CN104480958A - 一种桥梁预制承台及桥梁建造方法 - Google Patents
一种桥梁预制承台及桥梁建造方法 Download PDFInfo
- Publication number
- CN104480958A CN104480958A CN201410771769.3A CN201410771769A CN104480958A CN 104480958 A CN104480958 A CN 104480958A CN 201410771769 A CN201410771769 A CN 201410771769A CN 104480958 A CN104480958 A CN 104480958A
- Authority
- CN
- China
- Prior art keywords
- cushion cap
- bridge
- bridge prefabrication
- prefabrication cushion
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
Abstract
本发明公开了一种桥梁预制承台,所述桥梁预制承台在与桩基对应的位置处留有后浇孔,后浇孔侧壁设有抗剪槽;所述桥梁预制承台的底板处设置有预留槽,槽内植入止水胶囊,加压止水后能在所述后浇孔内形成干作业环境;以及所述后浇孔内设置有主筋,用于当将所述桥梁预制承台与桩基焊接固定时,将所述主筋接长、绑扎构造钢筋并浇筑混凝土,以使所述桥梁预制承台与桩基有效连接。本发明用以实现在海洋环境中以埋床法快速施工桥梁预制承台,可以将阻水面积大的承台结构埋入海床减少阻水率,同时在岸上预制主要受力结构确保施工质量,避免采用海上围堰,减少了施工费用,缩短了施工周期,保证了施工安全。
Description
技术领域
本发明涉及桥梁建造领域,更具体地涉及一种桥梁预制承台及桥梁建造方法,适用于海洋环境快速施工埋床法桥梁预制承台结构,实现桩基与预制承台的有效连接。
背景技术
随着国家经济和社会的不断发展,越来越多的海洋环境的桥梁建设项目得到实施,但由于外海建设环境复杂,条件恶劣,建设费用高,导致桥梁建设施工难度大。在此背景下,为了避免水压对过水断面的过分压缩,需要将海中桥梁承台埋入海床,由此埋床法应运而生。采用埋床法桥梁预制承台,可以将阻水面积大的承台结构埋入海床减少阻水率,同时在岸上预制主要受力结构确保施工质量。现场通过止水装置形成干作业环境,有效连接预制承台与桩基,实施主筋接长、绑扎构造钢筋,浇筑连接部位的混凝土,保证了二者有效连接。
由于埋床法需要通过止水装置形成干作业环境,在外海恶劣的施工环境下,有可能大风大浪,导致维持干作业环境非常困难,因此,如何快速施工埋床法预制承台及其与桩基之间的连接构造成为迫切需要解决的技术难题。
发明内容
针对上述技术问题,本发明的主要目的之一在于提供一种桥梁预制承台及其建造方法,以便快速建设预制承台及其与桩基之间的连接构造。
为了实现上述目的,作为本发明的一个方面,本发明提供了一种桥梁预制承台,其特征在于,所述桥梁预制承台在与桩基对应的位置处设有后浇孔,所述后浇孔侧壁设有抗剪槽;以及所述桥梁预制承台的底板处设置有预留槽,槽内设有止水胶囊,当启用所述止水胶囊后,能在所述后浇孔内形成干作业环境。
其中,当启用所述止水胶囊加压后,能在15m水深处有效止水。
其中,所述抗剪槽在浇筑混凝土后,能够提供抗剪能力,抵抗后浇混凝土与所述后浇孔内壁之间的剪力。
其中,所述抗剪槽的形状为梯形、矩形或三角形。
其中,所述后浇孔内设置有主筋,用于当将所述桥梁预制承台与桩基焊接固定时,将所述主筋接长、绑扎构造钢筋并浇筑混凝土,以使所述桥梁预制承台与桩基有效连接。
作为本发明的另一个方面,本发明还提供了一种采用桥梁预制承台的桥梁建造方法,包括以下步骤:
建造所述桥梁的桩基;
待桩基施工完毕后,将如权利要求1至5任意一项所述的桥梁预制承台吊装沉放到位,启用设置在所述桥梁预制承台底板处预设槽内的止水胶囊,在所述桥梁预制承台的后浇孔内形成干作业环境;
焊接固定所述桩基与所述桥梁预制承台,并将所述桥梁预制承台后浇孔内的主筋接长,绑扎构造钢筋,浇筑混凝土。
其中,当启用所述止水胶囊加压后,能在15m水深处有效止水。
其中,在所述桥梁预制承台与桩基对应的位置处设置的后浇孔内的侧壁上设置有抗剪槽。
其中,所述抗剪槽在浇筑混凝土后,能够提供抗剪能力,抵抗后浇混凝土与所述后浇孔内壁之间的剪力。
其中,所述抗剪槽的形状为梯形、矩形或三角形。
基于上述技术方案可知,本发明具有如下优点:采用本发明的桥梁预制承台用于埋床法时,可以将阻水面积大的承台结构埋入海床减少阻水率,同时在岸上预制主要受力结构确保施工质量;现场通过止水装置形成干作业环境,有效连接预制承台与桩基,实施主筋接长、绑扎构造钢筋,浇筑连接部位的混凝土,保证二者有效连接;可以避免采用海上围堰,大大减少施工费用;此外,本发明的桥梁预制承台采用岸上预制,现场安装施工,不仅保证构件施工质量,同时大大缩短施工周期,保证施工安全。
附图说明
图1为本发明的桥梁预制承台的立面示意图;
图2为本发明的桥梁预制承台的A-A局部放大示意图;
图3为本发明的桥梁预制承台的B-B局部放大示意图。
附图标记说明:
1、桥梁预制承台,2、后浇孔,3、抗剪槽,4、预留槽,5、止水胶囊,6、剪力键,7、预埋件,9、桩基。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明白,以下结合具体实施例,并参照附图,对本发明作进一步的详细说明。
本发明提供了一种桥梁预制承台1,在与桩基9对应的位置处设有后浇孔2,后浇孔侧壁设有抗剪槽3。该桥梁预制承台1的底板处设置有预留槽4,槽内植入止水胶囊5,加压止水后可以在该桥梁预制承台1后浇孔2内形成干作业环境。该桥梁预制承台1后浇孔2内设置有主筋,当将该桥梁预制承台1与桩基9之间的剪力键6进行焊接以将两者固定时,可以用于将该桥梁预制承台1后浇孔2内的主筋接长,绑扎构造钢筋,浇筑混凝土。
本发明的上述桥梁预制承台中,止水胶囊,又叫止水气囊,采用本领域通用的产品,但优选当该止水胶囊5加压后,能在15m水深处有效止水。
后浇孔侧壁设置的抗剪槽3,当浇筑混凝土后,能够提供抗剪能力,抵抗后浇混凝土与预制承台后浇孔内壁之间的剪力。该抗剪槽的形状可以为本领域公知的形状,例如梯形、矩形、三角形等。
本发明还提供了一种采用桥梁预制承台的桥梁建造方法,包括以下步骤:
建造所述桥梁的桩基9;
待桩基9施工完毕后,将预制的桥梁预制承台1吊装沉放到位,启用设置在所述桥梁预制承台1底板处预留槽4内的止水胶囊5,在所述桥梁预制承台1的后浇孔2内形成干作业环境;
焊接桩基9与该桥梁预制承台1之间的剪力键6以将两者固定,并将该桥梁预制承台1后浇孔2内的主筋接长,绑扎构造钢筋,浇筑混凝土。
通过接长该桥梁预制承台1预留孔4内的主筋,并在桩基9周围配置构造钢筋,可以实现该桥梁预制承台1与桩基9之间的有效连接。
下面通过具体实施例对本发明做进一步的阐述。
图1所示为本发明的桥梁预制承台1,对应桩基位置设有后浇孔2。
如图3所示,本发明的桥梁预制承台1的后浇孔2侧壁设有抗剪槽3,所述抗剪槽在浇筑混凝土后,能够提供抗剪能力,抵抗后浇混凝土与所述后浇孔内壁之间的剪力。
如图2所示,该桥梁预制承台1底板上,例如底板与桩基钢管壁相对的侧面上设有预留槽4,用于置入止水胶囊5。当桩基施工完成,吊装沉放该桥梁预制承台1时,启用该止水胶囊5加压后可实现15m水深处的止水。抽水后在后浇孔2内实现干作业环境,可以方便下述操作。
如图2所示,该桥梁预制承台1与桩基钢管壁相邻的底板上侧设有剪力键6,通过将该剪力键6与桩基9钢管壁进行焊接,可以将该桥梁预制承台1与桩基固定连接。该桥梁预制承台1与桩基钢管壁相邻的底板上设置有预埋件7和主筋(图中未示出),通过接长该桥梁预制承台1后浇孔2内的主筋,并在桩基9周围配置构造钢筋,然后采用混凝土浇筑后浇孔2内,可以实现该桥梁预制承台1与桩基的有效连接。
以上所述的具体实施例,对本发明的目的、技术方案和有益效果进行了进一步详细说明,应理解的是,以上所述仅为本发明的具体实施例而已,并不用于限制本发明,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (10)
1.一种桥梁预制承台,其特征在于,所述桥梁预制承台在与桩基对应的位置处设有后浇孔,所述后浇孔侧壁设有抗剪槽;以及所述桥梁预制承台的底板处设置有预留槽,槽内设有止水胶囊,当启用所述止水胶囊后,能在所述后浇孔内形成干作业环境。
2.根据权利要求1所述的桥梁预制承台,其中当启用所述止水胶囊加压后,能在15m水深处有效止水。
3.根据权利要求1所述的桥梁预制承台,其中所述抗剪槽在浇筑混凝土后,能够提供抗剪能力,抵抗后浇混凝土与所述后浇孔内壁之间的剪力。
4.根据权利要求3所述的桥梁预制承台,其中所述抗剪槽的形状为梯形、矩形或三角形。
5.根据权利要求1所述的桥梁预制承台,其中所述后浇孔内设置有主筋,用于当将所述桥梁预制承台与桩基焊接固定时,将所述主筋接长、绑扎构造钢筋并浇筑混凝土,以使所述桥梁预制承台与桩基有效连接。
6.一种采用桥梁预制承台的桥梁建造方法,包括以下步骤:
建造所述桥梁的桩基;
待桩基施工完毕后,将如权利要求1至5任意一项所述的桥梁预制承台吊装沉放到位,启用设置在所述桥梁预制承台底板处预设槽内的止水胶囊,在所述桥梁预制承台的后浇孔内形成干作业环境;
焊接固定所述桩基与所述桥梁预制承台,并将所述桥梁预制承台后浇孔内的主筋接长,绑扎构造钢筋,浇筑混凝土。
7.根据权利要求6所述的采用桥梁预制承台的桥梁建造方法,其中当启用所述止水胶囊加压后,能在15m水深处有效止水。
8.根据权利要求6所述的采用桥梁预制承台的桥梁建造方法,其中在所述桥梁预制承台与桩基对应的位置处设置的后浇孔内的侧壁上设置有抗剪槽。
9.根据权利要求6所述的采用桥梁预制承台的桥梁建造方法,其中所述抗剪槽在浇筑混凝土后,能够提供抗剪能力,抵抗后浇混凝土与所述后浇孔内壁之间的剪力。
10.根据权利要求6所述的采用桥梁预制承台的桥梁建造方法,其中所述抗剪槽的形状为梯形、矩形或三角形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410771769.3A CN104480958A (zh) | 2014-12-12 | 2014-12-12 | 一种桥梁预制承台及桥梁建造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410771769.3A CN104480958A (zh) | 2014-12-12 | 2014-12-12 | 一种桥梁预制承台及桥梁建造方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104480958A true CN104480958A (zh) | 2015-04-01 |
Family
ID=52755556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410771769.3A Pending CN104480958A (zh) | 2014-12-12 | 2014-12-12 | 一种桥梁预制承台及桥梁建造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104480958A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735336A (zh) * | 2016-03-14 | 2016-07-06 | 张译元 | 一种采用桥梁预制承台的桥梁建造方法 |
CN106836262A (zh) * | 2017-01-25 | 2017-06-13 | 上海市政工程设计研究总院(集团)有限公司 | 一种装配式桥梁下部结构的施工方法 |
CN106978789A (zh) * | 2017-04-10 | 2017-07-25 | 李彬 | 一种基于河流能量的桥梁对河流阻水影响判别方法 |
CN109403366A (zh) * | 2018-12-13 | 2019-03-01 | 福州大学 | 一种装配式钢管混凝土桩基及其施工方法 |
CN114086588A (zh) * | 2021-11-11 | 2022-02-25 | 东南大学 | 一种深水环境下桩承式预制罩型承台基础及施工方法 |
CN114411455A (zh) * | 2021-11-26 | 2022-04-29 | 同济大学 | 一种全预制拼装有轨电车桩板结构路基及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62260919A (ja) * | 1986-05-07 | 1987-11-13 | Tokyu Constr Co Ltd | 基礎地盤の耐震補強方法 |
CN101962956A (zh) * | 2009-07-22 | 2011-02-02 | 中交公路规划设计院有限公司 | 一种桥梁预制基础及其埋床法 |
CN102767189A (zh) * | 2012-07-31 | 2012-11-07 | 中铁第五勘察设计院集团有限公司 | 一种设置桩承台基础及其施工方法 |
CN102828521A (zh) * | 2012-08-16 | 2012-12-19 | 中交第二航务工程局有限公司 | 一种预制承台水下止水方法 |
CN202925571U (zh) * | 2012-11-06 | 2013-05-08 | 中交第二航务工程局有限公司 | 用于水深超20m海洋环境的环状止水胶囊 |
CN204456160U (zh) * | 2014-12-12 | 2015-07-08 | 中交公路规划设计院有限公司 | 一种桥梁预制承台 |
-
2014
- 2014-12-12 CN CN201410771769.3A patent/CN104480958A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62260919A (ja) * | 1986-05-07 | 1987-11-13 | Tokyu Constr Co Ltd | 基礎地盤の耐震補強方法 |
CN101962956A (zh) * | 2009-07-22 | 2011-02-02 | 中交公路规划设计院有限公司 | 一种桥梁预制基础及其埋床法 |
CN102767189A (zh) * | 2012-07-31 | 2012-11-07 | 中铁第五勘察设计院集团有限公司 | 一种设置桩承台基础及其施工方法 |
CN102828521A (zh) * | 2012-08-16 | 2012-12-19 | 中交第二航务工程局有限公司 | 一种预制承台水下止水方法 |
CN202925571U (zh) * | 2012-11-06 | 2013-05-08 | 中交第二航务工程局有限公司 | 用于水深超20m海洋环境的环状止水胶囊 |
CN204456160U (zh) * | 2014-12-12 | 2015-07-08 | 中交公路规划设计院有限公司 | 一种桥梁预制承台 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735336A (zh) * | 2016-03-14 | 2016-07-06 | 张译元 | 一种采用桥梁预制承台的桥梁建造方法 |
CN106836262A (zh) * | 2017-01-25 | 2017-06-13 | 上海市政工程设计研究总院(集团)有限公司 | 一种装配式桥梁下部结构的施工方法 |
CN106978789A (zh) * | 2017-04-10 | 2017-07-25 | 李彬 | 一种基于河流能量的桥梁对河流阻水影响判别方法 |
CN109403366A (zh) * | 2018-12-13 | 2019-03-01 | 福州大学 | 一种装配式钢管混凝土桩基及其施工方法 |
CN109403366B (zh) * | 2018-12-13 | 2024-01-16 | 福州大学 | 一种装配式钢管混凝土桩基及其施工方法 |
CN114086588A (zh) * | 2021-11-11 | 2022-02-25 | 东南大学 | 一种深水环境下桩承式预制罩型承台基础及施工方法 |
CN114411455A (zh) * | 2021-11-26 | 2022-04-29 | 同济大学 | 一种全预制拼装有轨电车桩板结构路基及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480958A (zh) | 一种桥梁预制承台及桥梁建造方法 | |
CN104018436B (zh) | 预制箱涵系统及其安装方法 | |
CN107142929A (zh) | 海上非打入型大直径单桩基础结构及其施工方法 | |
CN103321241B (zh) | 深水开敞式组合基础码头及其施工方法 | |
CN204456160U (zh) | 一种桥梁预制承台 | |
CN206376287U (zh) | 地铁车站主体与附属结构接口处的抗浮结构 | |
CN103161172B (zh) | 电梯井底降水施工方法 | |
CN206298900U (zh) | 一种地下连续墙预埋式钢围檩堵头体系 | |
CN202787334U (zh) | 一种隧道施工中深井管的封闭结构 | |
CN103572770B (zh) | 一种桩箱水工结构物及其建造方法 | |
CN106223355A (zh) | 一种深水高桩承台抱箍法有底钢套箱的装置及施工方法 | |
CN105971022A (zh) | 带有凸起的混凝土工程变形缝垂直止水型腔模的施工方法 | |
CN203684215U (zh) | 一种碳纤维布袋现浇反拱曲面组合异形桩 | |
CN107288141B (zh) | 一种逆作法无接缝柔性防水施工工艺 | |
CN201158821Y (zh) | 一种钢套箱围堰 | |
CN207143965U (zh) | 钢板混凝土组合式抗浮止水结构 | |
CN103741682B (zh) | 一种碳纤维布袋现浇反拱曲面组合异形桩的施工方法 | |
CN107964975B (zh) | 钢管复合桩与承台的pbl剪力键连接结构的施工方法 | |
CN203144967U (zh) | 高土石围堰防渗土料与混凝土防渗墙的连接结构 | |
CN206408654U (zh) | 一种地下工程预留变形缝连接接口结构 | |
CN206581282U (zh) | 地下连续墙ω型铣接头 | |
CN205000296U (zh) | 一种应用高趾墙的混凝土面板结构 | |
CN209585028U (zh) | 一种沉井施断桩 | |
CN210766791U (zh) | 一种抗剪力基坑水下封底混凝土结构 | |
CN107268602A (zh) | 一种咬合桩的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150401 |
|
RJ01 | Rejection of invention patent application after publication |