CN103683480A - 一种站域备自投协同控制方法 - Google Patents

一种站域备自投协同控制方法 Download PDF

Info

Publication number
CN103683480A
CN103683480A CN201310732649.8A CN201310732649A CN103683480A CN 103683480 A CN103683480 A CN 103683480A CN 201310732649 A CN201310732649 A CN 201310732649A CN 103683480 A CN103683480 A CN 103683480A
Authority
CN
China
Prior art keywords
pressure side
low
auto restart
prepared auto
automatic switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310732649.8A
Other languages
English (en)
Inventor
金震
辛培哲
董凯达
宋璇坤
余群兵
张春合
严伟
华秀娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
NR Electric Co Ltd
State Grid Liaoning Electric Power Co Ltd
State Grid Economic and Technological Research Institute
Original Assignee
NR Electric Co Ltd
State Grid Economic and Technological Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, State Grid Economic and Technological Research Institute filed Critical NR Electric Co Ltd
Priority to CN201310732649.8A priority Critical patent/CN103683480A/zh
Publication of CN103683480A publication Critical patent/CN103683480A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开一种站域备自投协同控制方法,包括如下内容:高压侧备自投启动,同时暂停低压侧备自投,如果高压侧备自投动作成功,那么低压侧备自投由于低压侧母线电压恢复不会再动作;如果高压侧备自投动作失败,再加速低压侧备自投动作;站内高压侧不失电而低压侧失电时,加速低压侧备自投动作。此种控制方法可进行变电站高低压侧上下两级备自投相关信息交互,优化和提升全站的备自投功能,加快故障发生时的恢复供电时间。

Description

一种站域备自投协同控制方法
技术领域
本发明涉及一种电力系统输配电的自动投切,特别涉及变电站站域备自投的控制方法。
背景技术
近年来,备自投装置在220kV及以下电压等级的变电站中得到广泛应用,在提高供电可靠性方面发挥了重要作用。
变电站的高压侧备自投一般有进线互投和分段自投,低压侧备自投一般有主变互投和分段自投。通常情况下在高压侧配置一台备自投装置,在低压侧配置另外一台备自投装置,这两台备自投装置相互独立,缺乏联系,而且这两台装置往往不是同一个厂家生产的。这会导致如下问题:
(1)高压侧线路故障时,低压侧备自投抢先于高压侧备自投动作,违背了备自投的哪级故障哪级恢复的原则。
当高压侧线路发生单相永久性故障时,线路保护的重合闸会导致非故障相间电压短暂恢复。由于高、低压侧备自投装置相互独立,缺乏联系,且装置内部跳闸计时方式没有技术限定,对于这种电压短暂恢复的情况,如果低压侧备自投的跳闸计时器保持当前计时值,而高压侧备自投的跳闸计时器清零,那么当线路保护重合闸动作合开关于永久性故障并且加速跳开后,低压侧备自投会接着当前计时值继续计时,而高压侧备自投是从零开始计时,低压侧备自投计时会先到达整定时间而抢先于高压侧备自投动作。
(2)低压侧备自投动作迟缓。
在高压侧线路发生三相故障且高压侧备自投动作失败的情况下,或者当高压侧正常不失电而低压侧失电时,由于高、低压侧备自投装置相互独立,缺乏联系,低压侧备自投不知道高压侧备自投动作失败或者不知道高压侧正常不失电,仍按原常规动作时间动作,丧失了快速动作特性。
基于以上分析,需要对现有的备自投方式进行改进,本案由此产生。
发明内容
本发明的目的,在于提供一种站域备自投协同控制方法,其可进行变电站高低压侧上下两级备自投相关信息交互,优化和提升全站的备自投功能,加快故障发生时的恢复供电时间。
为了达成上述目的,本发明的解决方案是:
一种站域备自投协同控制方法,包括如下步骤:
(1)高压侧备自投启动,同时暂停低压侧备自投,如果高压侧备自投动作成功,那么低压侧备自投由于低压侧母线电压恢复不会再动作;如果高压侧备自投动作失败,再加速低压侧备自投动作;
(2)站内高压侧不失电而低压侧失电时,加速低压侧备自投动作。
上述步骤(1)中,首先判断高压侧是否失电,若失电则启动高压侧备自投,若未失电则继续判断低压侧是否失电,若低压侧未失电则重新判断高压侧是否失电,若低压侧失电则转步骤(2),加速低压侧备自投动作。
上述步骤(1)中,判定高压侧失电后,继续判断高压侧备自投是否启动,若启动则继续判断高压侧备自投动作是否成功,若未启动则判断高压侧备自投是否曾经动作,若曾经动作则加速低压侧备自投动作,若未曾经动作则控制低压侧备自投经整定时间后动作。
采用上述方案后,本发明综合统筹考虑变电站高低压侧上下两级备自投之间的关系,避免相互独立的两台高、低压侧备自投装置在高压侧线路发生单相永久性故障时导致低压侧备自投抢先高压侧备自投动作的问题,优化和提升全站的备自投功能,并且通过加速低压侧备自投的技术,能够缩短故障停电时间,加快恢复供电。本发明既可应用于智能变电站的站域保护装置中的备自投功能,也可应用于由变电站监控系统实现的备自投功能。
附图说明
图1是典型110kV变电站主接线图;
图2是本发明的流程图。
具体实施方式
以下将结合附图,对本发明的技术方案及有益效果进行详细说明。
本发明提供一种站域备自投协同控制方法,通过综合统筹考虑全站(如图1所示)高低压侧上下两级备自投之间的关系,进行两级备自投相关信息交互,优化和提升全站的备自投功能,其流程图如图2所示,包括如下步骤:
(1)判断高压侧是否失电,未失电则进入步骤(2),若因高压侧线路故障或上级变电站失电导致本站高压侧失电时,则启动高压侧备自投,同时暂停低压侧备自投,直到高压侧备自投动作之后才解除该暂停命令;再判断高压侧备自投是否启动,若未启动则进入步骤(3),启动则继续判断高压侧备自投动作是否成功,动作失败则进入步骤(4),成功则低压侧电压就会恢复,低压侧备自投不会再动作,完成控制流程;
(2)判断低压侧是否失电,若未失电则返回步骤(1),而当本站的主变故障时,此时高压侧电压完好不失电,而低压侧会失电,这种情况下则加速低压侧备自投动作,这样就能缩短停电时间,加快恢复供电,完成控制流程;
(3)判断高压侧备自投是否曾经动作,若曾经动作则加速低压侧备自投动作,若未曾经动作则只能由低压侧备自投来实现备用电源的自动投入,控制低压侧备自投经整定时间后才能动作,从而与上级变电站的备自投装置配合,完成控制流程;
(4)加速低压侧备自投动作,完成控制流程。
本发明通过软件编程既可应用于智能变电站的站域保护控制装置的备自投功能,也可应用于由变电站监控系统实现的备自投功能,只需要修改软件,不会增加硬件成本开销。本发明亦可应用于变电站高、低压侧分别配置的两台备自投装置,除了需要软件编程之外,还需要对这两台备自投装置稍作改造,增加外部接线联系,即高压侧备自投装置把暂停低压侧备自投的命令以硬接点方式输出,而低压侧备自投装置以开入方式接收该命令,这样就可以优化原来的备自投功能。
以上实施例仅为说明本发明的技术思想,不能以此限定本发明的保护范围,凡是按照本发明提出的技术思想,在技术方案基础上所做的任何改动,均落入本发明保护范围之内。

Claims (3)

1.一种站域备自投协同控制方法,其特征在于包括如下步骤:
(1)高压侧备自投启动,同时暂停低压侧备自投,如果高压侧备自投动作成功,那么低压侧备自投由于低压侧母线电压恢复不会再动作;如果高压侧备自投动作失败,再加速低压侧备自投动作;
(2)站内高压侧不失电而低压侧失电时,加速低压侧备自投动作。
2.如权利要求1所述的一种站域备自投协同控制方法,其特征在于:所述步骤(1)中,首先判断高压侧是否失电,若失电则启动高压侧备自投,若未失电则继续判断低压侧是否失电,若低压侧未失电则重新判断高压侧是否失电,若低压侧失电则转步骤(2),加速低压侧备自投动作。
3.如权利要求2所述的一种站域备自投协同控制方法,其特征在于:所述步骤(1)中,判定高压侧失电后,继续判断高压侧备自投是否启动,若启动则继续判断高压侧备自投动作是否成功,若未启动则判断高压侧备自投是否曾经动作,若曾经动作则加速低压侧备自投动作,若未曾经动作则控制低压侧备自投经整定时间后动作。
CN201310732649.8A 2013-12-27 2013-12-27 一种站域备自投协同控制方法 Pending CN103683480A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310732649.8A CN103683480A (zh) 2013-12-27 2013-12-27 一种站域备自投协同控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310732649.8A CN103683480A (zh) 2013-12-27 2013-12-27 一种站域备自投协同控制方法

Publications (1)

Publication Number Publication Date
CN103683480A true CN103683480A (zh) 2014-03-26

Family

ID=50320125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310732649.8A Pending CN103683480A (zh) 2013-12-27 2013-12-27 一种站域备自投协同控制方法

Country Status (1)

Country Link
CN (1) CN103683480A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104466970A (zh) * 2014-12-22 2015-03-25 国家电网公司 一种备自投动态联切控制方法、装置和系统
CN105515169A (zh) * 2014-09-26 2016-04-20 南京南瑞继保电气有限公司 一种多层次备自投系统、优先级配合方法及构建方法
CN106410954A (zh) * 2016-11-03 2017-02-15 广州供电局有限公司 区域备自投的控制方法、装置和备自投控制方法、系统
CN107834690A (zh) * 2017-10-20 2018-03-23 中国石油化工集团公司 上、下级快速切换装置联动方法和联动系统
CN112751333A (zh) * 2019-10-30 2021-05-04 株洲中车机电科技有限公司 一种轨道交通用智能低压开关柜及控制方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101673965A (zh) * 2009-10-14 2010-03-17 华南理工大学 一种电力系统广域备用电源自动投切控制方法
CN101951016A (zh) * 2010-04-22 2011-01-19 广东电网公司 基于广域信息的备用电源自动投入自适应建模和控制方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101673965A (zh) * 2009-10-14 2010-03-17 华南理工大学 一种电力系统广域备用电源自动投切控制方法
CN101951016A (zh) * 2010-04-22 2011-01-19 广东电网公司 基于广域信息的备用电源自动投入自适应建模和控制方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曾铁军等: "《2008中国电力系统保护与控制学术研讨会论文集》", 31 December 2008 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105515169A (zh) * 2014-09-26 2016-04-20 南京南瑞继保电气有限公司 一种多层次备自投系统、优先级配合方法及构建方法
CN104466970A (zh) * 2014-12-22 2015-03-25 国家电网公司 一种备自投动态联切控制方法、装置和系统
CN106410954A (zh) * 2016-11-03 2017-02-15 广州供电局有限公司 区域备自投的控制方法、装置和备自投控制方法、系统
CN106410954B (zh) * 2016-11-03 2019-10-18 广州供电局有限公司 区域备自投的控制方法、装置和备自投控制方法、系统
CN107834690A (zh) * 2017-10-20 2018-03-23 中国石油化工集团公司 上、下级快速切换装置联动方法和联动系统
CN107834690B (zh) * 2017-10-20 2020-09-01 中国石油化工集团公司 上、下级快速切换装置联动方法和联动系统
CN112751333A (zh) * 2019-10-30 2021-05-04 株洲中车机电科技有限公司 一种轨道交通用智能低压开关柜及控制方法

Similar Documents

Publication Publication Date Title
CN103683480A (zh) 一种站域备自投协同控制方法
CN102788933A (zh) 利用自动拉路控制器查找电网小电流单相接地故障的方法
CN103916053A (zh) 一种电动机再起动控制器
CN104333123A (zh) 门禁系统的门禁设备
CN104953705A (zh) 基于不完整一次主接线的内桥备用电源自动投入控制方法
CN104242455A (zh) 适应DG接入的110kV变电站保护与控制动作配合策略
CN104898018A (zh) 配电网单相接地故障自动试拉检测与控制装置
CN104578386A (zh) 变压器低压侧分段路器备自投电路及其自投方法
CN104052148A (zh) 一种适用于柴油发电机的自投自复方法和装置
CN104037762A (zh) 一种配电线路分段开关控制方法
CN104485732A (zh) 变电站的备用电源投入控制方法
CN103532221A (zh) 一种自适应330kV变电站接线及运行方式的线路备自投实现方法
CN206195453U (zh) 一种百万机组无高压备用电源的快速恢复启动系统
CN105356585B (zh) 断路器合闸闭锁回路
CN108347056B (zh) 交直流混合微电网控制方法
CN107508278B (zh) 一种不需要线路电压的备投方法
CN107240958B (zh) 一种用于网络备投的开关偷跳处理方法
CN105425103A (zh) 一种特高压直流输电双极线路故障重启协调功能改进方法及系统
CN110581642A (zh) 一种变流器软启动电路及方法
CN105337404A (zh) 用于变电站的进线备自投控制方法、装置及系统
CN104863835A (zh) 一种空压机控制方法及系统
CN104124749B (zh) 备自投与配电自动化配合的双环网配电线路故障处理方法
CN111244907B (zh) 一种变电站内断路器的开断时序控制方法及系统
CN103701202A (zh) 串供变电站备用电源自投供电的方法与系统
CN204794328U (zh) 三相电双电源自动切换装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NANRUI RELAY PROTECTION ELECTRICITY CO LTD, NANJIN

Free format text: FORMER OWNER: STATE POWER ECONOMIC RESEARCH INSTITUTE

Effective date: 20150128

Owner name: STATE GRID LIAONING ELECTRIC POWER CO., LTD.

Free format text: FORMER OWNER: NANRUI RELAY PROTECTION ELECTRICITY CO LTD, NANJING

Effective date: 20150128

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jin Zhen

Inventor after: Hua Xiujuan

Inventor after: Song Xuankun

Inventor after: Zhang Youming

Inventor after: Dong Kaida

Inventor after: Zhang Zhongrui

Inventor after: Xin Peizhe

Inventor after: Yu Qunbing

Inventor after: Zhang Chunhe

Inventor after: Yan Wei

Inventor before: Jin Zhen

Inventor before: Xin Peizhe

Inventor before: Dong Kaida

Inventor before: Song Xuankun

Inventor before: Yu Qunbing

Inventor before: Zhang Chunhe

Inventor before: Yan Wei

Inventor before: Hua Xiujuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIN ZHEN XIN PEIZHE DONG KAIDA SONG XUANKUN YU QUNBING ZHANG CHUNHE YAN WEI HUA XIUJUAN TO: JIN ZHEN SONG XUANKUN ZHANG YOUMING DONG KAIDA ZHANG ZHONGRUI XIN PEIZHE YU QUNBING ZHANG CHUNHE YAN WEI HUA XIUJUAN

Free format text: CORRECT: ADDRESS; FROM: 211100 NANJING, JIANGSU PROVINCE TO: 110006 SHENYANG, LIAONING PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150128

Address after: 110006 No. 18, Ningbo Road, Shenyang, Liaoning

Applicant after: State Grid Liaoning Electric Power Co., Ltd.

Applicant after: Nanrui Relay Protection Electricity Co., Ltd., Nanjing

Applicant after: State Power Economic Research Institute

Applicant after: State Grid Corporation of China

Address before: 211100 Jiangning Province Economic and Technological Development Zone, Jiangsu City, No. Sheng Tai Road, No. 99

Applicant before: Nanrui Relay Protection Electricity Co., Ltd., Nanjing

Applicant before: State Power Economic Research Institute

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326