- CN104563927B CN104563927B CN201410721094.1A CN201410721094A CN104563927B CN 104563927 B CN104563927 B CN 104563927B CN 201410721094 A CN201410721094 A CN 201410721094A CN 104563927 B CN104563927 B CN 104563927B
- Authority
- CN
- China
- Prior art keywords
- pressure
- drilling fluid
- core holder
- core
- formation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/005—Testing the nature of borehole walls or the formation by using drilling mud or cutting data
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
本发明涉及一种适用于欠平衡钻井的井壁稳定方法及实验装置。包括以下步骤:(一)确定泥页岩的地层水活度;(二)确定待钻地层孔隙压力;(三)计算地层温度;(四)利用膜效率测试实验装置测量地层膜效率;(五)根据钻井液液柱压力和井深确定钻井液密度;(六)如果确定钻井液密度,则确定钻井液液柱压力同地层压力之间的差值为欠压值,根据总势能平衡原理,利用欠压值获得化学势差,再根据化学势差和地层水活度确定钻井液活度;(七)根据确定结果调整钻井液密度或活度来保持井壁稳定。有益效果:充分考虑了化学势的作用,精确的给出保持地层总势能平衡时的钻井液密度,有效的防止了钻井液滤液侵入地层,提高了井壁稳定性,增强了欠平衡钻井技术的应用推广。
The invention relates to a well wall stabilization method and an experimental device suitable for underbalanced drilling. The method includes the following steps: (1) determining the formation water activity of the shale; (2) determining the pore pressure of the formation to be drilled; (3) calculating the formation temperature; (4) measuring the formation membrane efficiency by using a membrane efficiency testing experimental device; (5) ) Determine the drilling fluid density according to the drilling fluid column pressure and the well depth; (6) If the drilling fluid density is determined, determine the difference between the drilling fluid column pressure and the formation pressure as the underpressure value. According to the principle of total potential energy balance, use The chemical potential difference is obtained from the underpressure value, and then the drilling fluid activity is determined according to the chemical potential difference and the formation water activity; (7) The drilling fluid density or activity is adjusted according to the determination result to maintain the stability of the borehole wall. Beneficial effects: fully consider the role of chemical potential, accurately give the drilling fluid density when maintaining the balance of the total potential energy of the formation, effectively prevent the drilling fluid filtrate from invading the formation, improve the stability of the well wall, and enhance the performance of the underbalanced drilling technology. App promotion.
Description
技术领域 technical field
本发明涉及一种油田钻井方法,特别涉及一种适用于欠平衡钻井的井壁稳定方法及实验装置。 The invention relates to an oil field drilling method, in particular to a well wall stabilization method and an experimental device suitable for underbalanced drilling.
背景技术 Background technique
欠平衡钻井是指钻井过程中钻井液的循环压力(包括液柱压力和循环回压),低于地层的孔隙压力,使地层的流体有控制的进入井筒并将其循环到地面的钻井技术。采用欠平衡钻井技术即可以提高机械钻速,延长钻头寿命,减少或消除漏失及压差卡钻,提高钻井效率、降低钻井直接成本;也可以发现新产层,减少油气层浸泡时间,减轻或消除钻井液对地层的侵入伤害,从而有效保护油气层,提高储层的累计产量。 Underbalanced drilling refers to the drilling technology in which the circulating pressure of the drilling fluid (including liquid column pressure and circulating back pressure) is lower than the pore pressure of the formation during the drilling process, so that the formation fluid enters the wellbore in a controlled manner and circulates it to the surface. The use of underbalanced drilling technology can increase the mechanical penetration rate, prolong the life of the drill bit, reduce or eliminate leakage and differential pressure sticking, improve drilling efficiency, and reduce the direct cost of drilling; it can also discover new production layers, reduce oil and gas layer soaking time, reduce or Eliminate the invasion and damage of drilling fluid to the formation, so as to effectively protect the oil and gas layers and increase the cumulative production of the reservoir.
因此,欠平衡钻井技术在国内外得到了广泛的应用。从2007年开始,美国每年完成欠平衡钻井数都在12000口以上,约占每年钻井总数的26%,已成为打开储层的首选技术;国内近年来大力推广欠平衡钻井技术,截至到2012年,中国已完成欠平衡井1017口,应用效果显著;但欠平衡钻井的井壁稳定性问题一直没有得到有效的解决,已经成为制约欠平衡钻井技术发展的主要障碍。 Therefore, underbalanced drilling technology has been widely used at home and abroad. Since 2007, the number of underbalanced drilling wells completed in the United States has been more than 12,000 per year, accounting for about 26% of the total number of wells drilled each year. It has become the preferred technology for opening reservoirs; , China has completed 1017 underbalanced wells, and the application effect is remarkable; however, the wellbore stability of underbalanced drilling has not been effectively solved, and has become the main obstacle restricting the development of underbalanced drilling technology.
欠平衡钻井的井壁失稳多发生在泥页岩层段。泥页岩地层打开后,钻井液同地层接触后会发生压力传递和物质交换,造成地层压力变化和岩石强度降低,导致井壁失稳。地层压力传递和物质交换主要受两种因素控制:(1)钻井液液柱压力和地层孔隙压力之间的水力势差;(2)钻井液滤液同地层流体之间的化学势差。目前,欠平衡钻井的钻井液密度是根据地层坍塌压力、地层孔隙压力和设备的承压能力来设计的,只考虑了水力势差对地层压力传递和物质交换的影响,即保持液柱压力小于地层孔隙压力,而未考虑化学势对地层压力传递和物质交换的影响,从而导致在化学势的作用下钻井滤液侵入地层,造成井壁坍塌,卡钻等井下复杂情况。因此,只有保持钻井液和地层流体之间的水力势差和化学势差同时平衡,即总势能平衡,才能防止钻井液滤液侵入地层,降低地层强度,造成复杂事故和污染地层。 Wellbore instability in underbalanced drilling mostly occurs in shale intervals. After the shale formation is opened, pressure transmission and material exchange will occur after the drilling fluid contacts the formation, resulting in formation pressure changes and rock strength reduction, leading to wellbore instability. Formation pressure transfer and material exchange are mainly controlled by two factors: (1) the hydraulic potential difference between the drilling fluid column pressure and the formation pore pressure; (2) the chemical potential difference between the drilling fluid filtrate and the formation fluid. At present, the drilling fluid density of underbalanced drilling is designed according to the formation collapse pressure, formation pore pressure and the pressure bearing capacity of the equipment. Formation pore pressure, without considering the influence of chemical potential on formation pressure transfer and material exchange, resulting in drilling filtrate intrusion into formation under the action of chemical potential, resulting in downhole complex situations such as borehole wall collapse and pipe sticking. Therefore, only by keeping the hydraulic potential difference and chemical potential difference between the drilling fluid and the formation fluid balanced at the same time, that is, the total potential energy balance, can the drilling fluid filtrate be prevented from invading the formation, reducing the strength of the formation, causing complex accidents and polluting the formation.
综上所述,传统的欠平衡钻井液密度设计方法无法适用,以总势能平衡理论为基础发明一种简单、实用的欠平衡钻井井壁稳定设计方法对欠平衡钻井井壁稳定至关重要。 In summary, the traditional underbalanced drilling fluid density design method is not applicable, and a simple and practical underbalanced drilling borehole stability design method based on the total potential energy balance theory is very important for underbalanced drilling borehole stability.
