CN104458418A - Working face coal wall stability control simulation experiment table and application method - Google Patents

Working face coal wall stability control simulation experiment table and application method Download PDF

Info

Publication number
CN104458418A
CN104458418A CN201410769492.0A CN201410769492A CN104458418A CN 104458418 A CN104458418 A CN 104458418A CN 201410769492 A CN201410769492 A CN 201410769492A CN 104458418 A CN104458418 A CN 104458418A
Authority
CN
China
Prior art keywords
experiment table
working face
load
side guard
stability control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410769492.0A
Other languages
Chinese (zh)
Other versions
CN104458418B (en
Inventor
王家臣
杨胜利
孔德中
张通
田中磊
孙少龙
程占博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201410769492.0A priority Critical patent/CN104458418B/en
Publication of CN104458418A publication Critical patent/CN104458418A/en
Application granted granted Critical
Publication of CN104458418B publication Critical patent/CN104458418B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a working face coal wall stability control simulation experiment table and an application method. The working face coal wall stability control simulation experiment table comprises a base mechanism, a bearing mechanism and a pressurizing mechanism, wherein the base mechanism is provided with a base, a slope adjustment jack, connecting groove holes and a connecting shaft; the bearing mechanism is provided with a bearing platform, a side protection plate, an ear ring, a rear cover, an organic glass baffle, a hydraulic support, reverse connecting groove holes, connecting holes, screw holes and screw rod angle steel; the pressurizing mechanism is provided with a cross beam, a longitudinal beam, a loading jack, a loading plate, a pull rod, pull rod connecting holes and a fastening nut. According to the invention, by the efficient matching of the base mechanism, the bearing mechanism and the pressurizing mechanism, coal wall deformation and damage characteristics with different mining height, different coal body intensity, different hydraulic support working resistance and different roof pressure can be obtained in an experiment, and the relationship of the accurate measurement of the coal wall stability with the mining height, the coal body intensity, the hydraulic support operation resistance and the roof pressure is achieved, the basis for the coal wall spalling prevention and control, stope roof load estimation, three-machine matched model selection and the like is provided, and the safe and efficient mining of a coal mining working face is realized.

Description

A kind of working face wall stability control simulation experiment table and application process
Technical field
The present invention relates to mining engineering and technology field, particularly relate to a kind of working face wall stability control simulation experiment table and application process.
Background technology
In recent years, along with improving constantly of comprehensive mechanization level, mining height workface technology becomes the important development direction of China's thick coal-layer mining gradually.Along with one time, longwall face extraction thickness is increasing, the strength increases of exploitation is high, the raising of mining rate has also caused some new problems, and coal wall caving, face roof-fall accident frequently occur, and becomes restriction large-mining-height working surface safety, the efficient key factor advanced fast.Coal wall caving not only can have influence on normally carrying out of safety in production, also can cause serious threat to the personal safety of workman in stope simultaneously.Therefore, the control of rib stability is the emphasis of Coal Face with Greater Mining Height Surrounding Rock Control.Both at home and abroad the research of rib stability is mostly concentrated on theoretical analysis and numerical simulation and a small amount of two dimensional surface physical model, seldom systematic study is carried out on the lower working face wall stability of each factor impact.Based on above-mentioned situation, in the urgent need to a kind of rib stability control simulation experiment table, reach the relation accurately measured between rib stability and mining height, coal mass strength, hydraulic support working resistance, roof pressure, determine under certain roof pressure and coal mass strength, keep rib stability reasonable mining height, hydraulic support working resistance, for coal wall caving control, the estimation of Stope roof load, three machine multiplication strains etc. provide foundation, realize coal-face safety and high efficiency.
Summary of the invention
The object of the embodiment of the present invention is to propose a kind of working face wall stability control simulation experiment table, pass through foundation means, load carrier, the efficient cooperation of pressing mechanism, different mining height can be obtained in experiment, different coal mass strength, different hydraulic support working resistance, rib deformation and failure characteristics under different roof pressure, reach and accurately measure rib stability and mining height, coal mass strength, hydraulic support working resistance, relation between roof pressure, determine the reasonable mining height keeping rib stability under certain roof pressure and coal mass strength, hydraulic support working resistance, for coal wall caving control, Stope roof load is estimated, three machine multiplication strains etc. provide foundation, realize workplace safety and high efficiency.To achieve these goals, the present invention adopts following technical scheme:
A kind of working face wall stability control simulation experiment table, comprising:
Foundation means, comprises pedestal, oblique adjusting lifting jack, connects slotted eye, coupling shaft, load carrier, comprises plummer, side guard plate, earrings, back cover, organic glass baffle plate, hydraulic support, instead connects slotted eye, connecting hole, screw, screw rod, angle steel, pressing mechanism, comprise crossbeam, longeron, load lifting jack, load plate, pull bar, pull bar connecting hole, clamp nut, described oblique adjusting lifting jack bottom is connected with both sides, pedestal rear portion, top is connected with plummer, described pedestal utilizes connection slotted eye to be tied by coupling shaft and plummer front end hinge with the anti-slotted eye that is connected, described side guard plate is welded with plummer by angle steel, described earrings is welded in side guard plate upper end, described back cover utilizes screw screw rod to be connected on rear side of side guard plate, described organic glass baffle plate utilizes screw screw rod to be connected on front side of side guard plate, described crossbeam welds with side guard plate, described longeron rear end is connected with pull bar upper end by pull bar connecting hole and clamp nut with beam welding front end, described pull bar lower end is connected with plummer front end by connecting hole and clamp nut, just be connected with load plate with longitudinal beam welding lower end in the middle part of described loading lifting jack, described hydraulic support is placed in load plate bottom, plummer front end next-door neighbour's organic glass baffle plate.
Preferably, described loading lifting jack is placed in the middle part of longeron, carries out Self-pressurizing agri by load plate to simulation rib.
Preferably, described load plate material is high strength height rigid steel plates, and its forward edge flushes with in the middle part of side guard plate, and rear portion is concordant with hydraulic support afterbody, and left and right and side guard plate stay certain distance.
Preferably, described side guard plate material high strength height rigid steel plates, its rear end is concordant with plummer, and front end is concordant with in the middle part of plummer.
Preferably, described hydraulic support is made by high-strength stainless steel, experimentally requires to have certain setting load, and shows the working resistance of support by the compression deformation of pillar.
Preferably, described back cover utilizes periphery screw and side guard plate rear end screw to be connected to side guard plate rear end by screw rod, experimentally requires when air-dry empirical model, and dismounting back cover, loads onto back cover during loading.
Preferably, described organic glass baffle plate utilizes organic glass baffle plate periphery screw and side guard plate front end screw to be connected to side guard plate front end by screw rod, can experimentally require to carry out installing, dismantling.
The invention allows for a kind of working face wall stability control simulation experiment table application process, apply above-mentioned experiment table, it comprises following job step:
Carry out safety inspection to each parts of experiment table before a, experiment, get rid of potential safety hazard, regulation experiment platform is to requirement of experiment state;
B, according to requirement of experiment and similar proportion, utilize the material formulation such as sand, gypsum, lime, water simulation coal body material;
C, than the specification of 1:5 ~ 1:20, the simulation coal body material of preparation is put into the space formed by plummer, side guard plate, organic glass baffle plate, load plate according to geometric similarity;
D, to utilize load lifting jack and will simulate the compacting of coal body material by load plate according to requirement of experiment, standing within 12 hours, treat that rib is shaping, dismounting organic glass baffle plate and rear cowl carry out air-dry;
E, after model is air-dry, loads onto back cover and recover the original boundary condition of rib hydraulic support is placed in rib front end, and give certain setting load;
F, utilize and load lifting jack and by load plate, simulation coal body material is pressurizeed step by step, the relation simultaneously between observed and recorded rib deformation and failure characteristics and on-load pressure, hydraulic support working resistance;
G, carry out different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure combination repeat step b to f;
H, test complete, cleaning experiment table, arranges rib deformation and failure characteristics under different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure.
Compared with existing relevant apparatus, tool of the present invention has the following advantages:
The working face wall stability control simulation experiment table that the present invention addresses, oblique adjusting lifting jack can adjustment model angle simulation different coal inclination angle under rib stress; Organic glass baffle plate vertical direction has rule, and carrier-table surface has rule in vertical organic glass baffle plate direction, can respectively experiments of measuring time rib the vertical and amount of moving horizontally; Plummer utilizes load plate to pass through to load lifting jack compacting simulation coal body material, and can give rib different roof pressures when testing, by the efficient cooperation of foundation means, load carrier, pressing mechanism, rib deformation and failure characteristics under different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure can be obtained in experiment, reach the relation accurately measured between rib stability and mining height, coal mass strength, hydraulic support working resistance, roof pressure, ensure the object of coal-face safety and high efficiency.
Accompanying drawing explanation
Fig. 1 is the part diagram of working face wall stability control simulation experiment table in the embodiment of the present invention.
Fig. 2 is the one-piece construction figure of working face wall stability control simulation experiment table in the embodiment of the present invention.
Fig. 3 is the working state figure of working face wall stability control simulation experiment table in the embodiment of the present invention.
Embodiment
Shown in composition graphs 1, Fig. 2, a kind of working face wall stability control simulation experiment table, comprise foundation means, load carrier, pressing mechanism and data collection and analysis mechanism, by the efficient cooperation of each mechanism, rib deformation and failure characteristics under different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure can be measured.
In foundation means, described oblique adjusting lifting jack 12 bottom is connected with both sides, pedestal 11 rear portion, and top is connected with plummer 21, and described pedestal 11 utilizes connection slotted eye 13, the anti-slotted eye 29 that connects is tied by coupling shaft 4 and plummer 21 front end hinge;
In load carrier, described side guard plate 26 is welded with plummer 21 by angle steel 28, described earrings 30 is welded in side guard plate 26 upper end, described back cover 25 utilizes screw 24 screw rod to be connected on rear side of side guard plate 26, described organic glass baffle plate 27 utilizes screw 24 screw rod to be connected on front side of side guard plate 26, and described hydraulic support 23 is placed in load plate 37 bottom, plummer 21 front end next-door neighbour's organic glass baffle plate 27;
In pressing mechanism, described crossbeam 36 welds with side guard plate 26, described longeron 33 rear end and crossbeam 36 are welded front end and are connected with pull bar 32 upper end by pull bar connecting hole 34 and clamp nut 31, described pull bar 32 lower end is connected with plummer 21 front end by connecting hole 22 and clamp nut 31, welds lower end be just connected with load plate 37 in the middle part of described loading lifting jack 35 with longeron 33.
Shown in composition graphs 3, first experimentally require to assemble experiment table successively according to the order of first foundation means then load carrier then pressing mechanism, and check the reliability of each mechanism; Then material sand, gypsum, lime, water mixed puts into lab space by the back cover 25 opened, and controls composite material height by the rule on organic glass baffle plate 27 surface; Then pressing mechanism compacting simulation coal body material; After simulation coal body forming materials, again utilize pressing mechanism to pressurize step by step, the vertical and Horizontal Deformation amount of observational record simultaneously and destructiveness, finally draw corresponding conclusion.
Its experimental procedure is roughly as follows:
Carry out safety inspection to each parts of experiment table before a, experiment, get rid of potential safety hazard, regulation experiment platform is to requirement of experiment state;
B, utilize sand, gypsum, lime, water according to requirement of experiment and similar proportion, preparation simulation coal body material;
C, than the specification of 1:5 ~ 1:20, the simulation coal body material of preparation is put into the space formed by plummer 21, side guard plate 26, organic glass baffle plate 27, back cover 25 according to geometric similarity;
D, utilizing according to requirement of experiment load plate 37 will simulate the compacting of coal body material by loading lifting jack 35, standingly within 12 hours, treating that rib is shaping, dismounting organic glass baffle plate 27 and back cover 25 carry out air-dry;
E, after model is air-dry, close back cover 25, hydraulic support 23 is placed in rib front end, and gives certain setting load;
F, utilize and load lifting jack 35 and by load plate 37, simulation coal body material is pressurizeed step by step, the relation simultaneously between observed and recorded rib deformation and failure characteristics and on-load pressure and hydraulic support 23 working resistance;
G, carry out different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure combination repeat step b to f;
H, test complete, cleaning experiment table, arranges rib deformation and failure characteristics under different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure.
Certainly; more than illustrate and be only preferred embodiment of the present invention; the present invention is not limited to enumerate above-described embodiment; should be noted that; any those of ordinary skill in the art are under the instruction of this instructions; the all equivalent replacement made, obviously form of distortion, within the essential scope all dropping on this instructions, ought to be subject to protection of the present invention.

Claims (8)

1. a working face wall stability control simulation experiment table, is characterized in that: described working face wall stability control simulation experiment table comprises:
Foundation means, comprises pedestal, oblique adjusting lifting jack, connects slotted eye, coupling shaft, load carrier, comprises plummer, side guard plate, earrings, back cover, organic glass baffle plate, hydraulic support, instead connects slotted eye, connecting hole, screw, screw rod, angle steel, pressing mechanism, comprise crossbeam, longeron, load lifting jack, load plate, pull bar, pull bar connecting hole, clamp nut, described oblique adjusting lifting jack bottom is connected with both sides, pedestal rear portion, top is connected with plummer, described pedestal utilizes connection slotted eye to be tied by coupling shaft and plummer front end hinge with the anti-slotted eye that is connected, described side guard plate is welded with plummer by angle steel, described earrings is welded in side guard plate upper end, described back cover utilizes screw screw rod to be connected on rear side of side guard plate, described organic glass baffle plate utilizes screw screw rod to be connected on front side of side guard plate, described crossbeam welds with side guard plate, described longeron rear end is connected with pull bar upper end by pull bar connecting hole and clamp nut with beam welding front end, described pull bar lower end is connected with plummer front end by connecting hole and clamp nut, just be connected with load plate with longitudinal beam welding lower end in the middle part of described loading lifting jack, described hydraulic support is placed in load plate bottom, plummer front end next-door neighbour's organic glass baffle plate.
2. working face wall stability control simulation experiment table according to claim 1, is characterized in that: described loading lifting jack is placed in the middle part of longeron, carries out automatic microcomputer control pressurization by load plate to simulation rib.
3. working face wall stability control simulation experiment table according to claim 1, it is characterized in that: described load plate material is high strength height rigid steel plates, its rear part edge flushes with in the middle part of side guard plate, and anterior concordant with hydraulic support afterbody, left and right and side guard plate stay certain distance.
4. working face wall stability control simulation experiment table according to claim 1, is characterized in that: described side guard plate material high strength height rigid steel plates, its rear end is concordant with plummer, and front end is concordant with in the middle part of plummer.
5. working face wall stability control simulation experiment table according to claim 1, it is characterized in that: described hydraulic support is made by high-strength stainless steel, and experimentally requirement can provide certain setting load, and show the working resistance of support by the compression deformation of pillar.
6. working face wall stability control simulation experiment table according to claim 1, it is characterized in that: described back cover utilizes periphery screw and side guard plate rear end screw to be connected to side guard plate rear end by screw rod, experimentally require when air-dry empirical model, dismounting back cover, loads onto back cover during loading.
7. working face wall stability control simulation experiment table according to claim 1, it is characterized in that: described organic glass baffle plate utilizes organic glass baffle plate periphery screw and side guard plate front end screw to be connected to side guard plate front end by screw rod, can experimentally require to carry out installing, dismantling.
8. a working face wall stability control simulation experiment table application process, is characterized in that, adopts the working face wall stability control simulation experiment table as described in any one of claim 1 to 7, comprises the steps:
Carry out safety inspection to each parts of experiment table before a, experiment, get rid of potential safety hazard, regulation experiment platform is to requirement of experiment state;
B, according to requirement of experiment and similar proportion, utilize the material formulation such as sand, gypsum, lime, water simulation coal body material;
C, than the specification of 1:5 ~ 1:20, the simulation coal body material of preparation is put into the space formed by plummer, side guard plate, organic glass baffle plate, load plate according to geometric similarity;
D, to utilize load lifting jack and will simulate the compacting of coal body material by load plate according to requirement of experiment, standing within 12 hours, treat that rib is shaping, dismounting organic glass baffle plate and rear cowl carry out air-dry;
E, after model is air-dry, loads onto back cover and recover the original boundary condition of rib hydraulic support is placed in rib front end, give certain setting load simultaneously;
F, utilize and load lifting jack and by load plate, simulation coal body material is pressurizeed step by step, the relation simultaneously between observed and recorded rib deformation and failure characteristics and on-load pressure, hydraulic support working resistance;
G, carry out different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure combination repeat step b to f;
H, test complete, cleaning experiment table, arranges rib deformation and failure characteristics under different mining height, different coal mass strength, different hydraulic support working resistance, different roof pressure.
CN201410769492.0A 2014-12-15 2014-12-15 A kind of working face wall stability control simulated experiment platform and application process Active CN104458418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410769492.0A CN104458418B (en) 2014-12-15 2014-12-15 A kind of working face wall stability control simulated experiment platform and application process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410769492.0A CN104458418B (en) 2014-12-15 2014-12-15 A kind of working face wall stability control simulated experiment platform and application process

Publications (2)

Publication Number Publication Date
CN104458418A true CN104458418A (en) 2015-03-25
CN104458418B CN104458418B (en) 2017-06-06

Family

ID=52904832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410769492.0A Active CN104458418B (en) 2014-12-15 2014-12-15 A kind of working face wall stability control simulated experiment platform and application process

Country Status (1)

Country Link
CN (1) CN104458418B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105044305A (en) * 2015-06-25 2015-11-11 中国矿业大学(北京) Experimental device for forecasting overlying strata breakage of coal mine
CN105445176A (en) * 2015-12-14 2016-03-30 榆林学院 Apparatus for evaluating concrete endurance under pressure
CN105784405A (en) * 2016-05-06 2016-07-20 徐州工程学院 Targeted false rock wall used for experiment of mine excavation equipment
CN105956304A (en) * 2016-05-05 2016-09-21 西安科技大学 Method and apparatus for determining rated bearing load of bracket for working face with large mining height in coal mine
CN106401624A (en) * 2016-11-01 2017-02-15 贵州大学 Working surface coal wall flexible reinforcement experimental system and reinforcement method
CN108508184A (en) * 2018-04-09 2018-09-07 山东科技大学 A kind of complex conditions seam mining subsidence analog simulation experimental rig and method
CN109060507A (en) * 2018-08-20 2018-12-21 山东科技大学 Un-uniformly distributed, which acts on lower coal bed gas extraction, influences roof deformation test method
CN109100212A (en) * 2018-08-20 2018-12-28 山东科技大学 The test method of working face driving speed influence coal deformation
CN109142027A (en) * 2018-08-20 2019-01-04 山东科技大学 Working face driving causes Coal Outburst Visualization method
CN109142053A (en) * 2018-08-20 2019-01-04 山东科技大学 The movement prominent test method of lower coal body is adopted in coal seam permeability influence
CN109214076A (en) * 2018-08-28 2019-01-15 太原理工大学 A kind of virtual planing method supporting fully-mechanized mining working geographical environment and equipment
CN109946164A (en) * 2019-03-11 2019-06-28 中国矿业大学(北京) A kind of experiment porch and experimental method for simulating the coal petrography catastrophe of coal mine stope
CN111312052A (en) * 2020-04-02 2020-06-19 中国矿业大学(北京) Experiment platform and experiment method for simulating movement of mining rock stratum
CN114360356A (en) * 2021-12-14 2022-04-15 中国矿业大学(北京) Flying refuse experiment table

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1562743A1 (en) * 1988-07-21 1990-05-07 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method and apparatus for testing samples of rocks
CN2133839Y (en) * 1992-08-21 1993-05-19 云南省化工研究院 Detector for strength of particles
US5668325A (en) * 1996-03-27 1997-09-16 Cyprus Amax Coal Company Method and apparatus for determining compressive stress in pillars
RU2190203C1 (en) * 2001-05-07 2002-09-27 Институт горного дела - научно-исследовательское учреждение СО РАН Method and bed to study electromagnetic radiation of solid body in the form of ring deformed to break-down
CN103278384A (en) * 2013-05-10 2013-09-04 天地科技股份有限公司 Testing device and measuring method for anchorage performance of coal and rock mass in coal mine tunnel
CN204241316U (en) * 2014-12-15 2015-04-01 中国矿业大学(北京) A kind of working face wall stability control simulation experiment table

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1562743A1 (en) * 1988-07-21 1990-05-07 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method and apparatus for testing samples of rocks
CN2133839Y (en) * 1992-08-21 1993-05-19 云南省化工研究院 Detector for strength of particles
US5668325A (en) * 1996-03-27 1997-09-16 Cyprus Amax Coal Company Method and apparatus for determining compressive stress in pillars
RU2190203C1 (en) * 2001-05-07 2002-09-27 Институт горного дела - научно-исследовательское учреждение СО РАН Method and bed to study electromagnetic radiation of solid body in the form of ring deformed to break-down
CN103278384A (en) * 2013-05-10 2013-09-04 天地科技股份有限公司 Testing device and measuring method for anchorage performance of coal and rock mass in coal mine tunnel
CN204241316U (en) * 2014-12-15 2015-04-01 中国矿业大学(北京) A kind of working face wall stability control simulation experiment table

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
苏海: "大采高综放工作面煤岩稳定性分析及其控制", 《中国煤炭》 *

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105044305A (en) * 2015-06-25 2015-11-11 中国矿业大学(北京) Experimental device for forecasting overlying strata breakage of coal mine
CN105445176B (en) * 2015-12-14 2019-01-15 榆林学院 One kind having concrete durability evaluation appts in the case of pressure
CN105445176A (en) * 2015-12-14 2016-03-30 榆林学院 Apparatus for evaluating concrete endurance under pressure
CN105956304A (en) * 2016-05-05 2016-09-21 西安科技大学 Method and apparatus for determining rated bearing load of bracket for working face with large mining height in coal mine
CN105956304B (en) * 2016-05-05 2018-12-14 西安科技大学 A kind of specified receiving load determination method of coal mine large-mining-height working surface bracket and device
CN105784405A (en) * 2016-05-06 2016-07-20 徐州工程学院 Targeted false rock wall used for experiment of mine excavation equipment
CN105784405B (en) * 2016-05-06 2018-04-20 徐州工程学院 Target position formula vacation palisades are used in the experiment of mining excavation equipment
CN106401624A (en) * 2016-11-01 2017-02-15 贵州大学 Working surface coal wall flexible reinforcement experimental system and reinforcement method
CN108508184A (en) * 2018-04-09 2018-09-07 山东科技大学 A kind of complex conditions seam mining subsidence analog simulation experimental rig and method
CN108508184B (en) * 2018-04-09 2023-08-18 山东科技大学 Device and method for simulating subsidence of surface of coal seam mining under complex condition
CN109142027B (en) * 2018-08-20 2020-08-04 山东科技大学 Visual test method for coal seam outburst caused by face excavation
CN109100212B (en) * 2018-08-20 2020-08-04 山东科技大学 Test method for influence of working face tunneling speed on coal body deformation
CN109142027A (en) * 2018-08-20 2019-01-04 山东科技大学 Working face driving causes Coal Outburst Visualization method
CN109142053A (en) * 2018-08-20 2019-01-04 山东科技大学 The movement prominent test method of lower coal body is adopted in coal seam permeability influence
CN109060507A (en) * 2018-08-20 2018-12-21 山东科技大学 Un-uniformly distributed, which acts on lower coal bed gas extraction, influences roof deformation test method
CN109142053B (en) * 2018-08-20 2020-08-04 山东科技大学 Coal body outburst test method under coal seam permeability influence mining action
CN109100212A (en) * 2018-08-20 2018-12-28 山东科技大学 The test method of working face driving speed influence coal deformation
CN109214076A (en) * 2018-08-28 2019-01-15 太原理工大学 A kind of virtual planing method supporting fully-mechanized mining working geographical environment and equipment
CN109214076B (en) * 2018-08-28 2022-11-04 太原理工大学 Virtual planning method for supporting geographical environment and equipment of fully mechanized coal mining face
CN109946164A (en) * 2019-03-11 2019-06-28 中国矿业大学(北京) A kind of experiment porch and experimental method for simulating the coal petrography catastrophe of coal mine stope
US11359999B2 (en) * 2019-03-11 2022-06-14 China University Of Mining And Technology, Beijing Experimental platform and experimental method for simulating coal rock disaster of coal mine stope
CN109946164B (en) * 2019-03-11 2020-07-24 中国矿业大学(北京) Experiment platform and experiment method for simulating coal and rock catastrophe of coal mine stope
CN111312052A (en) * 2020-04-02 2020-06-19 中国矿业大学(北京) Experiment platform and experiment method for simulating movement of mining rock stratum
CN111312052B (en) * 2020-04-02 2023-09-15 中国矿业大学(北京) Experimental platform and experimental method for simulating mining rock stratum movement
CN114360356A (en) * 2021-12-14 2022-04-15 中国矿业大学(北京) Flying refuse experiment table

Also Published As

Publication number Publication date
CN104458418B (en) 2017-06-06

Similar Documents

Publication Publication Date Title
CN104458418A (en) Working face coal wall stability control simulation experiment table and application method
US11359999B2 (en) Experimental platform and experimental method for simulating coal rock disaster of coal mine stope
US9926784B2 (en) Float-swing hydraulic support
CN104063535B (en) Design flow and optimization method of solid-filling coal mining hydraulic support
CN204630746U (en) A kind of top coals' recovery ratio and ore deposit are pressed and are manifested relationship experiments platform
CN104614191B (en) Experiment table of relationship between top coal's recovery ratio and strata behavior, application method thereof
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN105043852B (en) A kind of function loading device tested suitable for mine laneway analog simulation
CN109612840B (en) Experimental device and method for obtaining post-peak curve and residual strength of brittle rock
CN204241316U (en) A kind of working face wall stability control simulation experiment table
CN103032091A (en) Self-moving hydraulic support
CN106499421A (en) A kind of mechanical constant-resistance individual prop withdrawing technique and recovery method
CN105422149A (en) Quick anchorage remover
CN206945310U (en) A kind of workings subject to dy namic pressure stability three-dimensional analog simulation device
CN104018657A (en) Method for constructing high and large cornice through horizontal sliding platform
CN204324669U (en) A kind of wedge-caulking device of mining locker voussoir
CN203855324U (en) Lifting device for installing and removing underground coal mine working face
CN206951856U (en) A kind of portable manual Multipurpose bending machine
CN203730036U (en) Support and winch integrated apparatus
CN204321975U (en) A kind of loader differential mechanism assembly dismounting support
CN204199648U (en) A kind of coke furnace carbonization chamber scaffold
CN203937652U (en) Loader vehicle bridge automatic stand device
CN203847144U (en) Fully-mechanized coal mining face hydraulic support retracting equipment
CN103696794B (en) Support winch integrated apparatus
CN204590020U (en) Static pressure pile structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant