CN104452757A - 快速预应力锚杆结构及施工方法 - Google Patents
快速预应力锚杆结构及施工方法 Download PDFInfo
- Publication number
- CN104452757A CN104452757A CN201310419519.9A CN201310419519A CN104452757A CN 104452757 A CN104452757 A CN 104452757A CN 201310419519 A CN201310419519 A CN 201310419519A CN 104452757 A CN104452757 A CN 104452757A
- Authority
- CN
- China
- Prior art keywords
- anchor
- anchor rod
- anchor pole
- construction method
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及一种适用于快速预应力锚杆结构及施工方法,包括:垫片(1)、锚杆(2)、螺母(3)、固定墙体(4)、拓展槽(5)、旋转钢线(6)、锚头倒钩(7)。本发明的工作原理如下:本发明通过扩展槽(5)为锚杆(2)提供了预埋空间,锚杆(2)的周边有旋转钢线(6),在受到轴向里的时候产生非常大的阻力,在锚杆(2)的拓展槽(5)的低端有锚头倒钩(7)会在终端实现一种最大阻力。施工方法如下:通过电钻打孔,实现拓展槽(5)的开凿,锚杆(2)按照位置装入扩展槽(5),然后对锚杆(2)进行水泥灌浆,通过水泥填充使带有旋转钢线(6)的锚杆(2)与墙体或泥土更加完整的粘结。在锚杆(2)的露出端垫上垫片(1),旋转上螺母(3)实现锚杆的固定,施工后2小时后即可在锚杆上施加荷载。
Description
技术领域
本发明是涉及一种锚杆和施工方法,具体地说是涉及一种快速预应力锚杆结构及施工方法。
背景技术
预应力锚固是用锚固方法增加支挡结构或岩土体稳定性的一种措施。其方法是打钻孔穿过有可能滑动的或已经滑动过的滑动面,将钢筋(或钢索)的一端固定在孔底的稳定岩土体中,再将钢筋(或钢索)拉紧以至能产生一定的回弹力(即预应力),然后将钢筋(索)的另一端固定于岩土体或支挡结构表面,利用钢筋的回弹力压紧可能滑动的岩土体或支挡结构,以增大滑动面上的抗剪强度,从而达到提高岩土体或支挡结构稳定性的目的。
在预应力锚杆施工的过程中,由于钢筋和灌浆体之间的粘结力达到一定的值时才能进行张拉,一般过程中需要7天以上的时间,等待时间较长,为此,我们采用合理的技术和施工工艺,提出一种预应力锚杆的结构及施工工艺,可大大降低施工时间,这样便能使预应力锚杆的施工速度得到更大的发挥。
发明内容
本发明的目的是克服了现有技术中的不足,提供了一种快速预应力锚杆结构及施工方法。
为了解决上述技 术问题,本发明是通过以下技术方案实现:
本发明快速预应力锚杆结构及施工方法,包括:垫片1、锚杆2、螺母3、固定墙体4、拓展槽5、旋转钢线6、锚头倒钩7。
本发明的工作原理如下:本发明通过扩展槽5为锚杆2提供了预埋空间,锚杆2的周边有旋转钢线6,在受到轴向里的时候产生非常大的阻力,在锚杆2的拓展槽5的低端有锚头倒钩7会在终端实现一种最大阻力。
施工方法如下:通过电钻打孔,实现拓展槽5的开凿,锚杆2按照位置装入扩展槽5,然后对锚杆2进行水泥灌浆,通过水泥填充使带有旋转钢线6的锚杆2与墙体或泥土更加完整的粘结。在锚杆2的露出端垫上垫片1,旋转上螺母3实现锚杆的固定,施工后2小时后即可在锚杆上施加荷载。
与现有技术相比,本发明的有益效果是:
快速预应力锚杆结构及施工方法,结构设计合理、应用范围广,可以在不改变桩长度和截面面积的前提下,明显地增大桩基与周围土层之间的接触面积,可施加较大的预应力,减少工期。
附图说明
图1是快速预应力锚杆结构图。
具体实施方式
下面结合附图与具体实施方式对本发明作进一步详细描述:
本发明快速预应力锚杆结构及施工方法,包括:垫片1、锚杆2、螺母3、固定墙体4、拓展槽5、旋转钢线6、锚头倒钩7。
本发明的工作原理如下:本发明通过扩展槽5为锚杆2提供了预埋空间,锚杆2的周边有旋转钢线6,在受到轴向里的时候产生非常大的阻力,在锚杆2的拓展槽5的低端有锚头倒钩7会在终端实现一种最大阻力。
施工方法如下:通过电钻打孔,实现拓展槽5的开凿,锚杆2按照位置装入扩展槽5,然后对锚杆2进行水泥灌浆,通过水泥填充使带有旋转钢线6的锚杆2与墙体或泥土更加完整的粘结。在锚杆2的露出端垫上垫片1,旋转上螺母3实现锚杆的固定,施工后2小时后即可在锚杆上施加荷载。
本发明中涉及的未说明部份与现有技术相同或采用现有技术加以实现。
Claims (3)
1.一种快速预应力锚杆结构及施工方法,包括:垫片(1)、锚杆(2)、螺母(3)、固定墙体(4)、拓展槽(5)、旋转钢线(6)、锚头倒钩(7),其特征是:所述锚杆结构;所述施工方法。
2.根据权利要求1所述的锚杆结构,其特征是:所述锚杆结构是锚杆(2)的周边有旋转钢线(6),在受到轴向里的时候产生非常大的阻力,在锚杆(2)的拓展槽(5)的低端有锚头倒钩(7)会在终端实现一种最大阻力。
3.根据权利要求1所述的施工方法,其特征是:所述施工方法如下:通过电钻打孔,实现拓展槽(5)的开凿,锚杆(2)按照位置装入扩展槽(5),然后对锚杆(2)进行水泥灌浆,通过水泥填充使带有旋转钢线(6)的锚杆(2)与墙体或泥土更加完整的粘结,在锚杆(2)的露出端垫上垫片(1),旋转上螺母(3)实现锚杆的固定,施工后2小时后即可在锚杆上施加荷载。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310419519.9A CN104452757A (zh) | 2013-09-15 | 2013-09-15 | 快速预应力锚杆结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310419519.9A CN104452757A (zh) | 2013-09-15 | 2013-09-15 | 快速预应力锚杆结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104452757A true CN104452757A (zh) | 2015-03-25 |
Family
ID=52899457
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310419519.9A Pending CN104452757A (zh) | 2013-09-15 | 2013-09-15 | 快速预应力锚杆结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104452757A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107012864A (zh) * | 2017-06-11 | 2017-08-04 | 贵州大学 | 一种螺旋式预应力灌浆锚杆 |
CN107034880A (zh) * | 2017-06-11 | 2017-08-11 | 贵州大学 | 一种倒钩式灌浆锚杆 |
CN107059864A (zh) * | 2017-06-11 | 2017-08-18 | 贵州大学 | 一种管式预应力灌浆锚杆 |
CN107059863A (zh) * | 2017-06-11 | 2017-08-18 | 贵州大学 | 一种具有蝶形垫板的预应力灌浆锚杆 |
CN107059866A (zh) * | 2017-06-21 | 2017-08-18 | 湖北武大珞珈工程结构检测咨询有限公司 | 一种精轧螺纹钢锚杆锚头内压安装系统与方法 |
-
2013
- 2013-09-15 CN CN201310419519.9A patent/CN104452757A/zh active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107012864A (zh) * | 2017-06-11 | 2017-08-04 | 贵州大学 | 一种螺旋式预应力灌浆锚杆 |
CN107034880A (zh) * | 2017-06-11 | 2017-08-11 | 贵州大学 | 一种倒钩式灌浆锚杆 |
CN107059864A (zh) * | 2017-06-11 | 2017-08-18 | 贵州大学 | 一种管式预应力灌浆锚杆 |
CN107059863A (zh) * | 2017-06-11 | 2017-08-18 | 贵州大学 | 一种具有蝶形垫板的预应力灌浆锚杆 |
CN107059866A (zh) * | 2017-06-21 | 2017-08-18 | 湖北武大珞珈工程结构检测咨询有限公司 | 一种精轧螺纹钢锚杆锚头内压安装系统与方法 |
CN107059866B (zh) * | 2017-06-21 | 2022-09-02 | 武大巨成结构股份有限公司 | 一种精轧螺纹钢锚杆锚头内压安装系统与方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104452757A (zh) | 快速预应力锚杆结构及施工方法 | |
CN102864777A (zh) | 一种快速预应力锚杆结构及施工方法 | |
CN103924793B (zh) | 老旧住宅加固结构及其加固方法 | |
CN103352582B (zh) | 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法 | |
CN203530973U (zh) | 一种复合锚杆 | |
CN105203409A (zh) | 一种锚固加压的岩体现场直剪试验方法 | |
CN202595739U (zh) | 一种适合软土层使用的锚杆 | |
CN104532860A (zh) | 可回收土钉 | |
CN203546717U (zh) | 一种可回收预应力锚杆 | |
CN201272968Y (zh) | 组合锚固体系 | |
KR101016047B1 (ko) | 앵커 보강장치 및 시공방법 | |
CN203834478U (zh) | 夹片式预应力锚索主动送夹张拉锁定装置 | |
CN204185856U (zh) | 新型抗浮锚索装置 | |
CN202348300U (zh) | 一种矿用锚索 | |
CN203248177U (zh) | 可让压型垫板装置 | |
CN106836245A (zh) | 一种土钉墙支护结构及施工方法 | |
CN204419218U (zh) | 一种新型组合式钢绞线锚杆 | |
CN204282360U (zh) | 一种覆盖层预应力锚固结构 | |
CN103244161A (zh) | 可让压型垫板装置 | |
CN203924054U (zh) | 变截面锚固体锚杆或锚索加固结构 | |
CN201137142Y (zh) | 预应力锚杆锚固端直螺纹套筒固定结构 | |
CN2809219Y (zh) | 可回收锚筋的基坑支护锚杆 | |
CN104594375B (zh) | 一种岩石地基架空电力线路杆塔和拉线基础及施工工艺 | |
CN110344865B (zh) | 一种磁原理加固锚杆及其施工方法 | |
CN203257439U (zh) | 一种用于煤矿软岩巷道的锚索全长锚固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150325 |
|
WD01 | Invention patent application deemed withdrawn after publication |