CN104537168B - The comprehensively monitoring simulation training system model data management method of equipment oriented function - Google Patents
The comprehensively monitoring simulation training system model data management method of equipment oriented function Download PDFInfo
- Publication number
- CN104537168B CN104537168B CN201410811378.XA CN201410811378A CN104537168B CN 104537168 B CN104537168 B CN 104537168B CN 201410811378 A CN201410811378 A CN 201410811378A CN 104537168 B CN104537168 B CN 104537168B
- Authority
- CN
- China
- Prior art keywords
- equipment
- template
- point
- emulation
- equipments
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of comprehensively monitoring simulation training system model data management method of subway comprehensive monitoring equipment oriented function, including:Based on device oriented functional simulation, die plate equipment model data management framework is set up;The logic association carried out by functions of the equipments emulation logic template, the point template included to equipment template, realizes the functional simulation definition of equipment template;Device emulation model data configuration is carried out, to data modeling and functional simulation in subway comprehensive monitoring simulation training system.The present invention is based on device oriented functional simulation, set up a set of based on die plate equipment model data management framework, bonding apparatus functional simulation logic template, solve in comprehensively monitoring simulation training system in traditional data modeling and functional simulation design method, because being managed towards a function modeling caused by globality poor, the problems such as data volume is big.
Description
Technical field
The present invention relates to subway comprehensive monitoring system emulation training field, more particularly to a kind of synthesis of equipment oriented function
Supervisory control simulation training system model data management method.
Background technology
Subway comprehensive monitoring system (ISCS Integrated Supervisory Control System) is using one
Change hardware and software platform and dedicated communications network, collection such as electric power system, environment and equipment monitoring system, fire alarm system,
The multiple professional real time datas and ambient parameter such as gate control system, broadcast system, closed-circuit television system, ticket selling and checking system, remotely
Monitor, control the operation of each professional system and equipment.During the practical training to comprehensive monitoring system operating personnel often
Limited by place, equipment and fund, and rely more heavily on the realization using comprehensively monitoring simulation training system.Pass through mould
Intend the function of artificial site equipment, operating environment true to nature is provided for trainee, more intuitively, fast and efficiently lift training
The ability of practice of starting of student.
Comprehensively monitoring emulation training research and development and application deployment stage, it is necessary to for subway line itself the characteristics of carry out
Substantial amounts of modeling work.Model data is set up in comprehensively monitoring simulation training system database, each reality is mapped to
Equipment, and the emulation to the various work functions of equipment is realized by emulation logic.According to the actual conditions of different engineerings, database
The data volume of middle model data can reach that hundreds of thousands point is even more more.Modeling work generally requires several engineers and spends longer
Time could complete.
The shortcoming of prior art:1st, the direct collection of comprehensive monitoring system, monitored object are magnanimity in subway engineering scene
Data measuring point, the type substantially including DI, DO, AI, AO, PI etc..For the simulation training system of comprehensive monitoring system, its main flow
Data modeling and functional simulation design method, often handled around all kinds of basic points.With unit spot functional simulation
Realization based on, pass through the maintenance to a large amount of basic function points, realize emulation to whole comprehensive monitoring system function.It is this
Data modeling and the Realization of Simulation mode, towards be individual data point, can only mechanically realize the function to each data point
Emulation.And the function of field apparatus, often it is made up of multiple spot function.In this case, the equipment realized using traditional approach
Functional simulation, is piled up by substantial amounts of discrete functions point, loses globality, the systematicness of functions of the equipments.To the work(of analogue system
Energy research and development, application extension and application deployment, have all manufactured sizable trouble.
2nd, in comprehensive monitoring system, many equipment room sophisticated functions for possessing incidence relation are largely present, such as:Sequence, mould
The functions such as formula, linkage, timetable.The mode for being modeled and being emulated using traditional data, because it draws towards single-point functional configuration, level
The features such as dividing single, in the research and development at initial stage, test phase for realizing that such functional simulation is realized, to system research and development personnel, manufacture
Sizable workload and work complexity.
3rd, during the later stage deployment of simulation training system, debugging, safeguarding, for the actual conditions of different engineerings,
Model data in database is general in the even more ranks of hundreds of thousands point.Data volume it is huge, multi-point is existed in addition
Different function logics, traditional model data maintenance mode towards a functional simulation, to system maintenance personnel, is caused huge
Big work difficulty and workload.
The content of the invention
The technical problems to be solved by the invention be in view of the deficienciess of the prior art, a kind of equipment oriented function it is comprehensive
Supervisory control simulation training system model data management method is closed, using template-device model data management framework as core, equipment is made
For comprehensively monitoring simulation training system basic the Realization of Simulation object.Management is derived from the templating for realizing equipment static attribute
While, designed using functions of the equipments emulation logic formwork frame, derive from the dynamic function the Realization of Simulation templating of equipment, together
When, the model data Configuration Design step of equipment oriented functional simulation completes pattern number in comprehensively monitoring simulation training system
According to the total solution of management.
The design method of the model data way to manage of equipment oriented functional simulation of the present invention, using equipment template, point mould
The mode of plate and functions of the equipments emulation logic template is designed, and model data is managed collectively.This design and manager
Formula makes the equipment modeling method high unity of different majors, the association between model data is more had level, system
Property.
Technical solution of the present invention is as follows:
A kind of comprehensively monitoring simulation training system model data management method of equipment oriented function, including:
(1) device oriented functional simulation is based on, template-device model data management framework is set up;
(2) by functions of the equipments emulation logic template, the logic association that the point template included to equipment template is carried out is real
The functional simulation definition of existing equipment template;
(3) device emulation model data configuration is carried out, to data modeling in simulation training system and functional simulation.
Template-device model data management framework includes equipment template, point template, functions of the equipments emulation logic template, set
Standby, equipment point and functions of the equipments emulation logic;
Equipment template is the abstraction set of logically associated equipment point, describes the general-purpose attribute value of equipment;
Point template describes the general-purpose attribute value of functions of the equipments point;
Functions of the equipments emulation logic template describes the abstract of physical device function logic;
Equipment is device instance in comprehensive monitoring system;
Equipment point is used for the attribute for describing to include in device instance;
Functions of the equipments emulation logic describes the functional simulation logic of specific device instance;
The establishment of equipment template is abstract from example apparatus to be obtained, and equipment template includes imitating between point template and description point template
The functions of the equipments emulation logic template of true function logic, the realization of equipment modeling is derived from by corresponding device template;The function of equipment
The functions of the equipments emulation logic template that emulation logic is included by equipment template derives from.
Equipment point includes data signal output point (Digital Output, DO point), data signal input point (Digital
Input, DI point), analog signal output point (Analog Output, AO point), analog signal input point (Analog Input, AI
Point) and pulse signal input point (Pulse Input, PI point) five class signaling points.
The data management rule of template-device model data management framework includes following two:
(1) all devices are derived from equipment template;(2) all devices point is according to belonging to equipment.Equipment template extraction
The general-purpose attribute value of equipment, point template is extracted general-purpose attribute value a little.One equipment template is contained in requisition for definition
Point template, and an equipment then contains the corresponding point of equipment (point is equipment point).Equipment template and point template need advance
It is defined according to wishing to derive from the actual conditions of equipment.When equipment is derived from, pre-defined according to equipment template
Property value next life forming apparatus data;And the point that equipment is included, then property value next life according to defined in corresponding point template
Into point data.
Device emulation model data configuration, including device configuration, functions of the equipments emulation configuration and many functions of the equipments emulation groups
State;
All devices are considered as unit object, the data measuring point pair that unit object is included by it by device configuration
As constituting;Each data measuring point, each professional function measuring point such as including PSCADA, BAS, FAS, is a basic function pair
As.
Functions of the equipments emulate configuration:On the basis of various kinds of equipment point functional simulation has been carried out, by unit
Comprising multiple equipment point, according to functions of the equipments simulation rules (functions of the equipments simulation rules refer to, real equipment included certain
The operation rule of individual concrete function.), logic association is carried out by functions of the equipments emulation logic, realizes what is be made up of multifunctional dot
The complete function emulation configuration of equipment;
Many functions of the equipments emulate configurations:It is related to the comprehensively monitoring function that is made up of multiple equipment orthofunction in emulation to imitate
When true, according to the equipment room functional simulation of monitored object rule (equipment room functional simulation rule refers to, in comprehensive monitoring system by
The operation rule of the truth function of multiple equipment cooperative achievement.), implementation pattern, linkage, timetable comprehensively monitoring emulation (i.e. mould
Formula, linkage, timetable are awaited a subway the emulation of comprehensively monitoring Premium Features).
Device emulation model data configuration, specifically includes following steps:
S1, builds equipment point template and equipment template:
Point template extracts the general-purpose attribute value of point, the general-purpose attribute value of equipment template extraction equipment;Equipment template comprising pair
Answer between point template to be defined, point template by functions of the equipments emulation logic template progress logic association;
The property value of equipment template, point template and functions of the equipments emulation logic template is according to the actual parameter of equipment to be derived from
It is pre-defined.
S2, equipment derives from:
Derive from equipment when, according to equipment template pre-define attribute value generation device data, the point that equipment is included according to
The attribute value generation data point that the corresponding point template of point is defined, the copying that equipment possesses is sent by device emulation logic template
It is raw;
S3, the no special point adjustment of equipment:
The attribute of the no special point of equipment is according to data management regular (configurable rule) by point template control:Such as fruit dot
Template is changed, then checks data management rule;If data management rule allows, update and meet all of configuration rule condition
Equipment, so as to reach the purpose of batch modification equipment point property value.
In project implementing process, the attribute often put under a certain subsystem under same kind equipment and equipment be it is similar,
Therefore this way to manage was safeguarded to data, changed, with very big in the generation of engineering early stage system, data inputting stage
Advantage.
S4, the particular point adjustment of equipment:Manual configuration specifies particular point attribute.For the particular point of equipment, because it is special
Different property, therefore its data not receptor site template contral, by engineering staff is come voluntarily specified attribute.For example in engineering, certain equipment compared with
Similar miscellaneous equipment has more one (or several) point, in this case, can carry out template definition according to most general equipment,
Derive from after equipment, increase one (or several) particular point in this device, the model that can solve special circumstances equipment is generated
Problem.
The particular point adjustment of step S4 equipment also includes:If engineering exists isolated and disobeys and belong to specific in practice
The point of equipment, then limited, isolated by the second rule in the data management rule of template-device model data management framework
Point modeling when by setting up an empty template, a virtual device must be derived, make isolated point according to some equipment is belonged to
According to belonging to virtual device.
Especially, emulated for the interlock connection that many equipment are constituted, based on equipment group functional simulation logic emulate and determine
Justice.
Compare and prior art, the present invention has advantages below,
1st, the present invention sets up a set of based on template-device model data management based on device oriented functional simulation
Framework, bonding apparatus functional simulation logic template solves traditional data modeling and function in comprehensively monitoring simulation training system
In emulation design method, because towards the globality poor caused by the management of function modeling, data volume is big the problems such as.
2nd, during engineer applied, the design of the emulation configuration of objectification equipment oriented function so that towards comprehensively monitoring
During the multiple professional different type functions of the equipments simulation requirements such as system electric control, ring control, fire, driving, passenger, modularized equipment
Functional simulation fully meets the emulation demand for different characteristics.In project plan implementation process, model is greatly reduced
The maintenance workload of data, improves system deployment application efficiency.
3rd, the model data management of the functional simulation of comprehensively monitoring simulation training system, dependent on to each specialized service logic
Profound understanding and experience accumulation, in force, should by possess the engineer of abundant professional experiences understand user's request base
Realized on plinth and various kinds of equipment emulation logic is worked out, and should be according to simulation rules logic of the using effect to every aspect
Carry out necessary improvement and amendment.And the emulation training platform based on the invention modelling, towards unit functional simulation,
Possess multi-level simulation unit structure, do not limited substantially by service logic, so as to complete well various expert datas and
The functional simulation of data relationship.And with its system, flexible configuration mode, provided for different demands user unified, convenient
Maintenance channel.
4th, the present invention adapts to the depth requirements to various senior copyings in the multi-specialized the integration environment of comprehensively monitoring, greatly
The work complexity of system development and the workload of later maintenance are reduced, operating efficiency is improved.
5th, the present invention has stronger engineering adaptability and design flexibility, and for the system later stage, the expansion of senior application is provided
Realization means and platform.
Brief description of the drawings
Fig. 1 is template-device model data management configuration diagram;
Fig. 2 is equipment template function simulation definition schematic diagram;
Fig. 3 is the device emulation model data configuration flow chart of steps of equipment oriented functional simulation;
Fig. 4 is equipment group functional simulation schematic diagram.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.
Below with reference to the accompanying drawing of the present invention, clear, complete description is carried out to the technical scheme in the embodiment of the present invention
And discussion, it is clear that as described herein is only a part of example of the present invention, is not whole examples, based on the present invention
In embodiment, the every other implementation that those of ordinary skill in the art are obtained on the premise of creative work is not made
Example, belongs to protection scope of the present invention.
For the ease of the understanding to the embodiment of the present invention, make further by taking specific embodiment as an example below in conjunction with accompanying drawing
Illustrate, and each embodiment does not constitute the restriction to the embodiment of the present invention.
A kind of comprehensively monitoring simulation training system model data management method of equipment oriented function, including:
(1) device oriented functional simulation is based on, template-device model data management framework is set up;
(2) by functions of the equipments emulation logic template, the logic association that the point template included to equipment template is carried out is real
The functional simulation definition of existing equipment template;
(3) device emulation model data configuration is carried out, to data modeling in simulation training system and functional simulation.
As shown in figure 1, template-device model data management framework is patrolled including equipment template, point template, functions of the equipments emulation
Collect template, equipment, equipment point and functions of the equipments emulation logic;
Equipment point (point) includes DO points, DI points, AO points, AI points and PI points, i.e. data signal output point (Digital
Output, DO point), data signal input point (Digital Input, DI point), analog signal output point (Analog Output,
AO points), analog signal input point (Analog Input, AI point) and pulse signal input point (Pulse Input, PI point) five classes
Signaling point.
Equipment template is the abstraction set of logically associated equipment point, describes the general-purpose attribute value of equipment;
Point template describes the general-purpose attribute value of functions of the equipments point;
Functions of the equipments emulation logic template describes the abstract of physical device function logic;
Equipment is device instance in comprehensive monitoring system;
Equipment point is used for the attribute for describing to include in device instance;
Functions of the equipments emulation logic describes the functional simulation logic of specific device instance;
The establishment of equipment template is abstract from certain class example apparatus, is the core cell of the inventive method, by Qi Bao
The functions of the equipments emulation logic template of copying logic is constituted between all kinds of point templates and all kinds of points of description that contain.Specific equipment is real
The realization of example modeling, is derived from by the corresponding device template for being pre-designed completion and realized.That is, all kinds of information that example apparatus is included
All kinds of point templates included by equipment template derive from;The equipment that the functional simulation logic of example apparatus is included by equipment template
Functional simulation logic template derives from.
The data management rule of template-device model data management framework includes following two:
(1) all devices are derived from equipment template;(2) all devices point is according to belonging to equipment.Equipment template extraction
The general-purpose attribute value of equipment, point template is extracted general-purpose attribute value a little.One equipment template is contained in requisition for definition
Point template, and an equipment then contains the corresponding point of equipment.Equipment template and point template are needed previously according to wishing that derivation sets
Standby actual conditions are defined.When equipment is derived from, the property value that is pre-defined according to equipment template is generated
Device data;And the point that equipment is included, then the property value according to defined in the corresponding point template generate point data.
Device emulation model data configuration, including device configuration, functions of the equipments emulation configuration and many functions of the equipments emulation groups
State;
All devices are accordingly to be regarded as a unit object by device configuration, what each unit object was included by it
Various types of data measuring point object is constituted;
Functions of the equipments emulate configuration:, will be single on the basis of equipment point (DO, DI, AO, AI, PI) emulation has been carried out
The multiple equipment point included in element device, according to functions of the equipments simulation rules (" functions of the equipments simulation rules " herein refer to, this
The operation rule for some concrete function that real equipment is included.Such as:This real equipment includes following function:(1) equipment is included
One AI point, an AO point;(2) operation rule:When AI point values are " 220 ", its AO point value is automatically set as " 201 ";), lead to
Cross functions of the equipments emulation logic and carry out logic association, realize the complete function emulation configuration for the equipment being made up of multifunctional dot;
Many functions of the equipments emulate configurations:It is related to the comprehensively monitoring function that is made up of multiple equipment orthofunction in emulation to imitate
When true, according to the equipment room functional simulation of monitored object rule, (" equipment room functional simulation rule " refers to, in comprehensive monitoring system
By the operation rule of the truth function of multiple equipment cooperative achievement.Such as:Comprehensively monitoring high-level functional description is as follows:(1) this work(
" equipment a ", " equipment b ", " three equipment of equipment c " can be included;(2) function operation rule:When " equipment a " AI point values are
When " 220 ", and " when equipment b " AI point values are " 220 " simultaneously, then " equipment c " AO point values are automatically set as " 201 ";), it is real
Existing pattern, linkage, timetable are awaited a subway the emulation of comprehensively monitoring Premium Features.Utilize " template-device model data management frame
" equipment group functional simulation " administrative mechanism, realizes the emulation of comprehensively monitoring Premium Features in structure ".
As shown in figure 3, device emulation model data configuration, specifically includes following steps:
S1, builds equipment point template and equipment template:
Point template extracts the general-purpose attribute value of point, the general-purpose attribute value of equipment template extraction equipment;For in equipment template
The emulation of single or multiple function point functions, the logical relation set up by functions of the equipments emulation logic template between equipment point,
Realize the definition of functional simulation.In functions of the equipments emulation logic template, using generic script, included in equipment template
Each point template between logic association, be defined.Pass through this model data framework (point template and functions of the equipments emulation logic
The model data framework that template is constituted) derivative specific equipment, while with general static attribute belonging to this kind equipment,
Also achieve the emulation for the various dynamic functions that this kind equipment is included.
Patrolled as shown in Fig. 2 equipment template includes to emulate by functions of the equipments between correspondence point template to be defined, point template
Collect template and carry out logic association;In Fig. 2, equipment template includes 1,2,3,4,5 totally five point templates, and 1,2,3 point templates are data
Input, 4,5 point templates are data output, after data input is by the logical relation in functions of the equipments emulation logic template, are realized
Data output.
The property value of equipment template, point template and functions of the equipments emulation logic template is according to the actual conditions of equipment to be derived from
It is pre-defined.
S2, equipment derives from:
Derive from equipment when, according to equipment template pre-define attribute value generation device data, the point that equipment is included according to
The attribute value generation data point that the corresponding point template of point is defined, the copying that equipment possesses is sent by device emulation logic template
It is raw;
S3, the no special point adjustment of equipment:
The attribute of the no special point of equipment (refers to the number of template-device model data management framework according to data management rule
According to management rule), by point template control:If point template is changed, configuration rule is checked;If data management rule allows,
The all devices for meeting data management rule condition are then updated, so as to reach the purpose of batch modification equipment point property value.
In project implementing process, the attribute often put under a certain subsystem under same kind equipment and equipment be it is similar,
Therefore this way to manage was safeguarded to data, changed, with very big in the generation of engineering early stage system, data inputting stage
Advantage.
S4, the particular point adjustment of equipment:Manual configuration specifies particular point attribute.For the particular point of equipment, because it is special
Different property, therefore its data not receptor site template contral, by engineering staff is come voluntarily specified attribute.Such as the present embodiment, in engineering,
The more similar miscellaneous equipment of certain equipment has more one (or several) point, in this case, can carry out mould according to most general equipment
Plate is defined, after equipment is derived from, and increases one (or several) particular point in this device, with regard to that can solve special circumstances equipment
Model generates problem.
The particular point adjustment of step S4 equipment also includes:If engineering exists isolated and disobeys and belong to specific in practice
The point of equipment, it is isolated because regular second rule of data management by template-device model data management framework is limited
Point must be according to belonging to some equipment in modeling.By setting up an empty template, derive a virtual device, make isolated point according to
Belong to virtual device.
Point attribute configuration on point template, therefore generate equipment and point data after, still with it is specific for prison
Control object is conducted interviews, and equipment room interlock connection is still realized by the way of to specific progress script configuration.Using setting
Standby functional simulation logic template, to the emulation logic of concrete function in equipment in the way of generic script, is defined (such as Fig. 2
It is shown).After equipment is derived, equipment possesses the functional simulation logic of itself.If in particular cases, certain equipment is set with same type
Standby to there is difference in functionality logic, directly can modify realization on the emulation logic of this equipment.
As shown in figure 4, being emulated for the interlock connection that many equipment are constituted, emulated based on equipment group functional simulation logic
Definition.In Fig. 4, equipment group includes 1,2,3,4,5 totally five equipment, and 1,2,3 equipment are data input, and 4,5 equipment are that data are defeated
Go out, after data input is by the logical relation in equipment group functional simulation logic, realize data output.
It the above is only the preferred embodiment of the present invention, it should be pointed out that:Come for those skilled in the art
Say, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should be regarded as
Protection scope of the present invention.
Claims (7)
1. a kind of comprehensively monitoring simulation training system model data management method of equipment oriented function, it is characterised in that including:
Based on device oriented functional simulation, template-device model data management framework is set up;
The logic association carried out by functions of the equipments emulation logic template, the point template included to equipment template, realizes equipment
The functional simulation definition of template;
Device emulation model data configuration is carried out, to data modeling in simulation training system and functional simulation;
The device emulation model data configuration, including device configuration, functions of the equipments emulation configuration and many functions of the equipments emulation groups
State;
All devices are considered as unit object by the device configuration, and each unit object is surveyed by its data included
Point object is constituted;
The functions of the equipments emulate configuration:On the basis of equipment point functional simulation has been carried out, it will be included in unit
Multiple equipment point, according to functions of the equipments simulation rules, logic association is carried out by functions of the equipments emulation logic, realized by many work(
The complete function emulation configuration of the equipment constituted can be put;
Many functions of the equipments emulate configuration:It is related to the comprehensively monitoring function that is made up of multiple equipment orthofunction in emulation to imitate
When true, according to the equipment room functional simulation of monitored object rule, implementation pattern, linkage, the emulation of timetable comprehensively monitoring.
2. the comprehensively monitoring simulation training system model data management method of equipment oriented function according to claim 1,
Characterized in that,
The template-device model data management framework includes equipment template, point template, functions of the equipments emulation logic template, set
Standby, equipment point and functions of the equipments emulation logic;
The equipment template is the abstraction set of logically related equipment point, describes the general-purpose attribute value of equipment;
The point template describes the general-purpose attribute value of functions of the equipments point;
The functions of the equipments emulation logic template describes the abstract of functions of the equipments logic;
The equipment is device instance in comprehensive monitoring system;
The equipment point is used for the attribute for describing to include in device instance;
The functions of the equipments emulation logic describes the functional simulation logic of specific device instance;
The establishment of the equipment template is abstract from example apparatus to be obtained, and equipment template includes imitating between point template and description point template
The functions of the equipments emulation logic template of true function logic, the realization of the equipment modeling is derived from by corresponding device template;It is described to set
The functions of the equipments emulation logic template that standby functional simulation logic is included by equipment template derives from.
3. the comprehensively monitoring simulation training system model data management method of equipment oriented function according to claim 2,
Characterized in that, the equipment point includes data signal output point, data signal input point, analog signal output point, simulation letter
Number input point and pulse signal input point.
4. the comprehensively monitoring simulation training system model data management method of equipment oriented function according to claim 1,
Characterized in that,
The data management rule of template-device model data management framework includes:
All devices are derived from equipment template;
All devices point is according to belonging to equipment.
5. the comprehensively monitoring simulation training system model data management method of equipment oriented function according to claim 1,
Characterized in that,
The device emulation model data configuration, specifically includes following steps:
S1, builds equipment point template and equipment template:
Point template extracts the general-purpose attribute value of point, the general-purpose attribute value of equipment template extraction equipment;Equipment template is treated comprising correspondence
Logic association is carried out by functions of the equipments emulation logic template between the point template of definition, point template;
The property value of equipment template, point template and functions of the equipments emulation logic template is advance according to the actual parameter of equipment to be derived from
Definition;
S2, equipment derives from:
When deriving from equipment, the attribute value generation device data pre-defined according to equipment template, the point that equipment is included is according to described
The attribute value generation data point that the corresponding point template of point is defined, the copying that equipment possesses is sent by device emulation logic template
It is raw;
S3, the no special point adjustment of equipment:
The attribute of the no special point of equipment is according to data management rule, by point template control:If point template is changed, number is checked
According to management rule;If data management rule allows, all devices for meeting configuration rule condition are updated, so as to reach batch
Change the purpose of equipment point property value;
S4, the particular point adjustment of equipment:Manual configuration specifies particular point attribute.
6. the comprehensively monitoring simulation training system model data management method of equipment oriented function according to claim 5,
Characterized in that, the particular point adjustment of the step S4 equipment also includes:If engineering exist in practice it is isolated, disobey and belong to
The point of specific equipment, sets up empty template, derives virtual device, makes isolated point according to belonging to the virtual device.
7. the comprehensively monitoring simulation training system model data management method of equipment oriented function according to claim 1,
Characterized in that, also including, emulate, emulated based on equipment group functional simulation logic for the interlock connection that many equipment are constituted
Definition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811378.XA CN104537168B (en) | 2014-12-23 | 2014-12-23 | The comprehensively monitoring simulation training system model data management method of equipment oriented function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811378.XA CN104537168B (en) | 2014-12-23 | 2014-12-23 | The comprehensively monitoring simulation training system model data management method of equipment oriented function |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104537168A CN104537168A (en) | 2015-04-22 |
CN104537168B true CN104537168B (en) | 2017-10-10 |
Family
ID=52852695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410811378.XA Active CN104537168B (en) | 2014-12-23 | 2014-12-23 | The comprehensively monitoring simulation training system model data management method of equipment oriented function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104537168B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109542031B (en) * | 2018-11-20 | 2021-10-26 | 上海电器科学研究所(集团)有限公司 | Equipment configuration method in remote operation and maintenance system |
CN111368443A (en) * | 2020-03-06 | 2020-07-03 | 北京旷视机器人技术有限公司 | Equipment simulation method and device and electronic equipment |
CN112446148B (en) * | 2020-11-24 | 2024-04-23 | 南京轨道交通系统工程有限公司 | Data simulation system and method based on urban rail comprehensive monitoring |
CN112364531B (en) * | 2021-01-13 | 2021-03-30 | 长沙树根互联技术有限公司 | Compound model construction method and device, electronic equipment and storage medium |
CN112861456B (en) * | 2021-01-29 | 2022-07-22 | 中国电子科技集团公司第二十九研究所 | Process IP simulation model packaging and library management method and system and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101567582A (en) * | 2009-02-25 | 2009-10-28 | 江苏省电力公司南通供电公司 | General substation automation five-prevention system data description method |
KR20100086220A (en) * | 2009-01-22 | 2010-07-30 | (주)대우건설 | Graphical assessment technique for the span of prestressed concrete girder bridge |
CN102164045A (en) * | 2010-02-20 | 2011-08-24 | 微软公司 | Parameterized computer monitoring system |
CN103366059A (en) * | 2013-07-08 | 2013-10-23 | 国电南瑞科技股份有限公司 | Model data description method for secondary equipment of substation simulation and training system |
-
2014
- 2014-12-23 CN CN201410811378.XA patent/CN104537168B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100086220A (en) * | 2009-01-22 | 2010-07-30 | (주)대우건설 | Graphical assessment technique for the span of prestressed concrete girder bridge |
CN101567582A (en) * | 2009-02-25 | 2009-10-28 | 江苏省电力公司南通供电公司 | General substation automation five-prevention system data description method |
CN102164045A (en) * | 2010-02-20 | 2011-08-24 | 微软公司 | Parameterized computer monitoring system |
CN103366059A (en) * | 2013-07-08 | 2013-10-23 | 国电南瑞科技股份有限公司 | Model data description method for secondary equipment of substation simulation and training system |
Non-Patent Citations (3)
Title |
---|
IEC61850工程组态中的统一建模技术研究;周邺飞 等;《江苏电机工程》;20070831;第26卷;第72-74页 * |
一种基于触发器的数据管理方法的设计与实现;徐漫江 等;《化工自动化及仪表》;20130430;第40卷(第4期);第512-514、551页 * |
一种综合监控系统模型数据的管理方式与实现;张赛桥 等;《城市轨道交通研究》;20121231(第12期);第83-84、88页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104537168A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104537168B (en) | The comprehensively monitoring simulation training system model data management method of equipment oriented function | |
CN102570601B (en) | Transformer substation cockpit system | |
CN110336375A (en) | A kind of processing method and system of power system monitor warning information | |
CN108320104B (en) | Method for realizing protection fixed value on-line verification function obtaining model based on RelayCAC relay protection setting software | |
CN111585349B (en) | Power grid model management and monitoring system | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN104156822A (en) | SOA-based comprehensive enterprise level information system operation and maintenance management method | |
CN110784020A (en) | Automatic checking and accepting equipment, system and method for monitoring information | |
CN106971663A (en) | A kind of wind power plant analogue system and method | |
CN104463465B (en) | A kind of real time monitoring clustering methods based on distributed model | |
CN108508852A (en) | isolation management system and isolation management method | |
CN106557316A (en) | Based on 61850 site protective relaying device menu modeling method | |
CN107368955A (en) | The implementation method of power grid risk, equipment Risk and operating risk integration linkage | |
CN107481598A (en) | A kind of emulation training platform of intelligent substation | |
CN103545917A (en) | Scheduling-automation sub-station simulation system | |
CN107948008A (en) | A kind of modeling method for low-voltage network monitoring system | |
CN104504175A (en) | Simulation system and simulation method for spacecraft assembling | |
CN109614706A (en) | A kind of numeral simulation analysis management system | |
CN105186686B (en) | A kind of dispatching of power netwoks intelligent error preventing policy system based on full mesh topology | |
CN110189575B (en) | Big data-based distribution network operation and maintenance simulation training system | |
CN102064602A (en) | Operating method of B/S framework networked electronic simulation drawing board system | |
CN105576832A (en) | Sub-station simulation and transmission system and method of substation automation system | |
CN107741703A (en) | The virtual DCS emulation platforms man-machine interface framework of nuclear power | |
CN116846074B (en) | Intelligent electric energy supervision method and system based on big data | |
CN105421298A (en) | Sluice gate control method based on multiple-screen display |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230817 Address after: No.20, Gaoxin Road, high tech Zone, Nanjing, Jiangsu 210003 Patentee after: NARI TECHNOLOGY Co.,Ltd. Patentee after: Nanjing NARI Smart Transportation Technology Co.,Ltd. Address before: No.20, Gaoxin Road, high tech Zone, Nanjing, Jiangsu 210003 Patentee before: NARI TECHNOLOGY Co.,Ltd. Patentee before: NARI NANJING CONTROL SYSTEM Co.,Ltd. |