CN104485743A - Regional intelligent line loss refined distribution line - Google Patents

Regional intelligent line loss refined distribution line Download PDF

Info

Publication number
CN104485743A
CN104485743A CN201410801711.9A CN201410801711A CN104485743A CN 104485743 A CN104485743 A CN 104485743A CN 201410801711 A CN201410801711 A CN 201410801711A CN 104485743 A CN104485743 A CN 104485743A
Authority
CN
China
Prior art keywords
line
distribution line
electric energy
line loss
voltage electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201410801711.9A
Other languages
Chinese (zh)
Inventor
孟超
金娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ENTREPRENEURSHIP INFORMATION TECHNOLOGY Co Ltd
Original Assignee
JIANGSU ENTREPRENEURSHIP INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ENTREPRENEURSHIP INFORMATION TECHNOLOGY Co Ltd filed Critical JIANGSU ENTREPRENEURSHIP INFORMATION TECHNOLOGY Co Ltd
Priority to CN201410801711.9A priority Critical patent/CN104485743A/en
Publication of CN104485743A publication Critical patent/CN104485743A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the field of power transmission lines, in particular to a regional intelligent line loss refined distribution line which comprises a substation, a special transformer user, a distribution line, a public transformer zone area and a cable branch box, wherein the substation is connected with the initiating terminal of the distribution line; the special transformer user and the public transformer zone area are connected with the distribution line; the cable branch box is mounted on a branch point of the distribution line; a high-voltage electric energy meter is segmentally arranged on the distribution line; high-voltage electric energy meters are arranged at the line outgoing side of the substation, at the front end of a transformer of the special transformer user and on the branch point of the distribution line; the administration of power supply is provided with a server; the high-voltage electric energy meters are connected with the server through a GPRS network. According to the regional intelligent line loss refined distribution line, the regional intelligent line loss refined analysis and management are realized through transforming the original power supply line and additionally arranging the high-voltage electric energy meters and the server, so that the line loss abnormal regions can be rapidly located, the causes of abnormity of the line loss are analyzed in a limited manner, the line loss is reduced and great economic and social benefits are generated.

Description

Region intelligence line loss becomes more meticulous distribution line
Technical field
The present invention relates to electric power transmission line field, especially a kind of region intelligence line loss becomes more meticulous distribution line.
Background technology
At present, there are marketing system, user power utilization information acquisition system, large user's load management system in electric company, these systems are mainly used in the functions such as user's electric quantity acquisition, charge, record, data statistics, line loss analyzing, realize the comprehensive line loss analyzing of whole piece circuit, platform district line loss analyzing and the electricity consumption situation of each district, user all gathered, be recorded in power supply administration.But also there is following problem in the analysis of sliver damage: 1. comprehensive line loss and the platform district line loss that can only calculate whole piece circuit, can not feasible region line loss calculation.2. each circuit fulcrum line loss situation does not have effective means to calculate.3. sliver damage is higher, but can not quick position line loss abnormal area.4. there is no effective means analysis line loss abnormal cause, reduce line loss.
Summary of the invention
Region and fulcrum computing function is lacked in order to overcome existing supply line, cannot quick position, the deficiency that analysis ability is weak, the invention provides a kind of region intelligence line loss and to become more meticulous distribution line.
The technical solution adopted for the present invention to solve the technical problems is: a kind of region intelligence line loss becomes more meticulous distribution line, comprise transformer station, special change user, distribution line, Gong Biantai district and cable branch box, transformer station is connected to the initiating terminal of distribution line, special change user and Gong Biantai district are connected on distribution line, cable branch box is arranged on the breakout of distribution line, on distribution line, segmentation is provided with high-voltage electric energy meter, the outgoing line side of transformer station, the special change transformer front end of user and the breakout of distribution line are also all provided with high-voltage electric energy meter, power supply administration is provided with server, high-voltage electric energy meter is connected with server by GPRS network.
The invention has the beneficial effects as follows, by to original power line reconstruct, set up high-voltage electric energy meter and server, be used for adding up whole piece circuit electricity and line loss, and to the summary table monitoring of former power supply administration, avoid summary table table meter abnormal, measure segmentation electricity and line loss simultaneously, monitoring specially becomes user power utilization situation, utilize GPRS network that data are sent to power supply administration's server in real time, zoning line loss situation, feasible region intelligence line loss becomes more meticulous and analyzes and management, solve original power supply administration system can not to become more meticulous analysis and the problem of management area line loss, can quick position line loss abnormal area, finite analysis line loss abnormal cause, reduce line loss, create very large economic and social benefit.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is structural representation of the present invention.
Tu Zhong 1. transformer station, 2. specially becomes user, 3. distribution line, 4. Gong Biantai district, 5. cable branch box, 6. high-voltage electric energy meter, 7. server.
Embodiment
If Fig. 1 is structural representation of the present invention, a kind of region intelligence line loss becomes more meticulous distribution line, comprise transformer station 1, special change user 2, distribution line 3, Gong Biantai district 4 and cable branch box 5, transformer station 1 is connected to the initiating terminal of distribution line 3, special change user 2 and Gong Biantai district 4 are connected on distribution line 3, cable branch box 5 is arranged on the breakout of distribution line 3, on distribution line 3, segmentation is provided with high-voltage electric energy meter 6, the outgoing line side of transformer station 1, the special change transformer front end of user 2 and the breakout of distribution line 3 are also all provided with high-voltage electric energy meter 6, power supply administration is provided with server 7, high-voltage electric energy meter 6 is connected with server 7 by GPRS network.
By to original power line reconstruct, set up high-voltage electric energy meter 6 and server 7, feasible region intelligence line loss becomes more meticulous and analyzes and management.The high-voltage electric energy meter 6 being arranged on the outgoing line side of transformer station 1 is used for adding up whole piece circuit electricity and line loss, and to the summary table monitoring of former power supply administration, avoids summary table table meter abnormal; The high-voltage electric energy meter 6 of subsection setup on distribution line 3 is used for measuring segmentation electricity and line loss; The high-voltage electric energy meter 6 being arranged on the transformer front end specially becoming user 2 is used for monitoring the electricity consumption situation specially becoming user 2; The high-voltage electric energy meter 6 be arranged on the breakout of distribution line 3 is used for adding up the electricity in branch cable and line loss, all data separate GPRS network are sent to the server 7 in power supply administration in real time, mainly comprise the information such as power consumption, voltage, electric current, server 7 utilizes these data can zoning line loss situation, solve original power supply administration system can not to become more meticulous analysis and the problem of management area line loss, can quick position line loss abnormal area, finite analysis line loss abnormal cause, reduce line loss, create very large economic and social benefit.
Region computational methods illustrate: have 10 family users in the middle of such as high voltage electric energy Table A and high-voltage electric energy meter B.
The total amount of power supply in region=high-voltage electric energy meter A-high-voltage electric energy meter B
Family, total electricity sales amount=10, region user power utilization amount
Region line loss=[(high-voltage electric energy meter A-high-voltage electric energy meter B)-10 family user power utilization amounts]/(high-voltage electric energy meter A-high-voltage electric energy meter B)
Profit in this way can be quick, fine-grained management region line loss, also can quick position line loss abnormal area.
Embodiment:
Case: Jiangxi city 10KV circuit region electricity consumption situation (7 user)
Power supply administration's electricity (7) High pressure electricity (7) The average line loss of 7 user
November 14 2829.2 4500 37.13%
November 15 2835.9 4610 38.48%
November 16 3655.4 3770 3.04%
November 17 4338.1 4450 2.51%
November 18 4623.1 4720 2.05%
November 19 4641.5 4740 2.08%
November 20 4189.8 4300 2.56%
November 21 4740.8 4840 2.05%
November 22 3759 3850 2.36%
November 23 4768.5 4870 2.08%
November 24 3522.6 3620 2.69%
November 25 4202.9 4310 2.48%
November 26 4340.6 4440 2.24%
November 27 3667.5 3760 2.46%
November 28 3979.7 4090 2.70%
November 29 4011.9 4120 2.62%
November 30 4386.2 4430 0.99%
As above show, 10KV land line loss rate can be seen, adopt this method, can quick position line loss abnormal area, 14, quick position on the 15th is to one's respective area multiplexing electric abnormality, and after field engineer gets rid of line abnormal cause, this region line loss recovers normal, utilize this method effectively can reduce the comprehensive line loss rate of this circuit, produce larger economic and social profit.

Claims (1)

1. intelligence line loss in a region becomes more meticulous distribution line, comprise transformer station (1), special change user (2), distribution line (3), Gong Biantai district (4) and cable branch box (5), transformer station (1) is connected to the initiating terminal of distribution line (3), special change user (2) and Gong Biantai district (4) are connected on distribution line (3), cable branch box (5) is arranged on the breakout of distribution line (3), it is characterized in that: the upper segmentation of distribution line (3) is provided with high-voltage electric energy meter (6), the outgoing line side of transformer station (1), the transformer front end of special change user (2) and the breakout of distribution line (3) are also all provided with high-voltage electric energy meter (6), power supply administration is provided with server (7), high-voltage electric energy meter (6) is connected with server (7) by GPRS network.
CN201410801711.9A 2014-12-22 2014-12-22 Regional intelligent line loss refined distribution line Withdrawn CN104485743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410801711.9A CN104485743A (en) 2014-12-22 2014-12-22 Regional intelligent line loss refined distribution line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410801711.9A CN104485743A (en) 2014-12-22 2014-12-22 Regional intelligent line loss refined distribution line

Publications (1)

Publication Number Publication Date
CN104485743A true CN104485743A (en) 2015-04-01

Family

ID=52760263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410801711.9A Withdrawn CN104485743A (en) 2014-12-22 2014-12-22 Regional intelligent line loss refined distribution line

Country Status (1)

Country Link
CN (1) CN104485743A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104753046A (en) * 2015-04-24 2015-07-01 国网河南夏邑县供电公司 Distribution-circuit intermediate protection integrated device
CN111077363A (en) * 2018-10-18 2020-04-28 云南电网有限责任公司瑞丽供电局 Platform district line loss meticulous analysis and management system
CN113985204A (en) * 2021-10-27 2022-01-28 国网陕西省电力公司铜川供电公司 Low-voltage line loss segmented supervision method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104753046A (en) * 2015-04-24 2015-07-01 国网河南夏邑县供电公司 Distribution-circuit intermediate protection integrated device
CN111077363A (en) * 2018-10-18 2020-04-28 云南电网有限责任公司瑞丽供电局 Platform district line loss meticulous analysis and management system
CN113985204A (en) * 2021-10-27 2022-01-28 国网陕西省电力公司铜川供电公司 Low-voltage line loss segmented supervision method

Similar Documents

Publication Publication Date Title
CN102116857B (en) Method for checking electric quantity at power grid gate
CN106291252A (en) A kind of 10kV line loss and low-voltage platform area line loss management analysis method
CN103544652B (en) Power grid industry classification load automatic statistical method and system
CN103559654A (en) Comprehensive analysis system and method of power distribution network
CN103646286A (en) Data processing method for estimating efficiency of intelligent distribution network
CN102938106A (en) Power network power-cut scheme based major network N-1 risk assessment method and system
CN104297616A (en) 10kV distribution line breaking detection method based on multi-system information interaction
CN104483538A (en) Fine analysis and management device for regional line loss of public transformer region
CN104485743A (en) Regional intelligent line loss refined distribution line
CN110927447A (en) Multi-core-modularization-based station area six-branch loss monitoring device and monitoring method
CN203554074U (en) Distributed power generation grid-connected dual-power supply interface apparatus
CN104166061A (en) Intelligent power distribution and utilization state detection device based on 4D technology
CN103729697A (en) Power grid multilink interaction system for improving intermittent new energy digestion capability
Khazaee et al. Distribution loss reduction in residential and commercial pilots by using AMI system
CN106971264A (en) A kind of alternating current-direct current mixing micro-capacitance sensor analysis method for reliability
CN102956096A (en) Ethernet passive optical network (EPON) and wireless ad hoc network technology-based electricity consumption information acquisition system
CN104063757B (en) Transformer substation main electrical connection assessment method suitable for different development stages of power grids
CN103475091A (en) Electric-energy metering and managing system of power grid gateway
CN204316193U (en) Region intelligence line loss becomes more meticulous distribution line
CN203261124U (en) User side response system of smart power grid
CN104135077A (en) Power-distribution-network state simulation and evaluation system based on tree topology structure
CN206021347U (en) Comprehensive wastage reducing and energy saving distribution network big data system
CN204631531U (en) Electric energy metrical cluster monitoring system
CN104953706B (en) A kind of intelligence matches somebody with somebody the integrated information interacting method of electricity consumption
CN204314401U (en) High pressure specially becomes user power utilization exception monitoring equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication

Application publication date: 20150401