CN201427180Y - Secondary cooling device on lower port of mold - Google Patents

Secondary cooling device on lower port of mold Download PDF

Info

Publication number
CN201427180Y
CN201427180Y CN 200920103663 CN200920103663U CN201427180Y CN 201427180 Y CN201427180 Y CN 201427180Y CN 200920103663 CN200920103663 CN 200920103663 CN 200920103663 U CN200920103663 U CN 200920103663U CN 201427180 Y CN201427180 Y CN 201427180Y
Authority
CN
China
Prior art keywords
secondary cooling
crystallizer
water inlet
shower
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200920103663
Other languages
Chinese (zh)
Inventor
柳洪义
王子然
廖志海
李波
李大忠
冯润明
李双武
韩志杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron and Steel Co Ltd
Original Assignee
Hebei Iron and Steel Group Co Ltd
Tangshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron and Steel Group Co Ltd, Tangshan Iron and Steel Co Ltd filed Critical Hebei Iron and Steel Group Co Ltd
Priority to CN 200920103663 priority Critical patent/CN201427180Y/en
Application granted granted Critical
Publication of CN201427180Y publication Critical patent/CN201427180Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Continuous Casting (AREA)

Abstract

A secondary cooling device on the lower port of a mold belongs to the technical field of steel casting equipment and is used for secondary cooling of casting blanks. The secondary cooling device comprises eight spray pipes, wherein the eight spray pipes are distributed around the passage of the casting blanks at the lower port of the mold; the upper ends of the spray pipes are respectively connected with a water inlet communication pipe; the water inlet communication pipe forms an octagonal annular pipeline surrounding the passage of the casting blanks at the lower port of the mold; the lowerends of the spray pipes are respectively connected with a lower support plate; the lower support plate surrounds the octagonal frame of the passage of the casting blanks; and a plurality of nozzle mounting holes are formed on each spray pipe. After being supplied with water, the secondary cooling device can spray water from eight directions including four sides and four corners of the casting blanks so as to significantly improve the secondary cooling effect, thereby remarkably reducing steel leakage after the casting blanks are discharged from the mold, and reducing the crack and rhomboiditydefects of the casting blank. The secondary cooling device has the advantages of simple manufacture, convenient installation, low cost, convenient assembly/disassembly, and excellent secondary coolingeffect.

Description

A kind of crystallizer end opening secondary cooling apparatus
Technical field
The utility model relates to the cooling device of conticaster crystallizer in a kind of STEELMAKING PRODUCTION, belongs to the cast steel equipment technical field.
Background technology
In the cast steel production process, crystallizer is the important technological equipment of conticaster, after molten steel is diverted to crystallizer by tundish, once cool off by water-cooled copper, homogeneously crystallized one-tenth base shell around the strand, and along with the vibration and the rotation of straightening roller of crystallizer moves downward, go out that copper pipe is laggard goes into the unsupported secondary cooling zone of strand, be called one section of secondary cooling, the strand outside is the base shell of the about 15~20mm of thickness herein, and inside is not solidified molten steel.Need further cooling just can carry out solidifying fully of molten steel, the existing type of cooling is that the strand four sides is by the cooling of four split water bar water sprays, it is even to inhomogeneous cooling around the strand to exist cooling water, cooling effect is bad, and easily bleed-out, strand were prone to defectives such as face crack, casting blank off-square after strand went out crystallizer.For this reason, need design more effectively cooling device, to improve the quality of strand.
Summary of the invention
Technical problem to be solved in the utility model provide a kind of to cooling around the strand evenly, good cooling results, the measured crystallizer end opening of strand cooling back matter secondary cooling apparatus.
The technical scheme that solves the problems of the technologies described above is:
A kind of crystallizer end opening secondary cooling apparatus, it is made up of 8 nozzles, 8 showers are laid around the passage of continuous casting billet at the crystallizer end opening, the upper end of shower is connected communicating pipe with water inlet respectively, the annulus line of intaking communicating pipe interruption-forming 8 limit shapes under crystallizer, pipeline is round the operation passage of strand, and the lower end of shower is connected with lower supporting plate respectively, lower supporting plate is 8 limit shape frames around the strand passage, is arranged with a plurality of nozzle installing holes on each shower.
Above-mentioned crystallizer end opening secondary cooling apparatus, described water inlet communicating pipe the upper surface be connected by bolting with the crystallizer lower flange, the water inlet manifold that crystallizer lower flange hole and secondary cooling apparatus device are passed in the water supply connector of water inlet communicating pipe joins.
Above-mentioned crystallizer end opening secondary cooling apparatus has the blowdown pipe plug opening in the lower end of every shower.
The utility model is installed in crystallizer end opening place, can spray from eight directions of four faces and four angles of strand after the water flowing, the secondary cooling effect obviously improves, bleed-out obviously reduced after strand went out crystallizer, slab surface crack, off-square defective obviously reduce, have make simple, easy for installation, cost is low, convenient disassembly, advantage such as quick, the secondary cooling that strand is gone out the crystallizer end opening has produced good effect.
Description of drawings
Fig. 1 is a three-dimensional structure diagram of the present utility model;
Fig. 2 is a structural representation of the present utility model;
Fig. 3 is the vertical view of Fig. 2;
Fig. 4 is the upward view of Fig. 2;
Fig. 5 is a use scheme of installation of the present utility model;
Fig. 6 is the A-A cutaway view of Fig. 5.
Mark is as follows among the figure: shower 1, water inlet communicating pipe 2, lower supporting plate 3, nozzle installing hole 4, water supply connector 5, blowdown pipe plug opening 6, crystallizer housing 7, crystallizer lower flange 8, set bolt 9, strand 10, extrados shower 11, outer arc angle shower 12, side cambered surface shower 13, interior arc angle shower 14, intrados shower 15
The specific embodiment
Show among Fig. 1, the utility model is the octahedral spray crystallizer secondary cooling apparatus that simultaneously strand is sprayed, this device is a weldment, water supply connector 5 is connected communicating pipe 2 with the octagon water inlet, the diverse location on eight limits by water inlet communicating pipe 2, divide downwards to pick out 8 showers 1 that angle is different, shower 1 all adopts 50 square tubes, shower 1 and 32 nozzle installing holes 4 of layout on water inlet communicating pipe 4.
Fig. 2,3,4 shows, the different shower of 8 angles of this device is 11 1 of extrados showers, 12 two of outer arc angle showers, 13 two of side cambered surface showers, 14 two of interior arc angle showers, 15 two of intrados showers, 8 shower end openings all are connected with 8 limits of octagonal lower supporting plate 3, on lower supporting plate 3, leave 8 blowdown pipe plug openings 6, plug is installed, spray equipment is carried out blowdown with convenient with shower 1 corresponding position.
Fig. 5,6 shows that this device is installed in crystallizer end opening place, with set bolt 9 this device and crystallizer lower flange 8 is fixed, and crystallizer lower flange hole is passed in the water supply connector 5 of this device, and joins with the water inlet manifold of this device.After the water flowing, extrados shower 11, outer arc angle shower 12, side cambered surface shower 13, interior arc angle shower 14, intrados shower 15 can spray from 4 faces of strand and 8 directions at 4 angles.
Before not adopting the utility model, because the secondary cooling effect is bad after going out crystallizer, strand goes out breakout ratio height behind the crystallizer, and strand is prone to defectives such as face crack, off-square.Split water bar is changed frequent, and the use cost height has expended lot of manpower and material resources.
After adopting the utility model, secondary cooling obviously improved after strand went out crystallizer, and strand leaks after going out crystallizer Steel obviously reduces, and slab surface crack, off-square defective obviously reduce. The utility model is made simple, and is easy for installation, Cost is low, has simultaneously convenient disassembly, the characteristics such as quick, and the secondary cooling that strand is gone out the crystallizer end opening has produced excellent Good effect.

Claims (3)

1. crystallizer end opening secondary cooling apparatus, it is characterized in that: it is made up of 8 showers [1], 8 showers [1] are laid around the passage of strand [10] at the crystallizer end opening, the upper end of shower [1] is connected with water inlet communicating pipe [2] respectively, the annulus line of water inlet communicating pipe [2] interruption-forming 8 limit shapes under crystallizer, pipeline is round the operation passage of strand [10], the lower end of shower [1] is connected with lower supporting plate [3] respectively, lower supporting plate [3] is 8 limit shape frames around strand [10] passage, is arranged with a plurality of nozzle installing holes [4] on each shower [1].
2. crystallizer end opening secondary cooling apparatus according to claim 1, it is characterized in that: described water inlet communicating pipe [2] upper surface be connected by set bolt [9] with crystallizer lower flange [8], the water inlet manifold that crystallizer lower flange hole and secondary cooling apparatus are passed in the water supply connector [5] of water inlet communicating pipe [2] joins.
3. crystallizer end opening secondary cooling apparatus according to claim 2 is characterized in that: have blowdown pipe plug opening [6] in the lower end of every shower [1].
CN 200920103663 2009-07-13 2009-07-13 Secondary cooling device on lower port of mold Expired - Fee Related CN201427180Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200920103663 CN201427180Y (en) 2009-07-13 2009-07-13 Secondary cooling device on lower port of mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200920103663 CN201427180Y (en) 2009-07-13 2009-07-13 Secondary cooling device on lower port of mold

Publications (1)

Publication Number Publication Date
CN201427180Y true CN201427180Y (en) 2010-03-24

Family

ID=42030906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200920103663 Expired - Fee Related CN201427180Y (en) 2009-07-13 2009-07-13 Secondary cooling device on lower port of mold

Country Status (1)

Country Link
CN (1) CN201427180Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102151517A (en) * 2011-03-14 2011-08-17 南通星辰合成材料有限公司 Granulation feed nozzle distribution system for use in production process of bisphenol A
CN106180191A (en) * 2016-08-31 2016-12-07 中冶赛迪工程技术股份有限公司 A kind of wire and rod continuous casting billet is exempted to heat and is directly rolled system and method
CN109702162A (en) * 2019-03-06 2019-05-03 山东钢铁股份有限公司 A kind of conticaster and its casting billet surface clearing apparatus
CN110842165A (en) * 2019-12-12 2020-02-28 四川德胜集团钒钛有限公司 Spraying device for crystallizer of continuous casting machine
CN111974958A (en) * 2019-05-21 2020-11-24 中冶京诚工程技术有限公司 Crystallizer foot roller spraying device and crystallizer foot roller system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102151517A (en) * 2011-03-14 2011-08-17 南通星辰合成材料有限公司 Granulation feed nozzle distribution system for use in production process of bisphenol A
CN106180191A (en) * 2016-08-31 2016-12-07 中冶赛迪工程技术股份有限公司 A kind of wire and rod continuous casting billet is exempted to heat and is directly rolled system and method
CN109702162A (en) * 2019-03-06 2019-05-03 山东钢铁股份有限公司 A kind of conticaster and its casting billet surface clearing apparatus
CN111974958A (en) * 2019-05-21 2020-11-24 中冶京诚工程技术有限公司 Crystallizer foot roller spraying device and crystallizer foot roller system
CN110842165A (en) * 2019-12-12 2020-02-28 四川德胜集团钒钛有限公司 Spraying device for crystallizer of continuous casting machine

Similar Documents

Publication Publication Date Title
CN201427180Y (en) Secondary cooling device on lower port of mold
CN206185108U (en) Square billet secondary cooling spray set
CN202062044U (en) Pouring mechanism for long and thin castings
CN201008954Y (en) Secondary cooling device of billet conticaster
JP5779712B2 (en) Molten steel injection equipment
CN203018704U (en) Device for manufacturing large-scale hollow steel ingots through single-sleeve forced cooling
CN203076552U (en) Modified crystallizer foot roller frame
CN102303104A (en) Method for controlling narrow side bulging in continuous casting of ultra-thick plate blanks
CN111331088A (en) Crystallizer for arc-shaped hollow round billet continuous casting machine and arc-shaped hollow round billet continuous casting machine
CN202894257U (en) Improved structure of zero-section spray of tubular crystallizer for rectangular blank and cogged ingot
CN206716962U (en) A kind of casting mould of heavv section Slab thin wall casting
CN202667575U (en) Double-current straight square billet crystallizer
CN211679913U (en) Multi-section universal secondary cooling spray device for square and round billet arc continuous casting machine
CN212443142U (en) Crystallizer for arc-shaped hollow round billet continuous casting machine and arc-shaped hollow round billet continuous casting machine
CN106862511A (en) Continuous casting crystallizer foot-roller filters shower nozzle
JP4748875B2 (en) Mold for electromagnetic stirrer
CN102950267A (en) Spraying device for continuous casting
CN205996145U (en) Improved fan-shaped sections of slab continuous chiller
CN203621419U (en) Ejection round billet vertical casting machine of lifter
CN102773431B (en) Special inner crystallizer device for continuous casting
CN202571216U (en) Special inner crystallizer device for continuous casting
CN107746971B (en) A method of with electron-beam cold bed furnace cast titanium or titanium alloy hollow ingot
CN2905268Y (en) One-machine multiple stream tube type crystallizer for continuous casting apparatus
CN220679309U (en) Secondary cooling aerosol spray device of billet continuous casting machine
CN220240047U (en) Integral mouth of a river centering device of pouring basket in middle of continuous casting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HEBEI IRON + STEEL CO.,LTD.

Free format text: FORMER OWNER: TANGSHAN IRON AND STEEL CO., LTD.

Effective date: 20100331

Free format text: FORMER OWNER: HEBEI IRON + STEEL GROUP CO. LTD

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 063016 INTELLECTUAL PROPERTY DIVISION, TANGSHAN STEEL TECHNOLOGY CENTER, NO.9, BINHE ROAD, TANGSHAN CITY, HEBEI PROVINCE TO: 050000 NO.40, YUHUA WEST ROAD, SHIJIAZHUANG CITY, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100331

Address after: Yuhua city of Shijiazhuang province Hebei 050000 West Road No. 40

Patentee after: Hebei Iron & Steel Co., Ltd.

Address before: 063016 Hebei province Tangshan City No. 9 Binhe Road, Tangshan Iron and steel technology center of Intellectual Property Department

Patentee before: Tangshan Iron & Steel Co., Ltd.

Patentee before: Hebei Iron & Steel Group Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100324

Termination date: 20110713