CN104451067B - Centralized/distributed heat treatment cooling device - Google Patents
Centralized/distributed heat treatment cooling device Download PDFInfo
- Publication number
- CN104451067B CN104451067B CN201410712757.3A CN201410712757A CN104451067B CN 104451067 B CN104451067 B CN 104451067B CN 201410712757 A CN201410712757 A CN 201410712757A CN 104451067 B CN104451067 B CN 104451067B
- Authority
- CN
- China
- Prior art keywords
- pilot trench
- valve
- cooling
- endoporus
- outside
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/62—Quenching devices
- C21D1/63—Quenching devices for bath quenching
- C21D1/64—Quenching devices for bath quenching with circulating liquids
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D11/00—Process control or regulation for heat treatments
- C21D11/005—Process control or regulation for heat treatments for cooling
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
The invention discloses a centralized/distributed heat treatment cooling device. The centralized/distributed heat treatment cooling device comprises a quenching tank, a first cooling medium pipe, a submersible mixer, a second cooling medium pipe, a nozzle and a positioner, wherein the first cooling medium pipe is arranged at the bottom of the quenching tank; an upward spout is arranged on the part, located in the quenching tank, of the first cooling medium pipe; the submersible mixer is arranged above the spout; a worktable is arranged above the submersible mixer; the second cooling medium pipe is arranged under the worktable; an upward nozzle is arranged on the second cooling medium pipe; the positioner is arranged above the worktable; the positioner is hollow; the nozzle is communicated with the positioner. The invention also discloses a centralized distributed heat treatment cooling method based on the centralized distributed heat treatment cooling device. The centralized distributed heat treatment cooling device is simple in structure, low in investment, small in floor area and high in comprehensive benefits.
Description
Technical field
The present invention relates to a kind of collecting and distributing type is heat-treated cooling device.
Background technology
At present, domestic commonly used be " multi-layer annular jet agitator ", " multitube external water spray agitator ".The former is big
It is used for annular quenching tank, because the speed of annular water flow is faster, centrifugal force is bigger, and the current that this results in injection are more anxious, shape
The rotary water current becoming is faster, and the flow velocity of cannelure medium position is slower, and therefore actually used effect is bad;The external spray of multitube
Water agitator, due to external stirrer, the stroke of water spray stirring is 2 times of stirring distance in groove.Therefore, both agitating modes
Intensity of cooling low, especially can not solve the problems, such as the cooling of inner hole of workpiece, more be unable to reach the extraordinary material of deep sea drilling equipment
The special quenching of material " 4130 " (yield strength 80k and 105k) " 8630 and f22 " (yield strength 80k, 105k, 120k) will
Ask.
Accordingly, it would be desirable to a kind of new heat treatment cooling device is to solve the above problems.
Content of the invention
The purpose of the present invention is the defect for prior art, provides a kind of collecting and distributing type heat treatment cooling device.
For achieving the above object, collecting and distributing type heat treatment cooling device of the present invention can adopt the following technical scheme that
A kind of collecting and distributing type is heat-treated cooling device, including unit quenching tank, the first pilot trench, the second pilot trench, the 3rd pilot trench, the
Three pilot trench endoporus cooling valves, the second pilot trench endoporus cooling valve, the first pilot trench endoporus cooling valve, the 3rd valve of cooling outside pilot trench, the
Outside two pilot trench, cooling valve, the first pilot trench outside cooling valve, pilot trench overflow pipe, public sedimentation basin, public water pump, cooling tower supply water
Pipe, cooling water supervisor, cooling waterside pipe and cooling tower, described unit quenching tank includes the first pilot trench, the second pilot trench and the 3rd son
Groove, described first pilot trench, the second pilot trench and the 3rd pilot trench are pilot trench,
Described pilot trench includes quenching tank, outside cooling medium pipe, submersible agitator, endoporus cooling medium pipe, nozzle and determines
Position device, described outside cooling medium pipe is arranged on the bottom of described quenching tank, and described outside cooling medium pipe is located at described quenching
Part in groove has spout upward, and the top of described spout is provided with described submersible agitator, described submersible agitator
Top is provided with workbench, and the lower section of described workbench is provided with endoporus cooling medium pipe, described endoporus cooling medium Guan Shangshe
It is equipped with nozzle upward, the top of described workbench is provided with described locator, described locator is hollow, described nozzle is even
Lead to described locator;
Described cooling tower feed pipe, cooling water supervisor all connect described cooling tower with cooling waterside pipe;
The endoporus cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench all connects described cooling waterside pipe;
It is respectively arranged with the 3rd pilot trench on the endoporus cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench
Hole cooling valve, the second pilot trench endoporus cooling valve and the first pilot trench endoporus cooling valve;
The outside cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench all connects described cooling water supervisor;
It is respectively arranged with outside the 3rd pilot trench on the outside cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench
Valve is cooled down outside cooling valve and the first pilot trench outside portion's cooling valve, the second pilot trench;
Described overflow pipe connected unit quenching tank and described public sedimentation basin, described public sedimentation basin pass through public water pump and
Cooling tower feed pipe connects described cooling tower.
Inventive principle:
Unit quenching tank is made up of the first pilot trench, the second pilot trench and the 3rd pilot trench.Public water water supplying pump, to cooling tower, cools down
The cooled water of tower water outlet is responsible for three pilot trench and the outside of workpiece is cooled down;Cooling tower water outlet cooled waterside Guan Zhisan
Pilot trench cools down to the endoporus of workpiece.3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve and the first pilot trench endoporus
Cooling valve is separately mounted on three pilot trench endoporus cooling water pipes, cooling valve, the second pilot trench outside cooling valve outside the 3rd pilot trench
It is separately mounted on the outside cooling water pipe of three pilot trench with cooling valve outside the first pilot trench, this six valves are controlled by system,
According to the different operating modes of three pilot trench quenchings, provide the cooling medium of inequality.The overflow pipe of pilot trench, with public sedimentation basin and
Public water pump group becomes the circulatory system.
Further, described workbench is provided with concave station, the bottom of described locator and described concave station cooperation, described
The top of locator is taper.
Further, the quantity of described spout and submersible agitator is 3.
Further, the quantity of described nozzle and locator is 4.
Further, the top of described locator is made up of the gusset of cross.
Beneficial effect: the collecting and distributing type heat treatment cooling device structure of the present invention is simple, small investment saves floor space, comprehensive
Close high efficiency.
The invention also discloses a kind of collecting and distributing type is heat-treated cooling means, cooling is heat-treated using collecting and distributing type as above
Device, comprises the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to 80-
85%, the second pilot trench and the 3rd pilot trench enter the preparatory stage, the 3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve, the
Outside two pilot trench, the open degree of cooling valve and the 3rd pilot trench outside cooling valve is all adjusted to 5-10%;First group of workpiece is put into
One pilot trench, after 1-2 minute put into by first group of workpiece, adjustment first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench
Open degree is 50-70%;When 12-14 minute put into by first group of workpiece, the first pilot trench endoporus is cooled down valve and the first pilot trench
Outside cooling valve open degree is adjusted to 25-35%, meanwhile, the second pilot trench endoporus is cooled down cooling valve outside valve and the second pilot trench
Open degree is adjusted to 50-70%, and the second pilot trench enters and treats running status, and the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench are outside cold
But valve maintains 10% open degree;
2), when 14-16 minute put into by first group of workpiece, cooling outside the second pilot trench endoporus cooling valve and the second pilot trench
The open degree of valve is adjusted to 80-85%, and the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to
5-10%, the second pilot trench quenching put into by second group of workpiece, after 1-2 minute put into by second group of workpiece, will be cold for the second pilot trench endoporus
But the open degree of valve and the second pilot trench outside cooling valve is adjusted to 50-70%, the first pilot trench endoporus is cooled down valve and first simultaneously
Outside pilot trench, the open degree of cooling valve is adjusted to 25-35%, cooling valve dimension outside the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench
Hold the open degree of 5-10%;When 27-29 minute put into by first group of workpiece, the first pilot trench endoporus is cooled down valve and the first pilot trench
Outside cooling valve open degree is adjusted to 10%, and the second pilot trench endoporus cools down the open degree adjustment of cooling valve outside valve and the second pilot trench
To 25-35%, the open degree that the 3rd pilot trench endoporus cools down cooling valve outside valve and the 3rd pilot trench adjusts to 50-70%, the 3rd son
Groove enters and treats running status;
3), after 29-31 minute put into by first group of workpiece, cooling outside the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench
The open degree of valve adjusts to 80-85%, and outside the second pilot trench endoporus cooling valve and the second pilot trench, cooling valve is adjusted to 5-10%'s
Open degree, the 3rd group of workpiece is put into the 3rd pilot trench quenching;After 1-2 minute put into by the 3rd group of workpiece, the 3rd pilot trench endoporus is cold
But the open degree of valve and the 3rd pilot trench outside cooling valve is adjusted to 50-70%, outside the second pilot trench endoporus cooling valve and the second pilot trench
The open degree that portion cools down valve is adjusted to 25-35%, and the first pilot trench endoporus cools down the open degree of cooling valve outside valve and the first pilot trench
Maintain 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operation machine was at 1 minute
Interior first group of workpiece is transported outward, be then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench;
5), repeat step 1) -4), realize consecutive production.
Further, described collecting and distributing type is heat-treated cooling means, comprises the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to 80%,
Second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve, the second pilot trench
Outside outside cooling valve and the 3rd pilot trench, the open degree of cooling valve is all adjusted to 10%;First group of workpiece is put into the first pilot trench,
When first group of workpiece puts into 2 minutes, the open degree that adjustment first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is
60%;When first group of workpiece puts into the 13rd minute, the first pilot trench endoporus is cooled down cooling valve outside valve and the first pilot trench and opens
Degree is adjusted to 30%, and meanwhile, the open degree that the second pilot trench endoporus is cooled down cooling valve outside valve and the second pilot trench is adjusted to 60%,
Second pilot trench enters treats running status, and the 3rd pilot trench endoporus cools down the unlatching that cooling valve outside valve and the 3rd pilot trench maintains 10%
Degree;
2), when first group of workpiece puts into the 15th minute, cooling valve outside the second pilot trench endoporus cooling valve and the second pilot trench
Open degree be adjusted to 80%, the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to 10%,
The second pilot trench quenching put into by second group of workpiece, when second group of workpiece puts into 2 minutes, the second pilot trench endoporus is cooled down valve and second
Outside pilot trench, the open degree of cooling valve is adjusted to 60%, the first pilot trench endoporus is cooled down cooling valve outside valve and the first pilot trench simultaneously
Open degree be adjusted to 30%, the 3rd pilot trench endoporus cools down the open degree that cooling valve outside valve and the 3rd pilot trench maintains 10%;When
When first group of workpiece puts into the 28th minute, the first pilot trench endoporus is cooled down cooling valve open degree outside valve and the first pilot trench and is adjusted to
10%, the second pilot trench endoporus cool down cooling valve outside valve and the second pilot trench open degree adjust cold to 30%, the 3rd pilot trench endoporus
But the open degree of valve and the 3rd pilot trench outside cooling valve adjusts to enter to 60%, the 3rd pilot trench and treats running status;
3), when first group of workpiece puts into the 30th minute, cooling valve outside the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench
Open degree adjust and cool down, to 80%, second pilot trench endoporus, the open degree that cooling valve outside valve and the second pilot trench is adjusted to 10%,
3rd group of workpiece is put into the 3rd pilot trench quenching;When the 3rd group of workpiece puts into 2 minutes, the 3rd pilot trench endoporus cooling valve and the 3rd
Outside pilot trench, the open degree of cooling valve is adjusted to 60%, and the second pilot trench endoporus cools down the unlatching of cooling valve outside valve and the second pilot trench
Degree is adjusted to 30%, and the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operation machine is in 1 minute
First group of workpiece is transported outward, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench;
5), repeat step 1) -4), realize consecutive production.Cooling effect more preferably, more meets metal works in quenching process
In law of heat release.
Beneficial effect: the collecting and distributing type heat treatment cooling means of the present invention, meet heat release in quenching process for the metal works
Rule, adopts the dynamic type of cooling to adapt to extremely unbalanced law of heat release, thus reaching the cooling of Technology for Heating Processing requirement
Effect, and the collecting and distributing type of present invention heat treatment cooling means small investment, achievable consecutive production.
Brief description
Fig. 1 is the heating curve in quenching for the quenching tank;
Fig. 2 is the structural representation of the collecting and distributing type heat treatment cooling device of the present invention;
Fig. 3 is flow during three pilot trench continuous quenchings operations of collecting and distributing type heat treatment cooling device of the present invention;
Fig. 4 is the structural representation of pilot trench.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, it is further elucidated with the present invention it should be understood that these embodiments are merely to illustrate
The present invention rather than restriction the scope of the present invention, after having read the present invention, those skilled in the art are each to the present invention
The modification planting the equivalent form of value all falls within the application claims limited range.
Refer to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of collecting and distributing type is heat-treated cooling device, including unit quenching tank, the
One pilot trench 1, the second pilot trench 2, the 3rd pilot trench 3, the 3rd pilot trench endoporus cooling valve 4, the second pilot trench endoporus cooling valve 5, the first pilot trench
Valve 9, pilot trench is cooled down outside endoporus cooling valve 6, the 3rd pilot trench outside cooling valve 7, the second pilot trench outside cooling valve 8, the first pilot trench
Overflow pipe 10, public sedimentation basin 11, public water pump 12, cooling tower feed pipe 13, cooling water supervisor 14, cooling waterside pipe 15 and cold
But tower 16.Cooling tower feed pipe 13, cooling water supervisor 14 all connect cooling tower 16 with cooling waterside pipe 15.
Unit quenching tank includes the first pilot trench 1, the second pilot trench 2 and the 3rd pilot trench 3, the first pilot trench 1, the second pilot trench 2 and
Three pilot trench 3 are pilot trench.Wherein, pilot trench includes quenching tank, outside cooling medium pipe 21, submersible agitator 23, endoporus cooling Jie
Matter pipe 24, nozzle 25 and locator 26, outside cooling medium pipe 21 is arranged on the bottom of quenching tank, outside cooling medium pipe 21
Part in quenching tank has spout 22 upward, and the top of spout 22 is provided with submersible agitator 23, submersible agitator 23
Top be provided with workbench, the lower section of workbench is provided with endoporus cooling medium pipe 24, on endoporus cooling medium pipe 24 arrange
There is nozzle 25 upward, the top of workbench is provided with locator 26, locator 26 is hollow, can pass through endoporus cooling medium
Stream realizes the cooling to inner hole of workpiece.Potential energy produced by installing using cooling tower is high-order, is realized to workpiece using hollow jet flow
The cooling of endoporus.Carry out special quenching cooling using the workpiece that the present invention can have particular/special requirement to oil well head equipment etc.;Especially
Its inner hole of workpiece can be carried out strength cool down so that inner hole of workpiece position with outside hardness reach consistent.Nozzle 25 connects
Locator 26.Wherein, workbench is provided with concave station, the bottom of locator 26 is coordinated with concave station, the top of locator 26 is cone
Shape.The top of locator 26 is made up of the gusset of cross, and the gusset of cross has certain gradient, can with quenching part in
Match in hole.
Preferably, the quantity of spout 22 and submersible agitator 23 is 3.The quantity of nozzle 25 and locator 26 is 4
Individual.
3rd pilot trench 3, the second pilot trench 2 all connect cooling waterside pipe 15 with the endoporus cooling medium pipe 24 of the first pilot trench 1.The
3rd pilot trench endoporus cooling valve is respectively arranged with the endoporus cooling medium pipe 24 of three pilot trench 3, the second pilot trench 2 and the first pilot trench 1
4th, the second pilot trench endoporus cooling valve 5 and the first pilot trench endoporus cooling valve 6.Outside 3rd pilot trench 3, the second pilot trench 2 and the first pilot trench 1
Portion's cooling medium pipe 21 all connects cooling water supervisor 14.The outside cooling medium of the 3rd pilot trench 3, the second pilot trench 2 and the first pilot trench 1
Cooling valve 9 outside cooling valve 7 outside 3rd pilot trench, the second pilot trench outside cooling valve 8 and the first pilot trench is respectively arranged with pipe 21.
Overflow pipe 10 connected unit quenching tank and public sedimentation basin 11, public sedimentation basin 11 passes through public water pump 12 and cooling
Tower feed pipe 13 connects cooling tower.
Inventive principle:
Unit quenching tank is made up of the first pilot trench 1, the second pilot trench 2 and the 3rd pilot trench 3.Public water water supplying pump to cooling tower,
The cooled water of cooling tower water outlet is responsible for 14 to three pilot trench and the outside of workpiece is cooled down.Cooling tower water outlet cooled waterside pipe
15 to three pilot trench cool down to the endoporus of workpiece.3rd pilot trench endoporus cooling valve 4, the second pilot trench endoporus cooling valve 5 and the
One pilot trench endoporus cooling valve 6 is separately mounted on three pilot trench endoporus cooling water pipes, cooling valve 7, second outside the 3rd pilot trench
Outside groove, cooling valve 8 and the first pilot trench outside cooling valve 9 are separately mounted on the outside cooling water pipe of three pilot trench, this six valves
By system control, according to the different operating modes of three pilot trench quenchings, provide the cooling medium of inequality.10 is the overflow of pilot trench
Pipe, forms the circulatory system with public sedimentation basin 11 and public water pump 12.
The collecting and distributing type heat treatment cooling device structure of the present invention is simple, and small investment saves floor space, comprehensive benefit is high.
The heating curve in quenching for the quenching tank.It can be seen that, in a during workpiece quenching minute, it is the peak of heat release
Period, and after 5-6 minute, the heat release of workpiece gradually ease up it can be seen that, in quenching process, adopt one from start to finish not
The cooling flow becoming is it is clear that be the actual law of heat release not meeting workpiece.If by peak configuration, the capacity of cooling system is extremely
Three times greater less, and after 5-6 minute, the inevitable waste again causing equipment and the energy.
Present invention aim to overcoming drawbacks described above, designing a kind of brand-new cooling device, realizing large batch of company
The prouctiveness of continuous property quenching.The present invention fully studies law of heat release in quenching process for the metal works, using dynamically cold
But mode to be to adapt to extremely unbalanced law of heat release, thus reaching the cooling effect of Technology for Heating Processing requirement.The present invention adopts one
Platform large cooling column replaces multiple stage cooling tower, thus in the workpiece peak heat release period, adjustable substantial amounts of cooling medium, to meet
The special hardening of deep-sea oil well head product requires, and is a unit using three quenching tanks, presses rule in three quenching tanks
The fixed time period, regularly carry out the operation that quenches, and rely on a cooling tower that three different coolings of quenching tank are required to carry
For the cooling medium of inequality, thus the quenching demand of three quenching tanks can be met simultaneously.Deep-sea oil well head product can be met,
The special quenching of especially " 4130 " (yield strength 80k and 105k) " 8630 and f22 " (yield strength 80k, 105k, 120k)
Require.Small investment of the present invention, saves floor space, and comprehensive benefit is high.
The invention discloses a kind of collecting and distributing type is heat-treated cooling means, using collecting and distributing type heat treatment cooling device as above,
Comprise the following steps:
1), the starting stage, the first pilot trench endoporus cools down the open degree adjustment of cooling valve (9) outside valve (6) and the first pilot trench
For 80-85%, the second pilot trench and the 3rd pilot trench enter the preparatory stage, and the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus are cold
But outside valve (5), the second pilot trench outside cooling valve (8) and the 3rd pilot trench, the open degree of cooling valve (7) is all adjusted to 5-10%;Will
The first pilot trench (1) put into by first group of workpiece, after 1-2 minute put into by first group of workpiece, adjustment the first pilot trench endoporus cooling valve (6)
Open degree with cooling valve (9) outside the first pilot trench is 50-70%;When 12-14 minute put into by first group of workpiece, by first
Outside pilot trench endoporus cooling valve (6) and the first pilot trench, cooling valve (9) open degree is adjusted to 25-35%, meanwhile, by the second pilot trench
The open degree that hole cools down cooling valve (8) outside valve (5) and the second pilot trench is adjusted to 50-70%, and the second pilot trench (2) enters to be waited to run
State, the 3rd pilot trench endoporus cools down the open degree that cooling valve (7) outside valve (4) and the 3rd pilot trench maintains 10%;
2), when 14-16 minute put into by first group of workpiece, outside the second pilot trench endoporus cooling valve (5) and the second pilot trench
The open degree of cooling valve (8) is adjusted to 80-85%, and the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench
Open degree is adjusted to 5-10%, and the second pilot trench (2) quenching put into by second group of workpiece, after 1-2 minute put into by second group of workpiece, will
The open degree that second pilot trench endoporus cools down cooling valve (8) outside valve (5) and the second pilot trench is adjusted to 50-70%, simultaneously by first
The open degree that pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to 25-35%, and the 3rd pilot trench endoporus is cold
But cool down, outside valve (4) and the 3rd pilot trench, the open degree that valve (7) maintains 5-10%;When 27-29 minute put into by first group of workpiece
When, the first pilot trench endoporus is cooled down cooling valve (9) open degree outside valve (6) and the first pilot trench and is adjusted to 10%, in the second pilot trench
The open degree that hole cools down cooling valve (8) outside valve (5) and the second pilot trench adjusts to 25-35%, the 3rd pilot trench endoporus cooling valve (4)
Adjust to 50-70% with the open degree of cooling valve (7) outside the 3rd pilot trench, the 3rd pilot trench (3) enters and treats running status;
3), after 29-31 minute put into by first group of workpiece, outside the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench
The open degree of cooling valve (7) adjusts to 80-85%, and cooling valve (8) outside the second pilot trench endoporus cooling valve (5) and the second pilot trench is adjusted
The whole open degree for 5-10%, the 3rd group of workpiece is put into the 3rd pilot trench quenching;After 1-2 minute put into by the 3rd group of workpiece, the
The open degree that three pilot trench endoporus cool down cooling valve (7) outside valve (4) and the 3rd pilot trench is adjusted to 50-70%, the second pilot trench endoporus
Cooling valve (5) and the second pilot trench outside cooling valve (8) open degree be adjusted to 25-35%, first pilot trench endoporus cool down valve (6) and
Outside first pilot trench, the open degree of cooling valve (9) maintains 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operation machine was at 1 minute
Interior first group of workpiece is transported outward, be then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench (1);
5), repeat step 1) -4), realize consecutive production.
Preferably, above-mentioned steps specifically can adopt following parameter:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve 9 outside valve 6 and the first pilot trench is adjusted to
80%, the second pilot trench and the 3rd pilot trench enter the preparatory stage, the 3rd pilot trench endoporus cooling valve 4, the second pilot trench endoporus cooling valve 5,
The open degree that second pilot trench exit orifice cools down cooling valve 7 outside valve 8 and the 3rd pilot trench is all adjusted to 10%;First group of workpiece is put into
First pilot trench 1, when first group of workpiece puts into 2 minutes, cooling valve outside adjustment the first pilot trench endoporus cooling valve 6 and the first pilot trench
9 open degree is 60%;When first group of workpiece puts into the 13rd minute, the first pilot trench endoporus is cooled down outside valve 6 and the first pilot trench
Portion's cooling valve 9 open degree is adjusted to 30%, meanwhile, the second pilot trench endoporus is cooled down and cools down opening of valve 8 outside valve 5 and the second pilot trench
Qi Du is adjusted to 60%, and the second pilot trench 2 enters and treats running status, cooling outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench
Valve 7 maintains 10% open degree;
2), when first group of workpiece puts into the 15th minute, cooling valve outside the second pilot trench endoporus cooling valve 5 and the second pilot trench
8 open degree is adjusted to 80%, and the open degree that the first pilot trench endoporus cools down cooling valve 9 outside valve 6 and the first pilot trench is adjusted to
10%, second group of workpiece is put into the second pilot trench 2 and is quenched, and when second group of workpiece puts into 2 minutes, the second pilot trench endoporus is cooled down valve
The open degree of 5 and second valves 8 of cooling outside pilot trench is adjusted to 60%, the first pilot trench endoporus is cooled down valve 6 and the first pilot trench simultaneously
The open degree of outside cooling valve 9 is adjusted to 30%, and outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench, cooling valve 7 maintains
10% open degree;When first group of workpiece puts into the 28th minute, the first pilot trench endoporus is cooled down valve 6 and the first pilot trench is outside cold
But valve 9 open degree is adjusted to 10%, the second pilot trench endoporus cool down cooling valve 8 outside valve 5 and the second pilot trench open degree adjust to
30%, the 3rd pilot trench endoporus cools down valve 4 and the outside open degree cooling down valve 7 of the 3rd pilot trench adjusts and enters to 60%, the 3rd pilot trench 3
Treat running status;
3), when first group of workpiece puts into the 30th minute, cooling valve outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench
7 open degree adjusts and cools down, to 80%, second pilot trench endoporus, the unlatching that cooling valve 8 outside valve 5 and the second pilot trench is adjusted to 10%
Degree, the 3rd group of workpiece is put into the 3rd pilot trench quenching;When the 3rd group of workpiece puts into 2 minutes, the 3rd pilot trench endoporus cooling valve 4 He
Outside 3rd pilot trench, the open degree of cooling valve 7 is adjusted to 60%, cooling valve outside the second pilot trench endoporus cooling valve 5 and the second pilot trench
8 open degree is adjusted to 30%, and the open degree that the first pilot trench endoporus cools down cooling valve 9 outside valve 6 and the first pilot trench maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operation machine is in 1 minute
First group of workpiece is transported outward, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench 1;
5), repeat step 1) -4), realize consecutive production.
The collecting and distributing type heat treatment cooling means of the present invention, law of heat release in quenching process for the load wire workpiece, adopt
The dynamic type of cooling is to adapt to extremely unbalanced law of heat release, thus reaching the cooling effect of Technology for Heating Processing requirement, and
The collecting and distributing type heat treatment cooling means small investment of the present invention, achievable consecutive production.
Embodiment 1
Multinomial die forging be consecutive production, rhythm be 15 minutes four.For configuration three pilot trench unit quenching tank, often
Interval can carry out primary quenching for 15 minutes, and the cool time of technique setting is 45 minutes.Namely when the first pilot trench enters water quenching
15 minutes afterwards, the second pilot trench started into water quenching, and after the second pilot trench enters water quenching 15 minutes, the 3rd pilot trench starts into water quenching
Fire, when the 3rd pilot trench enters water quenching 15 minutes, the first pilot trench has completed the quenching of 45 minutes it is necessary to quenching of next round is met in discharging
Fire.A unit quenching tank being made up of three pilot trench is exactly the circulate operation so gone round and begun again, and realizes consecutive production
Function.
After first group of workpiece is come out of the stove, infrared ray sensor sends signal, and cooling tower supply-water pump 11 starts.System default
One pilot trench enters the starting stage run, and outside the first pilot trench endoporus cooling valve 6 and the first pilot trench, cooling valve 9 opens 80%, and
Second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve 4, second pilot trench endoporus cooling valve the 5, first son
Outside groove endoporus cooling valve 6 and the 3rd pilot trench, cooling valve 7 all opens 10%, and unit quenching tank is prepared the stage, and now first
Pilot trench has been enter into the circular flow state of big flow.
First group of 4 workpiece simultaneously enters the first pilot trench quenching, and cooling medium consumption reaches the 80% of total flow.After 2 minutes,
Workpiece peak heat release mistake, system call interception the first pilot trench endoporus cools down valve 6 and the open degree of the first pilot trench outside cooling valve 9 is
60%.
When first group of workpiece enters the first pilot trench the 13rd minute, that is, first 2 minutes of second group of workpiece quenching, system is by the
Outside one pilot trench endoporus cooling valve 6 and the first pilot trench, cooling valve 9 open degree is adjusted to 30%, keeps 30% inflow, meanwhile,
The inlet valve 5 and 8 of the second pilot trench is opened to enter to 60%, second pilot trench and is treated running status by system.3rd pilot trench endoporus cooling
Outside valve 4 and the 3rd pilot trench, cooling valve 7 maintains 10% open degree.
When first group of workpiece entrance first pilot trench quenches the 15th minute, outside the second pilot trench endoporus cooling valve 5 and the second pilot trench
Portion's cooling valve 8 is driven cooling valve 9 greatly to 80%, first pilot trench endoporus cooling valve 6 and the first pilot trench further and is adjusted to 10%.
Second group of workpiece enters the second pilot trench quenching, and after 2 minutes, the quenching of the second pilot trench have passed through peak heat release, and system automatically will
Outside second pilot trench endoporus cooling valve 5 and the second pilot trench, cooling valve 8 is adjusted to 60%, the first pilot trench endoporus is cooled down valve 6 simultaneously
Drive cooling valve 7 greatly to 30%, the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench with cooling valve 9 outside the first pilot trench to maintain
10% open degree.
When first group of workpiece entrance first pilot trench quenches the 28th minute, that is, first 2 minutes of the 3rd group of workpiece quenching, it is
First pilot trench endoporus is cooled down cooling valve 9 open degree outside valve 6 and the first pilot trench and is adjusted to 10% by system automatically, the second pilot trench endoporus
Outside cooling valve 5 and the second pilot trench, cooling valve 8 is opened and is cooled down cooling valve 7 outside valve 4 and the 3rd pilot trench to 30%, the 3rd pilot trench endoporus
Open to enter to 60%, the 3rd pilot trench and treat running status.
When first group of workpiece entrance first pilot trench quenches the 30th minute, outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench
Portion's cooling valve 7 is driven cooling valve 8 greatly to 80%, second pilot trench endoporus cooling valve 5 and the second pilot trench further and is adjusted to 10%
Open degree, the 3rd group of workpiece enter the 3rd pilot trench quenching.When 3rd group of workpiece entrance the 3rd pilot trench quenches 2 minutes, the 3rd son
Outside groove endoporus cooling valve 4 and the 3rd pilot trench, cooling valve 7 is automatically regulated to be 60% again, the second pilot trench endoporus cooling valve 5 and second
Outside pilot trench, cooling valve 8 is 30%, and outside the first pilot trench endoporus cooling valve 6 and the first pilot trench, cooling valve 9 keeps 10%.
When first group of workpiece entrance first pilot trench quenches the 43rd minute, the first pilot trench quenching terminates water outlet, and operation machine is at 1 point
Complete the outward transport of quenching part in clock, be then return in situ, in 1 minute, the 4th batch of workpiece be sent into the first pilot trench, start new again
One wheel circulation;
Traffic conditions when three pilot trench continuous quenchings run are shown in Fig. 3.
Claims (3)
1. a kind of collecting and distributing type heat treatment cooling device it is characterised in that: include unit quenching tank, the first pilot trench (1), the second pilot trench
(2), the 3rd pilot trench (3), the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5), the first pilot trench endoporus cooling
Cooling valve (7), the second pilot trench outside cooling valve (8), the first pilot trench outside cooling valve (9), pilot trench outside valve (6), the 3rd pilot trench
Overflow pipe (10), public sedimentation basin (11), public water pump (12), cooling tower feed pipe (13), cooling water supervisor (14), cooling water
Secondary pipe (15) and cooling tower (16), described first pilot trench (1), the second pilot trench (2) and the 3rd pilot trench (3) are arranged at unit quenching
In groove, described first pilot trench (1), the second pilot trench (2) and the 3rd pilot trench (3) are pilot trench,
Described pilot trench include quenching tank, outside cooling medium pipe (21), submersible agitator (23), endoporus cooling medium pipe (24),
Nozzle (25) and locator (26), described outside cooling medium pipe (21) is arranged on the bottom of described quenching tank, and described outside is cold
But the part that medium tube (21) is located in described quenching tank has spout (22) upward, and the top of described spout (22) is provided with
Described submersible agitator (23), the top of described submersible agitator (23) is provided with workbench, the lower section setting of described workbench
There is endoporus cooling medium pipe (24), described endoporus cooling medium pipe (24) is provided with nozzle (25) upward, described workbench
Top be provided with described locator (26), described locator (26) is hollow, and described nozzle (25) connects described locator
(26);
Described cooling tower feed pipe (13), cooling water supervisor (14) all connect described cooling tower (16) with cooling waterside pipe (15);
Described 3rd pilot trench (3), the second pilot trench (2) and endoporus cooling medium pipe (24) of the first pilot trench (1) all connect described cold
But waterside pipe (15);
It is respectively arranged with endoporus cooling medium pipe (24) of described 3rd pilot trench (3), the second pilot trench (2) and the first pilot trench (1)
3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5) and the first pilot trench endoporus cooling valve (6);
Described 3rd pilot trench (3), the second pilot trench (2) and the outside cooling medium pipe (21) of the first pilot trench (1) all connect described cold
But water supervisor (14);
It is respectively arranged with the outside cooling medium pipe (21) of described 3rd pilot trench (3), the second pilot trench (2) and the first pilot trench (1)
Cooling valve (9) outside cooling valve (7), the second pilot trench outside cooling valve (8) and the first pilot trench outside 3rd pilot trench;
Described overflow pipe (10) connected unit quenching tank and described public sedimentation basin (11), described public sedimentation basin (11) passes through public affairs
Connect described cooling tower with water pump (12) with cooling tower feed pipe (13);
Concave station, the bottom of described locator (26) and described concave station cooperation, described locator (26) are provided with described workbench
Top be taper, the top of described locator (26) is made up of the gusset of cross;
The quantity of described spout (22) and submersible agitator (23) is 3, the quantity of described nozzle (25) and locator (26)
It is 4.
2. a kind of collecting and distributing type heat treatment cooling means it is characterised in that be heat-treated cold using collecting and distributing type as claimed in claim 1
But device, comprises the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to 80-
85%, the second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve
(5), outside the second pilot trench, the open degree of cooling valve (8) and the 3rd pilot trench outside cooling valve (7) is all adjusted to 5-10%;By first
The first pilot trench (1) put into by group workpiece, after 1-2 minute put into by first group of workpiece, adjustment the first pilot trench endoporus cooling valve (6) and the
Outside one pilot trench, the open degree of cooling valve (9) is 50-70%;When 12-14 minute put into by first group of workpiece, by the first pilot trench
Outside endoporus cooling valve (6) and the first pilot trench, cooling valve (9) open degree is adjusted to 25-35%, meanwhile, will be cold for the second pilot trench endoporus
But the open degree of valve (5) and the second pilot trench outside cooling valve (8) is adjusted to 50-70%, and the second pilot trench (2) enters shape to be run
State, the 3rd pilot trench endoporus cools down the open degree that cooling valve (7) outside valve (4) and the 3rd pilot trench maintains 10%;
2), when 14-16 minute put into by first group of workpiece, cooling outside the second pilot trench endoporus cooling valve (5) and the second pilot trench
The open degree of valve (8) is adjusted to 80-85%, and the first pilot trench endoporus cools down the unlatching of cooling valve (9) outside valve (6) and the first pilot trench
Degree is adjusted to 5-10%, and second group of workpiece puts into the second pilot trench (2) quenching, after 1-2 minute put into by second group of workpiece, by second
The open degree that pilot trench endoporus cools down cooling valve (8) outside valve (5) and the second pilot trench is adjusted to 50-70%, simultaneously by the first pilot trench
The open degree that endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to 25-35%, the 3rd pilot trench endoporus cooling valve
(4) and cool down the open degree of valve (7) maintenance 5-10% outside the 3rd pilot trench;When 27-29 minute put into by first group of workpiece, will
Outside first pilot trench endoporus cooling valve (6) and the first pilot trench, cooling valve (9) open degree is adjusted to 10%, the second pilot trench endoporus cooling
Outside valve (5) and the second pilot trench, the open degree of cooling valve (8) adjusts to 25-35%, the 3rd pilot trench endoporus cooling valve (4) and the 3rd
Outside pilot trench, the open degree of cooling valve (7) adjusts to 50-70%, and the 3rd pilot trench (3) enters and treats running status;
3), after 29-31 minute put into by first group of workpiece, cooling outside the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench
The open degree of valve (7) adjusts to 80-85%, and cooling valve (8) outside the second pilot trench endoporus cooling valve (5) and the second pilot trench is adjusted to
The open degree of 5-10%, the 3rd group of workpiece is put into the 3rd pilot trench quenching;After 1-2 minute put into by the 3rd group of workpiece, the 3rd son
The open degree that groove endoporus cools down cooling valve (7) outside valve (4) and the 3rd pilot trench is adjusted to 50-70%, the second pilot trench endoporus cooling
Outside valve (5) and the second pilot trench, the open degree of cooling valve (8) is adjusted to 25-35%, the first pilot trench endoporus cooling valve (6) and first
Outside pilot trench, the open degree of cooling valve (9) maintains 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operation machine will in 1 minute
First group of workpiece outward transport, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench (1);
5), repeat step 1) -4), realize consecutive production.
3. collecting and distributing type heat treatment cooling means as claimed in claim 2 is it is characterised in that comprise the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to
80%, the second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve
(5), outside the second pilot trench, the open degree of cooling valve (8) and the 3rd pilot trench outside cooling valve (7) is all adjusted to 10%;By first group
The first pilot trench (1) put into by workpiece, and when first group of workpiece puts into 2 minutes, adjustment first pilot trench endoporus cools down valve (6) and the first son
Outside groove, the open degree of cooling valve (9) is 60%;When first group of workpiece puts into the 13rd minute, the first pilot trench endoporus is cooled down valve
(6) outside and the first pilot trench, cooling valve (9) open degree is adjusted to 30%, meanwhile, the second pilot trench endoporus is cooled down valve (5) and second
Outside pilot trench, the open degree of cooling valve (8) is adjusted to 60%, and the second pilot trench (2) enters and treats running status, and the 3rd pilot trench endoporus is cold
But cool down, outside valve (4) and the 3rd pilot trench, the open degree that valve (7) maintains 10%;
2), when first group of workpiece puts into the 15th minute, cooling valve outside the second pilot trench endoporus cooling valve (5) and the second pilot trench
(8) open degree is adjusted to 80%, and the open degree that the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted
Whole is 10%, and second group of workpiece puts into the second pilot trench (2) quenching, when second group of workpiece puts into 2 minutes, by the second pilot trench endoporus
Outside cooling valve (5) and the second pilot trench, the open degree of cooling valve (8) is adjusted to 60%, the first pilot trench endoporus is cooled down valve simultaneously
(6) outside and the first pilot trench, the open degree of cooling valve (9) is adjusted to 30%, and the 3rd pilot trench endoporus cools down valve (4) and the 3rd pilot trench
Outside cooling valve (7) maintains 10% open degree;When first group of workpiece puts into the 28th minute, the first pilot trench endoporus is cooled down valve
(6) outside and the first pilot trench, cooling valve (9) open degree is adjusted to 10%, outside the second pilot trench endoporus cooling valve (5) and the second pilot trench
The open degree that portion cools down valve (8) adjusts to 30%, the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench cooling valve (7)
Open degree adjusts to enter to 60%, the 3rd pilot trench (3) treats running status;
3), when first group of workpiece puts into the 30th minute, cooling valve outside the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench
(7) open degree adjusts to 80%, second pilot trench endoporus cooling valve (5) and the second pilot trench cooling valve (8) and is adjusted to 10%
Open degree, by the 3rd group of workpiece put into the 3rd pilot trench quenching;When the 3rd group of workpiece puts into 2 minutes, the 3rd pilot trench endoporus is cold
But the open degree of valve (4) and the 3rd pilot trench outside cooling valve (7) is adjusted to 60%, the second pilot trench endoporus cooling valve (5) and second
Outside pilot trench, the open degree of cooling valve (8) is adjusted to 30%, cooling valve outside the first pilot trench endoporus cooling valve (6) and the first pilot trench
(9) open degree maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operation machine is in 1 minute by the
One group of workpiece outward transport, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench (1);
5), repeat step 1) -4), realize consecutive production.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410712757.3A CN104451067B (en) | 2014-11-28 | 2014-11-28 | Centralized/distributed heat treatment cooling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410712757.3A CN104451067B (en) | 2014-11-28 | 2014-11-28 | Centralized/distributed heat treatment cooling device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104451067A CN104451067A (en) | 2015-03-25 |
CN104451067B true CN104451067B (en) | 2017-01-25 |
Family
ID=52897811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410712757.3A Active CN104451067B (en) | 2014-11-28 | 2014-11-28 | Centralized/distributed heat treatment cooling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104451067B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114540585A (en) * | 2020-11-20 | 2022-05-27 | 南京迪威尔高端制造股份有限公司 | Quenching heat treatment method for forged piece with hole |
CN114517251A (en) * | 2020-11-20 | 2022-05-20 | 南京迪威尔高端制造股份有限公司 | Heat treatment cooling device and method for 15-5PH stainless steel shale gas fracturing pump |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1239717C (en) * | 2003-12-30 | 2006-02-01 | 上海交通大学 | Controlled cooling equipment of immersion and spray quenching combined quench-hardening |
CN2866519Y (en) * | 2005-11-29 | 2007-02-07 | 宝山钢铁股份有限公司 | Steel pipe water quenching heat treatment device |
CN100595291C (en) * | 2008-04-03 | 2010-03-24 | 上海交通大学 | Multi-station quenching cooling equipment realizing fluid-immersion quenching by liquid level change |
DE202009005685U1 (en) * | 2009-04-16 | 2009-06-18 | Schlager Industrieofenbau Gmbh | Quenching or cooling device |
CN202913028U (en) * | 2012-10-25 | 2013-05-01 | 衡阳华菱钢管有限公司 | Water quenching control device for steel pipe |
CN203866360U (en) * | 2014-03-10 | 2014-10-08 | 北京机电研究所 | Continuous outward spray quenching device for oil casing |
CN103882199B (en) * | 2014-03-13 | 2017-03-15 | 广东坚宜佳五金制品有限公司 | The method and system of speciality Quenching apparatus of rod parts cooling |
-
2014
- 2014-11-28 CN CN201410712757.3A patent/CN104451067B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104451067A (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104451067B (en) | Centralized/distributed heat treatment cooling device | |
CN107058697B (en) | A kind of water hardening device of large-sized end enclosure | |
CN105803170B (en) | A kind of aluminium alloy cylindrical member spray quenching apparatus and its application method | |
CN102729350B (en) | Be used in the cooling system on the excavation machine of cut crystal | |
US10151480B2 (en) | Reactor for hydrothermal carbonization with optimized mixture of sludge and steam | |
CN102925641A (en) | Method for controlling flow fields in quenching water tank of large cylindrical workpiece | |
CN109807408A (en) | A kind of tapping device for shaft processing | |
CN106702122A (en) | Quenching cooling device for large seal head | |
CN101469359B (en) | Vertical spray quenching apparatus and quenching technique | |
CN107252877A (en) | Mould multiple spot cooling body and its hub mold of application | |
CN208594314U (en) | The quenching unit that workpiece is uniformly cooled down by adjusting flow velocity | |
CN207942248U (en) | A kind of drilling machine heat sink | |
CN207127221U (en) | Mould multiple spot cooling body and its hub mold of application | |
CN108588364A (en) | The quenching unit that workpiece is uniformly cooled down by adjusting flow velocity | |
CN103882199B (en) | The method and system of speciality Quenching apparatus of rod parts cooling | |
CN102181338A (en) | Fermentation tank group | |
CN205974600U (en) | Quenching and cooling device | |
CN205907158U (en) | Mud waste liquid pyrohydrolysis equipment | |
CN105382164B (en) | A kind of stem one-shaper | |
CN108180763A (en) | A kind of calcium carbide device for recycling heat and application method | |
CN203820845U (en) | Large-sized multifunctional vertical type water-soaking and air-blowing quenching device | |
CN202680450U (en) | Continuous extracting device for reconstituted tobacco raw materials | |
CN106348553A (en) | A set of three-sludge recycling treatment technology | |
CN210215462U (en) | Circulating water quenching device for PC steel bar production line | |
CN204737988U (en) | A equipment for turning round workpiece surface quenches |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |