flash or magnetic track, powered-off fault can cause data in hard disk to lose, and influence user's normal use.
Therefore, data safety index when hard disk operates powered-off fault is the important test evaluation index of hard disk,
It is that must survey item.It is substantially to be manually operated that present technology carries out hard disk powered-off fault test in use, specific to test
Method has the following two kinds:
Method 1:
Step a:Tested hard disk is installed to test main frame;
Step b:Installation operation system and mainboard driving on tested hard disk;
Step c:The readwrite tests software of installation a large amount of read-write operations to hard disk on tested hard disk, such as BurnIn Test;
Step d:The readwrite tests software of operation installation is written and read solid state disk test;
Step e:Manually by test main frame power operation;
Step f:Deng 1 minute or so, test main frame is re-powered, and is switched on;
Repeat step d, step e and step f.Whether artificial observation test main frame has blue screen or crash etc. in start process
Abnormal phenomenon is tested if existing and is not passed through.
The defects of method 1 is:Entire test process is required for artificially participating in, waste of manpower resource;And due to testing
It needs to plug test main frame power supply manually in journey, testing time has considerable restraint, leads to the test to solid state disk this aspect
Intensity is insufficient.
Method 2:
On the basis of method 1 to test main frame power on and power-down operation carry out integrated control, by hardware connection can
Multiple test main frames to be controlled to test simultaneously, but this mode programmability is weak.Or it needs through manually observation test
Whether host has the abnormal phenomenon such as blue screen or crash in start process, tests if existing and does not pass through.Method 2 there are the defects of
It is:Entire test process is required for artificially participating in, waste of manpower resource.Although multiple platforms can be tested simultaneously, due to
To the upper and lower electrically operated for integrated control of test main frame, if there is mistake occurs for a test main frame, entire test may result in
It stagnates.Test interval is fixed, it is impossible to change can, program capability is poor.
Invention content
For disadvantages described above, present invention aims at the testing efficiency for how promoting hard disk powered-off fault, while survey is promoted
Try effect.
To achieve these goals, the present invention provides a kind of hard disk powered-off faults to test system, which is characterized in that including
More test main frames, PDU, test server and to be installed to system software to be tested, the test main frame and testing service
Device is connected, and the PDU is connected with test server, and test main frame is powered by PDU, and the test main frame is equipped with hard disk
Connection terminal, the test server are equipped with monitoring module and control module, and the monitoring module, which is realized, transports test main frame
Row state recording, the control module realize the control to PDU, reach the power on/off time of control test main frame;, to tested hard
It disk installation operation system and drives and simultaneously distributes IP address, the tested hard disk installation operation system and driving and with distributing IP
Location is set on other disks in advance, directly by copy manually or script executive mode complete;In the test server also
Equipped with random-number-generating module, the power on/off time of test main frame is controlled to be set by the random-number-generating module;Test clothes
Business device control PDU powers on test main frame, while check whether testing time reaches standard M times of testing requirement, if reached,
Then test terminates.Otherwise, it waits for T1 seconds, waits for operating system startup completely and BurnIn Test bring into operation, use server
Operating status is actively reported server by ping test host or test main frame, checks whether test main frame normally starts.
Described hard disk powered-off fault test system, it is characterised in that be installed to setting in advance in system software to be tested
Surely there is system mode output module, the operating status of current system is periodically output to test server.
The hard disk powered-off fault test system, it is characterised in that test main frame passes through between PDU, test server
Wired or wireless carry out data communication.
The hard disk powered-off fault test system, it is characterised in that the PDU Shang Mei roads power supply slot can be independent
Control.
The present invention is cumbersome for existing test system and test process, and due to being manual operation, power down number has very big
Limitation, therefore can cause to test the problem of intensity is insufficient, a kind of hard disk powered-off fault test system is provided, equipment under test is put
Test main frame is put, on the server testing results program, can test polylith solid state disk simultaneously, and testing time can be into
Row programming adjustment can meet the power down test of various intensity.Improve testing efficiency and test effect.
Description of the drawings
Fig. 1 is the network connection figure of embodiment;
Fig. 2 is the power circuit connection figure of embodiment;
Fig. 3 is the software flow pattern of embodiment.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without creative efforts
Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of hard disk powered-off faults to test system, including more test main frame PC (1) to PC (n),
PDU, test server and to be installed to system software to be tested, the test main frame is connected with test server, described
PDU is connected with test server, and test main frame is powered by PDU, and the test main frame is equipped with hard disk connection terminal, described
Test server is equipped with monitoring module and control module, and the monitoring module, which is realized, records test main frame operating status, institute
Control of the control module realization to PDU is stated, realizes the power on/off time of control test main frame.
Fig. 1 is the network connection figure of embodiment;Test server, PDU and test main frame are carried out by interchanger and cable
Connection can also be used and be connected using wireless modes such as WiFi, realize the network interconnection of entire test environment.Clothes are tested in test process
Business device controls PDU by network, so as to control the power supply of test main frame, while by network monitoring and records each treat
The operating status of test main frame.
Fig. 2 is the power circuit connection figure of embodiment;The power supply of test server, PDU and interchanger is connected to general supply
On, test main frame power supply is provided by PDU.The test software control PDU of test server carries out Power to each test main frame
On and Power off.Automatic power-down operation is realized by software control.Test main frame Power is realized by autoexec
Operation after on.Autoexec automatic running after system boot, and carry out read-write operation.
Fig. 3 is the software flow pattern of embodiment, and test server control PDU powers on test main frame, while check test
Whether number reaches standard M times of testing requirement, if reached, test terminates.Otherwise, it waits for T1 seconds, waits for operating system
Start completely and BurnIn Test bring into operation.With server ping test host or test main frame actively by operating status
Server is reported, checks whether test main frame normally starts.If test main frame normally starts, by PDU to test main frame
Power-off again powers on test main frame after T2 seconds and carries out next test.If test server connection is less than test main frame or test
Host reports exception, then after waiting for T2 seconds, test main frame is powered on and is tested next time.The process that finally will entirely test
Programming count is carried out, and exports result.Random-number-generating module is additionally provided in test server, controls the power on/off of test main frame
Time is set by the random-number-generating module.The temporal random of powered-off fault can be simulated to greatest extent in this way
Property.
In conclusion after the completion of only test environment need to be built, what test needed to do every time is exactly to be installed to tested hard disk
Operating system and driving simultaneously distribute IP address, then according to the parameter of actual conditions configuration testing software, it is possible to be surveyed
Examination greatly reduces the input of manpower, and also guaranteed and testing and control software programmable ability is strong in test intensity.In order to
Further improve, be tested hard disk installation operation system and drive and distribute IP address, then according to actual conditions configuration testing
The parameter of software, these can set on other disks in advance, directly be by necessary manual copy or script execution
System installation and parameter configuration can be rapidly completed.
Above disclosed is only an embodiment of the present invention, cannot limit the interest field of sheet with this certainly,
One of ordinary skill in the art will appreciate that realize all or part of flow of above-described embodiment, and according to the claims in the present invention institute
The equivalent variations of work still fall within the range that the present invention is covered.
Claims (4)
1. a kind of hard disk powered-off fault tests system, which is characterized in that including more test main frames, PDU, test server and treats
System software to be tested is installed to, the test main frame is connected with test server, and the PDU is connected with test server
It connects, test main frame is powered by PDU, and the test main frame is equipped with hard disk connection terminal, and the test server is equipped with prison
Depending on module and control module, the monitoring module, which is realized, records test main frame operating status, and the control module is realized to PDU
Control, realize control test main frame the power on/off time, to tested hard disk installation operation system and driving and with distributing IP
Location, the tested hard disk installation operation system and drives and distributes IP address and set on other disks in advance, directly passes through
Copy or script executive mode are completed manually;Random-number-generating module is additionally provided in test server, controls the logical of test main frame
Power-off time is set by the random-number-generating module, and test server control PDU powers on test main frame, while check survey
Whether examination number reaches standard M time of testing requirement, if reached, tests and terminates;Otherwise, it waits for T1 seconds, waits system to be operated
System starts completely and BurnIn Test bring into operation, and actively shape will be run with server ping test host or test main frame
State reports server, checks whether test main frame normally starts.
2. hard disk powered-off fault according to claim 1 tests system, it is characterised in that be installed to system to be tested
System mode output module is preset on software, the operating status of current system is periodically output to test server.
3. hard disk powered-off fault according to claim 2 tests system, it is characterised in that test main frame, PDU, testing service
Pass through wired or wireless carry out data communication between device.
4. hard disk powered-off fault according to claim 3 tests system, it is characterised in that the PDU Shang Mei roads power supply
Slot can independent control.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410827621.7A CN104572371B (en) | 2014-12-25 | 2014-12-25 | A kind of hard disk powered-off fault tests system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410827621.7A CN104572371B (en) | 2014-12-25 | 2014-12-25 | A kind of hard disk powered-off fault tests system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104572371A CN104572371A (en) | 2015-04-29 |
CN104572371B true CN104572371B (en) | 2018-07-06 |
Family
ID=53088505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410827621.7A Active CN104572371B (en) | 2014-12-25 | 2014-12-25 | A kind of hard disk powered-off fault tests system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104572371B (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104658611A (en) * | 2013-11-25 | 2015-05-27 | 深圳市国微电子有限公司 | Method and system for testing abnormal power failure of solid-state hard disk |
CN104850474B (en) * | 2015-05-18 | 2019-03-05 | 深圳市金泰克半导体有限公司 | A kind of hard disc of computer batch-testing device and test method |
CN106021088A (en) * | 2015-07-10 | 2016-10-12 | 北京中电华大电子设计有限责任公司 | Method and device for atomicity test on JAVA card |
CN107507649A (en) * | 2017-09-26 | 2017-12-22 | 苏州恒成芯兴电子技术有限公司 | A kind of full-automatic test system and its method suitable for solid state hard disc |
CN108334426A (en) * | 2018-02-02 | 2018-07-27 | 杭州阿姆科技有限公司 | A kind of more SSD/HDD integration tests and tele-control system and its method |
CN110554936A (en) * | 2018-06-04 | 2019-12-10 | 记忆科技(深圳)有限公司 | SSD (solid State disk) testing method and system |
CN109213646A (en) * | 2018-08-29 | 2019-01-15 | 深圳佰维存储科技股份有限公司 | Hard disk intelligence power failure test equipment |
CN109388526B (en) * | 2018-11-01 | 2023-01-24 | 郑州云海信息技术有限公司 | Control circuit and reset operation method |
CN109524049B (en) * | 2018-11-26 | 2021-04-20 | 深圳忆联信息系统有限公司 | SSD abnormal power failure test method and device, computer equipment and storage medium |
CN109359001A (en) * | 2018-12-13 | 2019-02-19 | 浪潮电子信息产业股份有限公司 | Method, device and equipment for testing cold restart of solid-state disk |
CN109766230A (en) * | 2019-01-09 | 2019-05-17 | 深圳忆联信息系统有限公司 | Single-deck SSD powered-off fault test method, device and computer equipment |
CN110147299B (en) * | 2019-05-15 | 2023-08-29 | 深圳忆联信息系统有限公司 | Method and system for detecting abnormal power failure of SSD (solid State disk) complete machine |
CN110569158A (en) * | 2019-08-30 | 2019-12-13 | 东莞记忆存储科技有限公司 | method and device for testing abnormal power failure in SSD random scene and computer equipment |
CN110928733B (en) * | 2019-11-13 | 2023-08-08 | 深圳忆联信息系统有限公司 | Encryption and decryption test method and device based on solid state disk and computer equipment |
CN112559266B (en) * | 2020-12-09 | 2023-06-06 | 成都佰维存储科技有限公司 | Solid state disk testing method and device, readable storage medium and electronic equipment |
CN113257330B (en) * | 2021-06-23 | 2021-10-01 | 北京智芯半导体科技有限公司 | Test method and test device for power-down protection of storage device and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1760592A2 (en) * | 2005-09-02 | 2007-03-07 | Valeo Systèmes Thermiques | Control module test procedure and system linked to a LIN bus |
CN101770414A (en) * | 2009-01-05 | 2010-07-07 | 英业达集团(天津)电子技术有限公司 | Fault simulator |
CN102346699A (en) * | 2010-07-27 | 2012-02-08 | 英业达股份有限公司 | Method for testing hard disks |
CN103678069A (en) * | 2013-12-23 | 2014-03-26 | 国家电网公司信息通信分公司 | Cabinet server shelves-hitting performance testing equipment |
CN203941521U (en) * | 2013-12-23 | 2014-11-12 | 国家电网公司信息通信分公司 | The added performance test apparatus of a kind of cabinet-type server and rack |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI303318B (en) * | 2006-10-18 | 2008-11-21 | Asustek Comp Inc | Testing apparatus and method for testing boot and shut-down process of computer system |
-
2014
- 2014-12-25 CN CN201410827621.7A patent/CN104572371B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1760592A2 (en) * | 2005-09-02 | 2007-03-07 | Valeo Systèmes Thermiques | Control module test procedure and system linked to a LIN bus |
CN101770414A (en) * | 2009-01-05 | 2010-07-07 | 英业达集团(天津)电子技术有限公司 | Fault simulator |
CN102346699A (en) * | 2010-07-27 | 2012-02-08 | 英业达股份有限公司 | Method for testing hard disks |
CN103678069A (en) * | 2013-12-23 | 2014-03-26 | 国家电网公司信息通信分公司 | Cabinet server shelves-hitting performance testing equipment |
CN203941521U (en) * | 2013-12-23 | 2014-11-12 | 国家电网公司信息通信分公司 | The added performance test apparatus of a kind of cabinet-type server and rack |
Non-Patent Citations (1)
Title |
---|
"固态盘测试系统的设计与实现";李思思 等;《2014年第20届全国信息存储技术学术会议》;20140911;第142-147页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104572371A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104572371B (en) | A kind of hard disk powered-off fault tests system | |
CN108717393A (en) | A kind of applied program testing method and mobile terminal | |
CN111081309B (en) | Solid state disk test system | |
CN109684150B (en) | Performance test system, test method and simulation platform of storage particle controller | |
CN104268076A (en) | Testing method suitable for automatically testing memory bandwidth of each processor platform | |
CN106201804A (en) | The device of a kind of measuring and calculation mainboard, method and system | |
CN109509508A (en) | Abnormal power failure test method, device, medium and equipment for SSD | |
DE202015009308U1 (en) | Universal serial bus emulation of peripheral devices | |
CN106154072A (en) | A kind of Testing System for Electronic Equipment and method | |
CN117076179A (en) | Hard disk indicator lamp control method and device, electronic equipment and storage medium | |
CN108833201A (en) | Transponder aging testing system | |
CN105389200A (en) | Multi-group stimulation batch simulation method and system applied to super-large scale chip verification | |
CN108693415B (en) | Testing system and method for signal machine driving system | |
CN116913350B (en) | Test method and test platform based on modern standby of solid state disk | |
CN107364140A (en) | For more 3D printer initial parameter configurations and the method and system of Function detection | |
CN104678292B (en) | A kind of complex programmable logic device (CPLD) test method and device | |
CN110895502B (en) | Control method and device for hard disk state indicating device, electronic equipment and storage medium | |
CN109684142A (en) | A kind of method, system and the equipment of the test of BMC time accuracy | |
CN205563583U (en) | System for hard disk data are destroyed in batches, bad way is kept apart and validation data remains | |
CN116306429A (en) | Method, device, computer storage medium and terminal for realizing state data capture | |
CN204330921U (en) | Steric effect breadboard and pilot system | |
CN105260308A (en) | Method and device for testing Android terminal | |
CN210924549U (en) | Software burning device for vehicle-mounted face recognition equipment | |
CN107766183B (en) | Disk online and offline method and device based on test mechanism | |
CN102411527B (en) | Detecting method for image-processing chip, developing plate and detecting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180525 Address after: 518000 D24/F-02 East Shekou factory building, Shekou Houhai Road, Shekou street, Nanshan District, Shenzhen, Guangdong Applicant after: Shenzhen Yi Lian Information System Co., Ltd. Address before: 518057 D22/F, D13/F, D23/F, D14/F, D24/F, D15/F of the east corner plant of Houhai Road, Shekou, Nanshan District, Shenzhen, Guangdong Applicant before: Jiyi Sci. & Tech. (Shenzhen) Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |