CN104512700A - Railway wagon bogie overhauling method and conveying line - Google Patents

Railway wagon bogie overhauling method and conveying line Download PDF

Info

Publication number
CN104512700A
CN104512700A CN201310460445.3A CN201310460445A CN104512700A CN 104512700 A CN104512700 A CN 104512700A CN 201310460445 A CN201310460445 A CN 201310460445A CN 104512700 A CN104512700 A CN 104512700A
Authority
CN
China
Prior art keywords
bogie
conveyer
bogie truck
travel line
repair method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310460445.3A
Other languages
Chinese (zh)
Other versions
CN104512700B (en
Inventor
樊宗军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Leyu science and Technology Innovation Park Investment Development Co.,Ltd.
Original Assignee
NINGXIA ZHONGYUAN TIANSHENG TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA ZHONGYUAN TIANSHENG TECHNOLOGY Co Ltd filed Critical NINGXIA ZHONGYUAN TIANSHENG TECHNOLOGY Co Ltd
Priority to CN201310460445.3A priority Critical patent/CN104512700B/en
Publication of CN104512700A publication Critical patent/CN104512700A/en
Application granted granted Critical
Publication of CN104512700B publication Critical patent/CN104512700B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Conveyors (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention relates to a railway wagon bogie overhauling method and a conveying line; the conveying line is composed of a to-be-repaired bogie horizontal conveyor 1, a disassembling, overturning and checking platform, a detecting and assembling platform 3, a detected and assembled bogie suspension conveyor 4, a welding and assembling platform 5, a welded and assembled bogie suspension conveyor 6, an excellent bogie horizontal conveying line 7 and a hydraulic station; the railway wagon bogie overhauling method and the conveying line are characterized in that the to-be-repaired bogie horizontal conveyor 1 is respectively connected with the detected and assembled bogie suspension conveyor 4 and the welded and assembled bogie suspension conveyor 6; railway wagon bogies are conveyed to the excellent bogie horizontal conveying line 7; the detected and assembled bogie suspension conveyor 4 and the welded and assembled bogie suspension conveyor 6 respectively form annular conveying channels; and the quantity of the overhauling lines can be set according to the overhauling quantity of the bogies. The railway wagon bogie overhauling method and the conveying line have the advantages of compact layout and less occupied area; the overhauling platform can be arranged flexibly and the overhauling ability can be improved greatly.

Description

A kind of railway goods train bogie repair method and travel line
Technical field
The present invention relates to a kind of railway goods train bogie repair method and travel line, belong to Railway Freight Car Repair technique and equipment technology field.
Background technology
Adopt three kinds of forms at china railway roller bearing adapter stabilizer bar repair assembly line at present: one is that ground is ring-like, namely several Multifunctional repairing dollies operate on fixing endless track; Two is the linear patterns adopting carrier bar to transmit; Three is ring-like by the suspension type of chain-driving bogie hoist.These three kinds of bogie truck repair assembly line common ground are all process steps needing each bogie truck to be repaired must arrange through conveyor line, and this just will certainly cause the waste of repair time.Along with the Railway Freight Car Repair construction of base being developing direction with " specialization, scale, modernization "; the service ability of the existing bogie truck repair assembly line of above three kinds of forms far from can meet demand for development through facts have proved: a repair assembly line is far from being enough; at least to arrange two bogie truck repair assembly lines could meet; but two bogie truck conveyor line can cause again the waste of maintenance area and equipment, must innovate the repair method of existing bogie truck and mode of movement.
Summary of the invention
The object of this invention is to provide a kind of raising bogie truck service ability, reach the requirement of overhaul shop " large-scale production ", there is device layout is compact, floor area is little bogie truck repair method and travel line simultaneously.Be achieved through the following technical solutions for achieving the above object: the present invention relates to a kind of railway goods train bogie repair method and travel line, travel line is by bogie truck horizontal conveyer 1 to be repaired, decompose upset inspecting stand 2, detect assembly or fitting table 3, detect assembling bogie suspension conveyer 4, welding assembly platform 5, welding assembly bogie suspension conveyer 6, good bogie truck horizontal feed line machine 7, Hydraulic Station 8 forms, described a kind of railway goods train bogie repair method and the essential characteristic of travel line are that bogie truck horizontal conveyer 1 to be repaired is assembled bogie suspension conveyer 4 with detection respectively and is connected with welding assembly bogie suspension conveyer 6, railway goods train bogie is transported on good bogie truck travel line 7, detect assembling bogie suspension conveyer 4 and welding assembly bogie suspension conveyer 6 each self-forming annular transfer passage, the magnitude setting of its each bar repair line can overhaul quantity to set according to bogie truck.Described bogie truck horizontal conveyer 1 to be repaired is chain structure, be made up of frames 1-1, tow chain 1-2, actuating device 1-3, drive sprocket 1-4, driven sprocket 1-5 etc., chain is installed with bogie truck carrying platform 1-6, the quantity of platform can overhaul quantity set by bogie truck.The frame 2-2 possessing upset 60 ° that described decomposition upset inspecting stand 2 is controlled by hydraulic ram 2-1 forms.The frame 3-2 possessing upset 60 ° that described detection assembly or fitting table 3 is controlled by hydraulic ram 3-1 forms, and is positioned at the front end of horizontal conveyer 1, detects the bottom initiating terminal of assembling bogie suspension conveyer 4.Described detection assembling bogie suspension conveyer 4 is made up of elevated guideway 4-1, tow chain 4-2, balladeur train 4-3, suspender 4-4, change course device 4-5, actuating device 4-6 etc.The frame 5-2 possessing upset 60 ° that described welding assembly platform 5 is controlled by hydraulic ram 5-1 forms.Described welding assembly bogie suspension conveyer 6 is made up of elevated guideway 6-1, tow chain 6-2, balladeur train 6-3, suspender 6-4, change course device 6-5, actuating device 6-6 etc.Described good bogie truck horizontal conveyer 7 is chain structures, be made up of frames 7-1, tow chain 7-2, actuating device 7-3, drive sprocket 7-4, driven sprocket 7-5 etc., chain is installed with bogie truck carrying platform 7-6, the quantity of platform can overhaul quantity set by bogie truck.
advantage of the present invention is mainly reflected in:
1, compact in design, floor area are little;
2, inspection platform can be set flexibly, substantially increase service ability.
accompanying drawing explanation
fig. 1 is a kind of railway goods train bogie repair method and travel line schematic diagram:
1-bogie truck horizontal conveyer to be repaired: 1-1 frames 1-2 conduction chain 1-3 actuating device 1-4 drive sprocket 1-5 driven sprocket 1-6 bogie truck carrying platform
2-decomposes upset inspecting stand: 2-1 hydraulic ram 2-2 frame
3-detects assembly or fitting table: 3-1 hydraulic ram 3-2 frame
4-detects assembling bogie suspension conveyer: 4-1 elevated guideway 4-2 tow chain 4-3 balladeur train 4-4 suspender 4-5 change course device 4-6 actuating device
5-welding assembly platform: 5-1 hydraulic ram 5-2 frame
6-welding assembly bogie suspension conveyer: 6-1 elevated guideway 6-2 tow chain 6-3 balladeur train 6-4 suspender 6-5 change course device 6-6 actuating device
7-good bogie truck horizontal feed line machine: 7-1 frames 7-2 conduction chain 7-3 actuating device 7-4 drive sprocket 7-5 driven sprocket 7-6 bogie truck carrying platform
8-Hydraulic Station.
detailed description of the invention explanation
embodiment is told about below in conjunction with Fig. 1:
embodiment 1 one kinds of railway goods train bogie repair methods and the composition of travel line and the effect of each parts:
Travel line is by bogie truck horizontal conveyer 1 to be repaired, decompose upset inspecting stand 2, detect assembly or fitting table 3, detect assembling bogie suspension conveyer 4, welding assembly platform 5, welding assembly bogie suspension conveyer 6, good bogie truck horizontal feed line machine 7, Hydraulic Station 8 forms, described a kind of railway goods train bogie repair method and the essential characteristic of travel line are that bogie truck horizontal conveyer 1 to be repaired is assembled bogie suspension conveyer 4 with detection respectively and is connected with welding assembly bogie suspension conveyer 6, railway goods train bogie is transported on good bogie truck travel line 7, detect assembling bogie suspension conveyer 4 and welding assembly bogie suspension conveyer 6 each self-forming annular transfer passage, the magnitude setting of its each bar repair line can overhaul quantity to set according to bogie truck.Described bogie truck horizontal conveyer 1 to be repaired is chain structure, be made up of frames 1-1, tow chain 1-2, actuating device 1-3, drive sprocket 1-4, driven sprocket 1-5 etc., chain is installed with bogie truck carrying platform 1-6, the quantity of platform can overhaul quantity set by bogie truck.The frame 2-2 possessing upset 60 ° that described decomposition upset inspecting stand 2 is controlled by hydraulic ram 2-1 forms.The frame 3-2 possessing upset 60 ° that described detection assembly or fitting table 3 is controlled by hydraulic ram 3-1 forms, and is positioned at the front end of horizontal conveyer 1, detects the bottom initiating terminal of assembling bogie suspension conveyer 4.Described detection assembling bogie suspension conveyer 4 is made up of elevated guideway 4-1, tow chain 4-2, balladeur train 4-3, suspender 4-4, change course device 4-5, actuating device 4-6 etc.The frame 5-2 possessing upset 60 ° that described welding assembly platform 5 is controlled by hydraulic ram 5-1 forms.Described welding assembly bogie suspension conveyer 6 is made up of elevated guideway 6-1, tow chain 6-2, balladeur train 6-3, suspender 6-4, change course device 6-5, actuating device 6-6 etc.Described good bogie truck horizontal conveyer 7 is chain structures, be made up of frames 7-1, tow chain 7-2, actuating device 7-3, drive sprocket 7-4, driven sprocket 7-5 etc., chain is installed with bogie truck carrying platform 7-6, the quantity of platform can overhaul quantity set by bogie truck.
the maintenance craft of embodiment 2 one kinds of railway goods train bogie repair methods and travel line:
Bogie truck to be repaired by overhead traveling crane or rocking arm handling on the 1-8 bogie truck carrying platform on horizontal conveyer 1, arrive under the drive of actuating device and decompose upset inspecting stand 2, needing repair welding, change the bogie truck handling of accessory on welding assembly bogie suspension conveyer 6 through overhaul, arrive on welding assembly platform 5 and carry out replacing accessory and repair welding operation, be transported on good bogie truck horizontal feed line machine 7 after operation again; Do not need the bogie truck handling changing accessory and repair welding to carry out test set to arrival detection assembly or fitting table 3 on detection assembling bogie suspension conveyer 4 and pretend industry, be transported to again after operation on good bogie truck horizontal feed line machine 7.

Claims (8)

1. the present invention relates to a kind of railway goods train bogie repair method and travel line, travel line is by bogie truck horizontal conveyer 1 to be repaired, decompose upset inspecting stand 2, detect assembly or fitting table 3, detect assembling bogie suspension conveyer 4, welding assembly platform 5, welding assembly bogie suspension conveyer 6, good bogie truck horizontal feed line machine 7, Hydraulic Station 8 forms, described a kind of railway goods train bogie repair method and the essential characteristic of travel line are that bogie truck horizontal conveyer 1 to be repaired is assembled bogie suspension conveyer 4 with detection respectively and is connected with welding assembly bogie suspension conveyer 6, railway goods train bogie is transported on good bogie truck travel line 7, detect assembling bogie suspension conveyer 4 and welding assembly bogie suspension conveyer 6 each self-forming annular transfer passage, the magnitude setting of its each bar repair line can overhaul quantity to set according to bogie truck.
2. a kind of railway goods train bogie repair method according to claim 1, it is characterized in that described bogie truck horizontal conveyer 1 to be repaired is chain structure, be made up of frames 1-1, tow chain 1-2, actuating device 1-3, drive sprocket 1-4, driven sprocket 1-5 etc., chain is installed with bogie truck carrying platform 1-6, the quantity of platform can overhaul quantity set by bogie truck.
3. a kind of railway goods train bogie repair method according to claim 1 and travel line, is characterized in that the frame 2-2 possessing upset 60 ° that described decomposition upset inspecting stand 2 is controlled by hydraulic ram 2-1 forms.
4. a kind of railway goods train bogie repair method according to claim 1 and travel line, it is characterized in that the frame 3-2 possessing upset 60 ° that described detection assembly or fitting table 3 is controlled by hydraulic ram 3-1 forms, be positioned at the front end of horizontal conveyer 1, detect the bottom initiating terminal assembling bogie suspension conveyer 4.
5. a kind of railway goods train bogie repair method according to claim 1 and travel line, is characterized in that described detection assembling bogie suspension conveyer 4 is made up of elevated guideway 4-1, tow chain 4-2, balladeur train 4-3, suspender 4-4, change course device 4-5, actuating device 4-6 etc.
6. a kind of railway goods train bogie repair method according to claim 1 and travel line, is characterized in that the frame 5-2 possessing upset 60 ° that described welding assembly platform 5 is controlled by hydraulic ram 5-1 forms.
7. a kind of railway goods train bogie repair method according to claim 1 and travel line, is characterized in that described welding assembly bogie suspension conveyer 6 is made up of elevated guideway 6-1, tow chain 6-2, balladeur train 6-3, suspender 6-4, change course device 6-5, actuating device 6-6 etc.
8. a kind of railway goods train bogie repair method according to claim 1, it is characterized in that described good bogie truck horizontal conveyer 7 is chain structures, be made up of frames 7-1, tow chain 7-2, actuating device 7-3, drive sprocket 7-4, driven sprocket 7-5 etc., chain is installed with bogie truck carrying platform 7-6, the quantity of platform can overhaul quantity set by bogie truck.
CN201310460445.3A 2013-10-04 2013-10-04 A kind of railway goods train bogie overhauls pipeline Active CN104512700B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310460445.3A CN104512700B (en) 2013-10-04 2013-10-04 A kind of railway goods train bogie overhauls pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310460445.3A CN104512700B (en) 2013-10-04 2013-10-04 A kind of railway goods train bogie overhauls pipeline

Publications (2)

Publication Number Publication Date
CN104512700A true CN104512700A (en) 2015-04-15
CN104512700B CN104512700B (en) 2017-10-27

Family

ID=52788647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310460445.3A Active CN104512700B (en) 2013-10-04 2013-10-04 A kind of railway goods train bogie overhauls pipeline

Country Status (1)

Country Link
CN (1) CN104512700B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105059319A (en) * 2015-08-04 2015-11-18 彭佳 Railway wagon overhauling production line without crown block and overhauling process thereof
CN107585179A (en) * 2017-08-31 2018-01-16 中车唐山机车车辆有限公司 Bogie repair method
CN110182233A (en) * 2019-06-12 2019-08-30 中国神华能源股份有限公司 Inspection and repair of carbody system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3865272B2 (en) * 1997-03-28 2007-01-10 本田技研工業株式会社 Vehicle assembly line and vehicle assembly method
CN201235866Y (en) * 2008-07-10 2009-05-13 北京铁科合力科技有限责任公司 Suspension type steering frame examination and repair production chain
CN201458285U (en) * 2009-08-14 2010-05-12 王清林 Suspension conveying line of railway wagon bogies
CN102085871A (en) * 2010-12-28 2011-06-08 中国北车集团沈阳机车车辆有限责任公司 Bogie overhauling system and method
CN203227996U (en) * 2013-01-24 2013-10-09 保尔沃特冶金技术(北京)有限公司 Carrying apparatus for bogie production line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3865272B2 (en) * 1997-03-28 2007-01-10 本田技研工業株式会社 Vehicle assembly line and vehicle assembly method
CN201235866Y (en) * 2008-07-10 2009-05-13 北京铁科合力科技有限责任公司 Suspension type steering frame examination and repair production chain
CN201458285U (en) * 2009-08-14 2010-05-12 王清林 Suspension conveying line of railway wagon bogies
CN102085871A (en) * 2010-12-28 2011-06-08 中国北车集团沈阳机车车辆有限责任公司 Bogie overhauling system and method
CN203227996U (en) * 2013-01-24 2013-10-09 保尔沃特冶金技术(北京)有限公司 Carrying apparatus for bogie production line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张建华: "论货车车辆段转向架检修流水线布置形式及能力分析", 《铁道标准设计》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105059319A (en) * 2015-08-04 2015-11-18 彭佳 Railway wagon overhauling production line without crown block and overhauling process thereof
CN106891915A (en) * 2015-08-04 2017-06-27 裴舜尧 A kind of railway freight-car is without overhead traveling crane maintenance craft
CN105059319B (en) * 2015-08-04 2017-07-04 彭小霞 A kind of railway freight-car is without overhead traveling crane Inspection and Repair Production Line and its maintenance craft
CN106891915B (en) * 2015-08-04 2018-09-11 裴舜尧 A kind of railway freight-car is without overhead traveling crane maintenance craft
CN107585179A (en) * 2017-08-31 2018-01-16 中车唐山机车车辆有限公司 Bogie repair method
CN110182233A (en) * 2019-06-12 2019-08-30 中国神华能源股份有限公司 Inspection and repair of carbody system

Also Published As

Publication number Publication date
CN104512700B (en) 2017-10-27

Similar Documents

Publication Publication Date Title
CN102085871B (en) Bogie truck examination and repair system and repair method
CN103449118B (en) A kind of weld car side wall line conveying mechanism
CN104512700A (en) Railway wagon bogie overhauling method and conveying line
CN103964152A (en) Conveyor lifting mechanism
JP2014156353A (en) Conveying device, kit with at least two frame profiles for creating frame construction, and usage of conveying device
CN107991093A (en) A kind of detection device that can detect carrier bar Short Item automatically
CN107298289A (en) The aerial induction system of weld car main weldering line main clamp
CN206938778U (en) A kind of railway goods train bogie examination and repair system
CN105345466A (en) Assembling line and assembling method for car seat
CN204823228U (en) Conveying device
CN207791927U (en) Brake beam underground pipeline
WO2023246022A1 (en) Off-line cut piece loading mechanism
CN201670639U (en) Full-automatic reciprocating type vertical conveyor
CN105234043B (en) A kind of immersion oil board
CN204957715U (en) Production line conveyer carton centering mechanism
CN203921923U (en) Little stroke lifting free parking car track
CN207479924U (en) A kind of electromobile frame automatic welding device
CN103552806A (en) Novel car coupler tail frame conveyor for a wagon
CN205151147U (en) Multithreading assembly line that overhauls EMUs is with moving machine of carrying
CN203319142U (en) Online weighing device of suspension conveying system
CN102493358A (en) Highway and railway two-purpose bridge girder erection machine
CN207275550U (en) A kind of novel automatic hangs sky pipeline
CN104760810A (en) Steering frame production system
CN105345468A (en) Assembling line and assembling method for car seat
RU2383457C2 (en) Goods' car repair complex

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200617

Address after: 215600 No.11 Renmin Road, Leyu Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: Zhangjiagang Leyu science and Technology Innovation Park Investment Development Co.,Ltd.

Address before: 750006 the Ningxia Hui Autonomous Region Yinchuan Xingqing District Ningxia mechanical and electrical wholesale market No. 3 Building No. 6 business room

Patentee before: NINGXIA ZHONGYUAN TIANSHENG TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right