CN104453225B - A kind of cushion cap column integrated construction adjusts structure - Google Patents

A kind of cushion cap column integrated construction adjusts structure Download PDF

Info

Publication number
CN104453225B
CN104453225B CN201410728194.7A CN201410728194A CN104453225B CN 104453225 B CN104453225 B CN 104453225B CN 201410728194 A CN201410728194 A CN 201410728194A CN 104453225 B CN104453225 B CN 104453225B
Authority
CN
China
Prior art keywords
oil top
horizontal
steel plate
cushion cap
shoulder pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410728194.7A
Other languages
Chinese (zh)
Other versions
CN104453225A (en
Inventor
陈晖�
江辉
刘树强
刘迪
刘琳
朱德军
郭乐
张义龙
秦晓建
娄刚
孔运生
韩丽强
陈富文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201410728194.7A priority Critical patent/CN104453225B/en
Publication of CN104453225A publication Critical patent/CN104453225A/en
Application granted granted Critical
Publication of CN104453225B publication Critical patent/CN104453225B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a kind of cushion cap column integrated construction and adjust structure, it is characterized in that: be horizontal symmetry two longitudinal shoulder pole girders of welding in the both sides of formwork erection template, longitudinal shoulder pole girder is positioned on two horizontal girds be arrangeding in parallel, and two longitudinal shoulder pole girders and two horizontal girds be arrangeding in parallel are overlooked and arranged in " well " word;Horizontal gird supports with oil top box respectively at two ends;Oil top box fixed placement, on subgrade case, to be fixedly installed on the beam-ends at horizontal gird of the oily top support in oil top box, and adjusts horizontal gird height with oil top。The present invention can ensure that the accurate of column absolute altitude and perpendicularity requirement by simple and effective adjustment。

Description

A kind of cushion cap column integrated construction adjusts structure
Technical field
The present invention relates to the auxiliary in cushion cap column integrated construction and adjust structure, be more specifically used for assisting adjustment column absolute altitude and perpendicularity in cushion cap column integrated construction, it is achieved the supplementary structure that model of the column is laid。
Background technology
In cushion cap column integrated construction, after cushion cap reinforcing bar binding, cushion cap template installation, column steel bar template entirety inserts cushion cap, and then column steel bar template is fixed, and has reinforced rear cushion cap column one-piece casting。Integral construction method is effectively shortened the engineering time of cushion cap column, eliminates the cold seam of cushion cap and column junction, decreases the anthropic factor impact on construction quality in the construction of cushion cap column。Cushion cap column integrated construction column absolute altitude perpendicularity is the control stress point in construction, but at present not about for guaranteeing that the auxiliary that the accurate of column absolute altitude and perpendicularity require adjusts utensil。
Summary of the invention
The present invention is for avoiding the weak point existing for above-mentioned prior art, it is provided that a kind of cushion cap column integrated construction adjusts structure, is guaranteed the accurate of column absolute altitude and perpendicularity requirement by simple and effective adjustment。
The present invention solves that technical problem adopts the following technical scheme that
Cushion cap column integrated construction of the present invention adjusts being structurally characterized in that of structure: be horizontal symmetry two longitudinal shoulder pole girders of welding in the both sides of model of the column, described longitudinal shoulder pole girder is positioned on two horizontal girds be arrangeding in parallel, and described two longitudinal shoulder pole girders and two horizontal girds be arrangeding in parallel are overlooked and arranged in " well " word;Described horizontal gird supports with oil top box respectively at two ends;Described oil top box fixed placement, on subgrade case, to be fixedly installed on the beam-ends at described horizontal gird of the oily top support in oil top box, and adjusts horizontal gird height with described oil top。
Cushion cap column integrated construction of the present invention adjusts the feature of structure and lies also in: the structure of described oil top box is set to: arrange oil top in a rectangular box, the both sides on oil top are fixedly installed I-steel respectively, it is placed with supporting steel plate, height adjusting cushion plate of jumping a queue between described I-steel and supporting steel plate at the top on oil top;Being provided with upright spacing steel plate in the both sides of described rectangular box, constituted groove with described upright spacing steel plate with supporting steel plate, the beam-ends of described horizontal gird is supported on described supporting steel plate and spacing in described groove by described upright spacing steel plate。
Cushion cap column integrated construction of the present invention adjusts the feature of structure and also resides in: adopt fining twisted steel fixing to drawing between described two longitudinal shoulder pole girders。
Compared with the prior art, the present invention has the beneficial effect that:
1, the present invention utilizes oil top and horizontal gird can effectively adjust column absolute altitude and perpendicularity, it is ensured that construction quality;
2, in the present invention, two longitudinal shoulder pole girders and two horizontal girds be arrangeding in parallel are arranged in " well " word, and its stabilized structure is firm。
3, present configuration is simple, easy to implement, reusable。
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of the present invention;
Fig. 2 is side-looking structural representation of the present invention;
Fig. 3 is plan structure schematic diagram of the present invention;
Fig. 4 is oil roof construction schematic diagram in the present invention;
Number in the figure: 1 model of the column, 2 longitudinal shoulder pole girders, 3 height adjusting cushion plates, 4 horizontal girds, 5 oil top boxs, 6 subgrade cases, 7 oil tops, 8 spacing steel plates, 9 I-steel, 10 supporting steel plates, 11 fining twisted steels, 12 cushion cap templates。
Detailed description of the invention
Referring to Fig. 1, Fig. 2 and Fig. 3, in this enforcement, cushion cap column integrated construction adjustment structure is: be horizontal symmetry two longitudinal shoulder pole girders 2 of welding in the both sides of model of the column 1, adopt fining twisted steel 11 fixing to drawing between two longitudinal shoulder pole girders 2, longitudinal shoulder pole girder 2 is positioned on two horizontal girds be arrangeding in parallel 4, and two longitudinal shoulder pole girders 2 and two horizontal girds be arrangeding in parallel 4 are overlooked and arranged in " well " word;Horizontal gird 4 supports with oil top box 5 respectively at two ends;Oil top box 5 fixed placement is on subgrade case 6, the beam-ends of horizontal gird 4 it is supported on the oil top 7 being fixedly installed in oil top box 5, and adjust horizontal gird 4 height with oil top 7, thus reaching the adjustment of column absolute altitude and perpendicularity, guarantee that column absolute altitude adjusts soon and accurately, improve project progress with this, ensure construction quality。
In being embodied as, shown in as shown in Figure 1, Figure 3 and Figure 4, the structure of oil top box 5 is set to: arrange oil top 7 in the rectangular box become by Plate Welding thick for 2cm, the both sides on oil top 7 are fixedly installed I-steel 9 respectively, it is placed with supporting steel plate 10, height adjusting cushion plate 3 of jumping a queue between I-steel 9 and supporting steel plate 10 at the top on oil top 7;Upright spacing steel plate 8 it is welded with in the both sides of rectangular box, groove is constituted with supporting steel plate 10 with upright spacing steel plate 8, the beam-ends of horizontal gird 4 is supported on supporting steel plate 10 and spacing in a groove by upright spacing steel plate 8, being subjected to displacement with horizontal gird 4 entirety in order to avoid regulating process central post template 1, horizontal gird 4 is to make with I-steel。Oil top 7 is jack, with oil top box 5, oil top 7 is played location, the fixing and effect protected, it is prevented that jack is operationally toppled over。Horizontal gird 4 is played effect that is spacing and that support by the supporting steel plate 10 in oil top box 5, and supporting steel plate 10 increases the contact area between oil top 7 and horizontal gird 4, it is ensured that stablizing of support system。
In work progress, after cushion cap reinforcing bar binding and cushion cap template 12 installation, column steel bar template entirety inserts cushion cap, cushion cap column integrated construction of the present invention is set and adjusts structure, the present invention is utilized accurately to adjust height and the perpendicularity of model of the column 1, then column template 1 is fixed, and has reinforced rear cushion cap column one-piece casting。

Claims (3)

1. a cushion cap column integrated construction adjusts structure, it is characterized in that: be horizontal symmetry two longitudinal shoulder pole girders (2) of welding in the both sides of model of the column (1), described longitudinal shoulder pole girder (2) is positioned on two horizontal girds be arrangeding in parallel (4), and described two longitudinal shoulder pole girders (2) and two horizontal girds be arrangeding in parallel (4) are overlooked and arranged in " well " word;Described horizontal gird (4) supports with oil top box (5) respectively at two ends;Described oil top box (5) fixed placement is on subgrade case (6), it is supported on the beam-ends of described horizontal gird (4) with oil top (7) being fixedly installed in oil top box (5), and adjusts horizontal gird (4) highly with described oil top (7)。
2. cushion cap column integrated construction according to claim 1 adjusts structure, it is characterized in that: it is characterized in that: the structure of described oil top box (5) is set to: arrange oil top (7) in a rectangular box, the both sides of oil top (7) are fixedly installed I-steel (9) respectively, it is placed with supporting steel plate (10), height adjusting cushion plate of jumping a queue between described I-steel (9) and supporting steel plate (10) at the top of You Ding (7);Upright spacing steel plate (8) it is provided with in the both sides of described rectangular box, being constituted groove with described upright spacing steel plate (8) with supporting steel plate (10), it is upper and spacing in described groove by described upright spacing steel plate (8) that the beam-ends of described horizontal gird (4) is supported on described supporting steel plate (10)。
3. cushion cap column integrated construction according to claim 1 and 2 adjusts structure, it is characterized in that: adopt fining twisted steel (11) fixing to drawing between described two longitudinal shoulder pole girders (2)。
CN201410728194.7A 2014-12-03 2014-12-03 A kind of cushion cap column integrated construction adjusts structure Active CN104453225B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410728194.7A CN104453225B (en) 2014-12-03 2014-12-03 A kind of cushion cap column integrated construction adjusts structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410728194.7A CN104453225B (en) 2014-12-03 2014-12-03 A kind of cushion cap column integrated construction adjusts structure

Publications (2)

Publication Number Publication Date
CN104453225A CN104453225A (en) 2015-03-25
CN104453225B true CN104453225B (en) 2016-06-22

Family

ID=52899914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410728194.7A Active CN104453225B (en) 2014-12-03 2014-12-03 A kind of cushion cap column integrated construction adjusts structure

Country Status (1)

Country Link
CN (1) CN104453225B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2816119Y (en) * 2005-06-16 2006-09-13 上海市政工程设计研究院 Regulation positioning apparatus of prefabricated heavy-duty pier
JP2012012835A (en) * 2010-06-30 2012-01-19 Okumura Corp Construction method of work floor for high altitude work
CN102363946A (en) * 2011-11-30 2012-02-29 上海市城市建设设计研究总院 Prefabricated upright post and bearing platform assembled structure and assembling and positioning process thereof
CN202787092U (en) * 2012-09-18 2013-03-13 颜可仁 Large-scale bearing platform pier column connection component installation accurate positioning device
CN204252545U (en) * 2014-12-03 2015-04-08 中铁上海工程局有限公司 A kind of cushion cap column integrated construction adjust structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2816119Y (en) * 2005-06-16 2006-09-13 上海市政工程设计研究院 Regulation positioning apparatus of prefabricated heavy-duty pier
JP2012012835A (en) * 2010-06-30 2012-01-19 Okumura Corp Construction method of work floor for high altitude work
CN102363946A (en) * 2011-11-30 2012-02-29 上海市城市建设设计研究总院 Prefabricated upright post and bearing platform assembled structure and assembling and positioning process thereof
CN202787092U (en) * 2012-09-18 2013-03-13 颜可仁 Large-scale bearing platform pier column connection component installation accurate positioning device
CN204252545U (en) * 2014-12-03 2015-04-08 中铁上海工程局有限公司 A kind of cushion cap column integrated construction adjust structure

Also Published As

Publication number Publication date
CN104453225A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN103437279B (en) Overhead cast-in-place box compression struts and construction technology thereof
CN102535849B (en) Constructional column top concreting method
CN202391137U (en) Reinforced concrete beam steel binding support
CN103883052A (en) Upturned beam and cast-in-place slab overall pouring construction method
CN204252545U (en) A kind of cushion cap column integrated construction adjust structure
CN106032704A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN102995553A (en) Arch rib of reinforced concrete arch bridge and erection support and manufacture method of arch rib
CN206800800U (en) Horizontal reinforcement distance piece
CN104453225B (en) A kind of cushion cap column integrated construction adjusts structure
CN206625260U (en) A kind of detachable late poured band support post
CN206589121U (en) It is a kind of to be used for precast beam, the diaphragm plate horizontal reinforcement mounting and positioning device of plate
CN103921347B (en) Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases
CN202925476U (en) Bridge floor pre-embedded sleeve positioner
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN205604085U (en) Unsettled support of built -in fitting
CN203684541U (en) Anisotropic I-section reinforcing steel bar support iron for controlling space between upper and lower rows of reinforcing steel bars of building cast-in-place slab
CN203684703U (en) Assembly jig frame for main truss spare parts of large-span steel structure roof cover
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN203765784U (en) Fixed drawing-inserting type installing mould frame for prefabricated T-beam rib plate reinforcing steel bar and pre-stressed pipeline
CN102797224B (en) Paving method and template supporting device of bridge deck slab
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
CN208072970U (en) The template system of concrete type seam construction
CN206070354U (en) A kind of pier shaft horizontal hoop fixture
CN207327275U (en) A kind of Precast T-Beam reinforcing bar mould bases positions peace system processed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant