CN104535853A
CN104535853A CN201410770679.2A CN201410770679A CN104535853A CN 104535853 A CN104535853 A CN 104535853A CN 201410770679 A CN201410770679 A CN 201410770679A CN 104535853 A CN104535853 A CN 104535853A
Authority
CN
China
Prior art keywords
module
fiber interface
intelligent substation
wireless
directionally connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410770679.2A
Other languages
Chinese (zh)
Other versions
CN104535853B (en
Inventor
罗蓬
郝晓光
赵宇皓
李铁成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, Hebei Electric Power Construction Adjustment Test Institute filed Critical State Grid Corp of China SGCC
Priority to CN201410770679.2A priority Critical patent/CN104535853B/en
Publication of CN104535853A publication Critical patent/CN104535853A/en
Application granted granted Critical
Publication of CN104535853B publication Critical patent/CN104535853B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a distributed test terminal of an LET wireless communication intelligent substation test system. The distributed test terminal comprises an FPGA module, a first Ethernet receiving and dispatching module, a second Ethernet receiving and dispatching module, a wireless one-way broadcast module, a wireless both-way broadcast module, a GPS timing module, a GPS antenna, a DA switching circuit, a drive module, an Ethernet fiber interface module, a first fiber interface, a second fiber interface, a third fiber interface and a fourth fiber interface. The distributed test terminal has the advantages that convenience is brought to carrying and assembling so that the distributed test terminal can be widely applied to installation debugging tests, off-the-line overhauling tests and technological performance evaluation of transformer substation sites; the distributed test terminal is connected with a far-end device in an LTE wireless local area private network mode, so that a debugging person does not need to carry fibers additionally; the operation states of most electric power systems can be accurately simulated, and working conditions of secondary devices for protection, measurement and control and the like are observed; meanwhile, a plurality of related protection and measurement and control devices which are arranged at intervals are connected in, so that complete testing of secondary systems an overall substation is achieved, and the field working processes are optimized.

Description

The distributed testing terminal of LET radio communication intelligent substation test system
Technical field
The invention belongs to intelligent substation technical field of measurement and test, relate to the distributed testing terminal of LET radio communication intelligent substation test system.
Background technology
Intelligent substation is based on DL860 standard (IEC61850 standard), adopt the advanced technologies such as digitized sampling, intelligent primary equipment and fiber optic Ethernet, there is the feature of digitizing, networking and information sharing of entirely standing, have higher requirement also to while improving intelligent substation level the detection of transformer station, debugging and test.
Intelligent substation test is the key link guaranteeing that intelligent substation puts into operation smoothly, and the reliability of secondary equipment of intelligent converting station and systemic-function, validity all depend on the guarantee of measuring technology.The test of secondary equipment of intelligent converting station not only should comprise the unit inspection of the equipment such as merge cells, intelligent terminal, digital protection; communication between also needing equipment, interoperability and composition system carry out comprehensive system level testing; therefore need to set up complete secondary equipment of intelligent converting station test, test macro, realize the integration testing comprising the full functionality such as relay protection, observing and controlling.
At present, the impact of the aspect technical merits such as tested person model, data transmission channel, terminal and interface, the existing testing tool for secondary equipment of intelligent converting station cannot applications well in substation field test environment, realize the collaborative test of multiple interval, polytype equipment.Subject matter comprises the following aspects:
1) intelligent substation has the feature of communication digitize, networking and information sharing of entirely standing, traditional secondary device testing tool can only receive and dispatch the test data of set form usually, complete the independent test of particular device, simple function, reliability and the validity of allomeric function after construction system cannot be guaranteed;
2) various at the secondary system of intelligent substation configuration mode run, secondary device manufacturer is numerous and diverse, there is larger difference in the communication protocol of equipment network mode, employing, does not still have a kind of testing tool can be common to the test assignment of dissimilar intelligent substation at present;
3) intelligent substation wall protection is at present arranged in protection indoor, and process layer combining unit and intelligent terminal dispersed placement on the spot; Given this distributed arrangement, by space length and environmental impact, the through-flow logical pressure in whole group of interval of substation field and function transmission etc. are difficult to realize, and bring certain hidden danger to the safe and stable operation of transformer station;
4) comprehensive Performance Detection cannot be carried out to secondary device in a pre-installation, this part job placement can only be debugged link at the scene and carry out, make debugging efforts abnormal heavy.
In sum, the mushroom development of building along with China's intelligent station, needs a kind of secondary device means of testing of the novel intelligent substation scene that is applicable to.By data transmission more flexibly and terminal access module, realize test main website seamless access intelligent station electrical secondary system, build typical intelligent station complex fault, developing fault and the senior Test Application such as equipment deficiency, personnel's maloperation, comprehensively deep assessment is carried out to the performance of secondary system of intelligent substation.
Summary of the invention
Technical matters to be solved by this invention is to provide one and LET radio communication intelligent substation test system and real secondary system of intelligent substation is linked together, and realizes the distributed testing terminal of the LET radio communication intelligent substation test system of the closed loop of whole test process.
For solving the problems of the technologies described above adopted technical scheme being: a kind of distributed testing terminal of LET radio communication intelligent substation test system, comprising FPGA module, the first to the second Ethernet transceiver module, wireless unidirectional broadcast module, wireless two-way broadcast module, GPS time block, gps antenna, DA change-over circuit, driver module, Ethernet fiber interface module and the first to the 24 road optical fiber interface; Described FPGA module comprises SV receiver module, SV processing module, GOOSE transceiver module, GOOSE forwarding module, clock module, clock recovery module and DA processing module;
The sampled value signal output part of the 2nd LET radio receiving transmitting module of the input termination LET radio communication intelligent substation test system of described wireless unidirectional broadcast module; The output terminal of described wireless unidirectional broadcast module connects the input end of described SV receiver module through described first Ethernet transceiver module; The respective input of SV processing module described in the output termination of described SV receiver module;
The output terminal of described SV processing module connects the respective input of described DA processing module and driver module respectively;
The on-off model port of the 2nd LET radio receiving transmitting module of LET radio communication intelligent substation test system and the corresponding port of described wireless two-way broadcast module are bi-directionally connected; Described wireless two-way broadcast module is bi-directionally connected through the corresponding port of described second Ethernet transceiver module and described GOOSE transceiver module; The corresponding port of described GOOSE transceiver module and described GOOSE forwarding module is bi-directionally connected; The corresponding port of described GOOSE forwarding module and described driver module is bi-directionally connected;
Described one 4 road optical fiber interface connects the corresponding output end of described driver module;
The corresponding port of described 24 road optical fiber interface and described driver module is bi-directionally connected;
Described gps antenna is bi-directionally connected through the corresponding port of described GPS time block and described clock module;
The corresponding port of described clock module and described clock recovery module is bi-directionally connected;
Described clock recovery module is bi-directionally connected with the corresponding port of SV processing module and Ethernet fiber interface module respectively;
The interval merge cells of the output termination intelligent substation of described DA change-over circuit;
The sampling input end of the wall protection supervisory equipment of the output termination intelligent substation of described one 4 road optical fiber interface;
The output terminal of described 24 road optical fiber interface and the wall protection supervisory equipment GOOSE input/output terminal of intelligent substation are bi-directionally connected;
Shield during the light B code pair of described Ethernet fiber interface module and intelligent substation and be bi-directionally connected.
Described DA change-over circuit is made up of DAC8562 chip and peripheral circuit thereof.
The model of described FPGA module is Cyclone IV EP4CE2217I7N; The model of described the first to the second Ethernet transceiver module is DB83640; Described wireless unidirectional broadcast module and wireless two-way broadcast module are letter horse wireless bridge; The model of described GPS time block is TIME-M3339; The model of described driver module is BCM5248; The model of described Ethernet fiber interface module is HFBR-2412TZ; The model of described first to the 24 road optical fiber interface is OCM3825-54.
The invention has the beneficial effects as follows:
1) all hardware equipment of the present invention adopts portable, modular design, and be easy to carry assembling, can be widely used in the Installation and Debugging test of substation field and stop transport maintenance test, technical feature evaluation.
2) distributed arrangement that the present invention is based on intelligent substation considers, by the field apparatus experimental facilities of near-end being arranged in different interval, connect on the spot, be connected by LTE wireless local private network mode and remote equipment, do not need commissioning staff additionally to carry optical fiber, system constructing convenience, environmental suitability are strong.
3) the present invention can the running status of accurate simulation major part electric system, investigates the working condition of the secondary devices such as protection, observing and controlling, carries out more comprehensive closed loop test to field device.
4) single device more in the past detects debugging method; the present invention accesses the relevant protection in multiple interval, measure and control device simultaneously; by simulating the electro-magnetic transient state of various fault; the action logic of check protection device; investigate the performance of protective device, investigate the performance of Interoperability between secondary device and communication network; achieve the complete test to whole station electrical secondary system, optimize work on the spot flow process.
Accompanying drawing explanation
Fig. 1 is theory diagram of the present invention.
Embodiment
Embodiment is as shown in Figure 1 known, and it comprises FPGA module, the first to the second Ethernet transceiver module, wireless unidirectional broadcast module, wireless two-way broadcast module, GPS time block, gps antenna, DA change-over circuit, driver module, Ethernet fiber interface module and the first to the 24 road optical fiber interface; Described FPGA module comprises SV receiver module, SV processing module, GOOSE transceiver module, GOOSE forwarding module, clock module, clock recovery module and DA processing module;
The sampled value signal output part of the 2nd LET radio receiving transmitting module of the input termination LET radio communication intelligent substation test system of described wireless unidirectional broadcast module; The output terminal of described wireless unidirectional broadcast module connects the input end of described SV receiver module through described first Ethernet transceiver module; The respective input of SV processing module described in the output termination of described SV receiver module;
The output terminal of described SV processing module connects the respective input of described DA processing module and driver module respectively;
The on-off model port of the 2nd LET radio receiving transmitting module of LET radio communication intelligent substation test system and the corresponding port of described wireless two-way broadcast module are bi-directionally connected; Described wireless two-way broadcast module is bi-directionally connected through the corresponding port of described second Ethernet transceiver module and described GOOSE transceiver module; The corresponding port of described GOOSE transceiver module and described GOOSE forwarding module is bi-directionally connected; The corresponding port of described GOOSE forwarding module and described driver module is bi-directionally connected;
Described one 4 road optical fiber interface connects the corresponding output end of described driver module;
The corresponding port of described 24 road optical fiber interface and described driver module is bi-directionally connected;
Described gps antenna is bi-directionally connected through the corresponding port of described GPS time block and described clock module;
The corresponding port of described clock module and described clock recovery module is bi-directionally connected;
Described clock recovery module is bi-directionally connected with the corresponding port of SV processing module and Ethernet fiber interface module respectively;
The interval merge cells of the output termination intelligent substation of described DA change-over circuit;
The sampling input end of the wall protection supervisory equipment of the output termination intelligent substation of described one 4 road optical fiber interface;
The output terminal of described 24 road optical fiber interface and the wall protection supervisory equipment GOOSE input/output terminal of intelligent substation are bi-directionally connected;
Shield during the light B code pair of described Ethernet fiber interface module and intelligent substation and be bi-directionally connected.
Described DA change-over circuit is made up of DAC8562 chip and peripheral circuit thereof.
The model of described FPGA module is Cyclone IV EP4CE2217I7N; The model of described the first to the second Ethernet transceiver module is DB83640; Described wireless unidirectional broadcast module and wireless two-way broadcast module are letter horse wireless bridge; The model of described GPS time block is TIME-M3339; The model of described driver module is BCM5248; The model of described Ethernet fiber interface module is HFBR-2412TZ; The model of described first to the 24 road optical fiber interface is OCM3825-54.
2nd LET radio receiving transmitting module of LET radio communication intelligent substation test system and LET radio receiving transmitting module wireless connections of LET radio communication intelligent substation test system; One LET radio receiving transmitting module of LET radio communication intelligent substation test system is bi-directionally connected with the corresponding port of emulation main website.
SV receiver module receives the electric current, the voltage sampling signal (emulation main website calculates) that transmit from wireless channel.
The current-voltage sampling signal that SV receiver module obtains by SV processing module, obtain by coding, protocol transform the SV message that the secondary devices such as rear end transforming plant protecting device can identify, concrete message is IEC61850-9-2 form.
DA processing module completes the transfer process of digital quantity to analog quantity of sample values.
The GOOSE message transmitted from wireless channel receives, is forwarded to the secondary devices such as transforming plant protecting device by GOOSE transmitting-receiving, forwarding module, transformer station is sent GOOSE message simultaneously and is transferred to wireless module, and pass back to emulation main website.
Clock module realizes total system clock synchronous function.
Clock recovery module is used for clock recovery when system clock is asynchronous.
In this mode, data terminal achieves the function of electric current, voltage transformer (VT).The direct output current of 8 tunnels analogy amount interface of data terminal, voltage analog small-signal; after power amplification circuit amplifies; secondary current, voltage analog are sent to real interval merge cells, then be supplied to the secondary devices such as protection, observing and controlling by point-to-point or networking mode.This pattern can be investigated the secondary device comprising merge cells and run and communication performance.
Under Intelligent substation merging unit simulation access module, data terminal instead of the function of tested interval merge cells.The electric current that EM transient calculation obtains by main website, voltage data send to data terminal by high-speed synchronous wireless channel; data terminal directly exports SV digitized sampling message by 4 road luminiferous ether network interfaces; be supplied to the secondary devices such as wall protection, observing and controlling by point-to-point or networking mode, investigate its serviceability.
Under intelligent substation intelligent terminal simulation access, the actual intelligent terminal in tested interval, switch tool primary equipment do not access whole test closed loop, but achieve the reception of corresponding GOOSE message, forwarding capability by test data terminal is alternative.After protective device collects fault amount; action command is fed back to main station system with GOOSE message form by terminal 4 road optical Ethernet interface, wireless channel; on off state in the corresponding change fault model of main station system; and electric current, voltage that adjustment exports, realize the closed loop test of the functions of the equipments such as protective device.
The present invention, according to intelligent substation testing standard and index, proposes the intelligent substation integrated test system scheme based on LTE radio communication being applicable to capital construction and maintenance test site.This integrated test system mainly comprises high-performance intelligent substation real-time simulator, towards the electromagnetic transient simulation software of whole station level test, in real time I/O interface arrangement, LTE wireless data transmission channel, distributed data terminal etc.
This test macro not only can carry out unit inspection to each component devices of intelligent station electrical secondary system; can also between equipment and composition system carry out system level testing; provide whole group work in coordination with test environment for comprising the full functionality such as digital protection, observing and controlling in intelligent substation, significant for the research of intelligent substation, design, test, detection and assessment etc.
Corresponding to the Three-tider architecture framework of intelligent substation station level, wall and process layer.This integration testing platform and real secondary equipment of intelligent converting station form the simulated testing system of closed loop jointly; platform provides electric current, the voltage needed for operation for tested secondary system of intelligent substation; both can electric current, magnitude of voltage in imitating substation normal course of operation; also can imitating substation fault and maloperation time fault current, voltage, thus investigate the action behavior of single cover protection and the coordinated ability of many cover protections.
This platform configuration has the universal model parameter library being applicable to the different Main connection form of intelligent station, can various types of equipment failure such as analog line, transformer, bus and various compositeness, developing fault electromagnetic transient.By the LTE high-speed synchronous wireless data channel between real-time simulator and distributed data terminal; for whole test macro provides high precision, high real-time data transmission guarantee, realize single device and the whole group of tests such as station interior merge cells, intelligent terminal, protective device flexibly and effectively.
Intelligent station real-time simulator is computing and the control core of whole secondary equipment of intelligent converting station integrated test system; based on Industry Control host hardware structural design; carry intelligent station simulation testing software; both GPF (General Protection False tester function can have been realized, again can by building the simulation of fault model assembly realization to Typical Route, main transformer, bus-bar fault.
Emulator main frame adopts real time operating system, and man-machine interface runs on wherein, and when can provide normal operation, high-precision current, the magnitude of voltage needed for device such as protection, observing and controlling, also can provide fault current, magnitude of voltage when electric network fault and maloperation.Emulator has the detailed electrical-magnetic model of the equipment such as transformer, circuit, isolating switch and various fault model; and construct more complicated compositeness, developing fault on this basis, comprehensively careful dynamic model test can be carried out to the performance of the secondary device such as digital protection, observing and controlling.
Real-time I/O Interface realization simulation core and peripheral analogue means carry out the interface function of real-time information interaction.Based on the result of calculation of transformer station's real-time simulator, by numeral or analog form be relay protection, measure and control device provides high-precision voltage, current signal source, and can Real-time Collection isolating switch, disconnector, grounding apparatus feedback of status to emulator.
PCI-E interface based on FPGA designs, and utilizes and is built in the special integration module of the PCI Express of FPGA, can save special PCI-E interface chip, reduce cost of hardware design, improve the integrated level of hardware.Utilize the programmable features of FPGA, substantially increase design flexibility, adaptability and extensibility.
LTE wireless data transmission channel: according to State Grid Corporation of China's intelligent station typical design requirements; it is indoor that 220kV and the protection of above intelligent station wall are arranged in protection; and process layer combining unit and intelligent terminal are arranged on the spot by primary equipment; based on this distributed arrangement, the test figure transmission in the present invention between process layer and wall adopts wireless mode.Wireless Telecom Equipment is connected with emulating host computer by the PCI-E bus of real-time I/O interface, electric current and voltage amount is sent to respectively the interval of specifying, and is uploaded to emulator after the GOOSE message that each interval feedback is come being resolved.
Consider the factor such as data scale, propagation delay time shake, in the present invention, test figure transmission adopts TD-LTE wireless local private network mode.Which follows 3GPP R10 LTE series of standard protocols, considers facing the factors such as frequently interference, deployed with devices and expansion in transformer station's actual application environment, selects working frequency range to be that 1.4/1.8GHz is changeable.According to typical intelligent station interval scale, determine the descending 80Mbps of data rate, up 30Mbps, maximum UE number 16.
This transceiver adopts 2 antennas (2 receive 1), and peak transmitted power 2W, effective covering radius 3km, can meet typical intelligent substation application scale completely.In addition, in order to make this emulation test system portability more, facilitate rig-site utilization, eNodeB functions of the equipments in LTE standard, EPC core net Function Integration Mechanism are entered in the embedded OS of master device, considerably increase the integrated level of system, reduce cost, facilitate the operation and maintenance of system.
Simulation test platform and real secondary system of intelligent substation link together by distributed data terminal, realize the closed loop of whole test process.In practical application, each data terminal can be positioned over by the intelligence convergence control cabinet of each interval to be measured, be connected by secondary devices such as cable or optical cable and transformer station merge cells, intelligent terminals.This data terminal should have analog quantity and digital quantity two kinds of sampled value output modes simultaneously, realizes being combined the simulation that unit front-end and back-end export data.In addition, data terminal also has the function of GOOSE quantity of state information communication, is connected, becomes the interface of wall and process layer information interaction by point-to-point or GOOSE net with the equipment such as protection, observing and controlling.In addition, for guaranteeing the high temporal consistance of test macro and secondary device, when terminal also should have accurate pair and the synchronous function of determinacy.
Data terminal supports two wireless modules simultaneously, is connected with emulating host computer by wireless channel, and one receives sampled value information, and another is specifically designed to transmit-receive switch amount and positional information.
Data terminal hardware supported 8 light 100 m ethernet interfaces, wherein 4 for transmitting the same IEC61850-9-2 or the FT3 form SV message in 4 tunnels, other 4 for transmitting the same GOOSE message of 4 tunnel contents.SV communication adopts full dataset message, data terminal supports 8 unique identifying numbers, and from SV message, extract sampled value needed for this interval by this identification number, and communicate by following communication protocol: [terminal 1 identification number] [passage 1 sampled value] ... [passage 8 sampled value] ... [terminal n identification number] [passage 1 sampled value] ... [passage 8 sampled value].
Data terminal supports that 8 road DA output, compatible double-bus and 3/2 wiring, two kinds of Main connection forms.Under double-bus form, line segregation data terminal provides the analog output of 1u+3i, and bus interval data terminal provides the analog output of 3u+3u; Under 3/2 mode of connection, line segregation data terminal exports the analog quantity of 4u+4i, and bus interval data terminal exports the analog quantity of 4u+4u.
In addition, data terminal and emulating host computer support multiple synchronization mode, comprising:
1.. main frame and terminal be all equipped with independently space-based GPS couple time system, antenna when to be connected pair by reserved GPS interface, when to realize pair;
2.. main frame and each reserved ST light mouth of terminal, shield cabinet, and during interior pair of station, system keeps synchronous when being all connected to transformer station's light B code pair;
3.. adopt wireless data sending radio principal and subordinate couple time, main frame to terminal send independently wireless pair time signal, realize between principal and subordinate pair time.
When above-mentioned three kinds pairs, mode can be selected separately according to real space environment, signal conditioning etc., also can work, standby each other simultaneously, under guaranteeing that whole emulation test system is operated in same clock.Different wireless terminals must be synchronous in the accuracy rating of 10 μ s.
In the engineering test process of reality, this data terminal can access electrical secondary system in several ways, realizes the stress test of the functional simulation of distinct device and electrical secondary system different range, difference in functionality.
1.. merge cells is simulated
In such a mode, data terminal instead of the function of tested interval merge cells.The electric current that EM transient calculation obtains by main website, voltage data send to data terminal by high-speed synchronous wireless channel; data terminal directly exports SV digitized sampling message by 4 road luminiferous ether network interfaces; be supplied to the secondary devices such as wall protection, observing and controlling by point-to-point or networking mode, investigate its serviceability.
2.. mutual inductor is simulated
In this mode, data terminal achieves the function of electric current, voltage transformer (VT).The direct output current of 8 tunnels analogy amount interface of data terminal, voltage analog small-signal; after power amplifier amplifies; secondary current, voltage analog are sent to real interval merge cells, then be supplied to the secondary devices such as protection, observing and controlling by point-to-point or networking mode.This pattern can be investigated the secondary device comprising merge cells and run and communication performance.
GOOSE quantity of state information transmission has following two kinds of patterns equally:
3.. intelligent terminal is simulated
In this mode, the actual intelligent terminal in tested interval, switch tool primary equipment do not access whole test closed loop, but achieve the reception of corresponding GOOSE message, forwarding capability by test data terminal is alternative.After protective device collects fault amount; action command is fed back to main station system with GOOSE message form by terminal 4 road optical Ethernet interface, wireless channel; on off state in the corresponding change fault model of main station system; and electric current, voltage that adjustment exports, realize the closed loop test of the functions of the equipments such as protective device.
4.. belt switch whole group of transmission
This pattern realizes whole group of test of interval secondary system band switch primary equipment to be measured.Be with mode 1 difference; after protective device collects fault amount; breaker tripping and closing are realized according to the protection-intelligent terminal-switchgear loop of reality; test data terminal gathers corresponding message from GOOSE net; main station system is returned to by wireless channel after parsing; main website changes the on off state in fault model, and electric current, voltage that corresponding adjustment exports.Realize the whole group of dynamic model test comprising intelligent terminal and switch primary equipment.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (3)

1. a distributed testing terminal for LET radio communication intelligent substation test system, is characterized in that: comprise FPGA module, the first to the second Ethernet transceiver module, wireless unidirectional broadcast module, wireless two-way broadcast module, GPS time block, gps antenna, DA change-over circuit, driver module, Ethernet fiber interface module and the first to the 24 road optical fiber interface; Described FPGA module comprises SV receiver module, SV processing module, GOOSE transceiver module, GOOSE forwarding module, clock module, clock recovery module and DA processing module;
The sampled value signal output part of the 2nd LET radio receiving transmitting module of the input termination LET radio communication intelligent substation test system of described wireless unidirectional broadcast module; The output terminal of described wireless unidirectional broadcast module connects the input end of described SV receiver module through described first Ethernet transceiver module; The respective input of SV processing module described in the output termination of described SV receiver module;
The output terminal of described SV processing module connects the respective input of described DA processing module and driver module respectively;
The on-off model port of the 2nd LET radio receiving transmitting module of LET radio communication intelligent substation test system and the corresponding port of described wireless two-way broadcast module are bi-directionally connected; Described wireless two-way broadcast module is bi-directionally connected through the corresponding port of described second Ethernet transceiver module and described GOOSE transceiver module; The corresponding port of described GOOSE transceiver module and described GOOSE forwarding module is bi-directionally connected; The corresponding port of described GOOSE forwarding module and described driver module is bi-directionally connected;
Described one 4 road optical fiber interface connects the corresponding output end of described driver module;
The corresponding port of described 24 road optical fiber interface and described driver module is bi-directionally connected;
Described gps antenna is bi-directionally connected through the corresponding port of described GPS time block and described clock module;
The corresponding port of described clock module and described clock recovery module is bi-directionally connected;
Described clock recovery module is bi-directionally connected with the corresponding port of SV processing module and Ethernet fiber interface module respectively;
The interval merge cells of the output termination intelligent substation of described DA change-over circuit;
The sampling input end of the wall protection supervisory equipment of the output termination intelligent substation of described one 4 road optical fiber interface;
The output terminal of described 24 road optical fiber interface and the wall protection supervisory equipment GOOSE input/output terminal of intelligent substation are bi-directionally connected;
Shield during the light B code pair of described Ethernet fiber interface module and intelligent substation and be bi-directionally connected.
2. the distributed testing terminal of LET radio communication intelligent substation test system according to claim 1, is characterized in that: described DA change-over circuit is made up of DAC8562 chip and peripheral circuit thereof.
3. the distributed testing terminal of LET radio communication intelligent substation test system according to claim 2, is characterized in that: the model of described FPGA module is Cyclone IV EP4CE2217I7N; The model of described the first to the second Ethernet transceiver module is DB83640; Described wireless unidirectional broadcast module and wireless two-way broadcast module are letter horse wireless bridge; The model of described GPS time block is TIME-M3339; The model of described driver module is BCM5248; The model of described Ethernet fiber interface module is HFBR-2412TZ; The model of described first to the 24 road optical fiber interface is OCM3825-54.
CN201410770679.2A 2014-12-12 2014-12-12 The distributed testing terminal of LTE radio communication intelligent substation test systems Active CN104535853B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410770679.2A CN104535853B (en) 2014-12-12 2014-12-12 The distributed testing terminal of LTE radio communication intelligent substation test systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410770679.2A CN104535853B (en) 2014-12-12 2014-12-12 The distributed testing terminal of LTE radio communication intelligent substation test systems

Publications (2)

Publication Number Publication Date
CN104535853A true CN104535853A (en) 2015-04-22
CN104535853B CN104535853B (en) 2017-08-04

Family

ID=52851416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410770679.2A Active CN104535853B (en) 2014-12-12 2014-12-12 The distributed testing terminal of LTE radio communication intelligent substation test systems

Country Status (1)

Country Link
CN (1) CN104535853B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105203870A (en) * 2015-09-07 2015-12-30 国家电网公司 Intelligent transformer substation secondary equipment integrated test system based on power line communication
CN109842099A (en) * 2017-11-27 2019-06-04 许继集团有限公司 A kind of route protection dual secondary circuit implementation method
CN110138602A (en) * 2019-04-28 2019-08-16 许昌开普检测研究院股份有限公司 A kind of message emulating processing system
CN110579658A (en) * 2019-08-22 2019-12-17 国网安徽省电力有限公司 Automatic test system and test method for intelligent substation protection device
CN110763937A (en) * 2019-10-31 2020-02-07 国网河南省电力公司电力科学研究院 Intelligent substation test platform and method based on electromagnetic transient real-time simulation
CN111461515A (en) * 2020-03-26 2020-07-28 广东电网有限责任公司 Intelligent analysis method for transformer substation vacant interval based on electric power big data

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202872464U (en) * 2012-09-20 2013-04-10 湖北省电力公司电力科学研究院 Secondary network measurement and multimode decision apparatus of intelligent substation
CN103076520A (en) * 2012-12-28 2013-05-01 中国电力科学研究院 Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
WO2014108002A1 (en) * 2013-01-14 2014-07-17 国家电网公司 Detection method and system of intelligent relay protection device
CN104020374A (en) * 2014-06-03 2014-09-03 河北省电力建设调整试验所 Intelligent substation secondary equipment site-wide simulation test system
WO2014153764A1 (en) * 2013-03-29 2014-10-02 国家电网公司 Method and device for automatic test of relay protection function of intelligent substation
WO2016090934A1 (en) * 2014-12-12 2016-06-16 国家电网公司 Simulation test device for mutual inductor of lte wireless communication intelligent substation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202872464U (en) * 2012-09-20 2013-04-10 湖北省电力公司电力科学研究院 Secondary network measurement and multimode decision apparatus of intelligent substation
CN103076520A (en) * 2012-12-28 2013-05-01 中国电力科学研究院 Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
WO2014108002A1 (en) * 2013-01-14 2014-07-17 国家电网公司 Detection method and system of intelligent relay protection device
WO2014153764A1 (en) * 2013-03-29 2014-10-02 国家电网公司 Method and device for automatic test of relay protection function of intelligent substation
CN104020374A (en) * 2014-06-03 2014-09-03 河北省电力建设调整试验所 Intelligent substation secondary equipment site-wide simulation test system
WO2016090934A1 (en) * 2014-12-12 2016-06-16 国家电网公司 Simulation test device for mutual inductor of lte wireless communication intelligent substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许伟国等: "数字化变电站网络通信在线故障诊断系统的设计与应用", 《电力自动化设备》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105203870A (en) * 2015-09-07 2015-12-30 国家电网公司 Intelligent transformer substation secondary equipment integrated test system based on power line communication
CN109842099A (en) * 2017-11-27 2019-06-04 许继集团有限公司 A kind of route protection dual secondary circuit implementation method
CN109842099B (en) * 2017-11-27 2021-08-03 许继集团有限公司 Method for realizing line protection dual secondary circuit
CN110138602A (en) * 2019-04-28 2019-08-16 许昌开普检测研究院股份有限公司 A kind of message emulating processing system
CN110138602B (en) * 2019-04-28 2022-08-16 许昌开普检测研究院股份有限公司 Message simulation processing system
CN110579658A (en) * 2019-08-22 2019-12-17 国网安徽省电力有限公司 Automatic test system and test method for intelligent substation protection device
CN110763937A (en) * 2019-10-31 2020-02-07 国网河南省电力公司电力科学研究院 Intelligent substation test platform and method based on electromagnetic transient real-time simulation
CN111461515A (en) * 2020-03-26 2020-07-28 广东电网有限责任公司 Intelligent analysis method for transformer substation vacant interval based on electric power big data
CN111461515B (en) * 2020-03-26 2022-04-19 广东电网有限责任公司 Intelligent analysis method for transformer substation vacant interval based on electric power big data

Also Published As

Publication number Publication date
CN104535853B (en) 2017-08-04

Similar Documents

Publication Publication Date Title
CN104569657B (en) A kind of LTE radio communications intelligent substation mutual inductor simulating test device
CN104535853B (en) The distributed testing terminal of LTE radio communication intelligent substation test systems
CN102072996B (en) System for realizing automatic digital protection and closed loop moving die test
CN104020374A (en) Intelligent substation secondary equipment site-wide simulation test system
CN102510131B (en) Method and device for testing overall performance of intelligent transformer substation
CN101576743B (en) Distributed ring main unit monitor terminal
CN106527181B (en) A kind of electrical power distribution automatization system emulation test method based on communication network
CN104166399A (en) Moving die simulation test system and method for intelligent substation protection device
CN204515048U (en) Digital transformer substation intelligent tester
CN203117313U (en) Dynamic simulation and emulation detecting platform for intelligent substation secondary system
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN105203870A (en) Intelligent transformer substation secondary equipment integrated test system based on power line communication
CN203324463U (en) Performance test and evaluation platform for small-current grounding line selection device
CN104935079A (en) Station-domain protection system of intelligent transformer station and function debugging method of system
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN203069709U (en) Intelligent transformer station relay protection device detector based on DDRTS
CN201839095U (en) Intelligent transformer substation testing and simulation system
CN103200280B (en) Transformer station process layer interface equipment
CN104601220B (en) LTE (Long Term Evolution) wireless communication intelligent substation test device
CN205354423U (en) Intelligent substation emulation training system
CN102636708A (en) Intelligent substation process layer network simulating system and device simulator
CN106532939A (en) Main-sub-machine heterogeneous in-situ measurement control device applied on intelligent transformer substation
CN103676661B (en) Multifunction emulation verifies system and its emulation verification method
CN203949994U (en) Relay protection test and simulation control device
CN103746304B (en) The remodeling method of Intelligent transformer station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant