- CN104466970A CN104466970A CN201410806476.4A CN201410806476A CN104466970A CN 104466970 A CN104466970 A CN 104466970A CN 201410806476 A CN201410806476 A CN 201410806476A CN 104466970 A CN104466970 A CN 104466970A
- Authority
- CN
- China
- Prior art keywords
- load
- real
- operation data
- time operation
- cut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 239000011159 matrix material Substances 0.000 claims description 9
- 238000005516 engineering process Methods 0.000 claims description 5
- 230000003993 interaction Effects 0.000 claims description 4
- 239000013307 optical fiber Substances 0.000 claims description 4
- 230000009471 action Effects 0.000 description 8
- 230000005540 biological transmission Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/248—UPS systems or standby or emergency generators
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Control Of Electrical Variables (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
数量较小负荷 | 数量中等负荷 | 数量较大负荷 | |
高危负荷 | 优先级10 | 优先级11 | 优先级12 |
重要负荷 | 优先级7 | 优先级8 | 优先级9 |
次重要负荷 | 优先级6 | 优先级5 | 优先级4 |
一般负荷 | 优先级3 | 优先级2 | 优先级1 |
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410806476.4A CN104466970B (zh) | 2014-12-22 | 2014-12-22 | 一种备自投动态联切控制方法、装置和系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410806476.4A CN104466970B (zh) | 2014-12-22 | 2014-12-22 | 一种备自投动态联切控制方法、装置和系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104466970A true CN104466970A (zh) | 2015-03-25 |
CN104466970B CN104466970B (zh) | 2017-08-08 |
Family
ID=52912564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410806476.4A Active CN104466970B (zh) | 2014-12-22 | 2014-12-22 | 一种备自投动态联切控制方法、装置和系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104466970B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105552919A (zh) * | 2016-03-02 | 2016-05-04 | 东方电子股份有限公司 | 电力系统备自投动作后主变过载处理方法 |
CN108616160A (zh) * | 2017-12-22 | 2018-10-02 | 重庆光可巡科技有限公司 | 带有检测电路的远距离供电电路系统 |
CN111555279A (zh) * | 2020-05-26 | 2020-08-18 | 天津市中力神盾电子科技有限公司 | 基于智能卸载三级负荷保持用电连续性的方法 |
CN112419088A (zh) * | 2020-11-24 | 2021-02-26 | 深圳供电局有限公司 | 切负荷方法、系统、装置、计算机设备和存储介质 |
CN113241773A (zh) * | 2021-05-24 | 2021-08-10 | 广东电网有限责任公司 | 一种居民台区配电运行控制方法及装置 |
CN114094594A (zh) * | 2021-11-24 | 2022-02-25 | 国网河北省电力有限公司经济技术研究院 | 一种变电站直流负荷分级控制方法、装置及终端设备 |
CN114583822A (zh) * | 2022-03-18 | 2022-06-03 | 国网伊犁伊河供电有限责任公司 | 结合电网供电风险的备自投装置过负荷跳闸方法及装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040178770A1 (en) * | 2001-05-25 | 2004-09-16 | Philippe Gagnon | Back-up power system |
CN101673965A (zh) * | 2009-10-14 | 2010-03-17 | 华南理工大学 | 一种电力系统广域备用电源自动投切控制方法 |
CN103607038A (zh) * | 2013-11-25 | 2014-02-26 | 广东电网公司电力调度控制中心 | 实现串供电网多级备自投的方法 |
CN103683480A (zh) * | 2013-12-27 | 2014-03-26 | 南京南瑞继保电气有限公司 | 一种站域备自投协同控制方法 |
CN204316092U (zh) * | 2014-12-22 | 2015-05-06 | 国家电网公司 | 一种备自投动态联切控制装置和系统 |
-
2014
- 2014-12-22 CN CN201410806476.4A patent/CN104466970B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040178770A1 (en) * | 2001-05-25 | 2004-09-16 | Philippe Gagnon | Back-up power system |
CN101673965A (zh) * | 2009-10-14 | 2010-03-17 | 华南理工大学 | 一种电力系统广域备用电源自动投切控制方法 |
CN103607038A (zh) * | 2013-11-25 | 2014-02-26 | 广东电网公司电力调度控制中心 | 实现串供电网多级备自投的方法 |
CN103683480A (zh) * | 2013-12-27 | 2014-03-26 | 南京南瑞继保电气有限公司 | 一种站域备自投协同控制方法 |
CN204316092U (zh) * | 2014-12-22 | 2015-05-06 | 国家电网公司 | 一种备自投动态联切控制装置和系统 |
Non-Patent Citations (1)
Title |
---|
刘震宇等: "有关备用电源自投装置的闭锁与可靠性问题的探讨", 《承德石油高等专科学校学报》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105552919A (zh) * | 2016-03-02 | 2016-05-04 | 东方电子股份有限公司 | 电力系统备自投动作后主变过载处理方法 |
CN105552919B (zh) * | 2016-03-02 | 2018-02-02 | 东方电子股份有限公司 | 电力系统备自投动作后主变过载处理方法 |
CN108616160A (zh) * | 2017-12-22 | 2018-10-02 | 重庆光可巡科技有限公司 | 带有检测电路的远距离供电电路系统 |
CN111555279A (zh) * | 2020-05-26 | 2020-08-18 | 天津市中力神盾电子科技有限公司 | 基于智能卸载三级负荷保持用电连续性的方法 |
CN112419088A (zh) * | 2020-11-24 | 2021-02-26 | 深圳供电局有限公司 | 切负荷方法、系统、装置、计算机设备和存储介质 |
CN112419088B (zh) * | 2020-11-24 | 2024-02-27 | 深圳供电局有限公司 | 切负荷方法、系统、装置、计算机设备和存储介质 |
CN113241773A (zh) * | 2021-05-24 | 2021-08-10 | 广东电网有限责任公司 | 一种居民台区配电运行控制方法及装置 |
CN113241773B (zh) * | 2021-05-24 | 2022-07-12 | 广东电网有限责任公司 | 一种居民台区配电运行控制方法及装置 |
CN114094594A (zh) * | 2021-11-24 | 2022-02-25 | 国网河北省电力有限公司经济技术研究院 | 一种变电站直流负荷分级控制方法、装置及终端设备 |
CN114094594B (zh) * | 2021-11-24 | 2024-04-19 | 国网河北省电力有限公司经济技术研究院 | 一种变电站直流负荷分级控制方法、装置及终端设备 |
CN114583822A (zh) * | 2022-03-18 | 2022-06-03 | 国网伊犁伊河供电有限责任公司 | 结合电网供电风险的备自投装置过负荷跳闸方法及装置 |
CN114583822B (zh) * | 2022-03-18 | 2024-08-20 | 国网伊犁伊河供电有限责任公司 | 结合电网供电风险的备自投装置过负荷跳闸方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104466970B (zh) | 2017-08-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104466970B (zh) | 一种备自投动态联切控制方法、装置和系统 | |
US20230291209A1 (en) | Method and apparatus for control of a commodity distribution system | |
CN109787224B (zh) | 一种防止连锁过载的地区电网负荷转供策略生成方法 | |
CN102761123A (zh) | 一种基于安装故障限流器的多直流落点系统分区方法 | |
CN112887207B (zh) | 用于电力ip-光通信网络的业务路由分配方法及装置 | |
CN113013871A (zh) | 一种配电网设备故障、检修时的负荷转供方法 | |
CN105743135A (zh) | 一种受端电网特高压交直流最优受电比例评估方法 | |
Shahin | Smart Grid self-healing implementation for underground distribution networks | |
CN204316092U (zh) | 一种备自投动态联切控制装置和系统 | |
CN104600833A (zh) | 备自投投退组合确定方法和系统 | |
CN110838760B (zh) | 一种电网故障数据收集方法及装置 | |
CN105391030A (zh) | 基于网络拓扑结构负荷逐渐加载聚合的计划孤岛划分方法 | |
CN113381434B (zh) | 一种柔性直流电网运行方式优化方法及装置 | |
CN115833397A (zh) | 变电站断路器的自动合闸控制方法、测控设备及存储介质 | |
CN106533958B (zh) | 一种跨网络隔离装置的异构系统的数据一致性校验方法 | |
CN110707759B (zh) | 一种风电高比例电网安全稳定控制方法 | |
Darabi et al. | On circuit breaker failure protection in 61850-based substations | |
CN110460070B (zh) | 一种超大规模电网的需求侧频率紧急控制的敏捷反应方法 | |
CN103050950A (zh) | 一种适用于配电网的差动保护方法 | |
CN107342592B (zh) | 一种基于故障触发的紧急协调电负荷平衡和快速切负荷措施的安全稳定控制方法 | |
CN105227677A (zh) | 基于负载均衡的电网故障信息处理方法 | |
CN109347209A (zh) | 一种变电站负荷控制方法、控制主站及系统 | |
CN106451463B (zh) | 一种分析环网系统中热稳断面的方法和装置 | |
CN104410152B (zh) | 一种变电站备自投控制系统和方法 | |
CN212991964U (zh) | 同名单相故障零序保护拒动的装置及应用其的保护系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Zhenyu Inventor after: Pan Liwei Inventor after: Wang Xueshan Inventor after: Yang Manman Inventor after: Chu Weina Inventor after: Sun Wenyu Inventor after: Bi Yuanyuan Inventor after: Zhang Baiyang Inventor after: Yuan Shaojun Inventor after: Fan Heming Inventor after: Bai Xuesong Inventor after: Yu Liqiang Inventor after: Zhu Yajun Inventor after: Chen Guangyu Inventor after: Gao Mingliang Inventor after: Wang Die Inventor before: Liu Zhenyu Inventor before: Yang Manman Inventor before: Chu Weina Inventor before: Yuan Shaojun Inventor before: Fan Heming Inventor before: Yu Liqiang Inventor before: Zhu Yajun Inventor before: Gao Mingliang Inventor before: Wang Xueshan Inventor before: Pan Liwei Inventor before: Chen Guangyu |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |