CN104561508A - Postweld normalizing method for gas-pressure welding of steel rails - Google Patents

Postweld normalizing method for gas-pressure welding of steel rails Download PDF

Info

Publication number
CN104561508A
CN104561508A CN201310518412.XA CN201310518412A CN104561508A CN 104561508 A CN104561508 A CN 104561508A CN 201310518412 A CN201310518412 A CN 201310518412A CN 104561508 A CN104561508 A CN 104561508A
Authority
CN
China
Prior art keywords
normalizing
temperature
rail
welding
flame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310518412.XA
Other languages
Chinese (zh)
Inventor
刘占向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Qili Steel Casting Co Ltd
Original Assignee
Qingdao Qili Steel Casting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Qili Steel Casting Co Ltd filed Critical Qingdao Qili Steel Casting Co Ltd
Priority to CN201310518412.XA priority Critical patent/CN104561508A/en
Publication of CN104561508A publication Critical patent/CN104561508A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/26Methods of annealing
    • C21D1/28Normalising
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/50Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for welded joints

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Abstract

The invention discloses a postweld normalizing method for gas-pressure welding of steel rails. The method comprises the following steps: determining the normalizing finishing temperature; for different steel rails, determining different finishing temperatures; after welding, instead of normalizing, welding another welding head at first, and adopting flame softer than the welding flame, namely weak carburizing flame, to heat when the previous welding head is cooled down to guarantee that the internal temperature meets the demand of the normalizing temperature; and adopting the two-stage flame swing method to heat; and adopting the blowing and atomizing method to increase the cooling speed to enable the internal hardness and the external hardness to tend to be uniform. The postweld normalizing method improves the strength, the plasticity and the toughness of the welding heads, enables the hardness to be uniform and properly reduced, eliminates incomplete normalizing and two heat-affected zones, enables the joint quality to meet the demands and can bring about favorable social benefits and economic benefits.

Description

Gas pressure welding of rail postwelding normalizing treatment method
 
Technical field
The invention belongs to the technical field of heat treatment of forged steel pieces, be specifically related to a kind of gas pressure welding of rail postwelding normalizing treatment method.
 
Background technology
Adopt in plasticity pressure gas welding welded rails process, along with the rising of temperature, welding temperature is at 1250 ~ 1300 DEG C, postwelding joint metal grain fineness number is in one-level substantially, belong to the open grain structure that austenite is overheated, make it to remain under comparatively big supercooling degree condition, plasticity, the toughness of this tissue are poor, and hard and crisp, cannot use; Meanwhile, after welding, also there is certain residual stress, after must heat-treating improving SNR, could use on the line better; For this reason, the process stipulation of pressure gas welding welded rails, the necessary normalizing treatment of postwelding; But in actually operating, normalizing treatment existing defects, joint quality does not reach requirement, must work out rational normalizing treatment method.
 
Summary of the invention
In order to overcome the above-mentioned technical problem that prior art field exists, the object of the invention is to, a kind of gas pressure welding of rail postwelding normalizing treatment method is provided, intensity and the plasticity and toughness of soldering tip can be improved, make hardness evenly and have suitable reduction, eliminate normalizing not thoroughly and the phenomenon of two heat affected zones, good Social benefit and economic benefit can be brought.
Gas pressure welding of rail postwelding normalizing treatment method provided by the invention, comprises the following steps:
(1), before welding rail construction, fully understand rail type, the chemical composition of this construction institute welding steel rail, then determine the finishing temperature of normalizing, temperature carries out verification experimental verification after determining, then upper track construction; For different rail, determine different finishing temperatures; As U 71and U 74rail, normalizing finishing temperature is defined as 850 DEG C ± 10 DEG C; U 71mn rail normalizing finishing temperature is 900 DEG C ~ 910 DEG C; PD3 rail (U 75v rail), normalizing finishing temperature is 910 DEG C ~ 920 DEG C;
(2) starting temperature of normalizing must control, at 400 DEG C ~ 500 DEG C, particularly to construct during the broiling summer, takes the positive pyrogenic process in gap, can ensure that postwelding temperature is down to suitable starting temperature; Method is: the not first normalizing of postwelding, but first welds another soldering tip, waits previous soldering tip to lower the temperature;
(3) the flame heating softer than welding flame is adopted, i.e. weak carbonizing flame (flare is longer) heating, particularly fall the lower soldering tip even reaching envrionment temperature is all the more so to temperature, and time lengthening to 5 ~ 6min, to make internal-external temperature difference reduce, ensure that internal temperature reaches normalizing temperature requirement;
(4) adopt the heating of two sections of pendulum pyrogenic processes, the later stage puts fiery width >=80mm, makes normalizing heat affected zone scope be greater than welded heat affecting zone scope, to eliminate two heat affected zones, and will pass through weld metal zone rapidly; Now, butt welded seam district is insulation just, instead of heats up, in order to avoid temperature raises cause coarse-grain;
(5) select suitable surveying instrument, range is greater than normalizing temperature (500 DEG C ~ 1000 DEG C), to ensure the accuracy of normalizing finishing temperature; High temperature season adopts the method for blowing and spraying to improve speed of cooling, makes inside and outside hardness be tending towards even.
Gas pressure welding of rail postwelding normalizing treatment method provided by the invention, its beneficial effect is, improve intensity and the plasticity and toughness of soldering tip, make hardness evenly and have suitable reduction, eliminate normalizing not thoroughly and the phenomenon of two heat affected zones, make joint quality reach requirement, good Social benefit and economic benefit can be brought.
 
Embodiment
Below in conjunction with an embodiment, gas pressure welding of rail postwelding normalizing treatment method provided by the invention is described in detail.
Embodiment
The gas pressure welding of rail postwelding normalizing treatment method of the present embodiment, comprises the following steps:
(1), before welding rail construction, fully understand rail type, the chemical composition of this construction institute welding steel rail, then determine the finishing temperature of normalizing, temperature carries out verification experimental verification after determining, then upper track construction; For different rail, determine different finishing temperatures; As U 71and U 74rail, normalizing finishing temperature is defined as 850 DEG C; U 71mn rail normalizing finishing temperature is 900 DEG C; PD3 rail (U 75v rail), normalizing finishing temperature is 910 DEG C;
(2) starting temperature of normalizing controls, at 400 DEG C, particularly to construct during the broiling summer, takes the positive pyrogenic process in gap, can ensure that postwelding temperature is down to suitable starting temperature; Method is: the not first normalizing of postwelding, but first welds another soldering tip, waits previous soldering tip to lower the temperature;
(3) the flame heating softer than welding flame is adopted, i.e. weak carbonizing flame (flare is longer) heating, particularly fall the lower soldering tip even reaching envrionment temperature is all the more so to temperature, and time lengthening is to 5min, to make internal-external temperature difference reduce, ensure that internal temperature reaches normalizing temperature requirement;
(4) adopt the heating of two sections of pendulum pyrogenic processes, the later stage puts fiery width and is greater than 80mm, makes normalizing heat affected zone scope be greater than welded heat affecting zone scope, to eliminate two heat affected zones, and will pass through weld metal zone rapidly; Now, butt welded seam district is insulation just, instead of heats up, in order to avoid temperature raises cause coarse-grain;
(5) select suitable surveying instrument, range is greater than normalizing temperature, to ensure the accuracy of normalizing finishing temperature; High temperature season adopts the method for blowing and spraying to improve speed of cooling, makes inside and outside hardness be tending towards even.
Gas pressure welding of rail postwelding normalizing treatment method, improves intensity and the plasticity and toughness of soldering tip, makes hardness evenly and has suitable reduction, eliminates normalizing thoroughly and the phenomenon of two heat affected zones, makes joint quality reach requirement.

Claims (1)

1. a gas pressure welding of rail postwelding normalizing treatment method, is characterized in that: said method comprising the steps of:
(1), before welding rail construction, fully understand rail type, the chemical composition of this construction institute welding steel rail, then determine the finishing temperature of normalizing, temperature carries out verification experimental verification after determining, then upper track construction; For different rail, determine different finishing temperatures; As U 71and U 74rail, normalizing finishing temperature is defined as 850 DEG C ± 10 DEG C; U 71mn rail normalizing finishing temperature is 900 DEG C ~ 910 DEG C; PD3 rail (U 75v rail), normalizing finishing temperature is 910 DEG C ~ 920 DEG C;
(2) starting temperature of normalizing must control, at 400 DEG C ~ 500 DEG C, particularly to construct during the broiling summer, takes the positive pyrogenic process in gap, can ensure that postwelding temperature is down to suitable starting temperature; Method is: the not first normalizing of postwelding, but first welds another soldering tip, waits previous soldering tip to lower the temperature;
(3) the flame heating softer than welding flame is adopted, i.e. weak carbonizing flame (flare is longer) heating, particularly fall the lower soldering tip even reaching envrionment temperature is all the more so to temperature, and time lengthening to 5 ~ 6min, to make internal-external temperature difference reduce, ensure that internal temperature reaches normalizing temperature requirement;
(4) adopt the heating of two sections of pendulum pyrogenic processes, the later stage puts fiery width >=80mm, makes normalizing heat affected zone scope be greater than welded heat affecting zone scope, to eliminate two heat affected zones, and will pass through weld metal zone rapidly; Now, butt welded seam district is insulation just, instead of heats up, in order to avoid temperature raises cause coarse-grain;
(5) select suitable surveying instrument, range is greater than normalizing temperature (500 DEG C ~ 1000 DEG C), to ensure the accuracy of normalizing finishing temperature; High temperature season adopts the method for blowing and spraying to improve speed of cooling, makes inside and outside hardness be tending towards even.
CN201310518412.XA 2013-10-29 2013-10-29 Postweld normalizing method for gas-pressure welding of steel rails Pending CN104561508A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310518412.XA CN104561508A (en) 2013-10-29 2013-10-29 Postweld normalizing method for gas-pressure welding of steel rails

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310518412.XA CN104561508A (en) 2013-10-29 2013-10-29 Postweld normalizing method for gas-pressure welding of steel rails

Publications (1)

Publication Number Publication Date
CN104561508A true CN104561508A (en) 2015-04-29

Family

ID=53078581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310518412.XA Pending CN104561508A (en) 2013-10-29 2013-10-29 Postweld normalizing method for gas-pressure welding of steel rails

Country Status (1)

Country Link
CN (1) CN104561508A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106544933A (en) * 2016-10-19 2017-03-29 攀钢集团攀枝花钢铁研究院有限公司 A kind of method that post weld heat treatment is carried out to steel rail weld joint
CN111363897A (en) * 2020-04-23 2020-07-03 中国铁建重工集团股份有限公司 Heat treatment method for welded joint of dissimilar material steel rail
CN111659973A (en) * 2020-05-15 2020-09-15 包头钢铁(集团)有限责任公司 Gas welding method for U76CrRE heat-treated steel rail

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106544933A (en) * 2016-10-19 2017-03-29 攀钢集团攀枝花钢铁研究院有限公司 A kind of method that post weld heat treatment is carried out to steel rail weld joint
CN106544933B (en) * 2016-10-19 2019-05-03 攀钢集团攀枝花钢铁研究院有限公司 The method that a kind of pair of steel rail weld joint carries out post weld heat treatment
CN111363897A (en) * 2020-04-23 2020-07-03 中国铁建重工集团股份有限公司 Heat treatment method for welded joint of dissimilar material steel rail
CN111363897B (en) * 2020-04-23 2021-11-02 中国铁建重工集团股份有限公司 Heat treatment method for welded joint of dissimilar material steel rail
CN111659973A (en) * 2020-05-15 2020-09-15 包头钢铁(集团)有限责任公司 Gas welding method for U76CrRE heat-treated steel rail
CN111659973B (en) * 2020-05-15 2022-03-22 包头钢铁(集团)有限责任公司 U76CrRE heat treatment steel rail gas pressure welding method

Similar Documents

Publication Publication Date Title
AU2018214003B2 (en) Post-weld heat treatment method for welded joints of bainitic rails
CN104924018B (en) A kind of Large Rotor big cross section crackle field repairing method
CN109022748B (en) Heat treatment method of U71MnH steel rail welded joint
CN109022747B (en) Postweld heat treatment method for U71MnH steel rail flash welding joint
CN109022746B (en) Heat treatment method of U71MnH steel rail flash welding joint
CN106868425B (en) The post weld heat treatment method of the high tough cut deal welding point low-temperature impact toughness of Mn in a kind of low C of improvement 690MPa levels
CN109207708B (en) Bainite steel rail welding joint and postweld heat treatment method for controlling white block structure of bainite steel rail welding joint
CN109457101B (en) Bainite steel rail welding joint and postweld heat treatment method for controlling white block structure of bainite steel rail welding joint
WO2020238724A1 (en) Construction method and cooling apparatus for post weld joint heat treatment of bainite steel rail
CN103643025B (en) Method of improving toughness of novel martensite heat-resistant steel A355P91 welding seam
CN105414878A (en) High-heat-resistance alloy steel casting defect repair method
CN106498146B (en) Method for improving low-temperature toughness of thick plate multi-pass welding joint
CN104561508A (en) Postweld normalizing method for gas-pressure welding of steel rails
CN102796863A (en) Method used for local postweld heat treatment of large-size steel casting after rewelding
CN103350272B (en) A kind of welding procedure of T91 and 12Cr1MoV dissimilar steel
CN107414405B (en) The repair technology of the bearing block weld crack of self-elevating drilling platform
CN102268530B (en) Heat treatment method of weld seam of welding weighted drill pipe
CN109022749B (en) Postweld heat treatment method for U71MnH steel rail welding joint
CN110438326A (en) Hypo eutectoid Post-Welding Heattreatment of Rail method
CN101791746A (en) Large high-temperature refractory steel pipeline welding process
CN103276187B (en) Process for improving comprehensive mechanical performances of weld of high-frequency straight welded tube
CN109530849B (en) Welding construction method for carbon steel pipeline in acidic environment
CN104400180A (en) Repair welding process of high alloy steel track shoe
CN105983758A (en) Gray cast iron welding process
CN105648448A (en) Bevel gear heat-treatment technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429