CN104511582A - Novel accidental quick dismounting device for dummy bar head - Google Patents
Novel accidental quick dismounting device for dummy bar head Download PDFInfo
- Publication number
- CN104511582A CN104511582A CN201310450248.3A CN201310450248A CN104511582A CN 104511582 A CN104511582 A CN 104511582A CN 201310450248 A CN201310450248 A CN 201310450248A CN 104511582 A CN104511582 A CN 104511582A
- Authority
- CN
- China
- Prior art keywords
- dummy bar
- accident
- bar head
- head
- novel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention provides a novel accident quick dismounting device for a dummy bar head. The novel accident quick dismounting device is used for dismounting and separating the dummy bar head and a dummy bar under an accident state. The novel accident quick dismounting device for the dummy bar head comprises a twisting rod (1). The novel accident quick dismounting device for the dummy bar head further comprises a sleeve (2) and a dismounting head (3); the sleeve (2) is arranged in the middle part of the twisting rod (1) and vertical to the twisting rod (1); one end of the sleeve (2) is connected with the twisting rod (1); the dismounting head (3) is arranged at the end part of the sleeve (2); the rear end of the dismounting head (3) is arranged in the sleeve (2) to form a dismounting head sleeve part, and while the front end of the dismounting head (3) exposes from the sleeve (2) to form a dismounting head exposing part; the dismounting head exposing part is a hexagonal stud head which is in match with connecting bolts of the dummy bar head and the dummy bar. With the adoption of the novel accident quick dismounting device for the dummy bar head, the efficiency of treating steel-leaked accident blanks can be increased, the time of treating the accident blanks is decreased, the labor intensity can be reduced, and the personal safety of cutting operators can be improved.
Description
Technical field
The present invention relates to the auxiliary equipment of steel industry conticaster, under referring in particular to accident condition, the instrument of during process of accident base, dummy head and dummy bar being separated.
Background technology
Iron and steel metallurgical industry, the mode of high-temperature molten steel solidification forming has die casting (high-temperature molten steel is watered into steel ingot, is processed into steel billet through blooming mill or forging press) and continuous casting (high-temperature molten steel is directly watered into continuous casting steel billet) two kinds of modes, implements continuous casting mode, can recovery rate of iron be improved, reduce production cost.
Crystallizer is the nucleus equipment of conticaster, by the heat exchange of crystallizer, high-temperature molten steel is solidified.In continuous casting Operational preparation, crystallizer seal operation is the key factor affecting continuous casting production direct motion.Crystallizer seals, and is mainly undertaken by dummy head.When continuous casting is produced, steel flows through submersed nozzle and enters crystallizer, first contact above dummy bar head and fill in dummy ingot encapsulant, mainly use spring, nail bits etc. at present, be intended to offset or reduce molten steel to the impact of dummy ingot head, reduce molten steel to splash, dummy bar head and initial molten steel are condensed well, is beneficial to and carries out throwing operation.Molten steel enters in crystallizer, starts to mold oscillation, and initial base shell, under the effect of crystallizer cooling water, starts to move downward gradually, is called as seedling-growing time during this period of time.Technique suggestion seedling-growing time in, Mold completes the formation of initial base shell, and along with dummy bar down.
But in actual production, due to the impact of the factors such as steel grade characteristic, seedling-growing time deficiency, the initial base shell of formation forms bleed-out accident after haveing crystallizer:
Will carry out accident base (when referring to have an accident, the strand under accident condition) emergent management after there is bleed-out accident, traditional way is on accident base, adopt cutting oxygen rifle to cut out cutting position, uses steel wire rope up handling.
Point five steps are needed to carry out in the process of accident base:
The first step: after crystallizer stops cast, hang away crystallizer immediately;
Second step: at accident base two side position, takes cutting gun to cut out wire line shoe position;
3rd step: use cutting oxygen rifle to cut off process to accident base;
4th step: to the accident base up handling of having cut, carry out the process of accident base;
5th step: to the remaining accident base up handling be connected on dummy bar head, carry out the process of accident base;
Cutting reprocessing is carried out to accident base, is because accident base length and dummy bar total length sum, is greater than the length of the normal ejection of crystallizer.
2 large shortcomings are had by this accident base processing mode:
One, during the cutting of accident base, owing to using overhead crane control, balance cannot ensure, the personal safety of therefore cutting personnel causes certain threat, and meanwhile, during due to emergent management, strand temperature reaches more than 800 DEG C, too increases the danger of cutting operation.
Its two, the cutting operation time is longer, affects accident base treatment effeciency
Summary of the invention
For solving the problem, the invention provides a kind of novel dummy bar head accident quick-release arrangement of quick release dummy bar head, technical scheme is as follows.
A kind of novel dummy bar head accident quick-release arrangement, for in the state of accident dummy bar head and dummy bar being separated, comprise torsion bar, it is characterized in that, described novel dummy bar head accident quick-release arrangement also comprises, be arranged in the middle part of described torsion bar, one end is connected with described torsion bar, perpendicular to the sleeve pipe of described torsion bar, be arranged at described cannula tip, rear end is socketed on described inside pipe casing and forms Tool for detaching socket part, the Tool for detaching that described sleeve pipe forms Tool for detaching exposed division is exposed in front end, described Tool for detaching exposed division is the hexagonal bolt head that can coordinate with the connecting bolt of described dummy bar head and dummy bar.
Thus, workman can dismantle dummy bar head on the operating platform that distance dummy bar head is far away.
According to one of the present invention novel dummy bar head accident quick-release arrangement, it is characterized in that, described Tool for detaching socket part is cylindrical.
According to one of the present invention novel dummy bar head accident quick-release arrangement, it is characterized in that, the cross-sectional area of described Tool for detaching socket part is greater than the cross-sectional area of described Tool for detaching exposed division.
According to one of the present invention novel dummy bar head accident quick-release arrangement, it is characterized in that, side, described Tool for detaching socket part is formed with the locating piece that can coordinate with described sleeve pipe.
According to one of the present invention novel dummy bar head accident quick-release arrangement, it is characterized in that, the inwall of described cannula tip is formed with the locating slot that can coordinate with described locating piece.
Thus, can at sleeve pipe inner position Tool for detaching.
According to one of the present invention novel dummy bar head accident quick-release arrangement, it is characterized in that, the tube wall that described sleeve pipe and described Tool for detaching are socketed is formed with bolt hole.
According to one of the present invention novel dummy bar head accident quick-release arrangement, it is characterized in that, described Tool for detaching side adjacent with described bolt hole is formed with the bolt slot communicated with described bolt hole.
According to one of the present invention novel dummy bar head accident quick-release arrangement, it is characterized in that, in described bolt hole and bolt slot, be provided with set bolt.
Thus, bolt can be used to pass the bolt hole of sleeve pipe, fix Tool for detaching by bolt slot.
According to one provided by the invention novel dummy bar head accident quick-release arrangement, bleed-out accident base treatment effeciency can be improved, the shortening accident base processing time.Can labour intensity be reduced, improve cutting operation personnel Personal Safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of dummy bar head and dummy ingot bar bar.
Fig. 2 is a kind of novel dummy bar head accident quick-release arrangement structural representation.
Fig. 3 is the structural representation of cannula tip.
Fig. 4 is the structural representation of Tool for detaching.
Fig. 5 is the structural representation of another angle of Tool for detaching.
Fig. 6 is sleeve pipe and dismantles head group and schematic diagram.
Fig. 7 is a kind of use schematic diagram of novel dummy bar head accident quick-release arrangement.
Wherein 1 is torsion bar, and 2 is sleeve pipe, and 2-1 is locating slot, and 3 is Tool for detaching, and 3-1 is locating piece, and 4 is dummy bar head, and 5 is dummy bar head changeover portion, and 6 is dummy bar body.
Detailed description of the invention
Embodiment 1
A kind of novel dummy bar head accident quick-release arrangement, for dummy bar head and dummy bar being separated, comprise torsion bar and sleeve pipe in the state of accident, described sleeve pipe is arranged in the middle part of described torsion bar, and perpendicular to torsion bar, end is provided with Tool for detaching
Described Tool for detaching rear end is class cylinder, and front end is hex bolts.Described Tool for detaching rear portion is formed with the locating piece that can coordinate with internal surface of sleeve pipe, and internal surface of sleeve pipe is formed with the locating slot corresponding with described locating piece.
The tube wall that described sleeve pipe and described Tool for detaching are socketed is formed with bolt hole, and Tool for detaching side is formed with the bolt slot communicated with described bolt hole, and a set bolt passes bolt hole, at bolt slot internal fixtion.
After accident occurs, personnel stand on home (beyond distance high-temperature accident base 1.5m), use dummy bar head quick-release arrangement, by dummy bar head and changeover portion connecting rod end hexagon socket head cap screw to dextrorotation, after pulling down bolt, connecting rod is extracted out from the other end, now, needs to use driving handling accident base and dummy bar head head to accident treatment position, dummy bar changeover portion and body, according to normal process mode, roller-way can be gone out from below, and change dummy ingot for subsequent use in time.
According to one provided by the invention novel dummy bar head accident quick-release arrangement, bleed-out accident base treatment effeciency can be improved, the shortening accident base processing time.Can labour intensity be reduced, improve cutting operation personnel Personal Safety.
Claims (8)
1. a novel dummy bar head accident quick-release arrangement, for in the state of accident dummy bar head and dummy bar being separated, comprise torsion bar (1), it is characterized in that, described novel dummy bar head accident quick-release arrangement also comprises, be arranged at described torsion bar (1) middle part, one end is connected with described torsion bar (1), perpendicular to the sleeve pipe (2) of described torsion bar (1), be arranged at described sleeve pipe (2) end, rear end is socketed on described sleeve pipe (2) inside and forms Tool for detaching socket part, the Tool for detaching (3) that described sleeve pipe (2) forms Tool for detaching exposed division is exposed in front end, described Tool for detaching exposed division is the hexagonal bolt head that can coordinate with the connecting bolt of described dummy bar head and dummy bar.
2. one according to claim 1 novel dummy bar head accident quick-release arrangement, is characterized in that, described Tool for detaching socket part is cylindrical.
3. one according to claim 1 novel dummy bar head accident quick-release arrangement, is characterized in that, the cross-sectional area of described Tool for detaching socket part is greater than the cross-sectional area of described Tool for detaching exposed division.
4. one according to claim 1 novel dummy bar head accident quick-release arrangement, is characterized in that, side, described Tool for detaching socket part is formed with the locating piece (3-1) that can coordinate with described sleeve pipe (2).
5. one according to claim 4 novel dummy bar head accident quick-release arrangement, is characterized in that, the inwall of described sleeve pipe (2) end is formed with the locating slot (2-1) that can coordinate with described locating piece (3-1).
6. one according to claim 1 novel dummy bar head accident quick-release arrangement, is characterized in that, the tube wall that described sleeve pipe (2) and described Tool for detaching (3) are socketed is formed with bolt hole.
7. one according to claim 6 novel dummy bar head accident quick-release arrangement, is characterized in that, described Tool for detaching (3) side adjacent with described bolt hole is formed with the bolt slot communicated with described bolt hole.
8. the novel dummy bar head accident of the one according to claim 6 or 7 quick-release arrangement, is characterized in that, be provided with set bolt in described bolt hole and bolt slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310450248.3A CN104511582A (en) | 2013-09-27 | 2013-09-27 | Novel accidental quick dismounting device for dummy bar head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310450248.3A CN104511582A (en) | 2013-09-27 | 2013-09-27 | Novel accidental quick dismounting device for dummy bar head |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104511582A true CN104511582A (en) | 2015-04-15 |
Family
ID=52787787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310450248.3A Pending CN104511582A (en) | 2013-09-27 | 2013-09-27 | Novel accidental quick dismounting device for dummy bar head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104511582A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060191382A1 (en) * | 2005-01-25 | 2006-08-31 | Pettit Theodore G | Socket ratchet wrench system with pivoting, sleeved handle and/or interchangeable gear housings and drives |
CN201344197Y (en) * | 2008-09-27 | 2009-11-11 | 苏州闪联高压电器有限公司 | Novel theft prevention bolt and special sleeve |
CN201769134U (en) * | 2010-05-12 | 2011-03-23 | 扬州天富龙汽车内饰纤维有限公司 | Tool for releasing fixing bolts of hot rolls |
US20110100166A1 (en) * | 2009-10-29 | 2011-05-05 | Hrayr Darbinyan | T-handle wrench |
CN202462285U (en) * | 2012-01-18 | 2012-10-03 | 中国三冶集团有限公司第一建筑工程公司 | Lengthened multi-head socket wrench |
CN202640222U (en) * | 2012-04-27 | 2013-01-02 | 山西省电力公司大同供电分公司 | Hexagon bolt spanner set |
-
2013
- 2013-09-27 CN CN201310450248.3A patent/CN104511582A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060191382A1 (en) * | 2005-01-25 | 2006-08-31 | Pettit Theodore G | Socket ratchet wrench system with pivoting, sleeved handle and/or interchangeable gear housings and drives |
CN201344197Y (en) * | 2008-09-27 | 2009-11-11 | 苏州闪联高压电器有限公司 | Novel theft prevention bolt and special sleeve |
US20110100166A1 (en) * | 2009-10-29 | 2011-05-05 | Hrayr Darbinyan | T-handle wrench |
CN201769134U (en) * | 2010-05-12 | 2011-03-23 | 扬州天富龙汽车内饰纤维有限公司 | Tool for releasing fixing bolts of hot rolls |
CN202462285U (en) * | 2012-01-18 | 2012-10-03 | 中国三冶集团有限公司第一建筑工程公司 | Lengthened multi-head socket wrench |
CN202640222U (en) * | 2012-04-27 | 2013-01-02 | 山西省电力公司大同供电分公司 | Hexagon bolt spanner set |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104164574B (en) | A kind of electroslag remelting prepares the method for high-rating generator retaining ring hollow steel ingot | |
CN103691860B (en) | The processing method of effective raising Quality of Large Forgings | |
CN101138785A (en) | Continuous casting method of bloom | |
RU2015137667A (en) | METHOD AND DEVICE FOR MINIMIZING EXPLOSIVE CAPACITY FOR CASTING WITH DIRECT COOLING OF ALUMINUM AND CASTING ALLOYS | |
CN102357625A (en) | Method for forging super-long hollow part from short core rod through free forging press | |
CN105598399A (en) | Production method of ultra-thickness casting blank | |
CN105798256A (en) | Semisolid die casting forming process for high-strength aluminum alloy steering knuckle | |
CN205270799U (en) | Aluminum alloy cold chamber die casting molding machine | |
CN204108272U (en) | Conticaster and Continuous Casting Rolls thereof | |
CN205559416U (en) | Water cooling hydro -cylinder | |
CN205056946U (en) | Casting mold | |
CN104511582A (en) | Novel accidental quick dismounting device for dummy bar head | |
CN211162323U (en) | Flame cutting mechanism of continuous casting machine | |
CN102962416A (en) | Device and method for producing thin aluminum alloy bar | |
CN102274944A (en) | Process for forming aluminium-alloy casting motor flange plate | |
CN217173831U (en) | Electrode clamping device of die steel electroslag remelting furnace | |
CN201249270Y (en) | Distributor air cooling device for aluminum liquid casting | |
CN202894257U (en) | Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot | |
CN205702420U (en) | Molten steel water filling port removes device | |
CN202045351U (en) | Guide device for dummy bar of continuous casting machine | |
CN102773431B (en) | Special inner crystallizer device for continuous casting | |
CN207026468U (en) | The stifled stream hammer of continuous casting metering nozzle | |
CN102861903A (en) | Connecting rod liquid-state die forging process | |
CN105400966A (en) | Gas refining process for aluminum alloy | |
CN104368804A (en) | Method for integrally machining plug and nozzle adapter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150415 |