CN202894257U - Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot - Google Patents

Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot Download PDF

Info

Publication number
CN202894257U
CN202894257U CN 201220631742 CN201220631742U CN202894257U CN 202894257 U CN202894257 U CN 202894257U CN 201220631742 CN201220631742 CN 201220631742 CN 201220631742 U CN201220631742 U CN 201220631742U CN 202894257 U CN202894257 U CN 202894257U
Authority
CN
China
Prior art keywords
spray
zero
water inlet
crystallizer
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220631742
Other languages
Chinese (zh)
Inventor
李卫彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Shengli Indust Technologies Co ltd
Original Assignee
SHENGLI (FUZHOU) HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENGLI (FUZHOU) HEAVY INDUSTRY Co Ltd filed Critical SHENGLI (FUZHOU) HEAVY INDUSTRY Co Ltd
Priority to CN 201220631742 priority Critical patent/CN202894257U/en
Application granted granted Critical
Publication of CN202894257U publication Critical patent/CN202894257U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

Disclosed is an improved structure of a zero-section spray of a tubular crystallizer for a rectangular blank and a cogged ingot. The improved structure is composed of a top flange, an upper flange, a water sleeve, a copper pipe, an outer shell, a lower flange, the zero-section spray, a foot roll device, a sealing piece, connecting bolts and connecting nuts. A middle fixing plate is fixed on the middle portion of an outer ring of the crystallizer. A water inlet pipe and a water return pipe of the crystallizer and a zero-section water inlet pipe are respectively fixed on the middle fixing plate. The zero-section spray is composed of spray pipes and a spray head fixed on the spray pipes. The improved structure is characterized in that the zero-section spray is composed of two sections of L-shaped spray pipes. The two sections of spray pipes are respectively provided with a water inlet. The zero-section water inlet pipe is respectively connected with the water inlets of the two sections of spray pipes. The improved structure conducts improvement based on an existing crystallizer, an annular whole spray pipe is improved to be composed of the two sections of L-shaped spray pipes. If one side is broken, only one side of the spray pipe needs to be maintained. And the spray pipe only needs to be moved out from the side face in the process of maintenance, and thus the improved structure is convenient to maintain, maintaining cost is reduced, and working efficiency of a continuous casting machine is improved.

Description

The improvement structure of rectangular bloom, bloom tube type mold zero section spray
Technical field:
The utility model relates to continuous casting equipment, rectangular bloom, the bloom crystallizer particularly used in a kind of steel production enterprise conticaster.
Background technology:
Continuous cast mold is the key equipment in the conticaster, and its structural behaviour directly affects production and the quality of continuous casting billet.At present, widely used rectangular bloom during continuous casting is produced, the bloom tube type mold, such as Fig. 1,2, shown in 3, by top flange 1, upper flange 3, water jacket 4, copper pipe 5, shell 6, lower flange 7, zero section spray 8, the compositions such as foot-roller unit 9 and various seal attachment bolt nuts, copper pipe 5 and water jacket 4 are housed in the shell 6, even cooling water seam is shaped in the middle of copper pipe 5 and the water jacket 4, the water jacket spacer flanger is divided into up and down two chambeies with shell 6 simultaneously, upper is backwater cavity, it is down intake antrum, the upper and lower side of shell 6 is equipped with flange and seal, zero section spray and foot-roller unit is equipped with in the lower end, is welded with crystallizer water inlet pipe 62 on the middle fixed head 61, return pipe 63 and zero section water inlet pipe 64(Fig. 2), return pipe communicates with the housing epicoele, water inlet pipe communicates with the housing cavity of resorption, and zero section water inlet pipe directly communicates with zero section spray 8.
As shown in Figure 3, zero section spray 8 is comprised of shower 82 and the spray head 81 that is fixed on the shower 82, and zero section water inlet pipe 64 is the water inlet 641 of logical shower directly, and shower 82 adopts whole polygonized structure, so that behind the continuous casting bleed-out, zero section maintenance Recovery processing difficulty is large.
Summary of the invention:
The purpose of this utility model is defective and the problem that exists for above-mentioned crystallizer, and the improvement structure of the rectangular bloom a kind of easy to maintenance that provides, bloom tube type mold zero section spray.
The technical scheme that the utility model adopts is a kind of rectangular bloom, the improvement structure of bloom tube type mold zero section spray, by the top flange, upper flange, water jacket, copper pipe, shell, lower flange, zero section spray, foot-roller unit and seal, the attachment bolt nut forms, fixed head in the middle of middle part, crystallizer outer ring is fixed with, the crystallizer water inlet pipe, return pipe, zero section water inlet pipe is separately fixed on the middle fixed head, zero section spray is comprised of shower and the spray head that is fixed on the shower, its main points are, zero section spray is comprised of two sections showers that are L-type, two sections showers have respectively water inlet, and zero section water inlet pipe joins with the water inlet of two showers respectively.
The utility model is to improve on the basis of existing crystallizer, the shower that the whole shower of ring-type is modified into two sections L-types forms, and as long as a side damages the one-sided shower of maintenance, and during maintenance as long as shift out from the side, convenient for maintaining has reduced maintenance cost.
The utility model also can be done further improvement, and the arranged on left and right sides of middle fixed head is fixed with respectively a crystallizer water inlet pipe, return pipe.Cooling for the crystallizer upper end has increased a water inlet pipe and return pipe more, has accelerated water intake velocity, and the flowing water of the water inlet pipe of a side is responsible for cooling off crystallizer half in theory, and the uniformity of cooling doubles.
The utility model has the advantage of: adopt split type zero segment structure, make things convenient for accident treatment, improve the conticaster operating rate.Two-way water feeding is all adopted in crystallizer upper end and zero section water inlet, cool off even, effective, billet quality stable, effectively improves casting speed, slab quality and the production economy efficient that has conticaster now.
Description of drawings:
Fig. 1 is the structural representation of existing rectangular bloom, bloom tube type mold
Fig. 2 is the top view of Fig. 1
Fig. 3 is the top view of zero section spray system
Fig. 4 structural representation of the present utility model
Fig. 5 is the top view of zero section spray system of the present utility model
Fig. 6 is the top view of Fig. 4
Fig. 7 is the top view of embodiment 2
Wherein: 8 zero sections sprays of water inlet 7 lower flanges, 81 spray heads, 82 showers, 9 foot-roller units of 64 0 sections water inlet pipe 641 showers of fixed head 62 water inlet pipes, 63 return pipes in the middle of 1 top flange, 3 upper flanges, 4 water jackets, 5 copper pipes, 6 shells 61.
The specific embodiment:
Below in conjunction with accompanying drawing the utility model is described in further detail, can makes the professional and technical personnel more understand the utility model, following embodiment is made amendment, it all is possible adding and replacing, and does not all exceed protection domain of the present utility model.
Embodiment 1, such as Fig. 4,5, shown in 6, a kind of rectangular bloom, the improvement structure of bloom tube type mold zero section spray, by top flange 1, upper flange 3, water jacket 4, copper pipe 5, shell 6, lower flange 7, zero section spray 8, foot-roller unit 9 and seal, the attachment bolt nut forms, fixed head 61 in the middle of middle part, crystallizer outer ring is fixed with, crystallizer water inlet pipe 62, return pipe 63, zero section water inlet pipe 64 is separately fixed on the middle fixed head 61, zero section spray 8 is comprised of shower 82 and the spray head 81 that is fixed on the shower 82, zero section spray 8 is comprised of two sections showers 82 that are L-type, two sections showers 82 have respectively water inlet 641, and zero section water inlet pipe 64 joins with the water inlet 641 of two showers respectively.It is same as the prior art that all the other do not state part.The utility model is to improve on the basis of existing crystallizer, the shower 82 that the whole shower of ring-type is modified into two sections L-types forms, and as long as a side damages the one-sided shower of maintenance, and during maintenance as long as shift out from the side, convenient for maintaining has reduced maintenance cost.
Embodiment 2, and as shown in Figure 7, the arranged on left and right sides of middle fixed head 61 is fixed with respectively a crystallizer water inlet pipe 62, return pipe 63.A water inlet pipe and return pipe have been increased more, accelerated water intake velocity, crystallizer and steel billet cooling are even, and the intensity of cooling in strand cross section is basically identical, shell thickness is also basically identical, effectively improves casting speed, slab quality and the production economy efficient of existing conticaster.It is identical with upper example that all the other do not state part.

Claims (2)

1. rectangular bloom, the improvement structure of bloom tube type mold zero section spray, by top flange (1), upper flange (3), water jacket (4), copper pipe (5), shell (6), lower flange (7), zero section spray (8), foot-roller unit (9) and seal, the attachment bolt nut forms, fixed head (61) in the middle of middle part, crystallizer outer ring is fixed with, crystallizer water inlet pipe (62), return pipe (63), zero section water inlet pipe (64) is separately fixed on the middle fixed head (61), zero section spray (8) is comprised of shower (82) and the spray head (81) that is fixed on the shower (82), it is characterized in that: zero section spray (8) is comprised of two sections showers (82) that are L-type, two sections showers (82) have respectively water inlet (641), and zero section water inlet pipe (64) joins with the water inlet (641) of two showers respectively.
2. the improvement structure of a kind of rectangular bloom according to claim 1, bloom tube type mold zero section spray, it is characterized in that: the arranged on left and right sides of middle fixed head (61) is fixed with respectively a crystallizer water inlet pipe (62) and return pipe (63).
CN 201220631742 2012-11-27 2012-11-27 Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot Expired - Lifetime CN202894257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220631742 CN202894257U (en) 2012-11-27 2012-11-27 Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220631742 CN202894257U (en) 2012-11-27 2012-11-27 Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot

Publications (1)

Publication Number Publication Date
CN202894257U true CN202894257U (en) 2013-04-24

Family

ID=48114976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220631742 Expired - Lifetime CN202894257U (en) 2012-11-27 2012-11-27 Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot

Country Status (1)

Country Link
CN (1) CN202894257U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103252467A (en) * 2013-05-10 2013-08-21 中冶南方工程技术有限公司 Secondary cooling spraying device for square billet continuous casting
CN105057626A (en) * 2015-08-27 2015-11-18 东北大学 Control system and method for grain refinement of corners of continuous casting billets
CN110842165A (en) * 2019-12-12 2020-02-28 四川德胜集团钒钛有限公司 Spraying device for crystallizer of continuous casting machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103252467A (en) * 2013-05-10 2013-08-21 中冶南方工程技术有限公司 Secondary cooling spraying device for square billet continuous casting
CN105057626A (en) * 2015-08-27 2015-11-18 东北大学 Control system and method for grain refinement of corners of continuous casting billets
CN110842165A (en) * 2019-12-12 2020-02-28 四川德胜集团钒钛有限公司 Spraying device for crystallizer of continuous casting machine

Similar Documents

Publication Publication Date Title
CN201482936U (en) Gravity-cast aluminum alloyed wheel casting die
CN102921914A (en) Heavy reduction technology for improving center segregation and center porosity of super-thick slabs
CN104399923B (en) A kind of method producing special heavy plate continuous casting billet
CN202894257U (en) Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot
CN202894245U (en) Tubular crystallizer of rectangular bloom and bloom of double-cooling loop
CN104325098A (en) Cast iron horizontal continuous casting double-water jacket type crystallizer
CN203470849U (en) Rapid cooling sand box
CN204108286U (en) Low-pressure casting die of aluminum vehicle wheel
CN205128898U (en) Aluminium alloy forming die
CN204509405U (en) A kind of press quenching device of complicated big cross section aluminium section bar
CN201020475Y (en) Auxiliary cooling pipe for tandem mill device
CN201841248U (en) Heat transferring devices in cold bed for continuously-cast single square billet
CN101934357B (en) Process for effectively controlling central segregation of continuous cast slab
CN201427180Y (en) Secondary cooling device on lower port of mold
CN203076552U (en) Modified crystallizer foot roller frame
CN202490829U (en) Fast clearing device for water vapor on surface of water-quenched hot rolled steel
CN202667575U (en) Double-current straight square billet crystallizer
CN207033891U (en) The cooling device of billet continuous casting withdrawal straightening machine hydraulic cylinder
CN201913213U (en) Water-cooled continuous casting spray pipe
CN204276841U (en) The fourplatemold that a kind of width face cools respectively
CN201832966U (en) Die body block of water-cooling crystallizer and die body formed by die body blocks
CN102699299B (en) Method for producing high-quality extra thick slab through complete gas atomization secondary cooling mode
CN202517015U (en) Copper and copper alloy flat ingot integrated crystallizer tooling system
CN202984612U (en) Water cooling device of horizontal continuous casting machine
CN203155963U (en) Novel crystallizer for pouring square billet

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Cangshan District of Fuzhou City, Fujian province 350008 Jinshan Industrial Zone BaiHuaZhou Road No. 9

Patentee after: FUJIAN SHENGLI INDUST. TECHNOLOGIES CO.,LTD.

Address before: Cangshan District of Fuzhou City, Fujian province 350008 Jinshan Industrial Zone BaiHuaZhou Road No. 9

Patentee before: SHENGLI (FUZHOU) HEAVY INDUSTRY Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130424