Summary of the invention
The object of the invention is to solve the problems referred to above existed in existing process resource data management, a kind of process resource data management system and construction method thereof are provided, it is convenient to effective unified management of various process data and knowledge in enterprise, simultaneously, its database table, the data display page and integrated interface all dynamically define and configure, thus the individual demand of enterprise can be met on the one hand, can easily existing process resource data management system be expanded in other system on the other hand; Further, it has data auditing flow and data auditing flow can Dynamic Definition, thus can guarantee the process data of its store and management and authenticity, the reliability and stability of knowledge.
In order to achieve the above object, the invention provides following technical scheme: a kind of process resource data management system, it comprises multiple process data subsystem, and each described process data subsystem comprises:
(1) multiple database table for storage technology data and knowledge, described database table is formed by the data model dynamically set up in the mode of Data Dynamic modeling;
(2) for showing the data display page of process data and the knowledge stored in described database table, the described data display page dynamically configures in the mode of data display page dynamic-configuration, simultaneously, described data display page configuration has data model, thus sets up the incidence relation between the described data display page and described data model;
(3) the data auditing flow for auditing the operation of described process data and knowledge, described data auditing flow dynamically defines in the mode of data auditing flow Dynamic Definition, and described data auditing flow configures to described data model, thus set up the incidence relation between described data model and described data auditing flow;
(4) for carrying out the integrated interface of data integration with other system, other system described can call process data and the knowledge of this process data subsystem by described integrated interface, and described integrated interface dynamically configures in the mode of integrated interface dynamic-configuration.
Further, wherein, described multiple process data subsystem comprises spinning process data subsystem, sheet metal process data subsystem, multiple material process data subsystem, process for machining data subsystem, welding technology data subsystem, process of surface treatment data subsystem, Technology for Heating Processing data subsystem, Forging Technology data subsystem, casting technique data subsystem, electric machining process data subsystem and assembly technology data subsystem.
Further, wherein, other system described comprises CAPP system, CAE system and CAM system.
Again further, wherein, described data auditing flow is by flow nodes and connect the Migration Line of flow nodes and form, and described flow nodes comprises single examination & approval, evaluation countersign, certainly examines countersign, joint examination countersign and decision node.
Again further, wherein, described data model comprises technics data model, process data model, technological parameter data model, material parameter data model, equipment technical parameters data model, frock technical parameter data model, tool technique supplemental characteristic model, typical process data model, process knowledge data model and technological standards canonical data model.
In addition, the invention provides a kind of construction method of above-mentioned process resource data management system, it comprises the steps:
(1) dynamically set up the various data models of one of them process data subsystem in the mode of Data Dynamic modeling, this data model forms the database table for storing various process data and knowledge of this process data subsystem;
(2) the various data display pages of described process data subsystem are dynamically configured in the mode of data display page dynamic-configuration, and be described data display page configuration data model, thus the incidence relation set up between the described data display page and described data model, and then be convenient to show on the described data display page the various process data and knowledge that store in described database table;
(3) the various data auditing flows of described process data subsystem are dynamically defined in the mode of data auditing flow Dynamic Definition;
(4) be described data model configuration data auditing flow, thus set up the incidence relation between described data model and described data auditing flow, so that audit the operation of described various process data and knowledge;
(5) dynamically configure the integrated interface of described process data subsystem in the mode of integrated interface dynamic-configuration, other system can call process data and the knowledge of described process data subsystem by described integrated interface;
(6) adopt mode as above-mentioned steps (1)-(5) build as described in other process data subsystem of process resource data management system.
Process resource data management system of the present invention can be involved in the various professional technological process of management enterprise various process data and the knowledge such as process, technological parameter, material parameter, manufacturing equipment parameter, typical process, defective workmanship, process knowledge, technological standards specification, contribute to auxiliary common process personnel and carry out technological design, and be convenient to shared, the intercommunication of various process data and knowledge, contribute to the technological level and the management level that improve enterprise.
Simultaneously, in the present invention, the process data model corresponding to various database tables of described process resource data management system all dynamically builds, thus facilitate user according to the difference adjustment or change process data model flexibly voluntarily of process data and knowledge, and then be convenient to the store and management of various process data and knowledge in enterprise.
Further, in the present invention, the data display page of described process resource data management system dynamically builds and safeguards, thus facilitates user to carry out various displaying, management and operation to process data and knowledge.
In addition, in the present invention, allow user dynamically to set up and service data auditing flow, and data auditing flow is associated with data model, thus realize user carries out various operation examination & verification to process data and knowledge, prevent user to the unordered operation of process data and knowledge; Further, its data auditing flow dynamically can change according to the demand of user, can meet the demand of different process data and knowledge being carried out to different examination & verification.
Finally, in the present invention, allow user dynamically to configure integrated interface, thus contribute to for by this process resource management system and other system, the systems such as such as CAPP, CAE, CAM are carried out integrated, and then contribute to providing required process data and knowledge for other system; Further, its integrated interface dynamically can configure according to the demand of user, and like this, when user needs and new system, when such as ERP system is carried out integrated, user can configure corresponding integrated interface quickly and easily, and what be convenient to new system is integrated.
Embodiment
Describe the specific embodiment of the present invention in detail below in conjunction with accompanying drawing, the content of embodiment is not as the restriction to protection scope of the present invention.
The present invention relates to process resource data management system and construction method thereof, it is convenient to the process data of various professional technological process and effective unified management of knowledge in enterprise, simultaneously, its database table, the data display page and integrated interface all dynamically carry out defining and configuring, thus the individual demand of enterprise can be met on the one hand, can easily existing process resource data management system be expanded in other system on the other hand; Further, it has data auditing flow and data auditing flow can Dynamic Definition, thus can guarantee the process data of its store and management and authenticity, the reliability and stability of knowledge.
In an enterprise, involved professional technological process mainly comprises panel beating, multiple material, spinning, machine work, welding, thermal treatment, forging, casting, surface treatment, electromachining, assembling etc.For the ease of managing the process data of all professional technological process involved in an enterprise and knowledge, process resource data management system of the present invention comprises multiple process data subsystem, each process data subsystem is for managing a kind of process data and knowledge of professional technological process, thus the Classification Management of the process data be convenient to different majors technological process and knowledge.
Fig. 1 shows the composition schematic diagram of process resource data management system of the present invention.As shown in Figure 1, process resource data management system of the present invention comprises multiple process data subsystem, and it is respectively spinning process data subsystem, sheet metal process data subsystem, multiple material process data subsystem, process for machining data subsystem, welding technology data subsystem, process of surface treatment data subsystem, Technology for Heating Processing data subsystem, Forging Technology data subsystem, casting technique data subsystem, electric machining process data subsystem and assembly technology data subsystem.
Wherein, described spinning process data subsystem, for managing various process data involved in spinning process process and knowledge, comprises technics, process, technological parameter, material parameter, equipment technical parameters, frock technical parameter, tool technique parameter, process knowledge etc.
Described sheet metal process data subsystem, for managing various process data involved in sheet metal process process and knowledge, comprises technics, process, technological parameter, material parameter, equipment technical parameters, frock technical parameter, process knowledge, typical process etc.
Described multiple material process data subsystem, for managing various process data involved in multiple material technological process and knowledge, comprises technics, process, technological parameter, material parameter, equipment technical parameters, tool technique parameter, process knowledge, raising component technological quality measures, parts manufacturing defect solution etc.
Described process for machining data subsystem is used for various process data involved in supervisor machining process and knowledge, comprises technics, process, technological parameter, material parameter, equipment technical parameters, tool technique parameter, process knowledge, typical process etc.
Described welding technology data subsystem, for managing various process data involved in welding procedure and knowledge, comprises technics, process, technological parameter, material parameter, tool technique parameter, process knowledge, typical process etc.
Described process of surface treatment data subsystem, for managing various process data involved in surfacing process and knowledge, comprises technics, process, technological parameter, equipment technical parameters, frock technical parameter, tool technique parameter, process knowledge, typical process etc.
Described Technology for Heating Processing data subsystem, for managing various process data involved in heat treatment process and knowledge, comprises technics, process, technological parameter, material parameter, equipment technical parameters, frock technical parameter, tool technique parameter, process knowledge, typical process, raising component technological quality measures, parts manufacturing defect solution etc.
Described Forging Technology data subsystem, for managing various process data involved in Forging Technology process and knowledge, comprises technics, process, technological parameter, equipment technical parameters, tool technique parameter, process knowledge, typical process, raising component technological quality measures, parts manufacturing defect solution etc.
Described casting technique data subsystem, for managing various process data involved in foundry technology process and knowledge, comprises technics, process, technological parameter, material parameter, equipment technical parameters, frock technical parameter, process knowledge, typical process, raising component technological quality measures etc.
Described electric machining process data subsystem, for managing various process data involved in electric machining process process and knowledge, comprises technics, process, technological parameter, material parameter, equipment technical parameters, frock technical parameter, tool technique parameter, process knowledge, typical process, raising component technological quality measures, parts manufacturing defect solution etc.
Described assembly technology data subsystem, for managing various process data involved in assembling technology procedure and knowledge, comprises technics, process, technological parameter, equipment technical parameters, frock technical parameter, process knowledge, raising component technological quality measures, parts manufacturing defect solution etc.
In the present invention, the formation of each process data subsystem above-mentioned is identical, therefore, below for one of them process data subsystem, introduces the formation of each process data subsystem in detail.
Fig. 2 shows the composition schematic diagram of each process data subsystem of process resource data management system of the present invention.As shown in Figure 2, each process data subsystem all comprises database table, the data display page, data auditing flow and integrated interface.Certainly, the process data involved by each process data subsystem and the difference of knowledge, the concrete formation of described database table, the data display page, data auditing flow and integrated interface has different.
Wherein, described database table has multiple, is respectively used to store various process data involved in corresponding professional technological process and knowledge.Fig. 3 shows the composition schematic diagram of the database table of the process data subsystem of process resource data management system of the present invention.As shown in Figure 3, the database table of each process data subsystem generally includes technics database table, process database table, technological parameter database table, material parameter database table, equipment technical parameters database table, frock technical parameter database table, tool technique parameter database table, typical process database table, process knowledge database table and technological standards normative database table etc.Certainly, according to the difference of professional technological process, the database table of each process data subsystem is not quite similar, and some process data subsystem only includes wherein a part of above-mentioned database table.
Wherein, described technics database table is for storing various technics involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it usually all comprises title, English name, definition, affiliated classification, is subordinate to specialty and Data Source etc.
Described process database table is for storing various processes involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it all comprises title, English name, definition, ultimate principle and process, process principle schematic and key process parameter etc. usually.
Described technological parameter database table is for storing various technological parameters involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it all comprises parameter name, parameter definition, Parameter units and parameter acquiring mode etc. usually.
Described material parameter database table is for storing various material parameters involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it all comprises material trademark, material type, material parameter unit, material thickness, material heat treatment state, density, plasticity etc. usually.
Described equipment technical parameters database table is for storing various equipment technical parameters involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it all comprises device name, unit type, specification of equipment, device type, applying unit, manufacturer, equipment life, maximum weight etc. usually.
Described frock technical parameter database table is for storing various frock technical parameters involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it all comprises frock title, frock type, frock applicable craft method, frock effect or purposes, Fixture Design principle information etc. usually.
Described tool technique parameter database table is for storing various tool technique parameters involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it all comprises tool number, instrument title, tool types, instrument specification, instrument own material etc. usually.
Described typical process database table is for storing typical process involved in professional technological process.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it usually all comprises title, English name, is suitable for part type and geometric properties, is suitable for part process feature, part material type etc.
Described process knowledge database table, for storing process knowledge involved in professional technological process, comprises and improves the knowledge of processing quality measure, the knowledge etc. of defective workmanship solution.Further, according to the difference of knowledge, there is corresponding field.
Described technological standards normative database table is for storing technological standards involved in professional technological process and technological specification.According to the difference of professional technological process, the also difference to some extent of the field involved by it.But the field involved by it all comprises the formal specification number of file, file name, English name, file content key word, file content brief introduction, version and date etc. usually.
As shown in the above, each database table, according to the difference of stored process data and knowledge, often has different field structures, and along with the change of process data and knowledge, its field structure also may be change.Therefore, if adopt the database table of fixed field structure, so the regulatory requirement of enterprise to different process data and knowledge will be difficult to meet.For this reason, in the present invention, the data model corresponding to database table of each process data subsystem is dynamically set up in the mode of Data Dynamic modeling, thus make user to adjust flexibly voluntarily or to change data model, to meet the regulatory requirement of each process data subsystem to process data and knowledge.
In the present invention, particularly, when user sets up the data model of process data subsystem, first by user determine data model title and for user provides a data model field template after user determines the title of data model.Have some field attributes that various field all comprises usually in this data model Field Template, such as sequence number, title, ID, school weigh field, data type, data dictionary, chained address, width, default value, length, must fill out, edit display, check display, explanation etc.
After provide described data model Field Template for user, user by inserting related content or selecting the options that provides of template can be just that described data model adds a field according to described data model Field Template in each field attribute.Certainly, if user-selected data type is " data dictionary ", so corresponding data dictionary should be selected in data dictionary attribute.Like this, user according to the difference of the process data of required storage and knowledge, can be the field that its corresponding data model adds needed for oneself, thus completes the structure of data model.
Such as, for technics data model, it field comprised has term name, English name, definition, affiliated classification, is subordinate to specialty and Data Source etc.By above-mentioned data model construction method, be respectively technics data model to build term name, English name, definition, affiliated classification, be subordinate to the field such as specialty and Data Source, thus formed and comprise term name, English name, definition, affiliated classification, be subordinate to the technics database table of the field such as specialty and Data Source.This technics database table is used for storing various technics involved in professional technological process.
Certainly, after building a data model, if think that certain field attribute of certain field is improper, can also modify to it.Such as, if think that " must fill out " attribute that the field of technics data model " is subordinate to specialty " should change "No" into by "Yes", so just can modify to it.
Meanwhile, after building a data model, if the field of this data model is improper, such as, if think and also need increase field or delete a field, so can increase the field of this data model or delete, to meet the demand of user.Meanwhile, also can allow user each field is carried out on move, move down, the operation such as top set, bottom set, to meet the individual demand of user.
In addition, after building a data model, Authorized operation can be carried out to this data model.Such as, for this data model arranges domestic consumer, data administrator, safety officer, audit administrator and system manager etc. respectively, thus give different users different authorities, so that different users can carry out different operations to the process data stored in the database table corresponding to this data model and knowledge.
After having built a data model, identical method be adopted to build next data model according to the demand of each process data subsystem.As mentioned above, for the ease of the management to various process data involved in each professional technological process and knowledge, in the present invention, can optionally for each process data subsystem, to set up in following data model all or part of: technics data model, process data model, technological parameter data model, material parameter data model, equipment technical parameters data model, frock technical parameter data model, tool technique supplemental characteristic model, typical process data model, process knowledge data model and technological standards canonical data model.These data models are finally formed as the database table of process data subsystem as shown in Figure 3, store various process data involved in professional technological process and knowledge by these database tables.
By building above-mentioned data model, each process data subsystem being provided with and storing various process data involved in corresponding professional technological process and the database table of knowledge.By loading corresponding process data and knowledge in described database table, contributing to auxiliary common process personnel and carrying out corresponding professional technological design etc.
The described data display page is for showing and operating the process data and knowledge that store in described database table.In the present invention, described process data subsystem comprises multiple data model, i.e. multiple database table, and the inside stores various process data and knowledge.But in actual use, a user does not often need all process datas and the knowledge of each professional technological process, and only may need process data and the knowledge of a part.Such as, only need the data such as technics, technological parameter, and do not need the data such as tool parameters; Or a user only needs the data such as technics and tool parameters within a period of time, and only needs the data such as technological parameter and equipment technical parameters within another a period of time.In this case, if various process data and knowledge are all showed user, make on the one hand the process data shown and knowledge too many, user uses inconvenience more; Another is convenient, increases the displaying workload of data system, waste system resource.
Therefore, in the present invention, the described data display page dynamically configures in the mode of data display page dynamic-configuration, makes user can selectably show required process data and knowledge, thus meet the demand of oneself.
In the present invention, particularly, when user configures the data display page of each process data subsystem, first an application is created for each data model, then be described process data subsystem configures tab page face, and the incidence relation set up between this tab page face and described application, thus show described application on described tab page face.
When creating application for data model, for user provides one to apply drawing template establishment.Have in this application drawing template establishment title that various application all comprises usually, DISPLAY ORDER, description and allow the attributes such as model.User only needs to insert related content in each attribute and one of them data model created before selecting in " allow model " attribute can realize the establishment of an application.Application required for each user can create according to the needs of oneself.Such as, if a user only needs technics data and technological parameter data, so its needs set up technics application and technological parameter application.Wherein, technics application institute allow model to be technics data model, technological parameter apply allow model to be technological parameter data model.
After creating application, just need for described process data subsystem configures tab page face.In the present invention, when setting up described tab page face, for user provides a tab page face drawing template establishment.Wherein, there is in this tab page face drawing template establishment title, the attribute such as DISPLAY ORDER and description that various tab page face all comprises usually.User, by inserting related content in each attribute, can realize the establishment in the tab page face of described process data subsystem.
The tab page face of the process data subsystem created by above-mentioned tab page face drawing template establishment is also an empty page, want to allow it can show various process data and knowledge, next to be this tab page face associated application, thus realize associating of the tab page face database table corresponding with the data model of application.In the present invention, associating between tab page face with application is set up by relation template.Particularly, after establishing described tab page face, for described tab page face provides a relation template, the various application created can be selected by user in described relation template, thus set up the incidence relation between described tab page face and various application.
Such as, if the process data of user's needs and knowledge comprise technics and technological parameter, technics application and technological parameter application so to be associated on the tab page face of its process data subsystem created.After the incidence relation having established tab page face and various application, can by the relevant information of various application, the content of each field of the database table corresponding to the data model namely applied is presented on described tab page face.Like this, by clicking each application on described tab page face, can call and the process data that stores in the database table corresponding to the data model of this application and knowledge, thus realizing the display of related process data and knowledge, and various operation can be carried out for it.
Described data auditing flow is used for auditing the operation of the various process data stored in described database table and knowledge.Process data involved by each professional technological process and knowledge kind are a lot, and the importance of each process data and knowledge, authority and management etc. are different again.If for all process datas and knowledge all provide a kind of fixing data auditing flow, be so obviously difficult to meet the individual demand of user and the different management expectancys of different process data and knowledge.
Therefore, in the present invention, described data auditing flow dynamically defines in the mode of data auditing flow Dynamic Definition.That is, by the difference of user according to the management of the process data stored in disparate databases table in each process data subsystem and knowledge, the data auditing flow of self-defined various process data and knowledge, thus increase its dirigibility, meet individual requirements.
In the present invention, particularly, when user sets up the data auditing flow of each process data subsystem, first by user determine data auditing flow Name and Description and for user provides a data auditing flow to define template after user determines the Name and Description of data auditing flow.
This data auditing flow definition template comprises workflow tool and editing area.Multiple flow nodes is comprised in described workflow tool.Described flow nodes comprises single examination & approval, evaluation countersign, certainly examines countersign, joint examination countersign and decision node.Wherein, the participant of described single careful label can be: participant, department, one in role.Described evaluation examines the participant of label for multiple.The described participant certainly examining label can be multiple, but must have a main responsible official.The participant of label is examined in described joint examination can for multiple and will point out the number percent that this node passes through.Described decision node is an automatic node, and without any need for artificial participation, this node can flow out many Migration Lines, and the Migration Line that decision node flows out is different from other Migration Line.Described editing area is for defining concrete data auditing flow.
When defining concrete data auditing flow, user is according to the examination & verification needs of various process data and knowledge, corresponding flow nodes is selected from described workflow tool, to be added in described editing area and to be determined the relevant information such as participant and authority of corresponding flow nodes, then with Migration Line, selected flow nodes is coupled together, the data auditing flow formed.
Fig. 4 shows an exemplary data auditing flow.When the data auditing flow shown in concrete definition Fig. 4, single approval process node first to add in editing area and determines the personnel of single examination & approval by user, then evaluation countersign flow nodes added in editing area and determine to evaluate the participant of countersign, then decision node is added in editing area, finally add joint examination countersign flow nodes in editing area to and reach much percentage Bizets after determining to make a joint checkup the participant of countersign and joint examination countersign allowing by joint examination countersign.After having added above-mentioned flow nodes and determine foregoing, each flow nodes has coupled together by the logic Migration Line according to approval process, can complete the definition of above-mentioned data auditing flow.
In the present invention, because each process data subsystem all relates to multiple data model.So, when defining data auditing flow, user should define corresponding data auditing flow respectively according to needing of auditing of the data of each data model, thus is convenient to audit the operation of various process data involved in each process data subsystem and knowledge.
After establishing data auditing flow, also to set up the incidence relation between described data model and corresponding data auditing flow, thus audit according to the operation of described data auditing flow to the process data stored in the database table corresponding to described data model and knowledge.
In the present invention, the incidence relation between data model and data auditing flow is set up by relation template.Particularly, can after the data model establishing each process data subsystem, for described data model provides a relation template, in described relation template, selected the data auditing flow defined by user, thus set up the incidence relation between data model and data auditing flow.Like this, user can associate a data auditing flow respectively for each data model of each process data subsystem.
After establishing the incidence relation between data model and data auditing flow, when the process data stored in the database table corresponding to described data model and knowledge operate, progressively must audit according to the auditing flow defined in described data auditing flow, and just can associative operation be carried out after examination & verification completes, thus ensure that the effective management to the process data in each process data subsystem and knowledge, ensure that its reliability and authority.
Such as, if establish the incidence relation between the data auditing flow shown in technics data model and Fig. 4, when the technics data so stored in the technics database table corresponding to technics data model operate, must audit according to the data auditing flow shown in Fig. 4, audit just operating of passing through.That is, first give single approving person to examine, if single approving person does not pass through, then do not allow to operate; If single approving person have passed, so give evaluation countersign personnel by by the content report after single approving person's examination & approval, carry out evaluation by evaluation countersign personnel to conutersign, and determine be reported to joint examination countersign or directly terminate according to the countersign result of evaluation countersign personnel.Particularly, if not by the countersign of evaluation countersign personnel, then directly terminate examination & verification, do not allow to operate; If have passed the countersign of evaluation countersign personnel, be so reported to joint examination countersign personnel, by joint examination countersign, personnel provide final result.That is, if having passed the countersign of joint examination countersign personnel, so allow to operate, if not by the countersign of joint examination countersign personnel, so do not allow to operate.
Described integrated interface is used for carrying out data integration with other system, makes other system described can be called process data and the knowledge of this process management subsystem by described integrated interface.Such as, described integrated interface comprises CAPP integrated interface, the process data that CAPP system can be stored in the database table of calling technological data subsystem by described CAPP integrated interface and knowledge, for described CAPP system provider legitimate name, Essential Terms, typical process, frock information, facility information and tool information etc., to carry out technical papers authorized strength work with helping technologist's Express specification.
Described integrated interface can also comprise CAE integrated interface and CAM integrated interface etc., CAE system and CAM system can by the process data that stores in the database table of described CAE integrated interface and CAM integrated interface calling technological data subsystem and knowledge, for described CAE system and CAM system carry out the support that technique Finite Element Simulation Analysis provides material parameter and technological parameter, technologist is carried out, and each professional process simulation analytic process is truer, quick, specification.
Except above-mentioned CAPP system, CAE system and CAM system, the process resource data management system of enterprise also will be carried out integrated with other data management system of enterprise usually, such as, and EPR system etc.Meanwhile, different according to the level of informatization of each enterprise, other data management system of carrying out data integration with described process resource data management system is also different.Therefore, if provide fixing integrated interface for described process resource data management system, the different demands of satisfied different enterprise are so difficult to.
Therefore, in the present invention, described integrated interface dynamically configures in the mode of integrated interface dynamic-configuration.Like this, user can configure integrated interface neatly, and does not need to develop realization through developer, thus realizes the data of fast integration enterprise existed system.
In the present invention, particularly, when configuring described integrated interface, for user provides an integrated interface template.Described integrated interface template comprises the identification field of each database table of interface name and process data subsystem, the tool number field etc. of the term name field of such as technics database table, the technological parameter name field of technological parameter database table, tool parameters database table.Like this, user, when configuring integrated interface, only needs to insert interface name, and according to the demand of integrated data system, selects corresponding identification field, can complete the configuration of integrated interface.
Such as, in order to carry out integrated with CAPP system, need for process data and knowledge such as CAPP system provider legitimate name, Essential Terms, typical process, frock information, facility information and tool informations.Therefore, when for CAPP system configuration integrated interface, user inserts CAPP system integration interface in " interface name " of described integrated interface template, and the method name field of the process database table choosing described integrated interface template to provide, the term name field of technics database table, the typical process name field of typical process database table, the frock name field of frock technical parameter database table, the device name field of equipment technical parameters database table and the tool number field of tool technique parameter database table, can generate and the CAPP system integration interface required for the CAPP system integration.
After user is by the good integrated interface of described integrated interface template configuration, corresponding middle table can be formed according to described integrated interface.The integrated interface configured according to user is stored and process data after screening and knowledge in described middle table.As shown in Figure 5, the process data stored in described middle table and knowledge are the process data that stores in each database table of process data subsystem and knowledge screening and come.
Such as, after user configures CAPP system integration interface, CAPP system middle table can be formed.Process data and the knowledge such as method name, Essential Terms, typical process, frock information, facility information and the tool information required for CAPP system is stored in this CAPP system middle table.Wherein, method name comes from process database table, Essential Terms come from technics database table, typical process comes from typical process database table, frock information comes from frock technical parameter database table, facility information comes from equipment technical parameters database table, and tool information comes from tool technique parameter database table.
Equally as shown in Figure 5, when other system needs to call related process data and knowledge from described process data subsystem, transfer from corresponding middle table.Such as, when CAPP system needs from the process datas such as described process data subsystem call method title, Essential Terms, typical process, frock information, facility information and tool information and knowledge, CAPP system transfers corresponding process data and knowledge above from formed CAPP system middle table.
Adopt said method, make user can according to the needs of other system dynamically for other system provides corresponding process data and knowledge, namely the integrated of other technology and system resource data system is contributed to, also be convenient to other system and call relevant process data and knowledge from process resource data system, irrelevant process data and knowledge other system be can't be supplied to, the process data of other system call process resource data management system and the specific aim of knowledge and efficiency ensure that.
Fig. 6 shows the process flow diagram of the construction method of process resource data management system of the present invention.As shown in Figure 6, the construction method of process resource data management system of the present invention first builds one of them process data subsystem, such as, spinning process data subsystem, after this process data subsystem complete to be built, identical method and step is adopted to build other process data subsystem again, until all process data subsystems of described process resource management system have all built.
The construction method of each process data subsystem and step are identical, and below with one of them process data subsystem, such as spinning process data subsystem is example, introduces the construction method of process data subsystem.
The first step dynamically sets up the various data models of spinning process data subsystem.Described data model forms the database table for storing various process data and knowledge of spinning process data subsystem.The concrete grammar dynamically setting up data model be before dependence data model Field Template described in detail set up the mode of data model.
Wherein, according to the process data of spinning process and the store and management demand of knowledge, the data model built for it comprises technics data model, process data model, technological parameter data model, material parameter data model, equipment technical parameters data model, frock technical parameter data model, tool technique supplemental characteristic model, typical process data model, process knowledge data model and technological standards canonical data model.By above-mentioned data model, form corresponding database table, the various process data of spinning process process and the storage of knowledge can be realized.
Second step is the various data display pages dynamically configuring described spinning process data subsystem in the mode of data display page dynamic-configuration, and the data model for setting up in the described data display page configuration first step, thus the incidence relation set up between the described data display page and described data model, and then be convenient to show on the described data display page the various process data and knowledge that store in described database table.Dynamically the concrete grammar of configuration data displayed page is described in detail before being creates application, is process data subsystem configures tab page face and the mode setting up the incidence relation between tab page face and application for data model.
3rd step dynamically defines the various data auditing flows of described spinning process data subsystem in the mode of data auditing flow Dynamic Definition.This data auditing flow is used for auditing the operation of various process data and knowledge.The dynamically mode of the dependence data auditing flow definition template that the concrete grammar of definition data auditing flow is described in detail before being.
4th step is the data auditing flow for defining in described 3rd step of described data model configuration, thus sets up the incidence relation between described data model and described data auditing flow, so that audit the operation of described various process data and knowledge.The mode of the dependence relation template that the concrete grammar setting up the incidence relation of data model and data auditing flow is described in detail before being.
5th step is the integrated interface dynamically configuring described spinning process data subsystem in the mode of integrated interface dynamic-configuration, and other system can call process data and the knowledge of described spinning process data subsystem by described integrated interface.The concrete grammar dynamically configuring integrated interface be before the mode of dependence integrated interface template described in detail and middle table.By this integrated interface, can realize described spinning process data subsystem and other system, such as CAE, CAM system etc. is integrated.
A complete spinning process data subsystem can be built by above step.After having built described spinning process data subsystem, adopt identical method and step to continue to build sheet metal process data subsystem, multiple material process data subsystem, process for machining data subsystem, welding technology data subsystem, process of surface treatment data subsystem, Technology for Heating Processing data subsystem, Forging Technology data subsystem, casting technique data subsystem, electric machining process data subsystem and assembly technology data subsystem etc., thus realize the structure of process resource data management system.
The content of embodiment is understood for the ease of those skilled in the art and uses the present invention and describe, and does not form restriction the present invention being protected to content.Those skilled in the art, after having read content of the present invention, can carry out suitable amendment to the present invention.Protection content of the present invention is as the criterion with the content of claim.When not departing from flesh and blood and the protection domain of claim, the various amendments carried out the present invention, change and replacement etc. are all within protection scope of the present invention.