中国专利申请号为200720187488.9的实用新型专利公布的半透膜膜效率测试仪及200420089356.9的实用新型专利公布的页岩膜效率测定仪均采用了将平衡状态的半透膜液的电导率同已知电导率比较,换算成半透膜膜效率的间接测量方法,只考虑了平衡状态下半透膜液性质的变化,忽略了泥页岩性质和孔隙结构对渗透压和膜效率的影响;中国专利申请号为200620034702.2的实用新型专利公布的钻井液半透膜测定装置只能进行常温条件下测试,无法测量实际地层温度下膜效率,同时只考虑了钻井过程中钻井液对岩心的浸泡,忽略了钻井液在井筒中的流动;泥页岩膜效率测定仪的研制,石油钻采工艺,2010年11期,作者,张岩,向兴金,鄢捷年,吴彬,赵磊;通过测量岩心两端溶液电阻率的变化,对比评价了不同钻井液体系的成膜效率,只能定性的分析,无法定量的给出泥页岩膜效率测量结果。泥页岩水化-力学耦合模拟实验装置与压力传递实验新技术以及石油学报2005年11月第26卷第6期徐加放,邱正松,吕开河泥页岩膜效率测试装置及测试技术研究石油机械2006年第34卷第8期吕开河,邱正松,徐加放虽然直接测量了渗透压和膜效率,但是只能利用规则的标准岩心开展实验,无法利用不规则的岩心和掉块开展实验,且实验装置复杂,不便现场操作使用。 The semi-permeable membrane membrane efficiency tester announced by the utility model patent of China Patent Application No. 200720187488.9 and the shale membrane efficiency tester announced by the utility model patent of 200420089356.9 all adopt the conductivity of the semi-permeable membrane liquid in the equilibrium state with the known Conductivity comparison, an indirect measurement method converted into semi-permeable membrane membrane efficiency, only considers the changes in the properties of the semi-permeable membrane fluid in equilibrium, ignoring the influence of shale properties and pore structure on osmotic pressure and membrane efficiency; Chinese patent The utility model patent application number 200620034702.2 discloses a drilling fluid semipermeable membrane measurement device that can only be tested at room temperature, and cannot measure the membrane efficiency at the actual formation temperature. The flow of drilling fluid in the wellbore; the development of the shale film efficiency tester, oil drilling and production technology, 2010, No. 11, author, Zhang Yan, Xiang Xingjin, Yan Jienian, Wu Bin, Zhao Lei; The film formation efficiency of different drilling fluid systems can only be analyzed qualitatively, and the measurement results of shale film efficiency cannot be given quantitatively. Shale Hydration-Mechanics Coupling Simulation Experimental Device and New Pressure Transfer Experimental Technology, and Journal of Petroleum, Volume 26, Issue 6, November 2005 Xu Jiafang, Qiu Zhengsong, Lu Kaihe Mud Shale Membrane Efficiency Test Device and Testing Technology Although Lu Kaihe, Qiu Zhengsong, and Xu Jiafang directly measured the osmotic pressure and membrane efficiency, they can only use regular standard cores to carry out experiments, and cannot use irregular cores and dropped blocks to carry out experiments. And the experimental device is complicated and inconvenient for on-site operation and use.
发明内容 Contents of the invention
本发明的目的就是针对现有技术存在的上述缺陷,提供一种适用于欠平衡钻井的井壁稳定方法及实验装置,该方法能够以简单的设备和操作程序保持井壁稳定,提高欠平衡技术的应用推广。 The purpose of the present invention is to aim at the above-mentioned defects existing in the prior art, and to provide a wellbore stabilization method and an experimental device suitable for underbalanced drilling. application promotion.
一种适用于欠平衡钻井的井壁稳定方法,包括以下步骤: A borehole stabilization method suitable for underbalanced drilling, comprising the following steps:
(一)利用等温吸附试验采集确定泥页岩的地层水活度; (1) Determining the formation water activity of mud shale by means of isothermal adsorption test collection;
(二)根据邻井测井数据和地层压力测试数据确定待钻地层孔隙压力; (2) Determine the pore pressure of the formation to be drilled according to the logging data of the adjacent well and the formation pressure test data;
(三)根据随钻测井的地层温度数据确定地层温度,或者根据地区的地温梯度计算地层温度; (3) Determine the formation temperature based on the formation temperature data of logging while drilling, or calculate the formation temperature according to the geothermal gradient in the region;
(四)利用膜效率测试实验装置测量地层膜效率;所述的膜效率测试实验装置包括伺服控制注入泵(1)、恒温箱(7)、岩心夹持器(8)、计算机数据采集系统(19)、背压调节器(21)、储液箱(28),岩心夹持器(8)置于恒温箱(7)内,伺服控制注入泵(1)用于实现给岩心的下端钻井液提供压力和给岩心的上端钻井液提供循环压力,背压调节器(21)用于保持岩心加持器(8)上端钻井液的流动压力恒定;计算机数据采集系统(19)用于实时采集和记录压力和恒温箱(7)中的温度;所述岩心夹持器(8)包括岩心夹持器上端盖(29)、岩心夹持器下端盖(30)、环氧树脂(9)和密封圈(31),岩心(10)夹在岩心夹持器上端盖(29)和岩心夹持器下端盖(30)之间,环氧树脂(9)将岩心的四周包裹形成规则的试样; (4) Measuring formation membrane efficiency by using a membrane efficiency testing experimental device; the membrane efficiency testing experimental device includes a servo-controlled injection pump (1), a constant temperature box (7), a core holder (8), a computer data acquisition system ( 19), the back pressure regulator (21), the liquid storage tank (28), the core holder (8) is placed in the constant temperature box (7), and the servo-controlled injection pump (1) is used to realize the drilling fluid for the lower end of the core Provide pressure and circulating pressure for the drilling fluid at the upper end of the core, the back pressure regulator (21) is used to keep the flow pressure of the drilling fluid at the upper end of the core holder (8) constant; the computer data acquisition system (19) is used for real-time acquisition and recording Pressure and temperature in the constant temperature box (7); the core holder (8) includes the upper end cover of the core holder (29), the lower end cover of the core holder (30), epoxy resin (9) and sealing ring (31), the rock core (10) is clamped between the upper end cover (29) of the core holder and the lower end cover (30) of the core holder, and the epoxy resin (9) wraps around the core to form a regular sample;
(五)如果确定使用某种钻井液时,则利用湿度计测量待用钻井液活度,确定钻井液与地层流体之间的化学势差,再根据总势能平衡原理,利用化学势差和地层孔隙压力确定钻井液液柱压力,根据钻井液液柱压力和井深确定钻井液密度; (5) If it is determined to use a certain drilling fluid, use a hygrometer to measure the activity of the drilling fluid to be used, determine the chemical potential difference between the drilling fluid and the formation fluid, and then use the chemical potential difference and formation fluid according to the principle of total potential energy balance. The pore pressure determines the drilling fluid column pressure, and the drilling fluid density is determined according to the drilling fluid column pressure and well depth;
(六)如果确定钻井液密度,则确定钻井液液柱压力同地层压力之间的差值为欠压值,根据总势能平衡原理,利用欠压值获得化学势差,再根据化学势差和地层水活度确定钻井液活度; (6) If the drilling fluid density is determined, determine the difference between the drilling fluid column pressure and the formation pressure as the underpressure value. According to the principle of total potential energy balance, use the underpressure value to obtain the chemical potential difference, and then according to the chemical potential difference and Formation water activity determines drilling fluid activity;
(七)根据确定结果调整钻井液密度或活度来保持井壁稳定。 (7) Adjust the drilling fluid density or activity according to the determined results to keep the wellbore stable.
上述的步骤(一)中的具体方法是: The specific method in the above step (1) is:
(a)称量若干个重量为(WI)的页岩样品; (a) Weigh several shale samples of weight (W I );
(b)将页岩样品放置在200°F的烘箱中24小时,然后测量每个干页岩样品重量(Wd); (b) Place the shale samples in an oven at 200°F for 24 hours, then measure the weight (W d ) of each dry shale sample;
(c)则每个页岩样品的原始含水量为: (c) Then the original water content of each shale sample is:
(1) (1)
(d)将烘干的页岩试样放置在不同活度的干燥器中; (d) Place the dried shale samples in desiccators with different activities;
(e)每天测量每个试样重量,直到重量不在增加,记录重量; (e) Measure the weight of each sample every day until the weight no longer increases, and record the weight ;
(f)根据页岩的吸附量和放置页岩的干燥器湿度绘制等温吸附曲线; (f) Draw the isotherm adsorption curve according to the adsorption amount of shale and the humidity of the dryer where the shale is placed;
(g)利用原始地层含水量确定原始地层水活度ashale。 (g) Determine the original formation water activity a shale using the original formation water content.
上述的步骤(四)中的膜效率测试实验装置中的伺服控制注入泵(1)通过第一高压管线(2)穿过恒温箱(7)的下端与岩心夹持器(8)的下端相连,第一高压管线(2)上设置第一阀门(3)、第一压力传感器(5);伺服控制注入泵(1)用于实现给岩心的下端钻井液提供压力和给岩心的上端钻井液提供循环压力;第一阀门(3)用于控制岩心加持器(8)下端钻井液的进出;第一压力传感器(5)用于指示和记录岩心加持器(8)下端的钻井液压力;在第一阀门(3)和第一压力传感器(5)之间外接第二阀门(4),第二阀门(4)用于放空或调节岩心加持器(8)下端面的钻井液压力;恒温箱(7)用于提供和保持膜效率测试时岩心加持器(8)所需要的温度。 The servo-controlled injection pump (1) in the membrane efficiency test experimental device in the above step (4) is connected to the lower end of the core holder (8) through the lower end of the thermostat box (7) through the first high-pressure pipeline (2) , the first valve (3) and the first pressure sensor (5) are set on the first high-pressure pipeline (2); the servo-controlled injection pump (1) is used to provide pressure to the drilling fluid at the lower end of the core and to provide the drilling fluid at the upper end of the core Provide circulating pressure; the first valve (3) is used to control the entry and exit of drilling fluid at the lower end of the core holder (8); the first pressure sensor (5) is used to indicate and record the drilling fluid pressure at the lower end of the core holder (8); The second valve (4) is externally connected between the first valve (3) and the first pressure sensor (5), and the second valve (4) is used to vent or adjust the drilling fluid pressure on the lower end surface of the core holder (8); (7) Used to provide and maintain the temperature required by the core holder (8) during the membrane efficiency test.
本发明提到的适用于欠平衡钻井的井壁稳定方法中的实验装置,包括伺服控制注入泵(1)、恒温箱(7)、岩心夹持器(8)、计算机数据采集系统(19)、背压调节器(21)、储液箱(28),岩心夹持器(8)置于恒温箱(7)内,伺服控制注入泵(1)用于实现给岩心的下端钻井液提供压力和给岩心的上端钻井液提供循环压力,背压调节器(21)用于保持岩心加持器(8)上端钻井液的流动压力恒定;计算机数据采集系统(19)用于实时采集和记录压力和恒温箱(7)中的温度;所述岩心夹持器(8)包括岩心夹持器上端盖(29)、岩心夹持器下端盖(30)、环氧树脂(9)和密封圈(31),岩心(10)夹在岩心夹持器上端盖(29)和岩心夹持器下端盖(30)之间,环氧树脂(9)将岩心的四周包裹形成规则的试样。 The experimental device in the wellbore stabilization method suitable for underbalanced drilling mentioned in the present invention includes a servo-controlled injection pump (1), a constant temperature box (7), a core holder (8), and a computer data acquisition system (19) , a back pressure regulator (21), a liquid storage tank (28), a core holder (8) placed in a constant temperature box (7), and a servo-controlled injection pump (1) is used to provide pressure to the drilling fluid at the lower end of the core and provide circulating pressure for the drilling fluid at the upper end of the core, and the back pressure regulator (21) is used to keep the flow pressure of the drilling fluid at the upper end of the core holder (8) constant; the computer data acquisition system (19) is used for real-time acquisition and recording of pressure and The temperature in the constant temperature box (7); the core holder (8) includes the upper end cover of the core holder (29), the lower end cover of the core holder (30), epoxy resin (9) and sealing ring (31 ), the core (10) is clamped between the upper end cover (29) of the core holder and the lower end cover (30) of the core holder, and the epoxy resin (9) wraps the surrounding of the core to form a regular sample.
上述的伺服控制注入泵(1)连接第二高压管线(11)的一端,第二高压管线(11)的另一端穿过恒温箱(7)的上端与岩心夹持器(8)的上端入口连接,第二高压管线(11)上设有第三阀门(12)和第二压力传感器(13),第三阀门(12)用于控制岩心加持器(8)上端钻井液的流入,第二压力传感器(13)用于指示和记录岩心加持器(8)上端入口处的钻井液压力; The above-mentioned servo-controlled injection pump (1) is connected to one end of the second high-pressure pipeline (11), and the other end of the second high-pressure pipeline (11) passes through the upper end of the thermostat box (7) and the inlet of the upper end of the core holder (8) connection, the second high-pressure pipeline (11) is provided with a third valve (12) and a second pressure sensor (13), the third valve (12) is used to control the inflow of drilling fluid at the upper end of the core holder (8), and the second The pressure sensor (13) is used to indicate and record the drilling fluid pressure at the entrance of the upper end of the core holder (8);
第三高压管线(15)的一端与背压调节器(21)连接,另一端穿过恒温箱(7)的上端与岩心夹持器(8)的上端出口连接,第三高压管线(15)上设有第四阀门(20)和第三压力传感器(16);第四阀门(20)用于控制岩心加持器(8)上端钻井液的流出,第三压力传感器(16)用于指示和记录岩心加持器(8)上端出口处的钻井液压力,背压调节器(21)用于保持岩心加持器(8)上端钻井液的流动压力恒定,第四高压管线(22)将第五阀门(23)连接在第四阀门(20)和背压调节器(21)之间,第五阀门(23)用于放空和置换岩心加持器(8)上端面的循环钻井液; One end of the third high-pressure pipeline (15) is connected to the back pressure regulator (21), and the other end passes through the upper end of the constant temperature box (7) to connect with the upper end outlet of the core holder (8). The third high-pressure pipeline (15) There is a fourth valve (20) and a third pressure sensor (16); the fourth valve (20) is used to control the outflow of drilling fluid at the upper end of the core holder (8), and the third pressure sensor (16) is used to indicate and Record the drilling fluid pressure at the outlet of the upper end of the core holder (8), the back pressure regulator (21) is used to keep the flow pressure of the drilling fluid at the upper end of the core holder (8) constant, and the fourth high-pressure pipeline (22) connects the fifth valve (23) Connected between the fourth valve (20) and the back pressure regulator (21), the fifth valve (23) is used to vent and replace the circulating drilling fluid on the upper end surface of the core holder (8);
第五高压管线(27)的一端与背压调节器(21)连接,另一端与储液箱(28)的上端连接,第五高压管线(27)上设有第四压力传感器(25)和第六阀门(26);第四压力传感器(25)用于指示和记录背压调节器(21)出口处的钻井液压力,第六阀门(26)用于控制背压调节器(21)出口处钻井液的流出,储液箱(28)用于收集循环流出的钻井液; One end of the fifth high-pressure pipeline (27) is connected to the back pressure regulator (21), and the other end is connected to the upper end of the liquid storage tank (28). The fifth high-pressure pipeline (27) is provided with a fourth pressure sensor (25) and The sixth valve (26); the fourth pressure sensor (25) is used to indicate and record the drilling fluid pressure at the outlet of the back pressure regulator (21), and the sixth valve (26) is used to control the outlet of the back pressure regulator (21) The outflow of drilling fluid at the place, the fluid storage tank (28) is used to collect the drilling fluid that circulates out;
所述计算机数据采集系统(19)分别通过第一数据采集线(6)、第二数据采集线(14)、第三数据采集线(17)、第四数据采集线(18)和第五数据采集线(24)连接第一压力传感器(5)、第二压力传感器(13)、第三压力传感器(16)、恒温箱7和第四压力传感器(25),计算机数据采集系统(19)用于实时采集和记录第一压力传感器(5)、第二压力传感器(13)、第三压力传感器(16)、第四压力传感器(25)的压力和恒温箱(7)中温度。 The computer data collection system (19) passes through the first data collection line (6), the second data collection line (14), the third data collection line (17), the fourth data collection line (18) and the fifth data collection line respectively. The acquisition line (24) is connected to the first pressure sensor (5), the second pressure sensor (13), the third pressure sensor (16), the incubator 7 and the fourth pressure sensor (25), and is used for the computer data acquisition system (19). The pressures of the first pressure sensor (5), the second pressure sensor (13), the third pressure sensor (16) and the fourth pressure sensor (25) and the temperature in the thermostat (7) are collected and recorded in real time.
上述的岩心夹持器(8)包括岩心夹持器上端盖(29)、岩心夹持器下端盖(30)、环氧树脂(9)和密封圈(31),岩心(10)夹在岩心夹持器上端盖(29)和岩心夹持器下端盖(30)之间,环氧树脂(9)将岩心的四周包裹形成规则的试样,固定岩心同时防止钻井液从侧面渗出;与岩心接触的岩心夹持器上端盖(29)底面和岩心夹持器下端盖(30)顶面各有一个密封圈(31),密封圈(31)用来密封岩心、防止顶底端液体的相通; The above-mentioned core holder (8) includes an upper end cover (29) of the core holder, a lower end cover (30) of the core holder, epoxy resin (9) and a sealing ring (31), and the core (10) is clamped on the core Between the upper end cover (29) of the holder and the lower end cover (30) of the core holder, the epoxy resin (9) wraps around the core to form a regular sample, and fixes the core while preventing the drilling fluid from seeping out from the side; and There is a sealing ring (31) on the bottom surface of the upper end cover (29) of the rock core holder and the top surface of the lower end cover (30) of the rock core holder respectively, and the sealing ring (31) is used to seal the rock core and prevent liquid from top and bottom. connected;
上述的岩心夹持器上端盖(29)的下端面和岩心夹持器下端盖(30)的上端面分别设有凹槽,便于钻井液的流动;第二高压管线(11)和第三高压管线(15)分别与岩心夹持器上端盖(29)相连,第二高压管线(2)与岩心夹持器下端盖(30)相连。 The lower end surface of the upper end cover (29) of the above-mentioned core holder and the upper end surface of the lower end cover (30) of the core holder are respectively provided with grooves to facilitate the flow of drilling fluid; the second high-pressure pipeline (11) and the third high-pressure The pipelines (15) are respectively connected to the upper end cover (29) of the core holder, and the second high-pressure pipeline (2) is connected to the lower end cover (30) of the core holder.
相对于现有技术,本发明具有如下的有益效果: Compared with the prior art, the present invention has the following beneficial effects:
(1)充分考虑了化学势的作用,精确的给出保持地层总势能平衡时的钻井液密度,有效的防止了钻井液滤液侵入地层,提高了井壁稳定性,增强了欠平衡钻井技术的应用推广; (1) The role of chemical potential is fully considered, and the drilling fluid density when maintaining the balance of the total formation potential energy is accurately given, which effectively prevents the drilling fluid filtrate from invading the formation, improves the stability of the wellbore wall, and enhances the performance of underbalanced drilling technology. application promotion;
(2)在确定欠压值时,可以通过调节钻井液活度保持井壁稳定,既提高了机械钻速,延长钻头寿命,又提高了钻井效率、保障快速安全钻进; (2) When determining the underpressure value, the well wall can be kept stable by adjusting the drilling fluid activity, which not only improves the ROP, prolongs the life of the drill bit, but also improves the drilling efficiency and ensures rapid and safe drilling;
(3)本发明提供的方法简单方便,可操作性强,应用效果好,具有广阔的推广前景,对现场钻井施工有较强的指导意义; (3) The method provided by the present invention is simple and convenient, has strong operability, good application effect, has broad promotion prospects, and has strong guiding significance for on-site drilling construction;
(4)本膜效率测试仪中利用环氧树脂密封岩心,克服了以往研究中无法测量不规则岩心或掉块的弊端,解决了试验岩心较难获取的困难,实现了利用井下掉块可以测试不同深度的地层膜效率,提高欠平衡钻井技术的应用范围,对现场应用更具指导性; (4) The epoxy resin is used to seal the core in this membrane efficiency tester, which overcomes the disadvantages of not being able to measure irregular cores or dropped blocks in previous studies, solves the difficulty of obtaining test cores, and realizes the use of downhole dropped blocks to test Formation film efficiency at different depths improves the application range of underbalanced drilling technology and is more instructive for field applications;
(5)本膜效率测试仪增加了恒温箱,实现了在高温条件下开展膜效率测试实验,克服了温度波动对测试结果产生误差的弊端。 (5) The constant temperature box is added to the membrane efficiency tester, which realizes the membrane efficiency test experiment under high temperature conditions, and overcomes the disadvantages of temperature fluctuations that cause errors in test results.
附图说明 Description of drawings
图1为本发明所提出的新型欠平衡钻井井壁稳定计算方法流程图; Fig. 1 is the flow chart of the novel underbalanced drilling borehole stability calculation method proposed by the present invention;
图2为本发明的测试泥页岩膜效率的实验装置示意图; Fig. 2 is the experimental device schematic diagram of testing mud shale film efficiency of the present invention;
图3为恒温箱内岩心夹持器示意图; Fig. 3 is the schematic diagram of the core holder in the constant temperature box;
图4为岩心夹持器上端盖底端面剖面图; Fig. 4 is a sectional view of the bottom end surface of the upper end cover of the core holder;
图5为岩心夹持器下端盖上端面剖面图; Fig. 5 is a sectional view of the upper end face of the lower end cover of the core holder;
图6为等温吸附曲线图; Fig. 6 is isotherm adsorption curve figure;
图7为覆岩层压力剖面图 Figure 7 is the pressure profile of the overlying strata
图8为地层正常压力趋势线图; Fig. 8 is a trend line diagram of formation normal pressure;
上图中:伺服控制注入泵(1)、第一高压管线(2)、第一阀门(3)、第二阀门(4)、第一压力传感器(5)、第一数据采集线(6)、恒温箱(7)、岩心夹持器(8)、环氧树脂(9)、岩心(10)、第二高压管线(11)、第三阀门(12)、第二压力传感器(13)、第二数据采集线(14)、第三高压管线(15)、第三压力传感器(16)、第三数据采集线(17)、第四数据采集线(18)、计算机数据采集系统(19)、第四阀门(20)、背压调节器(21)、第四高压管线(22)、第五阀门(23)、第五数据采集线(24)、第四压力传感器(25)、第六阀门(26)、第五高压管线(27)、储液箱(28)、岩心夹持器上端盖(29)、岩心夹持器下端盖(30)、密封圈(31)。 Above: servo control injection pump (1), first high pressure pipeline (2), first valve (3), second valve (4), first pressure sensor (5), first data acquisition line (6) , constant temperature box (7), rock core holder (8), epoxy resin (9), rock core (10), second high-pressure pipeline (11), third valve (12), second pressure sensor (13), The second data collection line (14), the third high pressure pipeline (15), the third pressure sensor (16), the third data collection line (17), the fourth data collection line (18), the computer data collection system (19) , the fourth valve (20), the back pressure regulator (21), the fourth high pressure pipeline (22), the fifth valve (23), the fifth data collection line (24), the fourth pressure sensor (25), the sixth Valve (26), fifth high-pressure pipeline (27), liquid storage tank (28), upper end cover of rock core holder (29), lower end cover of rock core holder (30), sealing ring (31).
具体实施方式 detailed description
本发明提出的新型欠平衡钻井井壁稳定技术,结合附图和实施例说明如下。 The new wellbore stabilization technology for underbalanced drilling proposed by the present invention is described as follows in conjunction with the accompanying drawings and examples.
为实现上述目的,本发明采用如下技术方案: To achieve the above object, the present invention adopts the following technical solutions:
一、利用等温吸附试验采集了泥页岩地层水活度,具体的实验方法如下: 1. The water activity of the shale formation was collected by isothermal adsorption test. The specific experimental method is as follows:
(1)称量若干个重量为(WI)的页岩样品; (1) Weigh several shale samples with a weight of (W I );
(2)将页岩样品放置在200°F的烘箱中24小时,然后测量每个干页岩样品重量(Wd); (2) Place the shale samples in an oven at 200°F for 24 hours, then measure the weight (W d ) of each dry shale sample;
(3)则每个页岩样品的原始含水量为: (3) The original water content of each shale sample is:
(1) (1)
(4)将烘干的页岩试样放置在不同活度的干燥器中; (4) Place the dried shale samples in desiccators with different activities;
(5)每天测量每个试样重量,直到重量不在增加,记录重量。 (5) Measure the weight of each sample every day until the weight does not increase, record the weight .
(6)根据页岩的吸附量和放置页岩的干燥器湿度绘制等温吸附曲线。 (6) Draw the isothermal adsorption curve according to the adsorption capacity of shale and the humidity of the dryer where the shale is placed.
(7)利用原始地层含水量确定原始地层活度ashale,具体如上图所示,根据原始地层页岩含水量确定原始地层水活度为0.915。 (7) Use the original formation water content to determine the original formation activity a shale , as shown in the above figure, the original formation water activity is determined to be 0.915 according to the original formation shale water content.
二、根据邻井测井数据和地层压力测试数据确定待钻地层孔隙压力; 2. Determine the pore pressure of the formation to be drilled according to the logging data of the adjacent well and the formation pressure test data;
(1)利用地层密度测井数据计算上覆岩层压力s v 。 (1) Calculate the overburden pressure s v by using the formation density logging data.
(2) (2)
式中:是一定深度上覆压力梯度,g/cm3;s v 是上覆岩层压力,MPa;是上部无测井资料地层段平均密度,g/cm3;是上部无测井资料地层段厚度,m;是一定深度的密度散点数据,g/cm3;是深度间隔,;H是井深,m。根据测井数据计算可以得到下图上覆岩层压力剖面。 In the formula: is the overlying pressure gradient at a certain depth, g/cm 3 ; s v is the overlying rock pressure, MPa; is the average density of the upper layer without logging data, g/cm 3 ; is the thickness of the upper layer without logging data, m; is the density scatter data at a certain depth, g/cm 3 ; is the depth interval, ; H is well depth, m. The pressure profile of the overlying strata in the figure below can be obtained by calculation based on the logging data.
(2)利用临近的3-5口井声波时差测井数据建立该区域地层的正常压实趋势线,确定下式中系数A和B。 (2) Use the acoustic transit time logging data of 3-5 adjacent wells to establish the normal compaction trend line of the formation in this area, and determine the coefficients A and B in the following formula.
(3) (3)
式中是深度h处的地层声波时差,μs/m;h是垂深,m;A和B是正常趋势线系数。建立的压力趋势线如下图所示。 In the formula is the formation acoustic time difference at depth h, μs/m; h is vertical depth, m; A and B are normal trend line coefficients. The established pressure trend line is shown in the figure below.
(3)根据地层上覆岩层压力和实际试油数据由下式求取地层指数c。 (3) Calculate the formation index c from the following formula according to the pressure of the overlying strata and the actual oil test data.
(4) (4)
其中,s v 为上覆岩层压力,MPa;P n 为正常地层压力,MPa;P p 为实际地层压力,MPa;Dt n 为预测深度正常趋势线上的声波时差,μs/m;Dt s 为预测深度地层实际声波时差,μs/m; Among them, s v is the overburden pressure, MPa; P n is the normal formation pressure, MPa; P p is the actual formation pressure, MPa; D t n is the acoustic time difference on the normal trend line of predicted depth, μs/m; D t s is the actual acoustic time difference of the predicted depth formation, μs/m;
(4)利用伊顿公式计算地层孔隙压力: (4) Calculating the formation pore pressure using Eaton's formula:
(5) (5)
其中,c为地区指数,P p 为预测的实际地层压力,MPa;。 Among them, c is the area index, P p is the predicted actual formation pressure, MPa;
三、既可以根据随钻测井的地层温度数据确定地层温度,也可以根据地区的地温梯度由下式计算地层温度。 3. The formation temperature can be determined according to the formation temperature data of logging while drilling, or the formation temperature can be calculated by the following formula according to the regional geothermal gradient.
式中是地层绝对温度梯度;是地面平均温度,℃;是地区地温梯度,℃/100m;H为地层深度,m。 In the formula is the absolute temperature gradient of the formation; is the average surface temperature, °C; is the regional geothermal gradient, ℃/100m; H is the formation depth, m.
四、利用膜效率测试实验装置测量地层膜效率,具体的方法如下; 4. Use the membrane efficiency testing experimental device to measure the formation membrane efficiency, the specific method is as follows;
如图2所示,膜效率测试实验装置,包括:伺服控制注入泵1,恒温箱7,岩心夹持器8,计算机数据采集系统19,背压调节器21,储液箱28,岩心夹持器8置于恒温箱7内。 As shown in Figure 2, the membrane efficiency test experimental device includes: servo control injection pump 1, constant temperature box 7, rock core holder 8, computer data acquisition system 19, back pressure regulator 21, liquid storage tank 28, rock core holder The device 8 is placed in the incubator 7.
所述伺服控制注入泵1通过第一高压管线2穿过恒温箱7的下端与岩心夹持器8的下端相连,第一高压管线2上设置第一阀门3、第一压力传感器5;伺服控制注入泵1用于实现给岩心的下端钻井液提供压力和给岩心的上端钻井液提供循环压力;第一阀门3用于控制岩心加持器8下端钻井液的进出;第一压力传感器5用于指示和记录岩心加持器8下端的钻井液压力;在第一阀门3和第一压力传感器5之间外接第二阀门4,第二阀门4用于放空或调节岩心加持器8下端面的钻井液压力;恒温箱7用于提供和保持膜效率测试时岩心加持器8所需要的温度。 The servo-controlled injection pump 1 passes through the lower end of the thermostat 7 through the first high-pressure pipeline 2 and is connected to the lower end of the core holder 8. The first high-pressure pipeline 2 is provided with a first valve 3 and a first pressure sensor 5; the servo control The injection pump 1 is used to provide pressure to the drilling fluid at the lower end of the core and to provide circulating pressure for the drilling fluid at the upper end of the core; the first valve 3 is used to control the entry and exit of the drilling fluid at the lower end of the core holder 8; the first pressure sensor 5 is used to indicate And record the drilling fluid pressure at the lower end of the core holder 8; a second valve 4 is externally connected between the first valve 3 and the first pressure sensor 5, and the second valve 4 is used to vent or adjust the drilling fluid pressure at the lower end of the core holder 8 ; The thermostat 7 is used to provide and maintain the temperature required by the core holder 8 during the membrane efficiency test.
第二高压管线11的一端与伺服控制注入泵1连接,另一端穿过恒温箱7的上端与岩心夹持器8的上端入口连接,第二高压管线11上设有第三阀门12和第二压力传感器13,第三阀门12用于控制岩心加持器8上端钻井液的流入,第二压力传感器13用于指示和记录岩心加持器8上端入口处的钻井液压力。 One end of the second high-pressure pipeline 11 is connected with the servo control injection pump 1, and the other end passes through the upper end of the thermostat 7 and is connected with the upper end inlet of the core holder 8. The second high-pressure pipeline 11 is provided with a third valve 12 and a second valve. The pressure sensor 13 and the third valve 12 are used to control the inflow of drilling fluid at the upper end of the core holder 8 , and the second pressure sensor 13 is used to indicate and record the drilling fluid pressure at the inlet of the upper end of the core holder 8 .
第三高压管线15的一端与背压调节器21连接,另一端穿过恒温箱7的上端与岩心夹持器8的上端出口连接,第三高压管线15上设有第四阀门20和第三压力传感器16;第四阀门20用于控制岩心加持器8上端钻井液的流出,第三压力传感器16用于指示和记录岩心加持器8上端出口处的钻井液压力,背压调节器21用于保持岩心加持器8上端钻井液的流动压力恒定。第四高压管线22将第五阀门23连接在第四阀门20和背压调节器21之间,第五阀门23用于放空和置换岩心加持器8上端面的循环钻井液。 One end of the third high-pressure pipeline 15 is connected with the back pressure regulator 21, and the other end passes through the upper end of the thermostat 7 and is connected with the upper end outlet of the core holder 8. The third high-pressure pipeline 15 is provided with a fourth valve 20 and a third valve. Pressure sensor 16; the fourth valve 20 is used to control the outflow of the drilling fluid at the upper end of the core holder 8, the third pressure sensor 16 is used to indicate and record the drilling fluid pressure at the outlet at the upper end of the core holder 8, and the back pressure regulator 21 is used for Keep the flow pressure of the drilling fluid at the upper end of the core holder 8 constant. The fourth high-pressure pipeline 22 connects the fifth valve 23 between the fourth valve 20 and the back pressure regulator 21 , and the fifth valve 23 is used for emptying and replacing the circulating drilling fluid on the upper end surface of the core holder 8 .
第五高压管线27的一端与背压调节器21连接,另一端与储液箱28的上端连接,第五高压管线27上设有第四压力传感器25和第六阀门26;第四压力传感器25用于指示和记录背压调节器21出口处的钻井液压力,第六阀门26用于控制背压调节器21出口处钻井液的流出,储液箱28用于收集循环流出的钻井液。 One end of the fifth high-pressure pipeline 27 is connected to the back pressure regulator 21, and the other end is connected to the upper end of the liquid storage tank 28. The fifth high-pressure pipeline 27 is provided with a fourth pressure sensor 25 and a sixth valve 26; the fourth pressure sensor 25 Used to indicate and record the drilling fluid pressure at the outlet of the back pressure regulator 21, the sixth valve 26 is used to control the outflow of drilling fluid at the outlet of the back pressure regulator 21, and the liquid storage tank 28 is used to collect the circulating drilling fluid.
所述计算机数据采集系统19分别通过第一数据采集线6、第二数据采集线14、第三数据采集线17、第四数据采集线18和第五数据采集线24连接第一压力传感器5、第二压力传感器13、第三压力传感器16、恒温箱7和第四压力传感器25,计算机数据采集系统19用于实时采集和记录第一压力传感器5、第二压力传感器13、第三压力传感器16、第四压力传感器25的压力和恒温箱7中温度。 Described computer data acquisition system 19 connects the first pressure sensor 5, the 2nd data acquisition line 14, the 3rd data acquisition line 17, the 4th data acquisition line 18 and the 5th data acquisition line 24 respectively by the first data acquisition line 6, Second pressure sensor 13, the 3rd pressure sensor 16, incubator 7 and the 4th pressure sensor 25, computer data acquisition system 19 is used for collecting and recording the first pressure sensor 5, the second pressure sensor 13, the 3rd pressure sensor 16 in real time , the pressure of the fourth pressure sensor 25 and the temperature in the thermostat 7.
如图3所示,所述岩心夹持器8,包括:岩心夹持器上端盖29、岩心夹持器下端盖30、环氧树脂9和密封圈31,岩心10夹在岩心夹持器上端盖29和岩心夹持器下端盖30之间,环氧树脂9将岩心的四周包裹形成规则的试样,固定岩心同时防止钻井液从侧面渗出;与岩心接触的岩心夹持器上端盖29底面和岩心夹持器下端盖30顶面各有一个密封圈31,密封圈31用来密封岩心、防止顶底端液体的相通。如图3、图4所示,岩心夹持器上端盖29的下端面和岩心夹持器下端盖30的上端面分别设有凹槽,便于钻井液的流动;第二高压管线11和第三高压管线15分别与岩心夹持器上端盖29相连,第二高压管线2与岩心夹持器下端盖30相连。 As shown in Figure 3, described rock core holder 8 comprises: rock core holder upper end cover 29, rock core holder lower end cover 30, epoxy resin 9 and sealing ring 31, rock core 10 is clamped on the rock core holder upper end Between the cover 29 and the lower end cover 30 of the core holder, the epoxy resin 9 wraps around the core to form a regular sample, and fixes the core while preventing drilling fluid from seeping out from the side; the upper end cover 29 of the core holder in contact with the core There is a sealing ring 31 on the bottom surface and the top surface of the lower end cover 30 of the core holder respectively, and the sealing ring 31 is used to seal the rock core and prevent the communication of the top and bottom liquids. As shown in Figure 3 and Figure 4, the lower end surface of the upper end cover 29 of the core holder and the upper end surface of the lower end cover 30 of the core holder are respectively provided with grooves to facilitate the flow of drilling fluid; the second high-pressure pipeline 11 and the third The high-pressure pipeline 15 is respectively connected with the upper end cover 29 of the core holder, and the second high-pressure pipeline 2 is connected with the lower end cover 30 of the core holder.
如图4所示,岩心夹持器上端盖29底端面剖面上带有凹槽,便于钻井液在岩心入口端面的流动; As shown in Figure 4, there are grooves on the section of the bottom end surface of the upper end cover 29 of the core holder to facilitate the flow of drilling fluid on the end surface of the core inlet;
如图5所示,岩心夹持器下端盖30上端面剖面上带有凹槽,便于钻井液在岩心出口端面的流动; As shown in Figure 5, there are grooves on the upper end surface section of the lower end cover 30 of the core holder to facilitate the flow of drilling fluid on the end surface of the core outlet;
其中,模拟膜效率测试实验的方法,利用上述实验装置,具体实验步骤如下: Wherein, the method for simulating the membrane efficiency test experiment uses the above-mentioned experimental device, and the specific experimental steps are as follows:
(1)、准备钻井液、地层流体和待实验的岩心; (1), prepare drilling fluid, formation fluid and rock core to be tested;
(2)、将待实验的岩心10放置在环氧树脂9中,制成试验需要的标准样,将待实验的标准样安装在岩心夹持器8上,并置于恒温箱7中,调节恒温箱7中温度为设定温度; (2), the rock core 10 to be tested is placed in the epoxy resin 9, and the standard sample required for the test is made, the standard sample to be tested is installed on the rock core holder 8, and placed in the thermostat 7, adjusted The temperature in the incubator 7 is the set temperature;
(3)、岩心饱和阶段 (3), core saturation stage
①在伺服控制注入泵1内加满地层流体;打开第一阀门3、其余阀门均处于关闭状态,利用伺服控制注入泵1逐步给岩心夹持器8底端注入地层流体并增加压力,直到第一压力传感器5显示的压力数值达到设定值,稳定后关闭第一阀门3; ① Fill up the formation fluid in the servo-controlled injection pump 1; open the first valve 3 and keep the other valves closed, and use the servo-controlled injection pump 1 to gradually inject the formation fluid into the bottom of the core holder 8 and increase the pressure until the first valve 3 is closed. The pressure value displayed by the pressure sensor 5 reaches the set value, and the first valve 3 is closed after stabilization;
②打开第三阀门12,第四阀门20和第五阀门23,第一阀门3,第二阀门4和第六阀门26均处于关闭状态;利用伺服控制注入泵1逐步给岩心夹持器8顶端注入地层流体,地层流体岩心夹持器8顶端循环流动,当地层流体在第五阀门23出口处流出时,关闭第五阀门23,调节背压调节器21,打开第六阀门26,利用伺服控制注入泵1和背压调节器21控制岩心夹持器8顶端循环流动压力大于底端压力0.5MPa,并保持恒定。 ② Open the third valve 12, the fourth valve 20 and the fifth valve 23, the first valve 3, the second valve 4 and the sixth valve 26 are all in the closed state; use the servo control injection pump 1 to gradually feed the top of the core holder 8 Formation fluid is injected, and the top of the formation fluid core holder 8 circulates. When the formation fluid flows out at the outlet of the fifth valve 23, the fifth valve 23 is closed, the back pressure regulator 21 is adjusted, and the sixth valve 26 is opened. The injection pump 1 and the back pressure regulator 21 control the circulating flow pressure at the top of the core holder 8 to be greater than the pressure at the bottom by 0.5 MPa, and keep it constant.
③利用计算机数据采集系统19采集及记录第一压力传感器5、第二压力传感器13、第三压力传感器16和第四压力传感器25压力数据,观察第二压力传感器13和第三压力传感器16,如果出现较大差异,则说明孔道堵塞,实验失败,如果压力相等,则实验正常;此时观察第一压力传感器5的压力数据,当第一压力传感器5同第三压力传感器16的压力相等时,则岩心饱和阶段完成。 3. Utilize the computer data acquisition system 19 to collect and record the first pressure sensor 5, the second pressure sensor 13, the third pressure sensor 16 and the fourth pressure sensor 25 pressure data, observe the second pressure sensor 13 and the third pressure sensor 16, if If there is a large difference, it means that the pores are blocked, and the experiment fails. If the pressures are equal, the experiment is normal; at this time, observe the pressure data of the first pressure sensor 5, and when the pressures of the first pressure sensor 5 and the third pressure sensor 16 are equal, Then the core saturation stage is completed.
(4)、膜效率测试阶段 (4) Membrane efficiency test stage
①在岩心饱和阶段完成后,将伺服控制注入泵1内流体替换为设计钻井液;并逐步给岩心夹持器8顶端注入,直到循环流出的钻井液流到储液箱28中。 ① After the core saturation stage is completed, replace the fluid in the servo-controlled injection pump 1 with the designed drilling fluid;
②根据第三压力传感器16和第一压力传感器5记录的最大压差就是实际的膨胀压力s 测量。 ② The maximum pressure difference recorded by the third pressure sensor 16 and the first pressure sensor 5 is the actual expansion pressure s measured .
(5)、测试实验完成后,打开第二阀门4、第四阀门20、第五阀门23和第六阀门26,关闭第一阀门3和第三阀门12;将压力释放,流体放出,然后取出岩心,实验完毕。 (5), after the test experiment is completed, open the second valve 4, the fourth valve 20, the fifth valve 23 and the sixth valve 26, close the first valve 3 and the third valve 12; the pressure is released, the fluid is released, and then taken out Core, the experiment is over.
(6)、膜效率计算。 (6) Calculation of membrane efficiency.
首先根据下式计算理论渗透压; First calculate the theoretical osmotic pressure according to the following formula;
是气体常数,8.314J/(mol*K),是绝对温度,K,是水的偏摩尔体积L/mol,是底端流体活度,是顶端循环流体活度。 is the gas constant, 8.314J/(mol*K), is the absolute temperature, K, is the partial molar volume of water L/mol, is the bottom fluid activity, is the top circulating fluid activity.
再利用式7计算膜效率 Calculate the membrane efficiency by using Equation 7 again
五、如果确定使用某种钻井液时,则利用湿度计测量待用钻井液活度,确定钻井液与地层流体之间的化学势差,在根据总势能平衡原理,利用化学势差和地层孔隙压力确定钻井液液柱压力,根据钻井液液柱压力和井深确定钻井液密度; 5. If it is determined to use a certain drilling fluid, use a hygrometer to measure the activity of the drilling fluid to be used to determine the chemical potential difference between the drilling fluid and the formation fluid. Based on the principle of total potential energy balance, use the chemical potential difference and formation pores The pressure determines the drilling fluid column pressure, and the drilling fluid density is determined according to the drilling fluid column pressure and well depth;
六、如果确定欠压值(钻井液液柱压力同地层压力之间的差值),根据总势能平衡原理,利用欠压值确定化学势差,再根据化学势差和地层水活度确定钻井液活度。 6. If the underpressure value (the difference between the drilling fluid column pressure and the formation pressure) is determined, according to the principle of total potential energy balance, use the underpressure value to determine the chemical potential difference, and then determine the drilling pressure according to the chemical potential difference and formation water activity. Liquid activity.
七、根据确定结果调整钻井液密度或活度来保持井壁稳定。 7. Adjust the drilling fluid density or activity according to the determined results to keep the wellbore stable.
其中,总势能计算公式如下: Among them, the total potential energy calculation formula is as follows:
①当已知钻井液活度时,计算方法如下: ① When the drilling fluid activity is known, the calculation method is as follows:
其中,钻井液与地层流体之间的化学势差计算公式如下: Among them, the formula for calculating the chemical potential difference between drilling fluid and formation fluid is as follows:
式中,为纯水的化学势,是气体常数,是绝对温度,是水的偏摩尔体积,是钻井滤液活度,是泥页岩地层水活度。 In the formula, is the chemical potential of pure water, is the gas constant, is the absolute temperature, is the partial molar volume of water, is the drilling filtrate activity, is the water activity of the shale formation.
将式(9)带入式(8)可得到总势能平衡时井壁液柱压力为: Substituting Equation (9) into Equation (8), the wellbore fluid column pressure at the balance of total potential energy can be obtained as:
式中,为地层水孔隙压力,为井壁液柱压力,为膜效率。 In the formula, is the formation water pore pressure, is the wellbore fluid column pressure, is the membrane efficiency.
其中,钻井液当量密度计算公式如下: Among them, the calculation formula of drilling fluid equivalent density is as follows:
式中,为钻井液当量密度,H为垂深。 In the formula, is equivalent density of drilling fluid, and H is vertical depth.
②已知欠压值,计算方法如下: ②The undervoltage value is known, and the calculation method is as follows:
将式(9)带入式(8)得到 Put formula (9) into formula (8) to get
式中,为欠压值。 In the formula, is the undervoltage value.
其中,钻井液活度计算公式如下: Among them, the calculation formula of drilling fluid activity is as follows:
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410721094.1A CN104563927B (en) | 2014-12-03 | 2014-12-03 | A kind of wellbore stability method and experimental facilities being applicable under balance pressure drilling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410721094.1A CN104563927B (en) | 2014-12-03 | 2014-12-03 | A kind of wellbore stability method and experimental facilities being applicable under balance pressure drilling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104563927A CN104563927A (en) | 2015-04-29 |
CN104563927B true CN104563927B (en) | 2016-02-10 |
Family
ID=53080913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410721094.1A Expired - Fee Related CN104563927B (en) | 2014-12-03 | 2014-12-03 | A kind of wellbore stability method and experimental facilities being applicable under balance pressure drilling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104563927B (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10788407B2 (en) | 2015-10-29 | 2020-09-29 | Cnooc Petroleum North America Ulc | Emulsion composition sensor |
CN105298385B (en) * | 2015-11-05 | 2017-07-14 | 中石化石油工程技术服务有限公司 | A kind of boring method for reinforcing mud shale with boring |
CN105626056B (en) * | 2015-12-22 | 2019-01-18 | 中国石油天然气集团公司 | A kind of method and apparatus of determining target area three-dimensional formation pore pressure |
CN105781541A (en) * | 2016-03-17 | 2016-07-20 | 成都创源油气技术开发有限公司 | Logging evaluation method for shale borehole stability |
CN110748339B (en) * | 2018-07-24 | 2022-12-23 | 中石化石油工程技术服务有限公司 | A method for stabilizing shale formations by adjusting drilling fluid activity |
CN110761784B (en) * | 2018-07-26 | 2023-01-10 | 中国石油天然气股份有限公司 | Method for determining chemical window of well bore working fluid |
CN108661626B (en) * | 2018-08-02 | 2023-11-21 | 西南石油大学 | High-temperature high-pressure well wall water invasion simulation experiment device |
CN109236285B (en) * | 2018-09-30 | 2022-02-18 | 西南石油大学 | Single-well undisturbed stratum mechanical profile calculation method and system |
CN111855484B (en) * | 2020-07-30 | 2022-05-20 | 西南石油大学 | Method for evaluating the ability of drilling fluid to stabilize wellbore in shale formation based on acoustic and electrical response |
US11828169B2 (en) * | 2020-11-12 | 2023-11-28 | Saudi Arabian Oil Company | Method of determining in-situ pore pressure in chemically active formations |
CN113533655B (en) * | 2021-07-23 | 2022-09-16 | 中国石油大学(北京) | Device for simulating stratum respiration effect and control method |
CN114718550A (en) * | 2022-04-07 | 2022-07-08 | 中国石油大学(华东) | Experimental device and method for evaluating well wall damage |
CN119000419B (en) * | 2024-10-21 | 2025-01-07 | 宝鸡贝仕德石油科技有限责任公司 | Drilling fluid density on-line monitoring system based on artificial intelligence |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201145679Y (en) * | 2007-12-26 | 2008-11-05 | 中国石油集团钻井工程技术研究院 | Semipermeable Membrane Efficiency Tester |
US8466094B2 (en) * | 2009-05-13 | 2013-06-18 | Clearwater International, Llc | Aggregating compositions, modified particulate metal-oxides, modified formation surfaces, and methods for making and using same |
CN102182444B (en) * | 2011-04-01 | 2014-07-02 | 中国石油集团川庆钻探工程有限公司 | Under-balanced drilling adaptability evaluation method |
CN103868841B (en) * | 2014-03-28 | 2016-03-02 | 海安县石油科研仪器有限公司 | Measure the experimental provision of extremely low mud shale permeability and membrane efficiency |
-
2014
- 2014-12-03 CN CN201410721094.1A patent/CN104563927B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104563927A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563927B (en) | A kind of wellbore stability method and experimental facilities being applicable under balance pressure drilling | |
CN107045671B (en) | Method for predicting liquid accumulation risk of water producing gas well | |
CN104133050B (en) | Porous rock effective stress coefficient and porosity method of testing simultaneously under stress condition | |
CN110598167B (en) | Processing method of oil-water relative permeability experimental data of low-permeability reservoir | |
WO2018010405A1 (en) | Shale block dynamic damage evaluation apparatus and method based on liquid pressure pulse | |
CN105156102B (en) | Bottom water reservoir water energy three-dimensional physical simulation device and method | |
CN111257202A (en) | Shale fracturing fluid forced imbibition and flowback experimental method under condition of containing adsorbed gas | |
CN107462936B (en) | A method for inversion of non-Darcy seepage law in low permeability reservoirs using pressure monitoring data | |
CN205063944U (en) | Three -dimensional physical simulation device of bottom water oil reservoir water energy | |
CN104655494A (en) | Dynamic triaxial tester for analyzing dynamic characteristics of deepwater natural gas hydrate sediment | |
CN105443093B (en) | Well head combined measuring device and its method for injection well | |
CN104406895A (en) | Novel coal bed permeability testing device and method | |
CN107014698A (en) | The measurement apparatus and measuring method of a kind of high temperature compressed coefficient of rock and permeability | |
CN106401577A (en) | Visual testing device and method for simulating bottom water coning of bottom water gas reservoir gas well | |
CN104405368B (en) | Gas well at HTHP well-head pressure-measuring method for distinguishing adaptability | |
CN108444890B (en) | Unsteady state titration device and method for testing medium and high permeability core liquid permeability | |
CN105067450B (en) | Measure the device and method of poroelastic medium Biot coefficient under High Temperature High Pressure | |
CN116044389B (en) | A method for determining reasonable production pressure difference in early depletion recovery of tight shale reservoirs | |
CN105804713B (en) | A kind of quick method for determining each substratum well head water filling of water injection well and starting pressure | |
CN204255815U (en) | A kind of novel coal seam permeability tester for testing | |
CN211401934U (en) | Hydrate-containing sediment consolidation static exploration penetration simulation device | |
CN204389309U (en) | The dynamic triaxial tests instrument of deep water natural gas hydrate deposits thing Analysis of Dynamic Characteristics | |
CN116359076A (en) | Wettability testing device and method under oil reservoir condition | |
Ye et al. | A new device for measuring the supercritical CO2 permeability in porous rocks under reservoir conditions | |
CN103630670B (en) | A kind of test unit measuring Characteristics of Damaged Rock Salt self-recoverage amount |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |