CN104533134B - A kind of concreting method of concrete filled steel tube steel tower - Google Patents
A kind of concreting method of concrete filled steel tube steel tower Download PDFInfo
- Publication number
- CN104533134B CN104533134B CN201410762534.8A CN201410762534A CN104533134B CN 104533134 B CN104533134 B CN 104533134B CN 201410762534 A CN201410762534 A CN 201410762534A CN 104533134 B CN104533134 B CN 104533134B
- Authority
- CN
- China
- Prior art keywords
- concrete
- main material
- tower
- tower body
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
The concreting method of a kind of concrete filled steel tube steel tower, comprises the following steps: a, with bolt by ring flange and tower body main material Flange joint;B, the sling point that rises using coaster to pass through on cantilever lift by crane concrete;C, concrete is poured in the main material of tower body by grouting mouth reserved on ring flange;D, complete the pouring of one section of main material of tower body after, remove the bolt of mounting flange and tower body main material flange, movable concrete lifting steelframe rises along with the group of iron tower main material is vertical, carries out pouring of next section of iron tower main material concrete;E, when pouring on next section of main material of tower body, repeat step a, b, c, d, until all main materials have poured.The present invention can realize the cast-in-place of concrete, but the requirement to construction machinery is relatively low, form of construction work is flexible, the area being difficult to arrive for concrete mixer can use the casting method of the present invention, the movable concrete lifting repeatable utilization of steelframe that the present invention uses, simple to operate, consumption of materials is few.
Description
Technical field
The present invention relates to the form of construction work of a kind of iron tower of power transmission line, be specifically related to a kind of for concrete filled steel tube steel tower
Concreting method.
Background technology
Along with the development of work transmission line, the size of steel tower, load there occurs the change of matter, and steel tower tends to maximizing,
As the component that bearing capacity is higher, concrete filled steel tube has begun to be applied to electric power line pole tower design.Steel tube concrete
Soil is remarkably improved the comprcssive strength of component compared with steel pipe, and it is long-pending to effectively reduce steel tube section, thus reduces bar cost, saves
Investment.The at present construction of concrete filled steel tube steel tower, mostly is after iron tower main material group founds certain altitude, by concrete mixer by outstanding
Concrete, to pipe top, is then poured in steel pipe by arm pump concrete.Owing to concrete mixer volume is relatively big, it is not suitable for landform
Big rise and fall and the poor area of transportation condition, have certain limitation.It is thus desirable to a kind of novel steel tube concrete steel tower of design
Concreting mode, to meet the concrete filled steel tube tower erection requirement of various orographic condition and transportation condition.
At present, adaptable to poor landform, the concreting method of easy construction has opens on iron tower main material
Hole, uses concrete mixer, by tapping, concrete pump is delivered to specific bit and puts, need again to iron tower main material after having poured
On perforate carry out repair welding.
Summary of the invention
In order to solve the problems referred to above, the present invention provides a kind of concreting speed fast, and the construction period is short, to various landform
The concreting method of the concrete filled steel tube steel tower that condition and transportation condition are all suitable for.
The purpose of the present invention is achieved through the following technical solutions:
The concreting method of a kind of concrete filled steel tube steel tower, comprises the following steps:
A. with bolt by ring flange and tower body main material Flange joint;
B. coaster is used to lift by crane concrete by the sling point that rises on cantilever;
C. concrete is poured in the main material of tower body by grouting mouth reserved on ring flange;
D., after completing the pouring of one section of main material of tower body, the bolt of mounting flange and tower body main material flange is removed, movable
Concrete lifting steelframe rises along with the group of iron tower main material is vertical, carries out pouring of next section of iron tower main material concrete;
When e. pouring on next section of main material of tower body, repeat step a, b, c, d, until all main materials have poured.
The lifting steelframe of movable concrete described in step d is made up of steel pipe, ring flange and cantilever.
At least 4 kinds of apertures and at least 10 screws are set on ring flange described in step a.
The present invention can realize the cast-in-place of concrete, and the requirement to construction machinery is relatively low, and form of construction work is flexible, for mixed
The area that solidifying soil pump truck is difficult to arrive can use the casting method of the present invention, the movable concrete lifting steelframe that the present invention uses
Repeatable utilization, simple to operate, consumption of materials is few.
Accompanying drawing explanation
Fig. 1 is the structural representation of movable concrete lifting steelframe in the present invention.
Fig. 2 is the section structure schematic diagram of ring flange in movable concrete lifting steelframe in the present invention.
In figure 1, play sling point, 2, cantilever, 3, steel pipe, 4, ring flange, 5, grouting mouth, 6, aperture be the screw of 1mm, 7, hole
Footpath is the screw of 2mm, 8, aperture be the screw of 3mm, 9, aperture be the screw of 4mm.
Detailed description of the invention
Embodiment 1
The concreting method of a kind of concrete filled steel tube steel tower, comprises the following steps:
A. with bolt by ring flange 4 and tower body main material Flange joint;
B. coaster is used to lift by crane concrete by the sling point 1 that rises on cantilever 2;
C. concrete is poured in the main material of tower body by grouting mouth 5 reserved on ring flange 4;
D., after completing the pouring of one section of main material of tower body, the bolt of mounting flange 4 and tower body main material flange is removed, movable
Concrete lifting steelframe rises along with the group of iron tower main material is vertical, carries out pouring of next section of iron tower main material concrete;
When e. pouring on next section of main material of tower body, repeat step a, b, c, d, until all main materials have poured.
The lifting steelframe of movable concrete described in step d is made up of steel pipe 3, ring flange 4 and cantilever 2.
At least 4 kinds of apertures and at least 10 screws are set on described ring flange 4.As it is shown in figure 1, on ring flange 4 from interior to
Outer be respectively provided with successively 12 apertures be the screw 6 of 1mm, aperture be the screw 7 of 2mm, aperture be that the screw 8 of 3mm, aperture are
The screw 9 of 4mm, to adapt to the main material Flange joint requirement of the tower body of different size, is carried out even by bolt and tower body main material flange
Connect.
In the present invention, movable concrete lifts by crane steelframe and the connected mode of iron tower main material and the shape of ring flange preformed hole
Formula can be adopted in other ways.
Claims (3)
1. the concreting method of a concrete filled steel tube steel tower, it is characterised in that: comprise the following steps:
A. with bolt by ring flange (4) and tower body main material Flange joint;
B. coaster is used to lift by crane concrete by the sling point (1) that rises on cantilever (2);
C. concrete is poured in the main material of tower body by the upper reserved grouting mouth (5) of ring flange (4);
D., after completing the pouring of one section of main material of tower body, the bolt of mounting flange (4) and tower body main material flange is removed, movable mixed
Solidifying soil lifting steelframe rises along with the group of iron tower main material is vertical, carries out pouring of next section of iron tower main material concrete;
When e. pouring on next section of main material of tower body, repeat step a, b, c, d, until all main materials have poured.
The concreting method of a kind of concrete filled steel tube steel tower the most according to claim 1, it is characterised in that: step d
Described in movable concrete lifting steelframe be made up of steel pipe (3), ring flange (4) and cantilever (2).
The concreting method of a kind of concrete filled steel tube steel tower the most according to claim 1, it is characterised in that: step a
Described in ring flange (4) is upper arranges at least 4 kinds of apertures and at least 10 screws.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410762534.8A CN104533134B (en) | 2014-12-14 | 2014-12-14 | A kind of concreting method of concrete filled steel tube steel tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410762534.8A CN104533134B (en) | 2014-12-14 | 2014-12-14 | A kind of concreting method of concrete filled steel tube steel tower |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104533134A CN104533134A (en) | 2015-04-22 |
CN104533134B true CN104533134B (en) | 2017-01-04 |
Family
ID=52848741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410762534.8A Expired - Fee Related CN104533134B (en) | 2014-12-14 | 2014-12-14 | A kind of concreting method of concrete filled steel tube steel tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104533134B (en) |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0633701B2 (en) * | 1990-02-19 | 1994-05-02 | 日本コンクリート工業株式会社 | Embedded nut adapter for steel tube concrete utility pole |
CN100462518C (en) * | 2007-03-09 | 2009-02-18 | 罗定市水泥制品有限公司 | Prestressed concrete electrical pole and its production |
CN101403256B (en) * | 2008-10-22 | 2012-07-04 | 宁夏送变电工程公司 | Grouting apparatus and method for stand steel pipe |
CN101936070A (en) * | 2010-09-03 | 2011-01-05 | 王亚运 | Automatic tower crane concrete pumping system |
CN203320963U (en) * | 2013-06-19 | 2013-12-04 | 中冶天工上海十三冶建设有限公司 | Detachable discharging cylinder for concrete casting |
CN103469894B (en) * | 2013-09-29 | 2016-02-17 | 天津二十冶建设有限公司 | A kind of servicing unit for steel frame columns jacking grouting and using method thereof |
CN103510702B (en) * | 2013-09-29 | 2016-01-20 | 广州建筑股份有限公司 | Steel core concrete column pin type concrete pouring construction method |
-
2014
- 2014-12-14 CN CN201410762534.8A patent/CN104533134B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104533134A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746422A (en) | Bridge prefabricated hollow pier column post-poured connecting structure and construction method | |
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN204097864U (en) | A kind of bridge prefabrication hollow pier stud delay-pour joint structure | |
CN203200771U (en) | Connection structure for pile extension top and bearing platform | |
CN201883746U (en) | Base of movable high-voltage wire pole | |
CN104727546A (en) | Method for using aluminum alloy form board to pour concrete floor and transmission hole mould of method | |
CN104533134B (en) | A kind of concreting method of concrete filled steel tube steel tower | |
CN204780928U (en) | Major diameter bored concrete pile concrete first set groundwater increment controlling means | |
CN109763658A (en) | A kind of support device and its construction method for arrangement material distributing machine in elevator | |
CN103362123A (en) | Reverse Y-shaped filling pile and construction method thereof | |
CN203514341U (en) | Mold supporting structure for concrete foundation hole of large device | |
CN204139190U (en) | A kind of Liftable preformed bricks fetal membrane | |
CN204435200U (en) | High ferro prefabricated case beam end-blocking rubber sleeve | |
CN203004045U (en) | Hopper for concrete falling | |
CN202689569U (en) | Concrete pouring hopper | |
CN202108042U (en) | Unbonded back tension pre-stress stiffening core composite pile | |
CN201883695U (en) | Spherical net rack vertical jacking equipment | |
CN205530400U (en) | Batter pile test model steel reinforcement cage cushion inclines | |
CN202500140U (en) | Simple concrete conical water blocking plug device | |
CN205012336U (en) | Area is pile driver of feed bin down | |
CN205012326U (en) | A double -deck lower equipment | |
CN204687076U (en) | The mixed earth stirrer of a kind of skyscraper | |
CN204875839U (en) | Mould is pour on iron tower basis | |
CN203905025U (en) | Foundation pit supporting wall with special-shaped reinforced concrete and cement soil separately arranged | |
CN203626243U (en) | Transmission hole mould for pouring concrete floor slab through aluminum alloy formworks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212 Patentee after: China Electric Power Construction Group Henan electric survey and Design Institute Co., Ltd. Address before: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212 Patentee before: Hennan Electric Power Survey & Design Institute |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170104 Termination date: 20191214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |