CN104525927B - Slag ladle with flow guide water channel - Google Patents

Slag ladle with flow guide water channel Download PDF

Info

Publication number
CN104525927B
CN104525927B CN201410657147.8A CN201410657147A CN104525927B CN 104525927 B CN104525927 B CN 104525927B CN 201410657147 A CN201410657147 A CN 201410657147A CN 104525927 B CN104525927 B CN 104525927B
Authority
CN
China
Prior art keywords
cinder ladle
diversion channel
slag ladle
slag
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410657147.8A
Other languages
Chinese (zh)
Other versions
CN104525927A (en
Inventor
施毅红
陈伟
卢松林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Heng Wei Chen Equipment Manufacturing Co., Ltd.
Original Assignee
WUHAN HENGWEI HEAVY MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN HENGWEI HEAVY MACHINERY CO Ltd filed Critical WUHAN HENGWEI HEAVY MACHINERY CO Ltd
Priority to CN201410657147.8A priority Critical patent/CN104525927B/en
Publication of CN104525927A publication Critical patent/CN104525927A/en
Application granted granted Critical
Publication of CN104525927B publication Critical patent/CN104525927B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/005Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like with heating or cooling means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
  • Furnace Details (AREA)

Abstract

The invention discloses a slag ladle with a flow guide water channel. The slag ladle comprises a cup-shaped slag ladle body and is characterized in that the flow guide water channel is arranged at the upper end of the slag ladle body to enable cooling water above smelting slag inside the smelting slag to flow into a water inlet of the flow guide water channel, and a water outlet of the flow guide water channel is lower than the water inlet; and the water outlet of the flow guide water channel is arranged downwards along the outer wall of the slag ladle body, and therefore flowing-out cooling water can flow downwards along the outer wall of the slag ladle. The flow guide water channel is arranged, and therefore on the one hand, the cooling speed of the slag ladle can be effectively accelerated, and cooling is conducted to the smelting slag in the slag ladle to achieve the effect of accelerated cooling on the whole slag ladle, the circulation period of the slag ladle is reduced, and the purchase number of slag ladles is reduced; and after a cooling water supply switch is closed, on the basis of the siphoning principle of the flow guide water channel, the water level of the cooling water in the slag ladle is reduced, so that in the process of lifting and transporting of the slag ladle, cooling water can be completely prevented from flowing over

Description

A kind of cinder ladle with diversion channel
Technical field
The present invention relates to a kind of copper smelting slag copper-clad, particularly to a kind of cinder ladle with diversion channel.
Background technology
Gradually deficient with copper ore resource, it is the strategy of respective country recycling economy, domestic in recent years nearly all Copper smelting plant has all carried out slow cooling solidification ore-dressing technique it is simply that no longer by smelting slag water quenching to copper weld pool slag, but stands using 12 The cast steel cinder ladle of square rice by smelting slag contain get up slow cooling, then crush, ball milling, flotation.Not only it is sufficiently used limited Resource, reduces the pressure to environmental protection for the Copper making, and smeltery also therefrom obtains rich profit simultaneously.
Slag ore-dressing technique key link is slag slow cooling, and the accumulative crystallization of the copper ion in smelting slag is a complicated dressing Process, higher to link temperature requirement, copper ion free gathering only under the conditions of smelting slag liquid finally meets ore-dressing technique Require the time that is to say, that smelting slag is in a liquid state more long be more conducive to ore-dressing technique, it requires that smelting slag is long in cinder ladle Phase deposits, and this is accomplished by purchasing substantial amounts of 12 cubic metres of cast steel cinder ladle, in order to reduce the usage quantity of cinder ladle, reduces ore dressing and becomes This.So natural slow cooling is as long as possible after slag retarded cooling process requires smelting slag to load cinder ladle, copper ion be sufficiently complete free, Require rapidly to cool down after gathering, crystallization, accelerate the turnover of cinder ladle.Typically Water spray is carried out to the smelting slag of solidification, accelerate Cooling, due to copper ashes pack arrangement form limitation, adds that slow cooling field considers emphatically field management problem, cinder ladle in construction project 1 typically in 12 ° of inclinations angle, are beneficial to the cooling corresponding gutter of current direction 2.Cooling water is most of relatively low from cinder ladle bead Direction is directly let out and has been fallen ground after overflowing, can only be to partly playing rapidly cooling effect, the bottom to cinder ladle and slag on cinder ladle Impact is divided less (as shown in Figure 1) in the higher direction of bag bead, is difficult to integrally play the effect accelerating cooling to cinder ladle, and cools down The spot temperature that water does not flow through is of a relatively high.In addition, cinder ladle car load muck haulage bag when, cinder ladle the moment leaving ground and Cinder ladle car travels in way, and by center of gravity, gravity and inertia effects, cinder ladle 1 can be centered on cinder ladle gudgeon, in the prong of cinder ladle car 3 Inside drastically rock (as shown in Figure 2), now the cooling water in cinder ladle can substantial amounts of spilling, trickle down on cinder ladle car, due to cooling Water contains higher sulfide, can be to the hydraulic jack of cinder ladle car, and the key position such as tire causes more serious erosion and damage.
Content of the invention
The technical problem to be solved is that the not enough offer one kind existing for above-mentioned prior art can not only Accelerate the rate of cooling of smelting slag in cinder ladle, be avoided that cinder ladle car excessive situation of cooling water during lifting and transport again The cinder ladle with diversion channel occurring.
The technical solution adopted in the present invention is: a kind of cinder ladle with diversion channel, and it includes the cinder ladle body of cup-shaped, It is characterized in that: the upper end of cinder ladle body is provided with diversion channel, makes the cooling water above smelting slag in cinder ladle permissible Flow into the water inlet of diversion channel, the outlet of diversion channel is less than this water inlet, and the outlet of diversion channel is along cinder ladle body Outer wall is arranged down, makes the cooling water energy of outflow along cinder ladle outer wall to dirty.
By technique scheme, described diversion channel and cinder ladle body cast entirety.
By technique scheme, the peak of described diversion channel is less than the upper surface of cinder ladle body.
By technique scheme, it is being arranged at intervals with multiple diversion channel along the circumferential direction of cinder ladle body.
By technique scheme, described cinder ladle body is obliquely installed.
By technique scheme, it is arranged in the specified dress of smelting slag positioned at the water inlet of the diversion channel of cinder ladle highest point Carry the position of more than line 30mm, the water inlet of the diversion channel of lowest part is arranged on more than smelting slag nominal load line.
By technique scheme, described diversion channel is in that inverted u shape is arranged.
By technique scheme, it is symmetrically arranged with left and right gudgeon in the outer wall upper end of cinder ladle body, along at left and right gudgeon Periphery circumference be all arranged at intervals with reinforcement, the outer wall upper end of cinder ladle body and the vertical place of left and right gudgeon be provided with a left side, Right support abutment, is provided with support feet in the bottom of cinder ladle body.
The present invention passes through to arrange diversion channel having the beneficial effect that acquired by the present invention, on the one hand can be by cooling water drain To the outer wall of cinder ladle, so that the cooling water of outflow is trickled downwards along cinder ladle outer wall, take away heat, can effectively accelerate cinder ladle cooling speed Spend and be conducted to the smelting slag in cinder ladle, the effect accelerating cooling is integrally played to cinder ladle, reduces the turn around time of cinder ladle, reduce The amount of purchase of cinder ladle;After closing cooling water water feeding switch, then pass through the siphon principle in diversion channel and reduce cooling in cinder ladle Water water level, such cinder ladle car it is possible to avoid cooling water excessive completely, is effectively kept away during lifting and transport cinder ladle car Exempt from cooling water to the erosion of cinder ladle car and infringement, reduced the fault rate of cinder ladle car, improve its service life.
Brief description
Fig. 1 is cinder ladle state of cooling schematic diagram of the prior art.
Fig. 2 transports the view of cinder ladle for cinder ladle car.
Fig. 3 is the main sectional view of the present invention.
Fig. 4 is the partial enlarged drawing of the i in Fig. 3.
Fig. 5 is the three-dimensional structure diagram of cinder ladle.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As in Figure 3-5, a kind of cinder ladle with diversion channel that the present embodiment provides, it includes the cinder ladle body of cup-shaped 4, it is symmetrically arranged with left and right gudgeon 5 in the outer wall upper end of cinder ladle body 4, be all spaced along the periphery circumference at left and right gudgeon 5 and set It is equipped with reinforcement 7, in the outer wall upper end of cinder ladle body, the vertical place of left and right gudgeon 5 is provided with left and right bearing 6, in cinder ladle originally The bottom of body is provided with support feet 8, and below the bead of cinder ladle body, the circumferential direction along cinder ladle body 1 is arranged at intervals with 4 Diversion channel 10, makes the cooling water 14 of smelting slag 9 top in cinder ladle can flow into the water inlet 11 of diversion channel 10, described The top 12 of diversion channel is less than the upper surface of cinder ladle body.Wherein, the outlet 13 of diversion channel 10 is less than this water inlet 11, The outlet 13 of diversion channel is arranged down along cinder ladle body 4 outer wall, makes the cooling water energy of outflow along cinder ladle outer wall to dirty.
In the present embodiment, described diversion channel is u-shaped, now by after diversion channel 10 machine-shaping, when casting cinder ladle, with Cinder ladle body 4 casts entirety.
Described cinder ladle body is obliquely installed, and angle of inclination a is 1-2 °, positioned at the water inlet of the diversion channel of cinder ladle highest point It is arranged in the position of more than 30mm at smelting slag nominal load line a, the water inlet of the diversion channel of lowest part is arranged on molten At refining slag nominal load line a.
Diversion channel 10 is arranged to meet the form of siphonage generation by the present invention, when the cooling water water level in cinder ladle is high When diversion channel top 12, the water in diversion channel 10 will rise from outlet 13 along the gentle downward trickling of cinder ladle outer wall Integrally accelerate the effect cooling down to cinder ladle.As long as confluent is more than the summation of diversion channel 10 water outlet, cooling water water level in cinder ladle Still the rate of cooling on cinder ladle top can equally not interfered with the state being full of.Once water feeding switch is closed, diversion channel 10 Interior water will occur siphonage, the water in cinder ladle can be extracted into relatively low water level, and cinder ladle car 3 is in lifting and transport cinder ladle During the excessive phenomenon of cooling water would not occur.

Claims (5)

1. a kind of cinder ladle with diversion channel, it include cup-shaped cinder ladle body it is characterised in that: in the upper end of cinder ladle body It is provided with the setting diversion channel in inverted u shape, be arranged at intervals with multiple diversion channel along the circumferential direction of cinder ladle body, making to be located at Cooling water above smelting slag in cinder ladle can flow into the water inlet of diversion channel, and the outlet of diversion channel is less than this water inlet Mouthful, the peak of described diversion channel is less than the upper surface of cinder ladle body, and the outlet of diversion channel is along cinder ladle body outer wall court Lower setting, makes the cooling water energy of outflow along cinder ladle outer wall to dirty.
2. a kind of cinder ladle with diversion channel according to claim 1 is it is characterised in that described diversion channel and cinder ladle Body casts entirety.
3. a kind of cinder ladle with diversion channel according to claim 1 and 2 is it is characterised in that described cinder ladle body inclines Tiltedly arrange.
4. a kind of cinder ladle with diversion channel according to claim 3 is it is characterised in that be located at leading of cinder ladle highest point The water inlet of flowing flux is arranged in the position of more than smelting slag nominal load line 30mm, the water inlet of the diversion channel of lowest part Mouth is arranged on more than smelting slag nominal load line.
5. a kind of cinder ladle with diversion channel according to claim 1 and 2 is it is characterised in that outer in cinder ladle body Wall upper end is symmetrically arranged with left and right gudgeon, is all arranged at intervals with reinforcement along the periphery circumference at left and right gudgeon, in cinder ladle originally The outer wall upper end of body is provided with left and right bearing with the vertical place of left and right gudgeon, and the bottom of cinder ladle body is provided with support feet.
CN201410657147.8A 2014-11-18 2014-11-18 Slag ladle with flow guide water channel Active CN104525927B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410657147.8A CN104525927B (en) 2014-11-18 2014-11-18 Slag ladle with flow guide water channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410657147.8A CN104525927B (en) 2014-11-18 2014-11-18 Slag ladle with flow guide water channel

Publications (2)

Publication Number Publication Date
CN104525927A CN104525927A (en) 2015-04-22
CN104525927B true CN104525927B (en) 2017-01-18

Family

ID=52841658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410657147.8A Active CN104525927B (en) 2014-11-18 2014-11-18 Slag ladle with flow guide water channel

Country Status (1)

Country Link
CN (1) CN104525927B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106319113A (en) * 2016-11-02 2017-01-11 阳谷祥光铜业有限公司 Cooling device for slag ladle
CN110382987A (en) * 2017-01-11 2019-10-25 Tms国际公司 For the cooling container from melting or melting waste recovery metal

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62101371A (en) * 1985-10-28 1987-05-11 Daido Steel Co Ltd Forcedly cooling method for ladle slag line
CN201437152U (en) * 2009-04-08 2010-04-14 武汉恒威重机有限公司 Copper slag packet
CN203635904U (en) * 2013-10-12 2014-06-11 中冶宝钢技术服务有限公司 Novel welding slag ladle for copper slag slow cooling process
CN104120278B (en) * 2014-07-29 2016-08-17 中冶宝钢技术服务有限公司 A kind of Novel welding cinder ladle being applicable to copper ashes retarded cooling process
CN204276884U (en) * 2014-11-18 2015-04-22 武汉恒威重机有限公司 A kind of cinder ladle with diversion channel

Also Published As

Publication number Publication date
CN104525927A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN203725753U (en) Steelmaking ladle structure
CN102912078B (en) The Multifunctional arc furnace system of minimumization power consumption and the processing procedure of manufacture product made from steel
CN203197232U (en) Steel ladle bottom structure capable of effectively reducing amount of residual molten steel of steel ladle
CN201239793Y (en) Improved molten iron pouring ladle
CN104525927B (en) Slag ladle with flow guide water channel
CN201560201U (en) Slag-iron separation device for vanadium-titanium blast furnace slag
CN106884065A (en) A kind of control device for controlling molten slag flow
CN201720418U (en) Molten iron diversion device
CN204276884U (en) A kind of cinder ladle with diversion channel
CN102030489A (en) Granulating device for granular melt, in particular for matte or ion-making slag
CN201106053Y (en) Coining device for grain slag of blast furnace
CN103170609A (en) Ferroalloy casting modeling device and ferroalloy casting modeling process in front of furnace
CN104325101B (en) A kind of continuous casting production turbulator
CN208276173U (en) Ladle pours remaining oxygen gas direct-recycling device
CN206588339U (en) The improved anti-molten steel splash safety device of continuous casting production
CN206635356U (en) One kind welding slag ladle
CN106825529B (en) Ferronickel cast iron device
CN207086890U (en) Ferronickel cast iron unit
CN210937112U (en) High-purity molten iron slag-free control casting device of pig casting machine
CN206153522U (en) Continuous casting ware current drive system
CN202701364U (en) Long nozzle continuous casting tundish
CN108705059B (en) direct forming method for waste casting residue
CN202701326U (en) An improved tundish and improved flow stabilizers for a billet caster
CN201553747U (en) Vanadium-titanium high-titanium slag metal iron recycling device
CN201198483Y (en) Tap cinder water-cooling spout

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180808

Address after: 430000 Room 9, 18th Floor, Building 12, 13, 14, Building 13, Wuhan China Light Valley Cultural and Creative Industry Park, 52 Liufang Avenue, Wuhan Donghu New Technology Development Zone, Wuhan, Hubei Province

Patentee after: Wuhan Heng Wei Chen Equipment Manufacturing Co., Ltd.

Address before: Room 601-602, Building 2, 6 Floors, No. 1 International Enterprise Center, No. 2, Guanshan Second Road, Donghu High-tech Park, Wuhan City, Hubei Province, 430074

Patentee before: Wuhan Hengwei Heavy Machinery Co.,Ltd.

TR01 Transfer of patent right