CN104554348A - Locomotive operation real-time analysis method and locomotive operation real-time analysis device - Google Patents

Locomotive operation real-time analysis method and locomotive operation real-time analysis device Download PDF

Info

Publication number
CN104554348A
CN104554348A CN201410739411.2A CN201410739411A CN104554348A CN 104554348 A CN104554348 A CN 104554348A CN 201410739411 A CN201410739411 A CN 201410739411A CN 104554348 A CN104554348 A CN 104554348A
Authority
CN
China
Prior art keywords
data
time analysis
locomotive control
control real
analysis device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410739411.2A
Other languages
Chinese (zh)
Inventor
黄鹏涛
杨武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN THINKING INFORMATION TECHNOLOGY Co Ltd
Original Assignee
HENAN THINKING INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN THINKING INFORMATION TECHNOLOGY Co Ltd filed Critical HENAN THINKING INFORMATION TECHNOLOGY Co Ltd
Priority to CN201410739411.2A priority Critical patent/CN104554348A/en
Publication of CN104554348A publication Critical patent/CN104554348A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to a locomotive operation real-time analysis method. The method comprises the following steps: (1) receiving data of a train running monitor device by the locomotive operation real-time analysis device; (2) recording the data by virtue of the locomotive operation real-time analysis device, and judging and processing the recorded data and a preset stipulated speed at the current position; judging and executing the recorded data or responding to an updating request of a host. The method has the beneficial effects that: the LKJ data of the train running monitor device is recorded by the locomotive operation real-time analysis device, and the recorded data and the preset stipulated speed of the current position are judged and processed; meanwhile, the recorded data is judged and executed or the updating request of the main machine is responded, thus the safety operation of a locomotive can be guaranteed.

Description

A kind of locomotive control real-time analysis method and device thereof
Technical field
The present invention relates to LKJ train operation field, particularly relate to a kind of locomotive control real-time analysis device and analysis method.
Background technology
In train travelling process, LKJ data play in real time, but in train travelling process, need the situation of sudden stop if run into, if can not process in time, then can cause severe safety accident.Such as: car team is when from closed interval sudden stop, because locomotive has the function that automatically sands, if unit, locomotive moves out the section that sands not in time, then shunting badness may be caused, cause this interval automatically to go out clearly, so rear defence signal then can open, and rear car team and locomotive finally may be caused to bump against.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of locomotive control real-time analysis method and device thereof, to solve prior art Problems existing.
For solving the problems of the technologies described above, the present invention by the following technical solutions:
A kind of locomotive control real-time analysis method, comprising:
(1) locomotive control real-time analysis device receives the data of train operation monitoring device;
(2) locomotive control real-time analysis device records data and carries out judgement to the data of record with the specified speed of the current location preset and processes; Data after record are carried out to the update request judging to perform or respond main frame simultaneously.
The data of described LKJ train comprise present speed, current time, current kilometer mark, current demand signal machine state and brake pipe pressure data.
Described judgement treating process is: according to current kilometer mark, signal serial number, data cross-channel, a number, train number Signal aspects kind, judge whether the specified speed of current speed and preset current location meets, if do not satisfied condition, generate early warning entry point information, early warning information sends by data transmission process simultaneously.
In program operation process, whether real-time judge electronic hand account has the judgement of request log file or upgrades the request of mainframe program, then respond association requests and execute file transmission or reception program update file.
A kind of locomotive control real-time analysis device, train operation monitoring device is communicated with locomotive control real-time analysis device by dual CAN bus, and locomotive control real-time analysis device is communicated with electronic hand account display terminal by RS485 communication interface; Described locomotive control real-time analysis device comprises:
Receive the communications interface unit of train operation monitoring device data;
To the memory cell that data record;
The data of record and the specified speed of default current location are carried out to the processing unit judging to process;
And, the data after record are carried out to the performance element judging to perform or respond main frame update request.
Beneficial effect of the present invention: locomotive control real-time analysis device records train operation monitoring device LKJ data and carries out judgement to the data of record with the specified speed of the current location preset and processes; Data after record are carried out to the update request judging to perform or respond main frame simultaneously, like this, ensure that the safe operation of locomotive.
Accompanying drawing explanation
Fig. 1 is system chart of the present invention.
Fig. 2 is data analysis flowcharts of the present invention.
Fig. 3 is the diagram of circuit of the interval parking early warning of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
As shown in Figure 1, a kind of locomotive control real-time analysis method, comprising:
(1) locomotive control real-time analysis device receives the data of train operation monitoring device;
(2) locomotive control real-time analysis device records data and carries out judgement to the data of record with the specified speed of the current location preset and processes; Data after record are carried out to the update request judging to perform or respond main frame simultaneously.
The data of described LKJ train comprise present speed, current time, current kilometer mark, current demand signal machine state and brake pipe pressure data.
Described judgement treating process is: according to current kilometer mark, signal serial number, data cross-channel, a number, train number Signal aspects kind, judge whether the specified speed of current speed and preset current location meets, if do not satisfied condition, generate early warning entry point information, early warning information sends by data transmission process simultaneously.
In program operation process, whether real-time judge electronic hand account has the judgement of request log file or upgrades the request of mainframe program, then respond association requests and execute file transmission or reception program update file.
That is, manipulation real time analysis system receives the real-time running data of train operation monitoring device from dual CAN bus after, if the information in data changes, then current data message is carried out record, simultaneously to data execution analysis process, namely according to current kilometer post, signal serial number, data cross-channel, a number, train number Signal aspects kind, judge whether the specified speed of current speed and preset current location meets, if do not satisfied condition, claim early warning entry point information, early warning information sends by data transmission process simultaneously.Carry out real-time judge electronic hand account in process in program whether have the judgement of request log file or upgrade the request of mainframe program, then respond association requests and execute file sends or accepts program updates file.
As shown in Figure 1, a kind of locomotive control real-time analysis device, locomotive control real-time analysis device adopts industrial grade two can bus communication mode at a high speed, timing obtains original real-time running data from LKJ train operation monitoring device, carries out analyzing and processing, data logging and early warning corner respectively send by linux multithreading mode of operation to data.Locomotive control real-time analysis device is communicated with electronic hand account display terminal by RS485 communication interface.
Described locomotive control real-time analysis device comprises: the communications interface unit receiving train operation monitoring device data; To the memory cell that data record; The data of record and the specified speed of default current location are carried out to the processing unit judging to process; And, the data after record are carried out to the performance element judging to perform or respond main frame update request.
As shown in Figure 3, in one embodiment of the invention, stop to interval and carry out early warning, concrete mistake is called: by two CAN communication, handles the real time information that real time analysis system receives train operation monitoring device (i.e. LKJ), real time information is judged, if in the normal situation of real time information accepted, train generation hard brake stop, then determine whether from closed interval according to current demand signal machine class and other information, if car team is not unit, causes interval parking, start warning immediately; If car team is unit, then timing from during parking, does not move ahead at the time locomotive more than 5 minutes or retreats more than more than 15 meters, then causing the self-closing stop of unit not move, start warning immediately yet.
Because car team is when from closed interval sudden stop, because locomotive has the function that automatically sands, if unit, locomotive moves out the section that sands not in time, then shunting badness may be caused, cause this interval automatically to go out clearly, so rear defence signal then can open, and rear car team and locomotive finally may be caused to bump against.And use method of the present invention carry out interval stop carry out early warning, the collision of rear train and locomotive can be avoided well.

Claims (5)

1. a locomotive control real-time analysis method, is characterized in that: comprise
(1) locomotive control real-time analysis device receives the data of train operation monitoring device;
(2) locomotive control real-time analysis device records data and carries out judgement to the data of record with the specified speed of the current location preset and processes; Data after record are carried out to the update request judging to perform or respond main frame simultaneously.
2. a kind of locomotive control real-time analysis method according to claim 1, is characterized in that: the data of described LKJ train comprise present speed, current time, current kilometer mark, current demand signal machine state and brake pipe pressure data.
3. a kind of locomotive control real-time analysis method according to claim 1, it is characterized in that: described judgement treating process is: according to current kilometer mark, signal serial number, data cross-channel, a number, train number Signal aspects kind, judge whether the specified speed of current speed and preset current location meets, if do not satisfied condition, generate early warning entry point information, early warning information sends by data transmission process simultaneously.
4. a kind of locomotive control real-time analysis method according to claim 1, it is characterized in that: whether real-time judge electronic hand account has the judgement of request log file or upgrade the request of mainframe program in program operation process, then respond association requests and execute file transmission or reception program update file.
5. a locomotive control real-time analysis device, is characterized in that: train operation monitoring device is communicated with locomotive control real-time analysis device by dual CAN bus, and locomotive control real-time analysis device is communicated with electronic hand account display terminal by RS485 communication interface; Described locomotive control real-time analysis device comprises:
Receive the communications interface unit of train operation monitoring device data;
To the memory cell that data record;
The data of record and the specified speed of default current location are carried out to the processing unit judging to process;
And, the data after record are carried out to the performance element judging to perform or respond main frame update request.
CN201410739411.2A 2014-12-08 2014-12-08 Locomotive operation real-time analysis method and locomotive operation real-time analysis device Pending CN104554348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410739411.2A CN104554348A (en) 2014-12-08 2014-12-08 Locomotive operation real-time analysis method and locomotive operation real-time analysis device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410739411.2A CN104554348A (en) 2014-12-08 2014-12-08 Locomotive operation real-time analysis method and locomotive operation real-time analysis device

Publications (1)

Publication Number Publication Date
CN104554348A true CN104554348A (en) 2015-04-29

Family

ID=53071681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410739411.2A Pending CN104554348A (en) 2014-12-08 2014-12-08 Locomotive operation real-time analysis method and locomotive operation real-time analysis device

Country Status (1)

Country Link
CN (1) CN104554348A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108099955A (en) * 2017-12-13 2018-06-01 湖南中车时代通信信号有限公司 By semaphore letter connection is controlled to close the deactivated method disclosed, system, storage medium
CN110888907A (en) * 2019-11-26 2020-03-17 辽宁鼎汉奇辉电子系统工程有限公司 Item point identification method based on LKJ running data
CN111634309A (en) * 2020-05-21 2020-09-08 哈尔滨市科佳通用机电股份有限公司 Method and device for recording data added by electric service
CN112037495A (en) * 2020-08-26 2020-12-04 天津七一二通信广播股份有限公司 Locomotive wireless comprehensive communication data monitoring system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011027166A1 (en) * 2009-09-03 2011-03-10 Westinghouse Brake And Signal Holdings Limited Railway systems using acoustic monitoring
CN102039915A (en) * 2010-12-10 2011-05-04 河南思维自动化设备有限公司 Vehicle-mounted basic data dynamic approval system for train operation monitoring device
WO2013121344A2 (en) * 2012-02-17 2013-08-22 Balaji Venkatraman Real time railway disaster vulnerability assessment and rescue guidance system using multi-layered video computational analytics
CN203623666U (en) * 2013-11-30 2014-06-04 河南思维信息技术有限公司 Locomotive operation real-time analysis system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011027166A1 (en) * 2009-09-03 2011-03-10 Westinghouse Brake And Signal Holdings Limited Railway systems using acoustic monitoring
CN102039915A (en) * 2010-12-10 2011-05-04 河南思维自动化设备有限公司 Vehicle-mounted basic data dynamic approval system for train operation monitoring device
WO2013121344A2 (en) * 2012-02-17 2013-08-22 Balaji Venkatraman Real time railway disaster vulnerability assessment and rescue guidance system using multi-layered video computational analytics
CN203623666U (en) * 2013-11-30 2014-06-04 河南思维信息技术有限公司 Locomotive operation real-time analysis system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
贾建中: ""机车操纵指导及地面处理系统的研究"", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
黄学政等: ""基于GSM技术的LKJ版本信息监控系统"", 《机车电传动》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108099955A (en) * 2017-12-13 2018-06-01 湖南中车时代通信信号有限公司 By semaphore letter connection is controlled to close the deactivated method disclosed, system, storage medium
CN110888907A (en) * 2019-11-26 2020-03-17 辽宁鼎汉奇辉电子系统工程有限公司 Item point identification method based on LKJ running data
CN111634309A (en) * 2020-05-21 2020-09-08 哈尔滨市科佳通用机电股份有限公司 Method and device for recording data added by electric service
CN112037495A (en) * 2020-08-26 2020-12-04 天津七一二通信广播股份有限公司 Locomotive wireless comprehensive communication data monitoring system

Similar Documents

Publication Publication Date Title
US9828011B2 (en) Communication system for guideway mounted vehicle and method of using the same
CN104554348A (en) Locomotive operation real-time analysis method and locomotive operation real-time analysis device
CN206906884U (en) A kind of vehicle fault diagnosis system and vehicle
EP3882777A2 (en) Method and apparatus for acquiring sample deviation data, and electronic device
CN103670114B (en) train door control method and device
CN203157940U (en) Remote intelligent vehicle locking device
WO2019165617A1 (en) Vehicle-mounted apparatus and vehicle collision analysis method and device
CN115861973A (en) Road abnormal state detection method, system, electronic equipment and storage medium
CN202152051U (en) Lane deviation alarm device
CN110992519A (en) New energy automobile fault data processing method and processing device
CN110758494A (en) Temporary speed limiting method and device, electronic equipment and storage medium
CN104819856A (en) Train bogie transverse stability detection method and device
CN105791042B (en) Communication quality testing method in ETC system
CN113085882B (en) Fault processing method and device, electronic equipment and storage medium
CN104282147A (en) Intelligent vehicle monitor method
CN109752993B (en) Remote online comprehensive monitoring method and system for vehicle-mounted seismic device
CN203381628U (en) Device for detecting transverse instability of train bogies
CN104464370A (en) Tower type lifting and transverse-moving stereo garage parking space state monitoring system
CN116305857A (en) Automatic driving simulation test method, device, equipment and storage medium
CN103632412B (en) Vehicle-mounted data management method and device
CN104670265B (en) A kind of device using FPGA to realize connecting train positioning system and onboard wireless electric control signal
CN104913944A (en) Hammer type breaker intelligent detection system
CN203623667U (en) Train operation monitoring vehicle-mounted system control unit communication frame
CN105700507A (en) Method and device for vehicle network diagnosis control
CN111098892B (en) Space position information positioning method and device of automatic train monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429