A kind of method and apparatus for management business resource Download PDFInfo
- Publication number
- CN104539445B CN104539445B CN201410719810.2A CN201410719810A CN104539445B CN 104539445 B CN104539445 B CN 104539445B CN 201410719810 A CN201410719810 A CN 201410719810A CN 104539445 B CN104539445 B CN 104539445B
- Authority
- CN
- China
- Prior art keywords
- information
- service
- equipment
- path
- resources
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
It is an object of the invention to provide a kind of method and apparatus for obtaining service resources.Method according to the present invention includes:Service requesting information is obtained, wherein, the service requesting information includes path configured information, the path for needing to obtain with instruction;Based on the service requesting information, screened in the service allocation list comprising one or more service resources information, to obtain at least one the service resources information for meeting the service requesting information, wherein, the service resources packet contains the service path information for being used for completing transmission services, wherein, IP layers equipment and/or light layer devices are included in the service path information.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of method and apparatus for management business resource.
Background technology
In the prior art, with big data and the development of cloud computing, in order to reach higher message transmission rate and bigger
Bandwidth, increasing Transmission system is using being contained in optical transport network (Optical Transport Network, OTN)
Light layer devices carry the data transfer between Internet data center (Internet Data Center, IDC).Fig. 1 shows
The exemplary network transmission system anticipated out according to prior art, reference picture 1, the network system include 3 internets
Data center IDC1 is carried out data transmission to IDC3 between them by OTN equipment.
However, light layer devices are normally only planned by the scheme based on prior art, and IP layer equipment can not be cooperateed with to enter
The unified MRP of row and deployment.Also, the mode based on prior art, IDC operation maintenance personnel can not learn network failure
It is due to the equipment in light layer devices or IDC and caused, unnecessary investigation work may be increased.
The content of the invention
It is an object of the invention to provide a kind of method for management business resource, wherein, methods described includes following step
Suddenly:
- service requesting information is obtained, wherein, the service requesting information includes path configured information, to indicate that needs obtain
The path obtained;
- service requesting information is based on, carried out in the service allocation list comprising one or more service resources information
Screening, to obtain at least one the service resources information for meeting the service requesting information, wherein, the service resources packet
Containing the service path information for completing transmission services, wherein, IP layers equipment and/or photosphere are included in the service path information
Equipment.
According to an aspect of the present invention, a kind of resource management apparatus for being used to obtain service resources is additionally provided, wherein,
The resource management apparatus includes:
For obtaining the device of service requesting information, wherein, the service requesting information includes path configured information, to refer to
Show the path that needs obtain;
For based on the service requesting information, entering in the service allocation list comprising one or more service resources information
Row screening, to obtain the device of at least one the service resources information for meeting the service requesting information, wherein, the business money
Source packet contains the service path information for being used for completing transmission services, wherein, IP layer equipment is included in the service path information
And/or light layer devices.
Compared with prior art, the present invention has advantages below:According to office's the solution of the present invention, can to IP layers equipment and
Light layer devices carry out unified MRP, facilitate user to plan related service;Also, according to the solution of the present invention, it may be determined that
The ownership layer of network failure, improve the efficiency of malfunction elimination work.
Brief description of the drawings
By reading the detailed description made to non-limiting example made with reference to the following drawings, of the invention is other
Feature, objects and advantages will become more apparent upon:
Fig. 1 illustrates an exemplary network transmission system according to prior art;
Fig. 2 illustrates a kind of method flow diagram for being used to obtain service resources according to the present invention;
Fig. 3 illustrates a kind of structural representation for being used to obtain the resource management apparatus of service resources according to the present invention
Figure;
Fig. 4 illustrates an exemplary service transmission path according to the present invention.
Same or analogous reference represents same or analogous part in accompanying drawing.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 illustrates a kind of method flow diagram for being used to obtain service resources according to the present invention.According to the present invention's
Method includes step S1 and step S2.
Wherein, the method according to the invention is realized by the resource management apparatus being contained in the network equipment.The net
Network equipment includes but is not limited to single network server, the server group of multiple webservers composition or based on cloud computing
The cloud being made up of a large amount of main frames or the webserver of (Cloud Computing), wherein, cloud computing is the one of Distributed Calculation
Kind, a super virtual computer being made up of the computer collection of a group loose couplings.
Preferably, the network according to the invention equipment can be obtained by predetermined interface and come from IP layers equipment and/or photosphere
The relevant information of equipment.
It is highly preferred that Common Object Request Broker Architecture (Common is passed through according to the resource management apparatus of the present invention
Object Request Broker Architecture, CORBA) or Simple Network Management Protocol (Simple Network
Management Protocol, SNMP) northbound interface in interface and the current network interconnects, obtains each in current network
The device configuration information of individual light layer devices.
Wherein, the IP layers equipment may be included in setting for Internet including interchanger, modem, router etc.
It is standby.
Wherein, the light layer devices include such as optical modem, fiber optical transceiver, optical switch, optical transmission device,
Dense wavelength division system equipment, optical transport network (Optical Transport Network, OTN) equipment, SDH
(Synchronous Digital Hierarchy, SDH) equipment, multi-service transport platform (Multi-Service Transfer
Platform, MSTP) equipment, Packet Transport Network (Packet Transport Network, PTN) equipment etc. may be included in photosphere
Equipment.
Wherein, the network equipment, IP layers equipment, the network residing for light layer devices include but is not limited to internet, wide area
Net, Metropolitan Area Network (MAN), LAN, VPN etc..
It should be noted that the network equipment, IP layers equipment, light layer devices and network are only for example, other are existing
Or the network equipment, IP layers equipment, light layer devices and the network that are likely to occur from now on be such as applicable to the present invention, should also include
Within the scope of the present invention, and it is incorporated herein by reference.
Reference picture 1, in step sl, resource management apparatus obtain service requesting information.
Wherein, the service requesting information includes path configured information, the path for needing to obtain with instruction.Preferably, should
Path configured information includes but is not limited to be used to indicate to need the starting point in path and the information of terminal obtained.Preferably, institute
State the quantity that path configured information may also include the service path for needing to obtain.
Preferably, the service requesting information may also include attribute indication information, and the attribute indication information is used to indicate to need
Path attribute corresponding to the path to be obtained.For example, attribute indication information may include required service rate, service protection
The attribute requirements information such as grade, business propagation delay time.
It is highly preferred that the path configured information can also include following at least any one:
1) nodal information passed through is needed;For example, path configured information indicates that required path needs to set by IP layers
Standby IP_1 and light layer devices OPN_1.
2) nodal information evaded is needed.Set for example, path configured information indicates that required path needs to evade photosphere
Standby OPN_2;
3) port information of one or more nodes included in path etc..For example, which instruction starting point node uses
Configured information that individual port is interconnected with other equipment etc..
According to the first example of the present invention, resource management apparatus is contained in the management system for providing MRP service, when
When user inputs the service path that its needs is opened in the user interface of system:Need to open 2 slave site Node_1 and arrive at a station
Point Node_2 service path;The service rate of demand is more than 1Tbps, and resource management apparatus obtains and the user in step sl
Service request corresponding to the information of input, the service requesting information include path configured information:Starting point Node_1;Point of destination
Node_2;Requested service number of paths " 2 ", and corresponding attribute indication information:Service rate requires 1Tbps.
Then, in step s 2, resource management apparatus is based on the service requesting information, is including one or more business
Screened in the service allocation list of resource information, meet that at least one service resources of the service requesting information are believed to obtain
Breath.
Wherein, the service resources packet contains the service path information for being used for completing transmission services, the service path
IP layers equipment and/or light layer devices are included in information.
Preferably, the service path packet is containing each IP device and photosphere for completing its approach needed for corresponding business
The respective identification information of equipment and its port information.
According to the present invention the second example, the service resources information from IDC computer room pos1 to IDC computer rooms pos2, its
By the IP device pos1_IP1 and light layer devices pos1_OP1 in IDC computer rooms pos1, the photosphere reached in IDC computer rooms pos2 is set
Standby pos2_OP2, and and then transmit to IP device pos2_IP2, then the service path information in its corresponding service resources information
Line_1 is as follows:
IDC computer rooms pos2 → IP device pos1_IP1 and its port information → light layer devices pos1_OP1 and port information →
Light layer devices pos2_OP2 and its port information → IP device pos2_IP2 and its port information → IDC computer rooms pos1.
Preferably, the service path information can include each IP layers equipment for completing the business institute approach and photosphere is set
It is standby.
For example, if the business of foregoing second example also needs to set by the photosphere between IDC computer room pos1 and IDC computer rooms pos2
Standby OP3 and OP4, then its corresponding service path information Line_1 is as follows:
IDC computer rooms pos2 → IP device pos1_IP1 and its port information → light layer devices pos1_OP1 and port information →
Light layer devices pos1_OP3 and port information → light layer devices pos1_OP4 and port information → light layer devices pos2_OP2 and its
Port information → IP device pos2_IP2 and its port information → IDC computer rooms pos1.
Preferably, the service resources information may also include business attribute information corresponding with service path information.
Wherein, the business attribute information is used at least one attribute information for indicating a service path, it is preferable that institute
State business attribute information and include but is not limited to following at least any one:
1) service rate information;Service rate information is used to indicate this service circuit speed, it is preferable that service rate is believed
What breath included this service circuit opens speed.
2) activation of service status information;The activation of service status information is used to indicate that each equipment in service path is current
Whether service bearer is had.Preferably, activation of service status information may include " to activate " and " un-activation ", wherein, " activation " instruction
The equipment currently has service bearer, and " un-activation " indicates the equipment currently without service bearer, available for carrying other business.
For example, for the port of an equipment, when its port status is " up ", corresponding activation of service status information is sharp
Living, otherwise, when its port status is " down ", its corresponding activation of service status information is un-activation.
3) service protection pattern;The service protection pattern is used to indicate the pattern protected currently for service path.
Preferably, service protection pattern includes but is not limited to following any protected mode:
I) SNCP (Sub-network Connection Protection, SNCP);
Ii) route protection;
Iii unprotects etc..
Wherein, those skilled in the art are any, it is to be appreciated that service protection pattern is not limited with foregoing cited three kinds
Used in current this area, and the following various protected modes that may be used may be included in the service protection pattern.
4) business-level information;The reference that the business-level information includes the various significance levels available for determination business is believed
Breath.For example, can be 4 business-levels by the delineation of activities in network:Diamond, gold medal, silver medal and bronze medal, so as to according to diamond>
Gold medal>Silver medal>The order of bronze medal carries out traffic grooming or service protection.
5) business delivery quality information;The business delivery quality information may be used to indicate corresponding service path including various
Transmission quality situation information.
Preferably, the business delivery quality information includes but is not limited to following at least any one:
I) bit error rate (Bit Error Rate, BER) information;
Ii) circuit Delay;
Iii) service path across segment number information etc..
Preferably, the business attribute information may also include weight additional information.
Wherein, the weight additional information is included based on every business attribute information of business route the business that determines
The weight information of route.
Preferably, the weight additional information is included based on every weight information to determine in delivery quality information.Example
Such as, the weight accessory information of service circuit can be determined based on following rule:The bit error rate, circuit Delay, across segment number information three
The weighted score of person successively decreases successively, to indicate that its priority is successively decreased successively, also, when considering the bit error rate, the power of no bit error rate
Restore to divide to be more than and weighted score of the bit error rate etc. be present.
Continue to illustrate based on foregoing second case, if foregoing service path information Line business attribute information includes:
Activation of service state " has activated ", service protection pattern " SNCP ", service rate " 5Tbps ", business-level " gold medal ", transmits matter
Attribute " 88 " is measured, then service resources information corresponding to service path information Line_1 is as follows:
IDC computer rooms pos2 → IP device pos1_IP1 and its port information → light layer devices pos1_OP1 and port information →
Light layer devices pos1_OP3 and port information → light layer devices pos1_OP4 and port information → light layer devices pos2_OP2 and its
Port information → IP device pos2_IP2 and its port information → IDC computer rooms pos1 → activation of service state " activation " → business
Protected mode " SNCP " → service rate " 5Tbps " → business-level " gold medal " → delivery quality attribute " bit error rate 0.23 ‰ ".
Specifically, resource management apparatus is based on the service requesting information, is including one or more service resources information
Service allocation list in screened, by obtain meet the service requesting information at least one of in a manner of service resources information
It is including but not limited to following any:
1) when the service resources information includes service path information, resource management apparatus is based on path instruction letter
Breath, filters out one or more candidate Traffics that service path information meets the path configured information in the service allocation list
Resource information.
For example, when the path configured information obtained includes start point information, endpoint information and needs the node letter evaded
During breath, resource management apparatus is based on the path configured information, from the multinomial service path letter in the service allocation list of itself storage
Filtered out in breath wherein corresponding with the starting point indicated by the path configured information and terminal and without needing to evade
The service path information of node.
2) when the service resources information also includes business attribute information corresponding with the service path information, and institute
When stating service requesting information also includes being used for the attribute indication information of the path attribute corresponding to the path that instruction needs obtain, money
Source control device is based on the path configured information, and service path information is filtered out in the service allocation list and meets the path
One or more candidate Traffic resource informations of configured information, and the attribute indication information is based on, described one or more
In candidate Traffic resource information, business attribute information is selected to meet at least one service resources letter of the attribute indication information
Breath.
Preferably, process in accordance with the present invention S2 further comprises step S21 (not shown).
In the step s 21, resource management apparatus can also based on predetermined screening rule, with reference to the service requesting information,
Screened in the service allocation list comprising one or more service resources information.
Wherein, the screening rule include device configuration information based on service path and/or business attribute information come it is true
It is fixed.For example, screening rule " can select to be selected the routing information of the minimum port of number every time ";Or screening rule can wrap
Include:" optimal routing information of selection transport of instruction information every time " etc..
For example, resource management apparatus obtains in step sl " opens four in IP device dev_1 between IP device dev_2
The service requesting information of bar service path ", wherein, the boards of port11 to port14 totally 4 available ports is included in dev_1,
Dev_2 includes the board of two available ports of port21 and port22, and predetermined screening rule includes " selected time of selection every time
The routing information of the minimum ports of number ", dev_1 each possible port sets into dev_2 are contained in current service allocation list
The service path information of conjunction, then resource management apparatus be based on screening rule, finally determine 4 routes port information it is as follows:
Equipment dev_1 port port11 → equipment dev_21 port port21;
Equipment dev_1 port port12 → equipment dev_21 port port22;
Equipment dev_1 port port13 → equipment dev_21 port port21;
Equipment dev_1 port port14 → equipment dev_21 port port22.
Wherein, those skilled in the art will be understood that the said equipment, board and port etc. merely to explanation screening rule
The simple example then done, and do not indicate that any restriction to actual screening process.
It is highly preferred that the screening rule is screened including the priority based on each service resources information, according to preceding
Stating the method for preferred scheme also includes step S3 (not shown), and the step S21 also includes step S211 (not shown).
In step s3, resource management apparatus is according to each service resources information at least one of described service resources information
Business attribute information determine the weight additional information of each service resources information.
Specifically, resource management apparatus is according to the industry of each service resources information at least one of described service resources information
Business attribute information, is established rules really based on predetermined weight additional information, to determine the additional letter of the weight of each service resources information
Breath, with so that determine its selected priority.
Preferably, resource management apparatus can be protected based on the business delivery quality information in business attribute information and/or business
Shield pattern, to determine the priority of each service resources information.
For example, delivery quality information includes the span number of the bit error rate (BER) information, circuit Delay and service path
Information, weight additional information are established rules really, including weighted score is followed successively by from high to low:The bit error rate, circuit Delay, across
Segment number information.Then in step s3, the excellent of each service resources information is first determined according to the bit error rate of each service resources information
The lower service resources information weighted score of first level, the wherein bit error rate is higher, the service resources information highest scoring of no bit error rate.
Then, for multiple service resources information that the bit error rate is identical or gap is in allowed band, then its respective circuit is calculated
Delay, and determine that the smaller service resources information weighted score of time delay is higher is then, identical or gap exists for time delay
Multiple service resources information in allowed band, continue to calculate it across segment number information, and determine the fewer service resources of span number
Information weighted score is higher.
Then, in step S211, resource management apparatus is based on the service requesting information, and according to each service resources
The weight additional information of information, screened in the service allocation list comprising one or more service resources information, to obtain
Meet at least one service resources information of the service requesting information.
Specifically, resource management apparatus is based on the service requesting information, is screened in service allocation list to obtain
Multiple service resources information for meeting its requirement, and according to the weight additional information of each service resources information, for example, according to power
Heavy point of principle from high to low, the service resources information of predetermined number is selected from the multiple service resources information selected.
Preferably, when the weight additional information of each service resources information is identical, the side such as random function can be passed through
Formula is selected.
Continue to illustrate foregoing First example, resource management apparatus indicates letter based on the path obtained in step sl
Breath:Starting point Node_1;Point of destination Node_2,20 are filtered out in the service allocation list of itself storage and meets that the path indicates
Information, starting point is Node_1 and point of destination is Node_2 candidate Traffic path, are next based on attribute indication information:Industry
Be engaged in rate requirement 1Tbps, 8 service paths for selecting service rate to be more than 1Tbps in 20 candidate Traffic paths.And
And resource management apparatus is selected wherein preferential based on the 8 respective precedence informations of service path determined in step s3
2 service paths feed back to the user before level highest.
According to a preferred embodiment of the present invention, when resource management apparatus can not obtain and institute from the service allocation list
When stating service resources information corresponding to service requesting information, the method according to the invention also includes step S4, the step S1 bags
Include step S101.
In step s 4, when corresponding with service requesting information business money can not be obtained from the service allocation list
During source information, resource management apparatus feeds back the renewal prompt message for the service requesting information.
Wherein, the renewal prompt message is used to prompt user can not obtain the available resources for meeting its service request.
Preferably, the renewal prompt message may also include for prompting user to change service path information or service attribute letter
The advisory information of breath.Such as, it is proposed that user reduces required service rate, or the starting point or terminal of change service path
Deng.
Then, in step S101, resource management apparatus receives industry obtained based on the renewal prompt message, new
It is engaged in solicited message, and step S2 is continued executing with to obtain the service request for meeting that this is new based on the service requesting information of the information
The service resources information of information.
For example, resource management apparatus receives service requesting information in step sl:Starting point Node_3;Point of destination
Node_4;Service rate requires 5Tbps, and determines not obtaining from service allocation list in step s 2 to believe with the service request
Service resources information corresponding to breath.Then resource management apparatus feeds back for acquired service requesting information more in step s 4
New prompt message.When user re-enters new solicited message based on the renewal prompt message:Starting point Node_3;Point of destination
Node_4;When service rate requires 4Tbps, resource management apparatus receives the new service requesting information in step S101, and
Then screened in step s 2 based on the new service requesting information in the service allocation list of itself storage, to obtain
Meet at least one service resources information of the new service requesting information.
Preferably, when industry corresponding with the new service requesting information still can not be obtained from the service allocation list
During resource information of being engaged in, resource management apparatus repeats above-mentioned steps S4 and step S101, until resource management apparatus is in step
At least one the service resources information for the new service requesting information for meeting to be received is got in S2;Or to resource management
Device fails to obtain new service requesting information.
Preferably, the method according to the invention is by performing step S5 (not shown), step S6 (not shown) and step S7
(not shown), to generate the service allocation list.
In step s 5, resource management apparatus obtains each IP layers equipment and each light layer devices in current network respectively
Device configuration information.
Preferably, the device configuration information of the IP layers equipment includes but is not limited to following at least any one:
1) hardware information;For example, the hardware information may include the groove position number that equipment includes, the plate that each groove position is installed
The type information of card, the available port number of each board and port information, each accessible rate information in port, luminous power
Information etc..
2) service configuration information;For example, such as show configuration, show run can be passed through
Routing configuration information of IP layers of display etc. is transferred in the instructions such as configuration, in another example, the expense of each IP device port
(cost) information etc..
3) equipment alarm information;Equipment alarm information includes the information for feedback device abnormal conditions, for example, temperature is different
The abnormal informations such as normal or CPU usage exception.
Preferably, the device configuration information of the light layer devices includes but is not limited to following at least any one:
1) hardware information;The hardware information of the content that the hardware information may include and above-mentioned IP layers equipment is same or similar,
It will not be repeated here.
2) service configuration information;For example, cross-connection information, port use information etc. in matrix.
3) equipment alarm information;For example, optical signal loses alarm (Loss Of Signal, LOS) etc..
Wherein, those skilled in the art will be understood that the device configuration information of IP layers equipment and light layer devices can be adopted respectively
Embodied with different forms, for example, the equipment alarm information of IP layer equipment can be using failure code, failure abbreviation etc. come real
It is existing, and the equipment alarm information of light layer devices can be realized using LOS warning information etc..
Wherein, resource management apparatus can be by for managing the internal management network of each IP device and exchanging for IP layers
Each equipment such as machine, router is connected, also, resource management apparatus can by it is in transmission network, for managing each light
The northbound interface of the NMS of layer equipment, is connected with each light layer devices in transmission network.
Preferably, resource management apparatus can be by such as foregoing corba interface and/or SNMP interfaces, and in current network
The northbound interface of transmission network be connected, to obtain the device configuration information of each light layer devices in the transmission network.
Then, in step s 6, resource management apparatus is to each IP layers equipment of acquisition and setting for each light layer devices
Standby configuration information is normalized.
Specifically, resource management apparatus is by each IP layers equipment of acquisition and the device configuration information of each light layer devices
Converted according to uniformly standard, so that by the device configuration information of the multiple equipment from different manufacturers in the form of unified
Represent.
For example, being both the port being connected in OTN equipment with IP layer equipment, LTX client is expressed as in the OTN equipment of Huawei
Mouthful, and Client ports are expressed as in the OTN equipment of Alcatel Lucent.Then resource management apparatus can be by above-mentioned LTX client's mouth
It is unified to represent what is be connected in OTN equipment with IP layer equipment with Client ports and Client ports are normalized
Port.
In another example for IP layers equipment and the warning information of light layer devices disconnecting, this kind is accused in the equipment of Huawei
Alert information is represented with R_LOS, and this kind of warning information is represented with LANLOS in the equipment of Alcatel Lucent.Then resource management
The representation of above-mentioned R_LOS warning information and LANLOS warning information can be normalized for device, unified with " visitor
Family side ports are abnormal " represent the warning information of IP layers equipment and light layer devices disconnecting.
Then, in the step s 7, device configuration information of the resource management apparatus based on each equipment after normalized
And the transmission list item of the current network, to determine one or more service resources information, this or more is included with generation
The service allocation list of item service resources information.
Specifically, each IP layers equipment and each light layer devices two are obtained in resource management apparatus slave unit configuration information
Side ports information, and matching is carried out according to the transmission list item and collected, to obtain one or more service path information.
Preferably, resource management apparatus can also according to the device configuration information of each equipment in the routing information, it is determined that
Business attribute information corresponding to the service path information.
According to a preferred embodiment of the invention, methods described also includes step S8 (not shown) and step S9 (figures
Do not show).
In step s 8, resource management apparatus receives the warning information from one or more equipment, wherein, it is one
Or multiple equipment may include IP layers equipment and/or light layer devices.
Then, in step s 9, resource management apparatus is with reference to the service allocation list, by one or more of equipment
The warning information of each equipment is associated, to determine that network failure corresponding with one or more of warning information is IP layers
Failure or photosphere failure.
Preferably, resource management apparatus is according to each IP layers equipment of acquisition and/or the port status information of light layer devices
And the warning information of each equipment after association, it is determined that network failure corresponding with one or more of warning information is IP
Layer failure or photosphere failure.
According to the second example of the present invention, the exemplary service path shown in reference picture 4, the service path includes 2
IP device R1 and R2, and the 2 transmission equipment A and transmission equipment B as light layer devices.Wherein, transmission equipment A L1 ports
It is connected with transmission equipment B L2 ports by trunk fiber, R1 port e1/1 passes through customer side tail optical fiber and the C1 of transmission equipment 1
Mouth is connected, and R2 e2/1 ports are connected by customer side tail optical fiber with transmission equipment B C2 ports.Resource management apparatus is in step S8
In the state of each equipment that receives it is as follows:
Transmission equipment A:L1 mouths do not receive light, and L1 mouths have LOS warning information, and C1 mouths receive and dispatch light normally and no alarm information;
Transmission equipment B:L2 mouths do not receive light, and L2 mouths have LOS warning information, and C2 mouths receive and dispatch light normally and no alarm information;
IP device R1:E1/1 mouths state is down, and transmitting-receiving light is normal;
IP device R2:E2/1 mouths state is down, and transmitting-receiving light is normal.
Then service path information of the resource management apparatus with reference to corresponding to several equipment, be judged as transmission equipment A and B it
Between break down, the judged result is presented to user.
Continue to illustrate foregoing second example, when R1 and R2 state sends change, resource management apparatus is in step
The new state of each equipment received in rapid S8 is as follows:
Transmission equipment A:C1 mouths do not receive light, and C1 mouths have LOS warning information, and L1 mouths receive and dispatch light normally and no alarm information;
Transmission equipment B:C2 mouths do not receive light, and L2 mouths have a Remote_LOS warning information, L2 mouths transmitting-receiving light it is normal and with nowhere to turn to
Alert information;
IP device R1:E1/1 mouths state is down, and transmitting-receiving light is abnormal, it is readable go out luminous power;
IP device R2:E2/1 mouths state is down, and transmitting-receiving light is normal.
Then service path information of the resource management apparatus with reference to corresponding to several equipment, judge transmission equipment A and R1
E1/1 is broken down between port, and is the tail optical fiber failure between R1 and transmission equipment C1, and the judged result is presented into use
Family.
Preferably, step S10 (not shown) is also included according to the method for this preferred embodiment.
In step S10, when it is determined that network failure corresponding with one or more of warning information is photosphere failure, money
Source control device further determines that this according to the port status information of one or more of warning information and each IP device
Network failure is that fiber link failure is still light layer devices failure.
Specifically, resource management apparatus further determines that the network failure based on the type indication information in warning information
Still it is light layer devices failure for fiber link failure.Such as net card failure (the card from light layer devices is received for example, working as
) etc. failure when type is the warning information of hardware fault, resource management apparatus can determine whether network failure as light layer devices therefore
Barrier.
Preferably, the service resources information also includes business attribute information corresponding with the service path information, institute
Stating business attribute information includes delivery quality information, also includes step S11 (not shown) according to the method for this preferred embodiment
With step S12 (not shown).
In step s 11, resource management apparatus determines business corresponding with the warning information of one or more of equipment
Routing information.
Then, in step s 12, resource management apparatus is according to the warning information of one or more of equipment, renewal with
Delivery quality information corresponding to the service path information.
For example, representing delivery quality information with numerical value, numerical value is bigger to represent that delivery quality is higher, and service path can have
Some highest delivery quality values are 100, for determining that the rule of delivery quality information includes:LOS warning information is received, then
The delivery quality value in corresponding service path is subtracted 1;Hardware alarm information is received, then by the delivery quality value in corresponding service path
Subtract 2.When receiving a LOS warning information, resource management apparatus determines corresponding with the LOS warning information in step s 11
Service path information route_1, and according to predetermined rule, by the service path information route_1 delivery quality values by original
98 come are updated to 97.
According to the method for the office present invention, unified MRP can be carried out to IP layers equipment and light layer devices, it is convenient to use
Plan related service in family;Also, the method according to the invention, it may be determined that the ownership layer of network failure, improve malfunction elimination work
The efficiency of work.
Fig. 3 illustrates a kind of structural representation for being used to obtain the resource management apparatus of service resources according to the present invention
Figure.Included being used for the device (hereinafter referred to as " acquisition device for obtaining service requesting information according to the resource management apparatus of the present invention
1”);For based on the service requesting information, being sieved in the service allocation list comprising one or more service resources information
Choosing, to obtain the device (hereinafter referred to as " screening plant of at least one the service resources information for meeting the service requesting information
2”)。
Acquisition device 1 obtains service requesting information.
Wherein, the service requesting information includes path configured information, the path for needing to obtain with instruction.Preferably, should
Path configured information includes but is not limited to be used to indicate to need the starting point in path and the information of terminal obtained.Preferably, institute
State the quantity that path configured information may also include the service path for needing to obtain.
Preferably, the service requesting information may also include attribute indication information, and the attribute indication information is used to indicate to need
Path attribute corresponding to the path to be obtained.For example, attribute indication information may include required service rate, service protection
The attribute requirements information such as grade, business propagation delay time.
It is highly preferred that the path configured information can also include following at least any one:
1) nodal information passed through is needed;For example, path configured information indicates that required path needs to set by IP layers
Standby IP_1 and light layer devices OPN_1.
2) nodal information evaded is needed.Set for example, path configured information indicates that required path needs to evade photosphere
Standby OPN_2;
3) port information of one or more nodes included in path etc..For example, which instruction starting point node uses
Configured information that individual port is interconnected with other equipment etc..
According to the first example of the present invention, resource management apparatus is contained in the management system for providing MRP service, when
When user inputs the service path that its needs is opened in the user interface of system:Need to open 2 slave site Node_1 and arrive at a station
Point Node_2 service path;The service rate of demand is more than 1Tbps, and acquisition device 1 obtains the information pair with user input
The service request answered, the service requesting information include path configured information:Starting point Node_1;Point of destination Node_2;Ask industry
Number of paths of being engaged in " 2 ", and corresponding attribute indication information:Service rate requires 1Tbps.
Then, screening plant 2 is based on the service requesting information, is including the business of one or more service resources information
Screened in allocation list, to obtain at least one the service resources information for meeting the service requesting information.
Wherein, the service resources packet contains the service path information for being used for completing transmission services, the service path
IP layers equipment and/or light layer devices are included in information.
Preferably, the service path packet is containing each IP device and photosphere for completing its approach needed for corresponding business
The respective identification information of equipment and its port information.
According to the present invention the second example, the service resources information from IDC computer room pos1 to IDC computer rooms pos2, its
By the IP device pos1_IP1 and light layer devices pos1_OP1 in IDC computer rooms pos1, the photosphere reached in IDC computer rooms pos2 is set
Standby pos2_OP2, and and then transmit to IP device pos2_IP2, then the service path information in its corresponding service resources information
Line_1 is as follows:
IDC computer rooms pos2 → IP device pos1_IP1 and its port information → light layer devices pos1_OP1 and port information →
Light layer devices pos2_OP2 and its port information → IP device pos2_IP2 and its port information → IDC computer rooms pos1.
Preferably, the service path information can include each IP layers equipment for completing the business institute approach and photosphere is set
It is standby.
For example, if the business of foregoing second example also needs to set by the photosphere between IDC computer room pos1 and IDC computer rooms pos2
Standby OP3 and OP4, then its corresponding service path information Line_1 is as follows:
IDC computer rooms pos2 → IP device pos1_IP1 and its port information → light layer devices pos1_OP1 and port information →
Light layer devices pos1_OP3 and port information → light layer devices pos1_OP4 and port information → light layer devices pos2_OP2 and its
Port information → IP device pos2_IP2 and its port information → IDC computer rooms pos1.
Preferably, the service resources information may also include business attribute information corresponding with service path information.
Wherein, the business attribute information is used at least one attribute information for indicating a service path, it is preferable that institute
State business attribute information and include but is not limited to following at least any one:
1) service rate information;Service rate information is used to indicate this service circuit speed, it is preferable that service rate is believed
What breath included this service circuit opens speed.
2) activation of service status information;The activation of service status information is used to indicate that each equipment in service path is current
Whether service bearer is had.Preferably, activation of service status information may include " to activate " and " un-activation ", wherein, " activation " instruction
The equipment currently has service bearer, and " un-activation " indicates the equipment currently without service bearer, available for carrying other business.
For example, for the port of an equipment, when its port status is " up ", corresponding activation of service status information is sharp
Living, otherwise, when its port status is " down ", its corresponding activation of service status information is un-activation.
3) service protection pattern;The service protection pattern is used to indicate the pattern protected currently for service path.
Preferably, service protection pattern includes but is not limited to following any protected mode:
I) SNCP (Sub-network Connection Protection, SNCP);
Ii) route protection;
Iii unprotects etc..
Wherein, those skilled in the art are any, it is to be appreciated that service protection pattern is not limited with foregoing cited three kinds
Used in current this area, and the following various protected modes that may be used may be included in the service protection pattern.
4) business-level information;The reference that the business-level information includes the various significance levels available for determination business is believed
Breath.For example, can be 4 business-levels by the delineation of activities in network:Diamond, gold medal, silver medal and bronze medal, so as to according to diamond>
Gold medal>Silver medal>The order of bronze medal carries out traffic grooming or service protection.
5) business delivery quality information;The business delivery quality information may be used to indicate corresponding service path including various
Transmission quality situation information.
Preferably, the business delivery quality information includes but is not limited to following at least any one:
I) bit error rate (Bit Error Rate, BER) information;
Ii) circuit Delay;
Iii) service path across segment number information etc..
Preferably, the business attribute information may also include weight additional information.
Wherein, the weight additional information is included based on every business attribute information of business route the business that determines
The weight information of route.
Preferably, the weight additional information is included based on every weight information to determine in delivery quality information.Example
Such as, the weight accessory information of service circuit can be determined based on following rule:The bit error rate, circuit Delay, across segment number information three
The weighted score of person successively decreases successively, to indicate that its priority is successively decreased successively, also, when considering the bit error rate, the power of no bit error rate
Restore to divide to be more than and weighted score of the bit error rate etc. be present.
Continue to illustrate based on foregoing second case, if foregoing service path information Line business attribute information includes:
Activation of service state " has activated ", service protection pattern " SNCP ", service rate " 5Tbps ", business-level " gold medal ", transmits matter
Attribute " 88 " is measured, then service resources information corresponding to service path information Line_1 is as follows:
IDC computer rooms pos2 → IP device pos1_IP1 and its port information → light layer devices pos1_OP1 and port information →
Light layer devices pos1_OP3 and port information → light layer devices pos1_OP4 and port information → light layer devices pos2_OP2 and its
Port information → IP device pos2_IP2 and its port information → IDC computer rooms pos1 → activation of service state " activation " → business
Protected mode " SNCP " → service rate " 5Tbps " → business-level " gold medal " → delivery quality attribute " bit error rate 0.23 ‰ ".
Specifically, screening plant 2 is based on the service requesting information, is including the industry of one or more service resources information
Screened in business allocation list, included in a manner of at least one service resources information that the service requesting information is met to obtain
But it is not limited to following any:
1) when the service resources information includes service path information, resource management apparatus is based on path instruction letter
Breath, filters out one or more candidate Traffics that service path information meets the path configured information in the service allocation list
Resource information.
For example, when the path configured information obtained includes start point information, endpoint information and needs the node letter evaded
During breath, resource management apparatus is based on the path configured information, from the multinomial service path letter in the service allocation list of itself storage
Filtered out in breath wherein corresponding with the starting point indicated by the path configured information and terminal and without needing to evade
The service path information of node.
2) when the service resources information also includes business attribute information corresponding with the service path information, and institute
When stating service requesting information also includes being used for the attribute indication information of the path attribute corresponding to the path that instruction needs obtain, money
Source control device is based on the path configured information, and service path information is filtered out in the service allocation list and meets the path
One or more candidate Traffic resource informations of configured information, and the attribute indication information is based on, described one or more
In candidate Traffic resource information, business attribute information is selected to meet at least one service resources letter of the attribute indication information
Breath.
Preferably, process in accordance with the present invention screening plant 2 further comprises for based on predetermined screening rule, with reference to
The service requesting information, the device screened in the service allocation list comprising one or more service resources information (figure
Do not show, hereinafter referred to as " sub- screening plant ").
Sub- screening plant, with reference to the service requesting information, is including one or more industry based on predetermined screening rule
Screened in the service allocation list for resource information of being engaged in.
Wherein, the screening rule include device configuration information based on service path and/or business attribute information come it is true
It is fixed.For example, screening rule " can select to be selected the routing information of the minimum port of number every time ";Or screening rule can wrap
Include:" optimal routing information of selection transport of instruction information every time " etc..
For example, acquisition device 1 obtains " in IP device dev_1's to opening four service paths between IP device dev_2 "
Service requesting information, wherein, the boards of port11 to port14 totally 4 available ports is included in dev_1, dev_2 is included
The board of two available ports of port21 and port22, predetermined screening rule include that " selection selected number is minimum every time
The routing information of port ", the business of dev_1 each possible port combinations into dev_2 is contained in current service allocation list
Routing information, then sub- screening plant be based on screening rule, finally determine 4 routes port information it is as follows:
Equipment dev_1 port port11 → equipment dev_21 port port21;
Equipment dev_1 port port12 → equipment dev_21 port port22;
Equipment dev_1 port port13 → equipment dev_21 port port21;
Equipment dev_1 port port14 → equipment dev_21 port port22.
Wherein, those skilled in the art will be understood that the said equipment, board and port etc. merely to explanation screening rule
The simple example then done, and do not indicate that any restriction to actual screening process.
It is highly preferred that the screening rule is screened including the priority based on each service resources information, according to preceding
Stating the resource management apparatus of preferred scheme also includes being used for according to each service resources at least one of described service resources information
The business attribute information of information come determine the device of the weight additional information of each service resources information (it is not shown, hereinafter referred to as
" weight determining device "), the sub- screening plant also includes being used to be based on the service requesting information, and is provided according to each business
The weight additional information of source information, screened in the service allocation list comprising one or more service resources information, to obtain
Take meet the service requesting information at least one of service resources information device (it is not shown, hereinafter referred to as " weight screening dress
Put ").
The service attribute of each service resources information in weight determining device at least one service resources information according to
Information determines the priority of each service resources information.
Specifically, weight determining device is according to the industry of each service resources information at least one of described service resources information
Business attribute information, is established rules really based on predetermined weight additional information, to determine the additional letter of the weight of each service resources information
Breath, with so that determine its selected priority.
Preferably, resource management apparatus can be protected based on the business delivery quality information in business attribute information and/or business
Shield pattern, to determine the priority of each service resources information.
For example, delivery quality information includes the span number of the bit error rate (BER) information, circuit Delay and service path
Information, weight additional information are established rules really, including weighted score is followed successively by from high to low:The bit error rate, circuit Delay, across
Segment number information.Then weight determining device first determines the excellent of each service resources information according to the bit error rate of each service resources information
The lower service resources information weighted score of first level, the wherein bit error rate is higher, the service resources information highest scoring of no bit error rate.
Then, for multiple service resources information that the bit error rate is identical or gap is in allowed band, then its respective circuit is calculated
Delay, and determine that the smaller service resources information weighted score of time delay is higher is then, identical or gap exists for time delay
Multiple service resources information in allowed band, continue to calculate it across segment number information, and determine the fewer service resources of span number
Information weighted score is higher.
Then, weight screening plant is based on the service requesting information, and attached according to the weight of each service resources information
Add information, screened in the service allocation list comprising one or more service resources information, meet the business to obtain
At least one service resources information of solicited message.
Specifically, weight screening plant is based on the service requesting information, is screened in service allocation list to obtain
Multiple service resources information for meeting its requirement, and according to the weight additional information of each service resources information, for example, according to power
Heavy point of principle from high to low, the service resources information of predetermined number is selected from the multiple service resources information selected.
Preferably, when the weight additional information of each service resources information is identical, the side such as random function can be passed through
Formula is selected.
Continue to illustrate foregoing First example, the path configured information that screening plant 2 is obtained based on acquisition device 1:
Starting point Node_1;Point of destination Node_2,20 are filtered out in the service allocation list of itself storage and meets path instruction letter
Candidate Traffic path cease, that starting point is Node_1 and point of destination is Node_2, is next based on attribute indication information:Business
Rate requirement 1Tbps, 8 service paths for selecting service rate to be more than 1Tbps in 20 candidate Traffic paths.Also,
8 respective precedence informations of service path that weight screening plant is determined based on weight determining device, select wherein preferential
2 service paths feed back to the user before level highest.
According to a preferred embodiment of the present invention, when resource management apparatus can not obtain and institute from the service allocation list
When stating service resources information corresponding to service requesting information, also included being used for according to the resource management apparatus of the present invention when can not be from
When service resources information corresponding with the service requesting information is obtained in the service allocation list, resource management apparatus feedback pair
It is described to obtain dress in the device (not shown, hereinafter referred to as " feedback device ") of the renewal prompt message of the service requesting information
Put 1 device for including being used for receiving service requesting information obtained based on the renewal prompt message, new (it is not shown, with
Lower abbreviation " request reception device ").
When service resources information corresponding with the service requesting information can not be obtained from the service allocation list, instead
Present renewal prompt message of the device feedback for the service requesting information.
Wherein, the renewal prompt message is used to prompt user can not obtain the available resources for meeting its service request.
Preferably, the renewal prompt message may also include for prompting user to change service path information or service attribute letter
The advisory information of breath.Such as, it is proposed that user reduces required service rate, or the starting point or terminal of change service path
Deng.
Then, reception device is asked to receive service requesting information obtained based on the renewal prompt message, new, sieve
Screening device 2 is continued executing with based on the service requesting information based on the service requesting information of the information, is including one or more
The step of being screened in the service allocation list of item service resources information, to obtain the business for meeting the new service requesting information
Resource information.
For example, acquisition device 1 receives service requesting information:Starting point Node_3;Point of destination Node_4;Service rate will
5Tbps is sought, resource management apparatus determines that service resources corresponding with the service requesting information can not be obtained from service allocation list
Information.Then feedback device feeds back the renewal prompt message for acquired service requesting information.When user is carried based on the renewal
Show that information re-enters new solicited message:Starting point Node_3;Point of destination Node_4;When service rate requires 4Tbps, request
Reception device receives the new service requesting information, and screening plant 2 is based on the new service requesting information, in the industry of itself storage
Screened in business allocation list, to obtain at least one the service resources information for meeting the new service requesting information.
Preferably, when industry corresponding with the new service requesting information still can not be obtained from the service allocation list
During resource information of being engaged in, resource management apparatus repeats renewal prompt message of the above-mentioned feedback for the service requesting information
Operation and the operation for receiving service requesting information obtained based on the renewal prompt message, new, until screening plant 2 obtains
Get at least one the service resources information for the new service requesting information for meeting to be received;Or to resource management apparatus not
New service requesting information can be obtained.
Preferably, included according to the resource management apparatus of the present invention:Set for obtaining each IP layers in current network respectively
The device (not shown, hereinafter referred to as " configuration acquisition device ") of the device configuration information of standby and each light layer devices;For right
Obtain each IP layers equipment and each light layer devices device configuration information be normalized device (it is not shown,
Hereinafter referred to as " normalization device ");And for the device configuration information based on each equipment after normalized and
The transmission list item of the current network, to determine one or more service resources information, one or more industry are included with generation
The device (not shown, hereinafter referred to as " information determining means ") of the service allocation list for resource information of being engaged in
Configuration acquisition device obtains each IP layers equipment and the device configuration of each light layer devices in current network respectively
Information.
Preferably, the device configuration information of the IP layers equipment includes but is not limited to following at least any one:
1) hardware information;For example, the hardware information may include the groove position number that equipment includes, the plate that each groove position is installed
The type information of card, the available port number of each board and port information, each accessible rate information in port, luminous power
Information etc..
2) service configuration information;For example, such as show configuration, show run can be passed through
Routing configuration information of IP layers of display etc. is transferred in the instructions such as configuration, in another example, the expense of each IP device port
(cost) information etc..
3) equipment alarm information;Equipment alarm information includes the information for feedback device abnormal conditions, for example, temperature is different
The abnormal informations such as normal or CPU usage exception.
Preferably, the device configuration information of the light layer devices includes but is not limited to following at least any one:
1) hardware information;The hardware information of the content that the hardware information may include and above-mentioned IP layers equipment is same or similar,
It will not be repeated here.
2) service configuration information;For example, cross-connection information, port use information etc. in matrix.
3) equipment alarm information;For example, optical signal loses alarm (Loss Of Signal, LOS) etc..
Wherein, those skilled in the art will be understood that the device configuration information of IP layers equipment and light layer devices can be adopted respectively
Embodied with different forms, for example, the equipment alarm information of IP layer equipment can be using failure code, failure abbreviation etc. come real
It is existing, and the equipment alarm information of light layer devices can be realized using LOS warning information etc..
Wherein, resource management apparatus can be by for managing the internal management network of each IP device and exchanging for IP layers
Each equipment such as machine, router is connected, also, resource management apparatus can by it is in transmission network, for managing each light
The northbound interface of the NMS of layer equipment, is connected with each light layer devices in transmission network.
Preferably, resource management apparatus can be by such as foregoing corba interface and/or SNMP interfaces, and in current network
The northbound interface of transmission network be connected, to obtain the device configuration information of each light layer devices in the transmission network.
Then, normalization device enters to each IP layers equipment of acquisition and the device configuration information of each light layer devices
Row normalized.
Specifically, normalization device is by each IP layers equipment of acquisition and the device configuration information of each light layer devices
Converted according to uniformly standard, so that by the device configuration information of the multiple equipment from different manufacturers in the form of unified
Represent.
For example, the port being connected in the OTN equipment of Huawei with IP layer equipment is expressed as LTX client's mouth, and Alcatel is bright
The port being connected in the OTN equipment equipment of news with IP layer equipment is expressed as Client ports.Then normalization device can will be above-mentioned
LTX client's mouth and Client ports are normalized, unified to represent to set with IP layers in OTN equipment with Client ports
The port of standby connection.
In another example for IP layers equipment and the warning information of light layer devices disconnecting, this kind is accused in the equipment of Huawei
Alert information is represented with R_LOS, and this kind of warning information is represented with LANLOS in the equipment of Alcatel Lucent.Then normalization
The representation of above-mentioned R_LOS warning information and LANLOS warning information can be normalized for device, unified with " visitor
Family side ports are abnormal " represent the warning information of IP layers equipment and light layer devices disconnecting.
Then, device configuration information of the information determining means based on each equipment after normalized and described current
The transmission list item of network, to determine one or more service resources information, believed with generation comprising one or more service resources
The service allocation list of breath.
Specifically, each IP layers equipment and each light layer devices two are obtained in information determining means slave unit configuration information
Side ports information, and matching is carried out according to the transmission list item and collected, to obtain one or more service path information.
Preferably, information determining means can also according to the device configuration information of each equipment in the routing information, it is determined that
Business attribute information corresponding to the service path information.
According to a preferred embodiment of the invention, the resource management apparatus also include being used to receive from one or
The device (not shown, hereinafter referred to as " alarm reception device ") of the warning information of multiple equipment and for reference to the business configuration
Table, the warning information of each equipment in one or more of equipment is associated, to determine and one or more of announcements
Network failure corresponding to alert information is IP layers failure or photosphere failure (not shown, hereinafter referred to as " alarm association device ").
Alert reception device and receive the warning information from one or more equipment, wherein, one or more of equipment
It may include IP layers equipment and/or light layer devices.
Then, alarm association device is with reference to the service allocation list, by each equipment in one or more of equipment
Warning information is associated, to determine that network failure corresponding with one or more of warning information is IP layers failure or light
Layer failure.
Preferably, resource management apparatus is according to each IP layers equipment of acquisition and/or the port status information of light layer devices
And the warning information of each equipment after association, it is determined that network failure corresponding with one or more of warning information is IP
Layer failure or photosphere failure.
According to the second example of the present invention, the exemplary service path shown in reference picture 4, the service path includes 2
IP device R1 and R2, and the 2 transmission equipment A and transmission equipment B as light layer devices.Wherein, transmission equipment A L1 ports
It is connected with transmission equipment B L2 ports by trunk fiber, R1 port e1/1 passes through customer side tail optical fiber and the C1 of transmission equipment 1
Mouth is connected, and R2 e2/1 ports are connected by customer side tail optical fiber with transmission equipment B C2 ports.Alarm reception device receives
The state of each equipment is as follows:
Transmission equipment A:L1 mouths do not receive light, and L1 mouths have LOS warning information, and C1 mouths receive and dispatch light normally and no alarm information;
Transmission equipment B:L2 mouths do not receive light, and L2 mouths have LOS warning information, and C2 mouths receive and dispatch light normally and no alarm information;
IP device R1:E1/1 mouths state is down, and transmitting-receiving light is normal;
IP device R2:E2/1 mouths state is down, and transmitting-receiving light is normal.
Then service path information of the alarm association device with reference to corresponding to several equipment, be judged as transmission equipment A and B it
Between break down, the judged result is presented to user.
Continue to illustrate foregoing second example, when R1 and R2 state sends change, resource management apparatus is in step
The new state of each equipment received in rapid S8 is as follows:
Transmission equipment A:C1 mouths do not receive light, and C1 mouths have LOS warning information, and L1 mouths receive and dispatch light normally and no alarm information;
Transmission equipment B:C2 mouths do not receive light, and L2 mouths have a Remote_LOS warning information, L2 mouths transmitting-receiving light it is normal and with nowhere to turn to
Alert information;
IP device R1:E1/1 mouths state is down, and transmitting-receiving light is abnormal, it is readable go out luminous power;
IP device R2:E2/1 mouths state is down, and transmitting-receiving light is normal.
Then service path information of the alarm association device with reference to corresponding to several equipment, judge transmission equipment A and R1
E1/1 is broken down between port, and is the tail optical fiber failure between R1 and transmission equipment C1, and the judged result is presented into use
Family.
Preferably, also included being used for when determination and one or more of alarms are believed according to the method for this preferred embodiment
When network failure corresponding to breath is photosphere failure, according to one or more of warning information and the port shape of each IP device
State information further determine that the network failure be fiber link failure be still light layer devices failure device (it is not shown, below
Referred to as " failure determination device ").
When it is determined that network failure corresponding with one or more of warning information is photosphere failure, failure determination device
According to the port status information of one or more of warning information and each IP device, further determine that the network failure is
Fiber link failure is still light layer devices failure.
Specifically, failure determination device further determines that the network failure based on the type indication information in warning information
Still it is light layer devices failure for fiber link failure.Such as net card failure (the card from light layer devices is received for example, working as
) etc. failure when type is the warning information of hardware fault, resource management apparatus can determine whether network failure as light layer devices therefore
Barrier.
Preferably, the service resources information also includes business attribute information corresponding with the service path information, institute
Stating business attribute information includes delivery quality information, is also included being used to determine according to the resource management apparatus of this preferred embodiment
(not shown, hereinafter referred to as " path is true for the device of service path information corresponding with the warning information of one or more of equipment
Determine device ") and walk for the warning information according to one or more of equipment, update pass corresponding with the service path information
Send the device (not shown, hereinafter referred to as " quality updating device ") of quality information.
Path determining device determines service path information corresponding with the warning information of one or more of equipment.
Then, quality updating device according to the warning information of one or more of equipment, believe by renewal and the service path
Delivery quality information corresponding to breath.
For example, representing delivery quality information with numerical value, numerical value is bigger to represent that delivery quality is higher, and service path can have
Some highest delivery quality values are 100, for determining that the rule of delivery quality information includes:LOS warning information is received, then
The delivery quality value in corresponding service path is subtracted 1;Hardware alarm information is received, then by the delivery quality value in corresponding service path
Subtract 2.When receiving a LOS warning information, path determining device determines service path letter corresponding with the LOS warning information
Route_1 is ceased, quality updating device is according to predetermined rule, by the service path information route_1 delivery quality values by original
98 be updated to 97.
According to office's the solution of the present invention, unified MRP can be carried out to IP layers equipment and light layer devices, it is convenient to use
Plan related service in family;Also, according to the solution of the present invention, it may be determined that the ownership layer of network failure, improve malfunction elimination work
The efficiency of work.
The software program of the present invention can realize steps described above or function by computing device.Similarly, originally
The software program (including related data structure) of invention can be stored in computer readable recording medium storing program for performing, for example, RAM is deposited
Reservoir, magnetically or optically driver or floppy disc and similar devices.In addition, some steps or function of the present invention can employ hardware to reality
It is existing, for example, coordinating as with processor so as to perform the circuit of each function or step.
In addition, the part of the present invention can be applied to computer program product, such as computer program instructions, when its quilt
When computer performs, by the operation of the computer, the method according to the invention and/or technical scheme can be called or provided.
And the programmed instruction of the method for the present invention is called, it is possibly stored in fixed or moveable recording medium, and/or pass through
Broadcast or the data flow in other signal bearing medias and be transmitted, and/or be stored according to described program instruction operation
In the working storage of computer equipment.Here, including a device according to one embodiment of present invention, the device includes using
Memory in storage computer program instructions and processor for execute program instructions, wherein, when the computer program refers to
When order is by the computing device, method and/or skill of the plant running based on foregoing multiple embodiments according to the present invention are triggered
Art scheme.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.This
Outside, it is clear that the word of " comprising " one is not excluded for other units or step, and odd number is not excluded for plural number.That is stated in system claims is multiple
Unit or device can also be realized by a unit or device by software or hardware.The first, the second grade word is used for table
Show title, and be not offered as any specific order.
Claims (18)
1. a kind of method for obtaining service resources, wherein, it the described method comprises the following steps:
- service requesting information is obtained, wherein, the service requesting information includes path configured information, needs what is obtained with instruction
Path;
- service requesting information is based on, screened in the service allocation list comprising one or more service resources information,
To obtain at least one the service resources information for meeting the service requesting information, wherein, the service resources packet is containing use
In the service path information for completing transmission services, wherein, set in the service path information comprising IP layers equipment and/or photosphere
It is standby;
Wherein, methods described is further comprising the steps of:
- receive the warning information from one or more equipment, wherein, one or more of equipment include IP layers equipment and/
Or light layer devices;
- with reference to the service allocation list, the warning information of each equipment in one or more of equipment is associated, with true
Fixed network failure corresponding with one or more of warning information is IP layers failure or photosphere failure.
2. according to the method for claim 1, wherein, the service resources information also includes and the service path information pair
The business attribute information answered, wherein, the service requesting information also includes attribute indication information, and the attribute indication information is used to refer to
Show the path attribute corresponding to the path that needs obtain;
Wherein, it is described to be based on the service requesting information, in the service allocation list comprising one or more service resources information
Screened, also include following step the step of at least one the service resources information for meeting the service requesting information to obtain
Suddenly:
- the path configured information is based on, service path information is filtered out in the service allocation list and meets that the path indicates
One or more candidate Traffic resource informations of information;
- attribute indication information is based on, in one or more candidate Traffic resource informations, select business attribute information
Meet at least one service resources information of the attribute indication information.
3. method according to claim 1 or 2, wherein, it is described to be based on the service requesting information, including one or more
Screened in the service allocation list of item service resources information, to obtain at least one business for meeting the service requesting information
The step of resource information, further comprises the steps:
- based on predetermined screening rule, with reference to the service requesting information, including the industry of one or more service resources information
Screened in business allocation list, to obtain at least one the service resources information for meeting the service requesting information.
4. according to the method for claim 3, wherein, the screening rule includes the weight based on each service resources information
Additional information is screened, and methods described is further comprising the steps of:
- each industry determined according to the business attribute information of each service resources information at least one of described service resources information
The weight additional information for resource information of being engaged in, to select to be used for realize the service requesting information based on the weight additional information
Service resources information;
Wherein, it is described based on predetermined screening rule, with reference to the service requesting information, including one or more service resources
Screened in the service allocation list of information, at least one service resources information of the service requesting information is met with acquisition
Step further comprises:
- service requesting information is based on, and according to the weight additional information of each service resources information, including one or more
Screened in the service allocation list of item service resources information, to obtain at least one business for meeting the service requesting information
Resource information.
5. according to the method for claim 1, wherein, methods described is further comprising the steps of:
- when service resources information corresponding with the service requesting information can not be obtained from the service allocation list, feedback
Renewal prompt message for the service requesting information;
Wherein, the step of acquisition service requesting information is further comprising the steps of:
- receive service requesting information obtained based on the renewal prompt message, new.
6. according to the method for claim 1, wherein, methods described is further comprising the steps of:
- when it is determined that network failure corresponding with one or more of warning information is photosphere failure, according to one or
The port status information of multiple warning information and each IP device, further determine that the network failure for fiber link failure also
It is for light layer devices failure.
7. the method according to claim 11, wherein, in addition to service attribute corresponding with service path information letter
Breath, the business attribute information include delivery quality information, wherein, methods described is further comprising the steps of:
- determine service path information corresponding with the warning information of one or more of equipment;
- according to the warning information of one or more of equipment, update delivery quality information corresponding with the service path information.
8. according to the method for claim 1, wherein, methods described is further comprising the steps of:
- device configuration information of each IP layers equipment and each light layer devices in current network is obtained respectively;
- each IP layers equipment of acquisition and the device configuration information of each light layer devices are normalized;
The transmission list item of-device configuration information based on each equipment after normalized and the current network, come true
Fixed one or more service resources information, the service allocation list of one or more service resources information is included with generation.
9. according to the method for claim 8, wherein, it is described to obtain each IP layers equipment and each in current network respectively
The step of device configuration information of light layer devices, comprises the following steps:
- interconnected by Corba or SNMP interfaces and the northbound interface of the current network, it is each in current network to obtain respectively
The device configuration information of IP layers equipment and each light layer devices.
10. a kind of resource management apparatus for being used to obtain service resources, wherein, the resource management apparatus includes:
For obtaining the device of service requesting information, wherein, the service requesting information includes path configured information, to indicate to need
The path to be obtained;
For based on the service requesting information, being sieved in the service allocation list comprising one or more service resources information
Choosing, to obtain the device of at least one the service resources information for meeting the service requesting information, wherein, the service resources letter
Breath comprising being used to complete the service path information of transmission services, wherein, in the service path information comprising IP layers equipment and/or
Light layer devices;
Wherein, the resource management apparatus also includes:
For receiving the device of the warning information from one or more equipment, wherein, one or more of equipment include IP
Layer equipment and/or light layer devices;
For with reference to the service allocation list, the warning information of each equipment in one or more of equipment to be associated,
To determine that network failure corresponding with one or more of warning information is the device of IP layers failure or photosphere failure.
11. resource management apparatus according to claim 10, wherein, the service resources information also includes and the business
Business attribute information corresponding to routing information, wherein, the service requesting information also includes attribute indication information, attribute instruction
Information is used for the path attribute corresponding to the path that instruction needs obtain;
Wherein, it is described to be used to be based on the service requesting information, including the business configuration of one or more service resources information
Screened in table, be additionally operable to obtaining the device of at least one the service resources information for meeting the service requesting information:
- the path configured information is based on, service path information is filtered out in the service allocation list and meets that the path indicates
One or more candidate Traffic resource informations of information;
- attribute indication information is based on, in one or more candidate Traffic resource informations, select business attribute information
Meet at least one service resources information of the attribute indication information.
12. the resource management apparatus according to claim 10 or 11, wherein, it is described to be used to believe based on the service request
Breath, is screened in the service allocation list comprising one or more service resources information, meets the service request to obtain
The device of at least one service resources information of information further comprises:
For based on predetermined screening rule, with reference to the service requesting information, including one or more service resources information
Service allocation list in screened, with obtain meet the service requesting information at least one of service resources information dress
Put.
13. resource management apparatus according to claim 10, wherein, the screening rule includes being based on each service resources
The weight additional information of information is screened, and the resource management apparatus also includes:
Determined for the business attribute information according to each service resources information at least one of described service resources information each
The weight additional information of individual service resources information, to select to be used for realize the service request based on the weight additional information
The device of the service resources information of information;
Wherein, it is described to be used for based on predetermined screening rule, with reference to the service requesting information, including one or more business
Screened in the service allocation list of resource information, meet that at least one service resources of the service requesting information are believed to obtain
The device of breath is further used for:
- service requesting information is based on, and according to the weight additional information of each service resources information, including one or more
Screened in the service allocation list of item service resources information, to obtain at least one business for meeting the service requesting information
Resource information.
14. resource management apparatus according to claim 10, wherein, the resource management apparatus also includes:
For when service resources information corresponding with the service requesting information can not be obtained from the service allocation list, instead
Present the device of the renewal prompt message for the service requesting information;
Wherein, the device for being used to obtain service requesting information also includes:
For receiving the device of service requesting information obtained based on the renewal prompt message, new.
15. resource management apparatus according to claim 10, wherein, the resource management apparatus also includes:
For when it is determined that network failure corresponding with one or more of warning information is photosphere failure, according to one
Or the port status information of multiple warning information and each IP device, it is fiber link failure to further determine that the network failure
Or it is the device of light layer devices failure.
16. resource management apparatus according to claim 10, wherein, in addition to industry corresponding with the service path information
Business attribute information, the business attribute information include delivery quality information, wherein, the resource management apparatus also includes:
For determining the device of service path information corresponding with the warning information of one or more of equipment;
For the warning information according to one or more of equipment, delivery quality letter corresponding with the service path information is updated
The device of breath.
17. resource management apparatus according to claim 10, wherein, the resource management apparatus also includes:
For obtaining the device of the device configuration information of each IP layers equipment and each light layer devices in current network respectively;
The dress being normalized for each IP layers equipment to acquisition and the device configuration information of each light layer devices
Put;
For device configuration information and the transmission list item of the current network based on each equipment after normalized, come
One or more service resources information are determined, to generate the dress of the service allocation list comprising one or more service resources information
Put.
18. resource management apparatus according to claim 17, wherein, it is described to be used to obtain each IP in current network respectively
The device of the device configuration information of layer equipment and each light layer devices is used for:
- interconnected by Corba or SNMP interfaces and the northbound interface of the current network, to obtain each photosphere in current network
The device configuration information of equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410719810.2A CN104539445B (en) | 2014-12-01 | 2014-12-01 | A kind of method and apparatus for management business resource |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410719810.2A CN104539445B (en) | 2014-12-01 | 2014-12-01 | A kind of method and apparatus for management business resource |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104539445A CN104539445A (en) | 2015-04-22 |
CN104539445B true CN104539445B (en) | 2018-02-23 |
Family
ID=52854914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410719810.2A Active CN104539445B (en) | 2014-12-01 | 2014-12-01 | A kind of method and apparatus for management business resource |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104539445B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105049239B (en) * | 2015-06-25 | 2018-05-25 | 北京百度网讯科技有限公司 | The recognition methods of interface connection relation and system |
CN106453145B (en) * | 2015-08-12 | 2020-02-18 | 中国移动通信集团公司 | Transmission link control method and device |
CN106850424A (en) * | 2015-12-07 | 2017-06-13 | 中国联合网络通信集团有限公司 | A kind of system of selection, the apparatus and system in IP layers of path |
CN106936606B (en) * | 2015-12-29 | 2019-12-06 | 中国电信股份有限公司 | service implementation method and system and service arranging equipment |
CN108011907B (en) * | 2016-10-31 | 2020-06-02 | 华为技术有限公司 | Resource allocation method and device for power distribution and utilization communication network |
CN108075967B (en) * | 2016-11-10 | 2021-04-09 | 成都华为技术有限公司 | Link selection method and device |
CN106657388A (en) * | 2017-01-13 | 2017-05-10 | 中通服软件科技有限公司 | Service activation method, server and industrial computer |
CN112087257B (en) * | 2019-06-13 | 2022-04-12 | 华为技术有限公司 | Fault protection method, equipment and system of optical network |
CN113055761A (en) * | 2019-12-27 | 2021-06-29 | 中兴通讯股份有限公司 | OTN detection, path determination, data transmission method and device, and readable storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102136940A (en) * | 2010-12-31 | 2011-07-27 | 华为技术有限公司 | Network recovery method and device |
CN103746841A (en) * | 2013-12-30 | 2014-04-23 | 华为技术有限公司 | Failure recovery method and controller |
CN103812778A (en) * | 2014-02-21 | 2014-05-21 | 华为技术有限公司 | Stream table entry generating method and device |
CN103973491A (en) * | 2014-05-09 | 2014-08-06 | 北京智谷睿拓技术服务有限公司 | Fault processing method, optical layer control network element and IP layer control network element |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7773539B2 (en) * | 2006-06-01 | 2010-08-10 | Cisco Technology, Inc. | Method for separation of IP+optical management domains |
-
2014
- 2014-12-01 CN CN201410719810.2A patent/CN104539445B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102136940A (en) * | 2010-12-31 | 2011-07-27 | 华为技术有限公司 | Network recovery method and device |
CN103746841A (en) * | 2013-12-30 | 2014-04-23 | 华为技术有限公司 | Failure recovery method and controller |
CN103812778A (en) * | 2014-02-21 | 2014-05-21 | 华为技术有限公司 | Stream table entry generating method and device |
CN103973491A (en) * | 2014-05-09 | 2014-08-06 | 北京智谷睿拓技术服务有限公司 | Fault processing method, optical layer control network element and IP layer control network element |
Also Published As
Publication number | Publication date |
---|---|
CN104539445A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104539445B (en) | A kind of method and apparatus for management business resource | |
US11469992B2 (en) | Systems and methods for managing multi-layer communication networks | |
CN100583811C (en) | Virtual network device | |
US9876572B2 (en) | Configuring a computer network to satisfy multicast dispersion and latency requirements using affinity and network topologies | |
CN109561028B (en) | Method and equipment for selecting transmission path based on traffic engineering | |
US5774669A (en) | Scalable hierarchical network management system for displaying network information in three dimensions | |
US8824887B2 (en) | Method and system for configuring a connection-oriented packet network over a wavelength division multiplexed optical network | |
CN103746911B (en) | A kind of SDN structure and its communication means | |
US7991872B2 (en) | Vertical integration of network management for ethernet and the optical transport | |
CN108809857A (en) | A method of the traffic monitoring based on SDN and service quality securing strategy | |
EP2774048B1 (en) | Affinity modeling in a data center network | |
CN103098425A (en) | Communication network system and method of configuring communication network | |
CN101015157A (en) | Alarm indication and suppression (ais) mechanism in an Ethernet oam network. | |
CN110011915A (en) | SDN network framework, flow transmission control method and device based on SDN | |
CN105530115B (en) | A kind of method and device for realizing operation management maintainance function | |
CN103843360B (en) | Service deployment method, device and the network equipment | |
KR101674177B1 (en) | Transport Software-Defined Network controller of providing E-LAN between multi-nodes and method thereof | |
CN105637806B (en) | Network topology determines method and apparatus, centralized network status information storage equipment | |
CN1321508C (en) | Priority monitor of open shortest path | |
CN109672621A (en) | A kind of method and apparatus selecting transmission path for vpn service | |
Morel et al. | Network services management using programmable data planes for visual cloud computing | |
CN1983984A (en) | Method for monitoring network service fault | |
CN101022358A (en) | Method for realizing resource cluster and management control in IP telecommunication network system | |
Muñoz et al. | Network virtualization, control plane and service orchestration of the ICT STRAUSS project | |
KR101829881B1 (en) | Flow management system, controller and method for detecting fault |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |