CN104500094B - Lining connecting structure applicable to jacking pipe for implementing connection passage - Google Patents

Lining connecting structure applicable to jacking pipe for implementing connection passage Download PDF

Info

Publication number
CN104500094B
CN104500094B CN201410831533.4A CN201410831533A CN104500094B CN 104500094 B CN104500094 B CN 104500094B CN 201410831533 A CN201410831533 A CN 201410831533A CN 104500094 B CN104500094 B CN 104500094B
Authority
CN
China
Prior art keywords
lining
concrete
ring
lining ring
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410831533.4A
Other languages
Chinese (zh)
Other versions
CN104500094A (en
Inventor
黄爱军
张海波
张向霞
齐明山
王春凯
杨波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201410831533.4A priority Critical patent/CN104500094B/en
Publication of CN104500094A publication Critical patent/CN104500094A/en
Application granted granted Critical
Publication of CN104500094B publication Critical patent/CN104500094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a lining connecting structure applicable to a jacking pipe for implementing a connection passage. The lining connecting structure comprises a first lining ring, a second lining ring and a third lining ring which are in homocentric and side-by-side arrangement, wherein a concrete pipe segment is arranged at a pipe segment, corresponding to the cutting range part of the jacking pipe, of each lining ring, each concrete pipe segment is in surrounding arrangement with other pipe segments of each located lining ring through a concrete filling steel plate block along the two sides in the annular direction, and the integral lining ring is formed. Concrete can be adopted as a lining structure at the connection passage part implemented by the jacking pipe, and compared with the original steel pipe segment structure, the lining connecting structure has the advantages that the construction cost is reduced, in addition, the casting lining is convenient, and the maintenance cost is low; in addition, the construction of interval connection passages can be safely and efficiently ensured.

Description

It is suitable to the lining cutting attachment structure that push pipe implements service channel
Technical field
The present invention relates to the attachment structure of the interval service channel of subterranean tunnel, more particularly to one kind are suitable to push pipe implements connection The lining cutting attachment structure of network passage.
Background technology
The construction method of interval service channel mainly has:Subsurface excavation method after cut and cover method, subsurface excavation method and first open cut, due to urban district Construction site is narrow and small, does not allow to block the traffic and effect on environment, in soft clay area frequently with freezing process.The construction freezing method soil body Intensity is high, construction safety, but operating expenses is higher, long construction period, to there is special freezing equipment and technical personnel, and Pollute the environment.Therefore in the case where the duration is nervous and environmental requirement is increasingly improved, how quickly, safe and environment-friendly, efficiently Construction is completed, the key for interval service channel engineering construction is become.
Push bench process is a kind of construction method of the laying underground piping of no-dig technique, by means of main top oil cylinder and pipeline relay well Deng jacking force, make tool pipe or development machine from working pit through soil layer, and shift onto sling in reception hole always, while will be tightly With buried pipeline after tool pipe or development machine.Constructed service channel from the method for tunnel lateral jacking using push bench process, work of constructing Make that face is little, noiselessness, speed is fast, equipment it is repeatable utilize, environmental protection, therefore should widely popularize.But in practice of construction, due to connection Network passage and the main tunnel duct piece open area of the structural attachments in main tunnel are big, and link node is difficult to carry out, and for waterproofing design Weak link.Thus main tunnel is connected design with push pipe service channel and becomes to restrict the crucial ring of construction by pipeline jacking method service channel Section.
The present situation of this area correlation technique:
The construction procedure of existing shield interval Freezing Method for Cross-passage Construction is as follows:
1) construction main body running tunnel, in service channel position Fourth Ring steel pipe sheet is arranged altogether, wherein middle two rings are loopful Steel pipe sheet, the ring of both sides two respectively arranges one piece of steel pipe sheet for service channel position, and remaining block is concrete pipe sheet;
2) using construction freezing method service channel position soil layer;
3) treat after the completion of freezing soil, withdraw from refrigeration process equipment, open the steel pipe sheet of service channel position, form tunneling Passage ingate;
4) subsurface excavation method implements service channel hair hole, pours into a mould service channel liner structure;
5) implement service channel and main tunnel link position structure, form integral cast-in-situ structure.
But but there is following defect in this freezing process:
Construction freezing method service channel needs using steel pipe sheet, needs a series of technical contingent of refrigeration plants, specialty, applies The work cycle is long, and operating expenses is high, and periphery soil body generation environment can be polluted in freezing process, and needs to be applied using subsurface excavation method Work.Therefore the duration is nervous, in the case that automatization and environmental requirement increasingly improve, how quickly, safe and environment-friendly, efficiently Construction is completed, the key for interval service channel engineering construction is become.
The content of the invention
In view of the drawbacks described above of prior art, the present invention provides a kind of lining cutting connection for being suitable to push pipe enforcement service channel Structure, its feature is that the lining cutting attachment structure includes a Lining Ring one, the and of a Lining Ring two concentric and be arranged side by side Lay a concrete pipe sheet, the concrete in one Lining Ring three, the section of jurisdiction at the cut coverage of the corresponding push pipe of each Lining Ring Section of jurisdiction both sides circumferentially are mutually enclosed respectively with other sections of jurisdiction of the respective Lining Ring being located by a concrete-filled steel plate and are set, Form holistic Lining Ring.
In certain embodiments, the concrete-filled steel plate is connected by a connecting bolt with described other sections of jurisdiction Connect.The connecting bolt can be the bolt of M30.
In certain embodiments, at least one hand hole for fetching is offered on each concrete pipe sheet.
In certain embodiments, the cut coverage of the push pipe is the cross-section region of push pipe, and the cross-section region is One is square.
In certain embodiments the concrete pipe sheet includes some reinforcing bars, and the ring along the concrete pipe sheet is reserved with Stretch into the intraplate reinforcing bar of the concrete-filled steel on both sides.As such, it is possible to strengthen the fastness of section of jurisdiction connection.
On the basis of common sense in the field is met, above-mentioned each optimum condition, can combination in any, obtain final product each preferable reality of the present invention Apply example.
Beneficial effects of the present invention:The present invention is being suitable at the service channel of push pipe enforcement, using concrete as lining cutting Structure, relative to original steel disc contact structure, not only reduces construction cost, and is easy to pour block, and cost of upkeep is low.Separately Outward, this structure can also safe efficiently guarantee the construction of interval service channel.
The technique effect of the design, concrete structure and generation of the present invention is described further below with reference to accompanying drawing, with It is fully understood from the purpose of the present invention, feature and effect.
Description of the drawings
Fig. 1 is the spare interface position view of two service channels of the present invention.
Fig. 2 is Lining Ring connection amplification assumption diagram at the by-pass of the present invention.
Fig. 3 is that Lining Ring connects the structure for amplifying sectional view along I-I at by-pass in Fig. 2.
The expansion enlarged drawing of the section of jurisdiction in the Lining Ring one of Fig. 4 present invention in correspondence cut coverage.
Fig. 5 is along the section view amplification assumption diagram of I-I in Lining Ring one.
Fig. 6 is that enlarged drawing is launched in the section of jurisdiction of the correspondence cut coverage in the Lining Ring two or Lining Ring three of both sides.
Fig. 7 is the cutaway view Amplified image of A-A in Fig. 6.
Fig. 8 is the broken away view of the locking nub of the square push pipe of the present invention.
Fig. 9 a be at service channel and main tunnel interface after water lower ring structural representation.
Fig. 9 b be at service channel and main tunnel interface after pour right and left rings girder construction schematic diagram.
Description of reference numerals:
Other sections of jurisdiction 5 of Lining Ring 1, Lining Ring 22, Lining Ring 33, section of jurisdiction 4, ring,
Concrete-filled steel plate 7, concrete pipe sheet 8, reinforcing bar 6, M30 bolts 9,
Push pipe 10, ring beam 11, cut coverage 12, hand hole 13
Specific embodiment
Name several preferred embodiments, and combine accompanying drawing becoming apparent from intactly illustrating the present invention.
Embodiment
The purpose of the present invention is achieved through the following technical solutions:
As shown in Fig. 1~8, the present invention is will to design special at the section of jurisdiction of the main tunnel location of the correspondence of interval service channel Section of jurisdiction, using the steel plate structure of Concrete Filled design is combined with concrete pipe sheet, reserves service channel push pipe section of jurisdiction interface position Put, using construction by pipeline jacking method service channel, after the completion for the treatment of jacking, then pour into a mould hole ring beam, and then form monoblock type contact Channel design.
During Specific construction, the lining cutting attachment structure that push pipe implements service channel is suitable to, is mainly included the following steps that:
1) as shown in Figures 1 to 3, during main body constructing tunnel, three be arranged side by side in service channel position opening Annular Lining Ring (i.e. positioned at the Lining Ring 22 and Lining Ring 33 of both sides, centrally located Lining Ring 1 1) in section of jurisdiction (i.e. The section of jurisdiction 4 of the region of cut coverage 12 of correspondence push pipe), using concrete-filled steel plate 7 and the structure phase of concrete pipe sheet 8 With reference to design, i.e. in the cut coverage 12 of square jacking, such as transverse section to be the square top of 2600mm*2600mm In the cut coverage of pipe, concrete pipe sheet 8 is first laid, then in periphery (including both sides of the ring) difference of concrete pipe sheet 8 It is connected by M30 bolts 9 with other sections of jurisdiction 5 of ring using concrete-filled steel plate 7, to enclose the lining cutting to form an annular is set Ring structure.
2) when service channel is implemented using push pipe 10, the cutting model in three ring Lining Rings as shown in Figure 3 need to be cut away Enclose corresponding region.
As seen in figures 3-5, it is assumed that the Lining Ring 22, Lining Ring 33 positioned at both sides, and positioned at middle Lining Ring 1 Width be 1200mm, because Lining Ring 1 is located at the central authorities of three rings, therefore the whole overall with of Lining Ring 1 need to be cut away Concrete in the range of 1200mmX2600mm.
In addition, as shown in figure 4, along the ring of concrete pipe sheet 8, reserved steel bar 6 stretches into the Concrete Filled steel plate of both sides In block 7, concrete is filled with concrete-filled steel plate 7, to connect concrete pipe sheet 8 and concrete-filled steel plate 7.
As shown in figure 4, concrete pipe sheet 8 reserves hand hole 13 in casting process, it is easy to take out concrete pipe sheet after cutting 8。
3) as shown in Fig. 2 respectively positioned at the two block concretes filling steel plate block 7 and ring of the ring both sides of concrete pipe sheet 8 To other sections of jurisdiction 5 connected using 6.8 grades of M30 bolts 9.
4) as shown in Figure 3 and Figure 6, Lining Ring 22, Lining Ring 33 need to cut overall with for the mixed of 700mm*2600mm scopes Solidifying soil, in concrete pipe sheet reinforcing bar 6 is circumferentially also reserved with, and two block concretes for stretching into both sides are filled in steel plate block 7, Fill concrete connection concrete pipe sheet 8 and built-in steel plate block in concrete-filled steel plate 7;Concrete pipe sheet 8 was poured into a mould Hand hole 13 is reserved in journey, is easy to take out concrete pipe sheet 8 after cutting.
5) as shown in Fig. 2 the concrete-filled steel plate 7 of both sides adopts 6.8 grades of M30 bolts 9 with other sections of jurisdiction 5 of ring Connection.
6) detachable two parts nodal plate is being adopted with main tunnel junction for the push pipe 10 of pushing tow, when using, is only being needed Two parts nodal plate is spliced to form the tube head of the square push pipe 10 of one, as shown in Figure 8.
7) as shown in Fig. 9 a~9b, implementing push pipe service channel and main tunnel junction, after pour the upper and lower He of ring beam 11 The ring beam 11 of left and right.The pouring loop beam portion point can realize that the ring beam is filled using existing ring beam construction method in prior art The improvement of the non-this programme of note itself is located, and and therefore not to repeat here.
Each preferred embodiment of the present invention described in detail above.It should be appreciated that one of ordinary skill in the art Just many modifications and variations can be made with design of the invention without the need for creative work.Therefore, all skills in the art Art personnel can be obtained by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical scheme, all should be in the protection domain being defined in the patent claims.

Claims (4)

1. it is a kind of to be suitable to the lining cutting attachment structure that push pipe implements service channel, it is characterised in that the lining cutting attachment structure includes With one heart and the Lining Ring one, a Lining Ring two and the Lining Ring three that are arranged side by side, the cutting of each Lining Ring correspondence push pipe A concrete pipe sheet is laid in section of jurisdiction at scope, and concrete pipe sheet both sides circumferentially pass through respectively a concrete-filled steel Plate mutually encloses with other sections of jurisdiction of the respective Lining Ring being located and sets, and forms holistic Lining Ring;The concrete pipe sheet includes Some reinforcing bars, the intraplate reinforcing bar of the concrete-filled steel for stretching into both sides is reserved with along the ring of the concrete pipe sheet.
2. lining cutting attachment structure as claimed in claim 1, it is characterised in that the concrete-filled steel plate is by a connection Bolt is connected with described other sections of jurisdiction.
3. lining cutting attachment structure as claimed in claim 1, it is characterised in that offer at least on each concrete pipe sheet One hand hole for fetching.
4. lining cutting attachment structure as claimed in claim 1, it is characterised in that the cut coverage of the push pipe is cross-section for push pipe Face region, the cross-section region is one square.
CN201410831533.4A 2014-12-23 2014-12-23 Lining connecting structure applicable to jacking pipe for implementing connection passage Active CN104500094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410831533.4A CN104500094B (en) 2014-12-23 2014-12-23 Lining connecting structure applicable to jacking pipe for implementing connection passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410831533.4A CN104500094B (en) 2014-12-23 2014-12-23 Lining connecting structure applicable to jacking pipe for implementing connection passage

Publications (2)

Publication Number Publication Date
CN104500094A CN104500094A (en) 2015-04-08
CN104500094B true CN104500094B (en) 2017-05-03

Family

ID=52941533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410831533.4A Active CN104500094B (en) 2014-12-23 2014-12-23 Lining connecting structure applicable to jacking pipe for implementing connection passage

Country Status (1)

Country Link
CN (1) CN104500094B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837388A (en) * 2017-02-03 2017-06-13 天津大学 Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN106593487B (en) * 2017-02-03 2018-09-11 天津大学 Detachable steel tube section constructing method for construction freezing method at tunnel connection channel
CN106869963B (en) * 2017-03-24 2018-10-12 山东大学 A kind of prefabricated compound section of jurisdiction of curve pipe roof construction shield tunnel
CN108222949A (en) * 2018-01-03 2018-06-29 上海市机械施工集团有限公司 Passage construction structures and methods
CN108005686A (en) * 2018-01-12 2018-05-08 中铁上海工程局集团有限公司 With the service channel combined steel section of jurisdiction at main tunnel connecting position and construction method
CN109184731B (en) * 2018-08-30 2020-05-12 上海隧道工程有限公司 Combined pipe joint structure at pipe jacking hole and construction method thereof
CN109026060B (en) * 2018-08-30 2020-08-11 上海隧道工程有限公司 Duct piece cutting part structure for connecting channel punching center dislocation by mechanical method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100944A (en) * 2006-07-07 2008-01-09 同济大学 Segment deformation control and flood-proof device and operation method for tunnel opening construction
CN203655307U (en) * 2013-12-30 2014-06-18 中铁第四勘察设计院集团有限公司 Waste water pump room in metro tunnel
CN204371357U (en) * 2014-12-23 2015-06-03 上海市城市建设设计研究总院 Be suitable for the lining cutting syndeton that push pipe implements service channel

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06280488A (en) * 1993-03-25 1994-10-04 Ishikawajima Constr Materials Co Ltd Structure of joint of segment
JP3781952B2 (en) * 2000-07-28 2006-06-07 大豊建設株式会社 Segments for the construction of passages and doors for multiple tunnels and construction methods for passages and doors
JP2008274608A (en) * 2007-04-27 2008-11-13 Oriental Shiraishi Corp Underground passage, precast block and construction method used therefor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100944A (en) * 2006-07-07 2008-01-09 同济大学 Segment deformation control and flood-proof device and operation method for tunnel opening construction
CN203655307U (en) * 2013-12-30 2014-06-18 中铁第四勘察设计院集团有限公司 Waste water pump room in metro tunnel
CN204371357U (en) * 2014-12-23 2015-06-03 上海市城市建设设计研究总院 Be suitable for the lining cutting syndeton that push pipe implements service channel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"沈阳地铁盾构隧道设计浅谈";王瑞峰;《北方交通》;20110131(第1期);53-56 *

Also Published As

Publication number Publication date
CN104500094A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN104500094B (en) Lining connecting structure applicable to jacking pipe for implementing connection passage
CN106351670B (en) A kind of closed pre support tunnel structure
CN104295814B (en) Underground steel and concrete structure pipeline of a kind of inner wall belt spiral compound stiffening ring and preparation method thereof
CN204371357U (en) Be suitable for the lining cutting syndeton that push pipe implements service channel
CN103790598A (en) Method for manufacturing shield tunnel longitudinal prestressing concrete lining segment
CN205206838U (en) Collapsible loess tunnel supporting construction
CN108756940B (en) Tunnel construction
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN103953351B (en) Enlarging construction method is dug under existing tunnel in the case of a kind of uninterrupted traffic
CN103410161A (en) Slant grouting control steel anchor pipe frame and construction method thereof
CN103556623B (en) Across the continuous wall construction method of buried heavy civil pipeline
CN105114098A (en) Method for treating unfavorable geology segment of diversion tunnel and major-diameter diversion tunnel structure
CN105484773A (en) System plugging and draining structure for tunnel leakage treatment
CN206035500U (en) Adopt prestressing steel's section of jurisdiction connecting device
CN107035383A (en) The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN105401593A (en) Assembly type square underground pipe gallery
CN105041348B (en) A kind of underground space tunneling construction method of use compound roof
CN204716253U (en) Circular major diameter diversion tunnel structure
CN110273424A (en) A kind of construction method of yard piping
CN204187155U (en) A kind of underground steel and concrete structure pipeline of inner wall belt spiral compound stiffening ring
JP2018138738A (en) Invert construction method
CN101141054A (en) Compaction grouting method for preventing land subsidence after non-digging horizontal drilling
CN106368211B (en) Rectangular concrete pile for building piping lane side wall
CN203925521U (en) A kind of shield tunnel bottom stratum consolidation channels configuration
CN107905258A (en) Pipe gallery exterior wall concrete construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 200011 Tibet South Road, Shanghai, No. 1170, No.

Applicant after: Shanghai urban construction design & Research Institute (Group) Co., Ltd.

Address before: 200011 Tibet South Road, Shanghai, No. 1170, No.

Applicant before: Shanghai Urban Construction Design & Research Institute

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant