CN104453949A - Narrow-beam transition section steel mould trolley for tunnel and construction method - Google Patents
Narrow-beam transition section steel mould trolley for tunnel and construction method Download PDFInfo
- Publication number
- CN104453949A CN104453949A CN201410732694.8A CN201410732694A CN104453949A CN 104453949 A CN104453949 A CN 104453949A CN 201410732694 A CN201410732694 A CN 201410732694A CN 104453949 A CN104453949 A CN 104453949A
- Authority
- CN
- China
- Prior art keywords
- backform
- transition section
- transition
- template
- narrow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007704 transition Effects 0.000 title claims abstract description 115
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 72
- 239000010959 steel Substances 0.000 title claims abstract description 72
- 238000010276 construction Methods 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 claims abstract description 5
- 230000008602 contraction Effects 0.000 claims description 7
- 230000005641 tunneling Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- 230000001105 regulatory effect Effects 0.000 claims description 3
- 238000000465 moulding Methods 0.000 abstract description 3
- 239000010720 hydraulic oil Substances 0.000 abstract 1
- 230000007423 decrease Effects 0.000 description 3
- 238000007493 shaping process Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000000411 inducer Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000009416 shuttering Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410732694.8A CN104453949B (en) | 2014-12-07 | 2014-12-07 | A kind of narrow transition telescoping steel form construction method of tunnel bundle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410732694.8A CN104453949B (en) | 2014-12-07 | 2014-12-07 | A kind of narrow transition telescoping steel form construction method of tunnel bundle |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104453949A true CN104453949A (en) | 2015-03-25 |
CN104453949B CN104453949B (en) | 2016-06-29 |
Family
ID=52900619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410732694.8A Active CN104453949B (en) | 2014-12-07 | 2014-12-07 | A kind of narrow transition telescoping steel form construction method of tunnel bundle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104453949B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781108A (en) * | 2016-03-04 | 2016-07-20 | 中铁隧道集团二处有限公司 | Overall transition construction method for large-size steel mould between adjacent field regions |
CN106677800A (en) * | 2016-12-21 | 2017-05-17 | 中国水电建设集团十五工程局有限公司 | Large tunnel variable cross-section concrete lining construction method |
CN107059873A (en) * | 2017-04-26 | 2017-08-18 | 中国葛洲坝集团第二工程有限公司 | Transition side becomes circle template and construction method |
CN107100647A (en) * | 2017-05-26 | 2017-08-29 | 中铁隧道集团二处有限公司 | A kind of trolley formwork and its assembling and construction method of the gradual change of tunnel arch wall lining section |
CN108005684A (en) * | 2017-11-06 | 2018-05-08 | 新疆兵团水利水电工程集团有限公司 | Separated steel mould trolley and its construction method |
CN108361068A (en) * | 2018-01-09 | 2018-08-03 | 中石化上海工程有限公司 | A kind of cavern's Varied section design method of underground water seal cave depot |
CN108442941A (en) * | 2018-02-26 | 2018-08-24 | 龚岗 | Tunnel bolt-spary supports concrete monoblock type subsectin bottler template and construction method |
CN109488095A (en) * | 2018-11-07 | 2019-03-19 | 中建三局第建设工程有限责任公司 | Construction method based on acrylic bealock punching block |
CN110107314A (en) * | 2019-04-30 | 2019-08-09 | 中国葛洲坝集团第二工程有限公司 | Transition region of tunnel lining construction method |
CN110966009A (en) * | 2019-12-31 | 2020-04-07 | 中铁第四勘察设计院集团有限公司 | Construction method of bifurcated tunnel |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1144197A (en) * | 1997-07-29 | 1999-02-16 | Gifu Kogyo Kk | Method and device for placing tunnel concrete using form with variable cross-sectional shape |
CN101082280A (en) * | 2007-07-18 | 2007-12-05 | 湖南中铁五新钢模有限责任公司 | Single-track railway tunnel lining trolley |
CN201486572U (en) * | 2009-08-05 | 2010-05-26 | 中交隧道工程局有限公司 | Multi-reducing lining mould plate trolley |
CN203499697U (en) * | 2013-10-11 | 2014-03-26 | 北京住总集团有限责任公司 | Trolley used for concrete construction of various cross sections through mining method |
CN203856478U (en) * | 2014-04-24 | 2014-10-01 | 中铁三局集团有限公司 | Lining trolley applicable to tunnel with variable fracture surface |
CN204344137U (en) * | 2014-12-07 | 2015-05-20 | 中国葛洲坝集团股份有限公司 | The narrow transition section steel form carrier of a kind of tunnel bundle |
-
2014
- 2014-12-07 CN CN201410732694.8A patent/CN104453949B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1144197A (en) * | 1997-07-29 | 1999-02-16 | Gifu Kogyo Kk | Method and device for placing tunnel concrete using form with variable cross-sectional shape |
CN101082280A (en) * | 2007-07-18 | 2007-12-05 | 湖南中铁五新钢模有限责任公司 | Single-track railway tunnel lining trolley |
CN201486572U (en) * | 2009-08-05 | 2010-05-26 | 中交隧道工程局有限公司 | Multi-reducing lining mould plate trolley |
CN203499697U (en) * | 2013-10-11 | 2014-03-26 | 北京住总集团有限责任公司 | Trolley used for concrete construction of various cross sections through mining method |
CN203856478U (en) * | 2014-04-24 | 2014-10-01 | 中铁三局集团有限公司 | Lining trolley applicable to tunnel with variable fracture surface |
CN204344137U (en) * | 2014-12-07 | 2015-05-20 | 中国葛洲坝集团股份有限公司 | The narrow transition section steel form carrier of a kind of tunnel bundle |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781108B (en) * | 2016-03-04 | 2017-11-28 | 中铁隧道集团二处有限公司 | A kind of construction method for being used to close on large-scale steel-mould trolley entirety transition between place |
CN105781108A (en) * | 2016-03-04 | 2016-07-20 | 中铁隧道集团二处有限公司 | Overall transition construction method for large-size steel mould between adjacent field regions |
CN106677800A (en) * | 2016-12-21 | 2017-05-17 | 中国水电建设集团十五工程局有限公司 | Large tunnel variable cross-section concrete lining construction method |
CN107059873A (en) * | 2017-04-26 | 2017-08-18 | 中国葛洲坝集团第二工程有限公司 | Transition side becomes circle template and construction method |
CN107100647B (en) * | 2017-05-26 | 2019-10-29 | 中铁隧道集团二处有限公司 | A kind of assembling and construction method of the trolley formwork of tunnel arch wall lining section gradual change |
CN107100647A (en) * | 2017-05-26 | 2017-08-29 | 中铁隧道集团二处有限公司 | A kind of trolley formwork and its assembling and construction method of the gradual change of tunnel arch wall lining section |
CN108005684A (en) * | 2017-11-06 | 2018-05-08 | 新疆兵团水利水电工程集团有限公司 | Separated steel mould trolley and its construction method |
CN108005684B (en) * | 2017-11-06 | 2023-11-28 | 新疆兵团水利水电工程集团有限公司 | Separated steel mould trolley and construction method thereof |
CN108361068A (en) * | 2018-01-09 | 2018-08-03 | 中石化上海工程有限公司 | A kind of cavern's Varied section design method of underground water seal cave depot |
CN108361068B (en) * | 2018-01-09 | 2019-07-26 | 中石化上海工程有限公司 | A kind of cavern's Varied section design method of underground water seal cave depot |
CN108442941A (en) * | 2018-02-26 | 2018-08-24 | 龚岗 | Tunnel bolt-spary supports concrete monoblock type subsectin bottler template and construction method |
CN109488095A (en) * | 2018-11-07 | 2019-03-19 | 中建三局第建设工程有限责任公司 | Construction method based on acrylic bealock punching block |
CN110107314A (en) * | 2019-04-30 | 2019-08-09 | 中国葛洲坝集团第二工程有限公司 | Transition region of tunnel lining construction method |
CN110966009A (en) * | 2019-12-31 | 2020-04-07 | 中铁第四勘察设计院集团有限公司 | Construction method of bifurcated tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN104453949B (en) | 2016-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453949B (en) | A kind of narrow transition telescoping steel form construction method of tunnel bundle | |
CN105952482B (en) | Self-propelled tunnel inverted arch lining trolley | |
CN102146796B (en) | Construction technology for inverted arch of two-track tunnel of high-speed railway | |
CN206538790U (en) | Interior mould trolley is used in a kind of cast-in-place pipe gallery construction | |
CN103437782B (en) | Hydraulic pressure automatic moving type steel form carrier and construction method thereof | |
CN204344137U (en) | The narrow transition section steel form carrier of a kind of tunnel bundle | |
CN105649654A (en) | Automatic hydraulic inverted arch trestle trolley and construction method thereof | |
CN103470272B (en) | A kind of chassis for the multiple section concrete construction of Mining Method and construction method thereof | |
CN102022123B (en) | Integral lining method for tunnel with altered diameter by model board trolley | |
CN202768014U (en) | Lining trolley for emergency parking strip | |
CN104005775B (en) | Tunnel invert backfill construction integrated template and construction technology thereof | |
CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
CN205676844U (en) | A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate | |
CN210712938U (en) | Pipe gallery trolley | |
CN204436411U (en) | A kind of for the large lining trolley across section tunnel | |
CN207212365U (en) | A kind of wall arch is separable can Monolithic lining chassis | |
CN103982200A (en) | Full-face inner sliding rail moving steel mould trolley | |
CN105736012B (en) | A kind of tunnel lining concrete grouting device | |
CN110714785A (en) | Pipe gallery top plate construction trolley, trolley set and construction method | |
CN106223983A (en) | A kind of diversion tunnel inclined shaft, flat section tunneling boring primary steel mould trolley | |
CN204627623U (en) | Tunnel just serves as a contrast formwork jumbo | |
CN203499697U (en) | Trolley used for concrete construction of various cross sections through mining method | |
CN203248170U (en) | Lining trolley for secondary lining construction of pedestrian crosswalk | |
CN207526506U (en) | separated steel mould trolley | |
CN104929660B (en) | Formation and construction set for continuous open-cut tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 430033 Hubei province in Qiaokou District of Wuhan City Jiefang Road Gezhouba Dam Building No. 558 Applicant after: China Gezhouba Group Co., Ltd. Applicant after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD. Address before: 443002 Hubei province Yichang City Road No. 1 Applicant before: China Gezhouba Group Co., Ltd. Applicant before: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD. |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160902 Address after: 443000 Dongshan Avenue, Hubei, Yichang, No. 11 Patentee after: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD. Address before: 430033 Hubei province in Qiaokou District of Wuhan City Jiefang Road Gezhouba Dam Building No. 558 Patentee before: China Gezhouba Group Co., Ltd. Patentee before: CHINA GEZHOUBA GROUP THREE GORGES CONSTRUCTION ENGINEERING CO., LTD. |