CN106291252A - A kind of 10kV line loss and low-voltage platform area line loss management analysis method - Google Patents

A kind of 10kV line loss and low-voltage platform area line loss management analysis method Download PDF

Info

Publication number
CN106291252A
CN106291252A CN201610825451.8A CN201610825451A CN106291252A CN 106291252 A CN106291252 A CN 106291252A CN 201610825451 A CN201610825451 A CN 201610825451A CN 106291252 A CN106291252 A CN 106291252A
Authority
CN
China
Prior art keywords
line loss
analysis method
low
platform area
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610825451.8A
Other languages
Chinese (zh)
Other versions
CN106291252B (en
Inventor
章志钧
张义莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201610825451.8A priority Critical patent/CN106291252B/en
Publication of CN106291252A publication Critical patent/CN106291252A/en
Application granted granted Critical
Publication of CN106291252B publication Critical patent/CN106291252B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/088Aspects of digital computing

Abstract

A kind of 10kV line loss and low-voltage platform area line loss management analysis method, belong to for electrical domain.It is by setting up matching net wire loss Standardized Management Pattern and Controlling line loss system;The links of combing line loss work, hold the focus of Controlling line loss, form the Controlling line loss pattern with point-like, coordinated by clarification in certain roles, tacit agreement, lead the Controlling line loss pattern of integration, gradually reduce power supply enterprise's line loss per unit, reduce for the power consumption in process of distributing electricity, thus improve power supply enterprise's economic value added;By the Controlling line loss application system of Criterion, report the work such as location, high capacity improving distribution transformer, platform district sharing of load for user malfunction for repairment and aid decision support is provided, effectively reduce because of breakdown repair not in time, long-term overload cause the phenomenons such as equipment damage to occur, significantly reduce power supply enterprise's economic loss value.Can be widely used for management of power supply and power utilization and energy-saving and cost-reducing field.

Description

A kind of 10kV line loss and low-voltage platform area line loss management analysis method
Technical field
The invention belongs to management domain of transmitting electricity, particularly relate to a kind of for 10kV circuit and the line loss analyzing of low-voltage platform area, Management method.
Background technology
Line loss is power network in the conveying of electric energy, the loss that distributes, caused in the link such as management.
Line loss per unit is an important performance index of power supply enterprise, reflects the Production&Operations Management level of enterprise, directly Affect operating cost and the economic benefit of enterprise.Effectively control line loss rate, is industry energy conservation consumption reduction, increases economic efficiency, it is achieved The important means of sustainable development.
Along with the propelling of State Grid Corporation of China's " the last one three is excellent " Modern Corporation developing goal, Controlling line loss has incorporated confession Electricity company important performance index category, eliminates requirements at the higher level to line loss management and control.From the point of view of management system, line loss management and control relates to crowd Many functional departments coact, management line loss, technical loss index work in coordination with the aspects such as improvement need the most close exchange and Coordinate.
The Controlling line loss of power distribution network (abbreviation distribution), is broadly divided into low-voltage platform area Controlling line loss and 10 kilovolts and above outlet Controlling line loss two large divisions.Low-voltage platform area line loss is primarily referred to as in units of bar change, distribution transforming, the supplied region of each transformator (platform District) line loss;10 kilovolts and above outlet line loss refer to 10 kilovolts and above special line, the line loss of non-special line.
The relevant device that 10 kilovolts and above outlet circuit Controlling line loss relate to mainly has negative control terminal, remotely manages end End, kilowatt-hour meter, load monitoring terminal etc., various equipment mostly use the mode of wireless public affairs/private network or carrier wave to enter with master station communication OK.
Low-voltage platform area Controlling line loss is always emphasis and the difficult point of matching net wire loss management.Owing to low-voltage platform area is large number of, Lacking technological means, its line loss fine-grained management work relatively lags behind.
The Controlling line loss work of line loss at present has had certain level that becomes more meticulous, no matter is from system or in management Substantially meet the needs of fine-grained management.But there is also series of problems at systems and management two aspect, mainly have following several Aspect problem:
1, each related system and interface problem are the most prominent.
The system integration Shanghai Power Network production management system (PMS), the big information system of marketing system (CMS) 2 and electric flux The 6 big acquisition systems such as acquisition system, Load Control Management System, centralized meter-reading system, information integrated level is high, almost covers power supply public affairs Take charge of all of acquisition system.But because the developer of each system is different, interface and link more, in real work, run into more Problem in terms of system and interface.
2, unified information access specification is lacked.
3, relating to department, specialty is more, lacks effective unified management.
4, communication issue restriction is bigger.Affected by many reasons, cable shielding layer carrier communication and GPRS public network without , all there is signal and be difficult to the communication quality problems such as covering, jitter in line mode, causes shortage of data, burr, sudden change etc. existing The generation of elephant, creates certain impact to line loss comparison.
5, defect elimination problem is the most prominent.Owing to participating in a variety of causes such as integrated information system, terminal unit substantial amounts The defect elimination pressure caused is big, and defect location difficulty is big.
So, in real work, in the urgent need to 10kV line loss and low-voltage platform area line loss management analysis method are entered The refinement of one step, improves its technological means, quickly searches failure cause and the treatment measures of the standard of offer, finds out what present situation existed Problem, thus tackle the problem at its root, improve the management level that line loss becomes more meticulous.
Summary of the invention
The technical problem to be solved is to provide a kind of 10kV line loss and low-voltage platform area line loss management analysis method. It, by the research to circuit Controlling line loss related fields, proposes reasonably suggestion at technological layer system problem, formulates work Make flow process, management method, to improve monthly integrity and the reasonability of track data, make system data more credible, reliably, for Oppose electricity-stealing and more strong data support is provided, thus increase economic efficiency.
The technical scheme is that a kind of 10kV line loss of offer and low-voltage platform area line loss management analysis method, including platform District's basic data is analyzed, and platform district line loss is added up, supply side data analysis, and sale of electricity side data and line loss abnormality processing is characterized in that:
In 10kV circuit As-Is analysis, carry out the circuit present situation in current electric company region summarizing and analyze, to specially Line is analyzed one by one, and combing goes out line loss per unit abnormal cause accounting situation, and the department relating to Controlling line loss and unit carry out skill With managerial investigation and analysis in art, sum up its problem existed both ways, for technically problem upper with management, propose to build If the suggestion of property, it is effectively improved Controlling line loss level;
In the As-Is analysis of low-voltage platform area, carry out current electric company Nei Tai district, region present situation summarizing and analyze, combing Go out qualified district of line loss per unit and abnormal platform district user character accounting situation, analyze the feature in line loss exception platform district, for difference Platform district line loss present situation, be analyzed platform district line loss arranging by model, find out factor affect line loss, then the most effective Eliminate the effects of the act, form continuous print platform district line loss changing tendency curve, be better understood by each district for electric company policymaker The analysis of line loss situation of change and influence factor is set up the reasonable value that data basis is platform district line loss and is really customized calibration standard, for platform District's line loss debases the standard and provides foundation, is differentiating that platform district line loss rationally provides theory on abnormal for electric company Controlling line loss person Foundation;
Described 10kV line loss and low-voltage platform area line loss management analysis method, by setting up matching net wire loss standardized management mould Formula, sets up and relates to the multi-specialized lines such as program plan, construction retrofit, production technology, management and running, power marketing, electric energy metrical Damage management system;By the links of system combing line loss work, put the internal relation of work in every in order, hold Controlling line loss Focus, formed with the Controlling line loss pattern of point-like, replace lamellar in the past, the management mode of planar, by clearly dividing Work, tacit agreement coordinate, and lead the Controlling line loss pattern of integration, gradually reduce power supply enterprise's line loss per unit, reduce for process of distributing electricity In power consumption, thus improve power supply enterprise's economic value added;
Described 10kV line loss and low-voltage platform area line loss management analysis method, the Controlling line loss application body of Criterion System, provides aid decision by reporting the work such as location, high capacity improving distribution transformer, platform district sharing of load for repairment for user malfunction Support, effectively reduce because of breakdown repair not in time, long-term overload cause the phenomenons such as equipment damage to occur, significantly reduce power supply enterprise Economic loss value.
Concrete, described 10kV line loss and low-voltage platform area line loss management analysis method, use following method to manage Reason is analyzed:
1) with 110kV, 35kV transformer station of electric company as sample, statistics main transformer, circuit, the electric flux with change of standing, formed Electric energy balance is added up, and analyzes power station electric flux unbalance factor and main transformer, the relation of line load, formulates 110kV, 35kV power station Electric energy balance standard;
2) incentive mechanism and the standard of Controlling line loss are set up, fair and reasonable to adapt to multi-level demand, and focusing on actual effects property, To transfer the work incentive of power supply enterprise employee;
3) analysis causes all kinds of factors of line loss, and proposes solution targetedly.Reducing Loss by Technology Means is utilized to drive reason The reduction of opinion line loss per unit, utilizes suggestion on management to drive the reduction of statistical line losses rate;
4) the Controlling line loss pattern of design power supply enterprise mixed type, highlights Controlling line loss core in daily management and makees With, make line loss strategic objective and company overall strategy target organically blend, functional department's job stream is expanded, by line loss pipe Reason workflow solidification, institutionalization, standardization, formed through the successful exercisable model of practice test.
Concrete, described 10kV line loss and low-voltage platform area line loss management analysis method, common during defect elimination is worked Fault, formulates rational load monitoring terminal operating situation analysis method;Sum up the fault occurred, and every kind of fault is carried out point Analysis, sets up basic treating method, forms success experience storehouse;Formulate corresponding management evaluation way, by defect elimination work and equipment Owner links up with, and makes defect elimination woprk standardization, procedure;
Wherein, described most common failure, at least include that A, B, C three-phase voltage is put more than a day and occurred that negative value, numerical value are more than 290V or less than 150V, A, B, C three-phase current is put more than a day to be there is negative value or is zero, active-power P, power factor (PF)It is negative Value, forward active energy, capacity of idle power numerical value are negative value, and when transformer load rate is more than 10%, meritorious comparison is being more than 10% or less than-10%, reactive power Q numerical exception, day the reverse capacity of idle power numerical value situation such as big.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for A, B, C three-phase voltage one There is negative value, numerical value more than 290V or less than the situation of 150V in it multiple spot, is carried out judgement and the defect elimination of fault by following method:
If a. phase voltage is zero
Breakdown judge: in 24 hours, A phase voltage is zero, two voltages of zero phase voltage numerical value and other are close, it is judged that on-the-spot A Phase voltage phase place misconnection is to zero phase;
Field service: check three-phase current, voltage link situation, for phase place wrong phenomenon, correctly connects with on-the-spot phase place Connect;
If b. phase voltage is abnormal
Breakdown judge: in 24 hours, C phase voltage is less than 150V, it is judged that on-the-spot C phase voltage wire clamp comes off or contacts the tightst;
Field service: check three-phase voltage wiring condition, for wire clamp obscission, fasten with insulating tape in time.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for A, B, C three-phase current one It multiple spot occur negative value or be zero situation, carried out judgement and the defect elimination of fault by following method:
A. electric current is negative value:
Breakdown judge: B phase current is negative value in 24 hours, belongs to current data abnormal, it is judged that current transformer connects into and out of line Line mistake;
Place lack measure: place shortage of staff person step on bar check every current transformer into and out of line direction, wiring of righting the wrong;
B. electric current is zero for a long time:
Breakdown judge: A phase current 24 hours is zero, Zero-phase current numerical value is close with B, C phase two;Belong to current data different Often, it is judged that current transformer damages or wiring comes off;
Place lacks measure: place shortage of staff person steps on bar and checks that current transformer is the most abnormal, changes faulty equipment;If wiring comes off, Fasten with screwdriver, prevent fault from again occurring.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for active-power P, power FactorFor the situation of negative value, carried out judgement and the defect elimination of fault by following method:
Breakdown judge: active-power P, power factor (PF)Being all negative value, electricity statistics exists abnormal, it is judged that load monitoring Terminal meter device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for forward active energy, nothing Merit SOC values is the situation of negative value, is carried out judgement and the defect elimination of fault by following method:
Breakdown judge: forward active power, reactive power are all negative value, and load monitoring terminal cannot complete normal electricity Statistical work;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, in transformer load rate During more than 10%, meritorious comparison, in the situation more than 10% or less than-10%, carries out the judgement of fault by following method and disappears Lack:
Breakdown judge: it is abnormal that meritorious comparison exists multiple spot, it is judged that load monitoring terminal meter device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, different for reactive power Q numerical value Normal situation, carries out judgement and the defect elimination of fault by following method:
Breakdown judge: negative value, numerical exception occurs in reactive power Q, electricity statistics exists abnormal, it is judged that load monitoring terminal Metering device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status;If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, capacity of idle power reverse for day The situation that numerical value is big, carries out judgement and the defect elimination of fault by following method:
Breakdown judge: reversely capacity of idle power numerical exception, electricity statistics exists abnormal, it is judged that load monitoring terminal meter fills Put and break down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status;If faulty equipment cannot be repaired, directly change spare unit.
Compared with the prior art, the invention have the advantage that
1. by setting up matching net wire loss Standardized Management Pattern, set up relate to program plan, construction retrofit, production technology, The multi-specialized Controlling line loss systems such as management and running, power marketing, electric energy metrical;Each ring by the work of system combing line loss Joint, puts the internal relation of work in every in order, holds the focus of Controlling line loss, forms the Controlling line loss pattern with point-like, takes The lamellar in past in generation, the management mode of planar, coordinated by clarification in certain roles, tacit agreement, lead the Controlling line loss pattern of integration, come Gradually reduce power supply enterprise's line loss per unit, reduce for the power consumption in process of distributing electricity, thus improve power supply enterprise's economic value added (EVA)。
2., by the comparing to anomalous line, the fault of metering device can be found in time, improve ability of opposing electricity-stealing, The raising of economic benefit is played directly, active influence.
3. carrying out by the technical program, can improve integrity and the reasonability of data, and raising can carry out data ratio To number of, lines and quality, thus advantageously in increasing economic efficiency.
Accompanying drawing explanation
Fig. 1 is that platform district of the present invention basic data analyzes schematic diagram;
Fig. 2 is platform district of the present invention line loss statistics schematic diagram;
Fig. 3 is supply side data analysis schematic diagram of the present invention;
Fig. 4 is that sale of electricity side data of the present invention analyzes schematic diagram;
Fig. 5 is line loss abnormality processing schematic diagram of the present invention.
Detailed description of the invention
The present invention will be further described below.
The line loss platform that becomes more meticulous is a huge informationization integration project, and it is integrated with production management system (PMS), battalion Pin system (CMS), integrated data platform, Electric Energy Acquisition System, SCADA system, D-SCADA system, centralized meter-reading system and load All systems relevant with generated energy acquisition such as management system, provide foundation for Controlling line loss.
Load monitoring management work is the important step guarantee of electric power enterprise unit-area management and lean production management, and Time, correctly include and analyze 10 kilovolts of distribution transformer load data, ask for planning, design and work and correct effective foundation be provided, really Protect safe and stable, the reliability service of power supply branch's distribution.
Distribution transformer load monitoring system is mainly the line loss comparison of platform district and provides supply side data, installs in load monitoring terminal and covers After having covered, can be that common line provides sale of electricity side data.
Electric Energy Acquisition System is designed as the preamble part of integrated data platform, and the electric energy data of collection enters comprehensive number According to platform, the function such as data statistic analysis, user's inquiry is all based on integrated data platform and realizes.
There are K-type (switchyard), p-type (looped network station) and three kinds of W type (open air station) in Shanghai Power Network 10 KV distribution station, also simultaneously It is configured with bar to become.Distribution SCADA system (hereinafter referred to as D-SCADA) is the system of the information gathering to all kinds power distribution station, D-SCADA system has data-interface by Real-time Data Center and power transmission and distribution production management system.
D-SCADA system mainly gathers the electric energy information of power distribution station, for line loss become more meticulous in platform 10 kilovolts and more than Circuit provides data.
Negative Ore-controlling Role original name Shanghai City power load control system, after be renamed as Shanghai City power load management system.System System applies computer technology, telecommunication technology, network technique and automatic control technology, is that a whole set of is to Shanghai master Large power customers is wanted to carry out Real-time Load monitoring, dynamic equilibrium control, load data collection, remote automatic meter reading, the quality of power supply Monitor and the integrated system of dsm.The means of communication of system be 230 wireless dedicated communications networks be main, wireless public network is Auxiliary.
Negative Ore-controlling Role is as one of the main source of 10 kilovolts and Above Transmission Lines sale of electricity side data, in line loss fine-grained management In play great effect.
Technical scheme, it is provided that a kind of 10kV line loss and low-voltage platform area line loss management analysis method, its invention Point is:
In 10kV circuit As-Is analysis, carry out the circuit present situation in current electric company region summarizing and analyze, to specially Line is analyzed one by one, and combing goes out line loss per unit abnormal cause accounting situation, and the department relating to Controlling line loss and unit carry out skill With managerial investigation and analysis in art, sum up its problem existed both ways, for technically problem upper with management, propose to build If the suggestion of property, it is effectively improved Controlling line loss level;
In the As-Is analysis of low-voltage platform area, carry out current electric company Nei Tai district, region present situation summarizing and analyze, combing Go out qualified district of line loss per unit and abnormal platform district user character accounting situation, analyze the feature in line loss exception platform district, for difference Platform district line loss present situation, be analyzed platform district line loss arranging by model, find out factor affect line loss, then the most effective Eliminate the effects of the act, form continuous print platform district line loss changing tendency curve, be better understood by each district for electric company policymaker The analysis of line loss situation of change and influence factor is set up the reasonable value that data basis is platform district line loss and is really customized calibration standard, for platform District's line loss debases the standard and provides foundation, is differentiating that platform district line loss rationally provides theory on abnormal for electric company Controlling line loss person Foundation;
Described 10kV line loss and low-voltage platform area line loss management analysis method, by setting up matching net wire loss standardized management mould Formula, sets up and relates to the multi-specialized lines such as program plan, construction retrofit, production technology, management and running, power marketing, electric energy metrical Damage management system;By the links of system combing line loss work, put the internal relation of work in every in order, hold Controlling line loss Focus, formed with the Controlling line loss pattern of point-like, replace lamellar in the past, the management mode of planar, by clearly dividing Work, tacit agreement coordinate, and lead the Controlling line loss pattern of integration, gradually reduce power supply enterprise's line loss per unit, reduce for process of distributing electricity In power consumption, thus improve power supply enterprise's economic value added;
Described 10kV line loss and low-voltage platform area line loss management analysis method, the Controlling line loss application body of Criterion System, provides aid decision by reporting the work such as location, high capacity improving distribution transformer, platform district sharing of load for repairment for user malfunction Support, effectively reduce because of breakdown repair not in time, long-term overload cause the phenomenons such as equipment damage to occur, significantly reduce power supply enterprise Economic loss value.
Concrete, described 10kV line loss and low-voltage platform area line loss management analysis method, use following method to manage Reason is analyzed:
1) with 110kV, 35kV transformer station of electric company as sample, statistics main transformer, circuit, the electric flux with change of standing, formed Electric energy balance is added up, and analyzes power station electric flux unbalance factor and main transformer, the relation of line load, formulates 110kV, 35kV power station Electric energy balance standard;
2) incentive mechanism and the standard of Controlling line loss are set up, fair and reasonable to adapt to multi-level demand, and focusing on actual effects property, To transfer the work incentive of power supply enterprise employee;
3) analysis causes all kinds of factors of line loss, and proposes solution targetedly.Reducing Loss by Technology Means is utilized to drive reason The reduction of opinion line loss per unit, utilizes suggestion on management to drive the reduction of statistical line losses rate;
4) the Controlling line loss pattern of design power supply enterprise mixed type, highlights Controlling line loss core in daily management and makees With, make line loss strategic objective and company overall strategy target organically blend, functional department's job stream is expanded, by line loss pipe Reason workflow solidification, institutionalization, standardization, formed through the successful exercisable model of practice test.
Concrete, described 10kV line loss and low-voltage platform area line loss management analysis method, common during defect elimination is worked Fault, formulates rational load monitoring terminal operating situation analysis method;Sum up the fault occurred, and every kind of fault is carried out point Analysis, sets up basic treating method, forms success experience storehouse;Formulate corresponding management evaluation way, by defect elimination work and equipment Owner links up with, and makes defect elimination woprk standardization, procedure;
Wherein, described most common failure, at least include that A, B, C three-phase voltage is put more than a day and occurred that negative value, numerical value are more than 290V or less than 150V, A, B, C three-phase current is put more than a day to be there is negative value or is zero, active-power P, power factor (PF)It is negative Value, forward active energy, capacity of idle power numerical value are negative value, and when transformer load rate is more than 10%, meritorious comparison is being more than 10% or less than-10%, reactive power Q numerical exception, day the reverse capacity of idle power numerical value situation such as big.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for A, B, C three-phase voltage one There is negative value, numerical value more than 290V or less than the situation of 150V in it multiple spot, is carried out judgement and the defect elimination of fault by following method:
If a. phase voltage is zero
Breakdown judge: in 24 hours, A phase voltage is zero, two voltages of zero phase voltage numerical value and other are close, it is judged that on-the-spot A Phase voltage phase place misconnection is to zero phase;
Field service: check three-phase current, voltage link situation, for phase place wrong phenomenon, correctly connects with on-the-spot phase place Connect;
If b. phase voltage is abnormal
Breakdown judge: in 24 hours, C phase voltage is less than 150V, it is judged that on-the-spot C phase voltage wire clamp comes off or contacts the tightst;
Field service: check three-phase voltage wiring condition, for wire clamp obscission, fasten with insulating tape in time.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for A, B, C three-phase current one It multiple spot occur negative value or be zero situation, carried out judgement and the defect elimination of fault by following method:
A. electric current is negative value:
Breakdown judge: B phase current is negative value in 24 hours, belongs to current data abnormal, it is judged that current transformer connects into and out of line Line mistake;
Place lack measure (place lack be process defect abbreviation, lower with): place shortage of staff person step on bar check every current transformer enter, Outlet direction, wiring of righting the wrong;
B. electric current is zero for a long time:
Breakdown judge: A phase current 24 hours is zero, Zero-phase current numerical value is close with B, C phase two;Belong to current data different Often, it is judged that current transformer damages or wiring comes off;
Place lacks measure: place shortage of staff person steps on bar and checks that current transformer is the most abnormal, changes faulty equipment;If wiring comes off, Fasten with screwdriver, prevent fault from again occurring.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for active-power P, power FactorFor the situation of negative value, carried out judgement and the defect elimination of fault by following method:
Breakdown judge: active-power P, power factor (PF)Being all negative value, electricity statistics exists abnormal, it is judged that load monitoring Terminal meter device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, for forward active energy, nothing Merit SOC values is the situation of negative value, is carried out judgement and the defect elimination of fault by following method:
Breakdown judge: forward active power, reactive power are all negative value, and load monitoring terminal cannot complete normal electricity Statistical work;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, in transformer load rate During more than 10%, meritorious comparison, in the situation more than 10% or less than-10%, carries out the judgement of fault by following method and disappears Lack:
Breakdown judge: it is abnormal that meritorious comparison exists multiple spot, it is judged that load monitoring terminal meter device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, different for reactive power Q numerical value Normal situation, carries out judgement and the defect elimination of fault by following method:
Breakdown judge: negative value, numerical exception occurs in reactive power Q, electricity statistics exists abnormal, it is judged that load monitoring terminal Metering device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status;If faulty equipment cannot be repaired, directly change spare unit.
Further, described 10kV line loss and low-voltage platform area line loss management analysis method, capacity of idle power reverse for day The situation that numerical value is big, carries out judgement and the defect elimination of fault by following method:
Breakdown judge: reversely capacity of idle power numerical exception, electricity statistics exists abnormal, it is judged that load monitoring terminal meter fills Put and break down;
Place lacks measure: after place shortage of staff person steps on bar, joins by data wire connected load monitoring terminal and each data of computer check Number, by entering the operating instructions change equipment running status;If faulty equipment cannot be repaired, directly change spare unit.
In Fig. 1, the platform district basic data of the technical program is analyzed, and is primarily directed to electricity system information and the user of low-voltage platform area The Back ground Information of the aspects such as information is collected, arranges and analyzes, and to guarantee the accuracy of platform district Back ground Information, these is carried out The accurate data processed is as the basic data of platform district line loss analyzing.Specifically include that the electricity system to Ge Tai district analyzes, to platform district Carry out the comparison of PMS and CMS user profile and Ge Tai district is carried out customer analysis etc..
In Fig. 2, the platform district line loss statistical analysis of the technical program mainly obtains platform district supply side and the data of sale of electricity side Calculate line loss per unit, and statistical analysis is carried out for these line losses per unit.Specifically include that acquisition platform district line loss statistical data, Tai Qu Line loss per unit calculates, the line loss per unit warning of abnormal platform district, the line loss per unit comparison of platform district and the unit line loss data statistics of electricity system.
In Fig. 3, the supply side data analysis of the technical program refers to abnormal platform district occur for line loss per unit, is powered Survey the analysis of data, analyse whether it is the exception owing to result in line loss per unit for the exception of electrical measurement data.Specifically include that acquisition is different Chang Taiqu reports to the police and the reparation of abnormal electrical power supply data for electrical measurement data, supply side abnormal data.
In Fig. 4, the sale of electricity side data of the technical program is analyzed, and refers to abnormal platform district occur for line loss per unit, sells The analysis of electricity side data, analyses whether it is owing to the exception of sale of electricity side data result in the exception of line loss per unit.Specifically include that acquisition Assorted item electricity feelings in zero charge condition, electricity sales amount in abnormal platform district sale of electricity side data, sale of electricity side Electricity customers situation, electricity sales amount Condition, electricity sales amount move back quality condition of checking meter in benefit charge condition and electricity sales amount.
In Fig. 5, the abnormal line loss of the technical program processes, and refers to that the platform district for line loss per unit is abnormal has carried out data analysis After work, form the possible reason causing line loss per unit abnormal, arrange related personnel to work targetedly, eliminate line loss per unit Abnormal situation.Specifically include that and form reason, internal field work disposal, outfield work disposal and the line loss defect elimination that line loss is possible.
Technical scheme, by setting up matching net wire loss Standardized Management Pattern, it is each that system combing line loss works Individual link, puts the internal relation of work in every in order, holds the focus of Controlling line loss, forms the Controlling line loss mould with point-like Formula, replaces lamellar in the past, the management mode of planar, is coordinated by clarification in certain roles, tacit agreement, leads the Controlling line loss mould of integration Formula, gradually reduces power supply enterprise's line loss per unit, reduces for the power consumption in process of distributing electricity.
The method can be widely used in management of power supply and power utilization and energy-saving and cost-reducing field.

Claims (10)

1. 10kV line loss and a low-voltage platform area line loss management analysis method, including the basic data analysis of platform district, platform district line loss is united Meter, supply side data analysis, sale of electricity side data and line loss abnormality processing, it is characterized in that:
In 10kV circuit As-Is analysis, the circuit present situation in current electric company region is carried out summarize analyze, to special line by Bar is analyzed, and combing goes out line loss per unit abnormal cause accounting situation, and the department relating to Controlling line loss and unit are carried out technically With managerial investigation and analysis, sum up its problem existed both ways, for technically problem upper with management, propose constructive Suggestion, be effectively improved Controlling line loss level;
In the As-Is analysis of low-voltage platform area, carry out current electric company Nei Tai district, region present situation summarizing and analyze, combing outlet Qualified district of loss rate and abnormal platform district user character accounting situation, analyze the feature in line loss exception platform district, for different platforms District's line loss present situation, is analyzed arranging to platform district line loss by model, finds out the factor affecting line loss, then rationally effectively disappear Except impact, form continuous print platform district line loss changing tendency curve, be better understood by each district's line loss for electric company policymaker The analysis of situation of change and influence factor is set up the reasonable value that data basis is platform district line loss and is really customized calibration standard, for platform district line Damage debases the standard and provides foundation, is differentiating that platform district line loss rationally provides theory to depend on abnormal for electric company Controlling line loss person According to;
Described 10kV line loss and low-voltage platform area line loss management analysis method, by setting up matching net wire loss Standardized Management Pattern, Set up and relate to the multi-specialized line loss pipes such as program plan, construction retrofit, production technology, management and running, power marketing, electric energy metrical Reason system;By the links of system combing line loss work, put the internal relation of work in every in order, hold the work of Controlling line loss Make emphasis, form the Controlling line loss pattern with point-like, replace lamellar in the past, the management mode of planar, by clarification in certain roles, write from memory Contract coordinates, and leads the Controlling line loss pattern of integration, gradually reduces power supply enterprise's line loss per unit, reduces for the electricity in process of distributing electricity Can consume, thus improve power supply enterprise's economic value added;
Described 10kV line loss and low-voltage platform area line loss management analysis method, the Controlling line loss application system of Criterion is logical Cross work such as reporting location, high capacity improving distribution transformer, platform district sharing of load for user malfunction for repairment and aid decision support be provided, Effectively reduce because of breakdown repair not in time, long-term overload cause the phenomenons such as equipment damage to occur, significantly reduce power supply enterprise's economy Penalty values.
2., according to the 10kV line loss described in claim 1 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, use following method to be managed analyzing:
1) with 110kV, 35kV transformer station of electric company as sample, statistics main transformer, circuit, the electric flux with change of standing, form electric energy Amount balance statistics, analyzes power station electric flux unbalance factor and main transformer, the relation of line load, formulates 110kV, 35kV power station electric energy Amount tension metrics;
2) incentive mechanism and the standard of Controlling line loss are set up, fair and reasonable to adapt to multi-level demand, and focusing on actual effects property, to adjust The work incentive of dynamic power supply enterprise employee;
3) analysis causes all kinds of factors of line loss, and proposes solution targetedly.Reducing Loss by Technology Means is utilized to drive Molded Line The reduction of loss rate, utilizes suggestion on management to drive the reduction of statistical line losses rate;
4) the Controlling line loss pattern of design power supply enterprise mixed type, highlights Controlling line loss central role in daily management, makes Line loss strategic objective and company overall strategy target organically blend, and expand functional department's job stream, by Controlling line loss work Make stream solidification, institutionalization, standardization, formed through the successful exercisable model of practice test.
3., according to the 10kV line loss described in claim 1 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, the most common failure during defect elimination is worked, formulate rational load prison Survey terminal operating situation analysis method;Sum up the fault occurred, and every kind of fault is analyzed, set up basic process and do Method, forms success experience storehouse;Formulate corresponding management evaluation way, defect elimination work is linked up with equipment owner, makes defect elimination work Standardization, procedure;
Wherein, described most common failure, at least include A, B, C three-phase voltage put more than a day occur negative value, numerical value more than 290V or Less than 150V, A, B, C three-phase current is put more than a day to be there is negative value or is zero, active-power P, power factor (PF)For negative value, just Being negative value to active energy, capacity of idle power numerical value, when transformer load rate is more than 10%, meritorious comparison is more than 10% or little In-10%, reactive power Q numerical exception, day the reverse capacity of idle power numerical value situation such as big.
4., according to the 10kV line loss described in claim 3 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, put more than a day for A, B, C three-phase voltage and occur that negative value, numerical value are more than 290V or less than the situation of 150V, carries out judgement and the defect elimination of fault by following method:
If a. phase voltage is zero
Breakdown judge: in 24 hours, A phase voltage is zero, two voltages of zero phase voltage numerical value and other are close, it is judged that on-the-spot A phase is electric Pressure phase place misconnection is to zero phase;
Field service: check three-phase current, voltage link situation, for phase place wrong phenomenon, correctly connects with on-the-spot phase place;
If b. phase voltage is abnormal
Breakdown judge: in 24 hours, C phase voltage is less than 150V, it is judged that on-the-spot C phase voltage wire clamp comes off or contacts the tightst;
Field service: check three-phase voltage wiring condition, for wire clamp obscission, fasten with insulating tape in time.
5., according to the 10kV line loss described in claim 3 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, put more than a day for A, B, C three-phase current and negative value occur or be zero Situation, carries out judgement and the defect elimination of fault by following method:
A. electric current is negative value:
Breakdown judge: B phase current is negative value in 24 hours, belongs to current data abnormal, it is judged that current transformer is wrong into and out of line wiring By mistake;
Place lack measure: place shortage of staff person step on bar check every current transformer into and out of line direction, wiring of righting the wrong;
B. electric current is zero for a long time:
Breakdown judge: A phase current 24 hours is zero, Zero-phase current numerical value is close with B, C phase two;Belong to current data abnormal, Judge that current transformer damages or wiring comes off;
Place lacks measure: place shortage of staff person steps on bar and checks that current transformer is the most abnormal, changes faulty equipment;If wiring comes off, use spiral shell Silk cutter fastening, prevents fault from again occurring.
6., according to the 10kV line loss described in claim 3 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, for active-power P, power factor (PF)For the situation of negative value, lead to Cross following method and carry out judgement and the defect elimination of fault:
Breakdown judge: active-power P, power factor (PF)Being all negative value, electricity statistics exists abnormal, it is judged that load monitoring terminal Metering device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, by data wire connected load monitoring terminal and each data parameters of computer check, logical Cross and enter the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
7., according to the 10kV line loss described in claim 3 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, when being negative value for forward active energy, capacity of idle power numerical value, Judgement and the defect elimination of fault is carried out by following method:
Breakdown judge: forward active power, reactive power are all negative value, load monitoring terminal cannot complete normal electricity statistics Work;
Place lacks measure: after place shortage of staff person steps on bar, by data wire connected load monitoring terminal and each data parameters of computer check, logical Cross and enter the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
8., according to the 10kV line loss described in claim 3 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, for when transformer load rate is more than 10%, meritorious comparison is greatly In 10% or situation less than-10%, carried out judgement and the defect elimination of fault by following method:
Breakdown judge: it is abnormal that meritorious comparison exists multiple spot, it is judged that load monitoring terminal meter device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, by data wire connected load monitoring terminal and each data parameters of computer check, logical Cross and enter the operating instructions change equipment running status.If faulty equipment cannot be repaired, directly change spare unit.
9., according to the 10kV line loss described in claim 3 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, during for reactive power Q numerical exception, entered by following method The judgement of row fault and defect elimination:
Breakdown judge: negative value, numerical exception occurs in reactive power Q, electricity statistics exists abnormal, it is judged that load monitoring terminal meter Device breaks down;
Place lacks measure: after place shortage of staff person steps on bar, by data wire connected load monitoring terminal and each data parameters of computer check, logical Cross and enter the operating instructions change equipment running status;If faulty equipment cannot be repaired, directly change spare unit.
10., according to the 10kV line loss described in claim 3 and low-voltage platform area line loss management analysis method, it is characterized in that described 10kV line loss and low-voltage platform area line loss management analysis method, when capacity of idle power numerical value reverse for day is big, by following side Method carries out judgement and the defect elimination of fault:
Breakdown judge: reversely capacity of idle power numerical exception, electricity statistics exists abnormal, it is judged that load monitoring terminal meter device goes out Existing fault;
Place lacks measure: after place shortage of staff person steps on bar, by data wire connected load monitoring terminal and each data parameters of computer check, logical Cross and enter the operating instructions change equipment running status;If faulty equipment cannot be repaired, directly change spare unit.
CN201610825451.8A 2016-09-14 2016-09-14 A kind of 10kV line loss and low-voltage platform area line loss management analysis method Active CN106291252B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610825451.8A CN106291252B (en) 2016-09-14 2016-09-14 A kind of 10kV line loss and low-voltage platform area line loss management analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610825451.8A CN106291252B (en) 2016-09-14 2016-09-14 A kind of 10kV line loss and low-voltage platform area line loss management analysis method

Publications (2)

Publication Number Publication Date
CN106291252A true CN106291252A (en) 2017-01-04
CN106291252B CN106291252B (en) 2019-09-10

Family

ID=57712561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610825451.8A Active CN106291252B (en) 2016-09-14 2016-09-14 A kind of 10kV line loss and low-voltage platform area line loss management analysis method

Country Status (1)

Country Link
CN (1) CN106291252B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107024641A (en) * 2017-03-29 2017-08-08 国网上海市电力公司 A kind of platform area line loss per unit exception monitoring system
CN107132410A (en) * 2017-03-13 2017-09-05 广东电网有限责任公司信息中心 10kV circuits line loss per unit abnormal cause detection method and system
CN107807344A (en) * 2017-09-14 2018-03-16 国家电网公司 The abnormal method of line loss is judged based on electric energy meter abnormal current
CN107817396A (en) * 2017-09-14 2018-03-20 国家电网公司 Based on the method that electric energy meter phase angle false judgment line loss is abnormal
CN107831379A (en) * 2017-09-14 2018-03-23 国家电网公司 Judge the abnormal method of line loss based on collection electricity unusual fluctuations
CN107831350A (en) * 2017-09-14 2018-03-23 国家电网公司 The abnormal method of line loss is judged based on electrical energy meter fault and typical fault wiring
CN108229087A (en) * 2017-09-30 2018-06-29 国网上海市电力公司 A kind of destructed method of low-voltage platform area typical scene
CN108573350A (en) * 2018-04-19 2018-09-25 国网湖北省电力有限公司电力科学研究院 A kind of matching net wire loss synchronization calculates and multidimensional analysis method
CN108764501A (en) * 2018-05-30 2018-11-06 国网上海市电力公司 A kind of analysis of line loss problem and defect elimination processing method
CN108805429A (en) * 2018-05-30 2018-11-13 国网上海市电力公司 " one continuous line " hardware and software platform fine-grained management method for taiwan area line loss
CN109507536A (en) * 2018-12-12 2019-03-22 国家电网有限公司 A kind of low-voltage platform area line loss electricity intelligent measure analytical equipment
CN110703019A (en) * 2019-10-12 2020-01-17 国网北京市电力公司 Power consumption abnormity accurate positioning method based on collected information of power transmission line
CN110889466A (en) * 2019-12-14 2020-03-17 贵州电网有限责任公司 Transformer area line loss analysis method based on line loss classifier
CN110927480A (en) * 2019-11-02 2020-03-27 国网上海市电力公司 Low-voltage transformer area loss reduction method for HPLC application environment
CN112435448A (en) * 2020-11-11 2021-03-02 广东电网有限责任公司广州供电局 Low-voltage transformer area maintenance method and system, electronic equipment and storage medium
CN112685885A (en) * 2020-12-25 2021-04-20 青岛鼎信通讯股份有限公司 Transformer area line loss analysis method for comprehensive big data analysis
CN113469486A (en) * 2021-04-19 2021-10-01 国网河北省电力有限公司电力科学研究院 Line negative loss and high loss analysis method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102637288A (en) * 2012-03-31 2012-08-15 上海市电力公司 Method for analysis of line loss in distribution-room area of power supply enterprise

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102637288A (en) * 2012-03-31 2012-08-15 上海市电力公司 Method for analysis of line loss in distribution-room area of power supply enterprise

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
宋小忠: "县级供电企业线损管理的研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
徐开拓: "10kV高压线损分析及对策", 《大众用电》 *
徐志光 等: "利用用电信息采集系统管理台区线损", 《电力需求侧管理》 *
林维莉 等: "基于支持向量机的低压台区线损管理诊断模型", 《华东电力》 *
章志钧 等: "嘉定配电网低压台区线损管理实践", 《上海电力》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107132410A (en) * 2017-03-13 2017-09-05 广东电网有限责任公司信息中心 10kV circuits line loss per unit abnormal cause detection method and system
CN107024641A (en) * 2017-03-29 2017-08-08 国网上海市电力公司 A kind of platform area line loss per unit exception monitoring system
CN107807344A (en) * 2017-09-14 2018-03-16 国家电网公司 The abnormal method of line loss is judged based on electric energy meter abnormal current
CN107817396A (en) * 2017-09-14 2018-03-20 国家电网公司 Based on the method that electric energy meter phase angle false judgment line loss is abnormal
CN107831379A (en) * 2017-09-14 2018-03-23 国家电网公司 Judge the abnormal method of line loss based on collection electricity unusual fluctuations
CN107831350A (en) * 2017-09-14 2018-03-23 国家电网公司 The abnormal method of line loss is judged based on electrical energy meter fault and typical fault wiring
CN108229087A (en) * 2017-09-30 2018-06-29 国网上海市电力公司 A kind of destructed method of low-voltage platform area typical scene
CN108573350B (en) * 2018-04-19 2021-07-16 国网湖北省电力有限公司电力科学研究院 Distribution network line loss synchronization calculation and multidimensional analysis method
CN108573350A (en) * 2018-04-19 2018-09-25 国网湖北省电力有限公司电力科学研究院 A kind of matching net wire loss synchronization calculates and multidimensional analysis method
CN108764501A (en) * 2018-05-30 2018-11-06 国网上海市电力公司 A kind of analysis of line loss problem and defect elimination processing method
CN108805429A (en) * 2018-05-30 2018-11-13 国网上海市电力公司 " one continuous line " hardware and software platform fine-grained management method for taiwan area line loss
CN109507536A (en) * 2018-12-12 2019-03-22 国家电网有限公司 A kind of low-voltage platform area line loss electricity intelligent measure analytical equipment
CN110703019A (en) * 2019-10-12 2020-01-17 国网北京市电力公司 Power consumption abnormity accurate positioning method based on collected information of power transmission line
CN110927480A (en) * 2019-11-02 2020-03-27 国网上海市电力公司 Low-voltage transformer area loss reduction method for HPLC application environment
CN110927480B (en) * 2019-11-02 2022-06-21 国网上海市电力公司 Low-voltage transformer area loss reduction method for HPLC application environment
CN110889466A (en) * 2019-12-14 2020-03-17 贵州电网有限责任公司 Transformer area line loss analysis method based on line loss classifier
CN110889466B (en) * 2019-12-14 2020-12-25 贵州电网有限责任公司 Transformer area line loss analysis method based on line loss classifier
CN112435448A (en) * 2020-11-11 2021-03-02 广东电网有限责任公司广州供电局 Low-voltage transformer area maintenance method and system, electronic equipment and storage medium
CN112685885A (en) * 2020-12-25 2021-04-20 青岛鼎信通讯股份有限公司 Transformer area line loss analysis method for comprehensive big data analysis
CN113469486A (en) * 2021-04-19 2021-10-01 国网河北省电力有限公司电力科学研究院 Line negative loss and high loss analysis method

Also Published As

Publication number Publication date
CN106291252B (en) 2019-09-10

Similar Documents

Publication Publication Date Title
CN106291252A (en) A kind of 10kV line loss and low-voltage platform area line loss management analysis method
CN109426205B (en) Industrial intelligent optimization energy-saving system
CN104951866B (en) Line loss comprehensive management benchmarking evaluation system and method for county-level power supply enterprise
CN108318782B (en) Power distribution network fault area identification method based on network topology and distribution transformer power failure information
CN102074954B (en) Comprehensive energy-conservation evaluation and decision-making method for urban and rural distribution network
CN106300652B (en) A kind of user side energy-saving electric management system
CN105096207B (en) Important power user power supply reliability assessment method based on analytic hierarchy process
CN108287294B (en) Power failure distribution transformer and topology analysis based power distribution network fault area rapid identification method
CN103901317A (en) Power distribution fault studying and judging method based on multisystem collaboration
CN104318374A (en) Method for assessing reliability of medium voltage distribution network for calculating upstream power restoration operation time
Zhichun et al. Topology identification method of low voltage distribution network based on data association analysis
CN106952178B (en) Telemetry bad data identification and reason distinguishing method based on measurement balance
Lantharthong et al. Techniques for reliability evaluation in distribution system planning
CN110348597A (en) A kind of power grid 110kV main transformer short term curve prediction method
CN105335824B (en) Distribution network failure repairing command methods and system based on data center
CN113063997A (en) Distribution transformer area line loss abnormity problem monitoring method
CN109245109B (en) Power supply low-voltage early warning system and method
CN113126017A (en) Fault diagnosis method for data acquisition failure in electric energy acquisition system
CN104063757B (en) Transformer substation main electrical connection assessment method suitable for different development stages of power grids
Fan et al. Design and application of integrated distribution network line loss analysis system
KR100705610B1 (en) An investment priority decision method for the electrical facilities considering the reliability
CN110458299A (en) Line-change of the monocyclic cable power distribution network mode of connection-abnormal discrimination method of table topology
CN110460037B (en) Line-to-table topology abnormity identification method for connection mode of bijection type cable distribution network
CN108649573A (en) A kind of computational methods for causing grid net loss to change by power transmission and transforming equipment maintenance
CN107767060A (en) Distribution line theoretical line loss caluclation system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant