CN104451067B - Centralized/distributed heat treatment cooling device - Google Patents

Centralized/distributed heat treatment cooling device Download PDF

Info

Publication number
CN104451067B
CN104451067B CN201410712757.3A CN201410712757A CN104451067B CN 104451067 B CN104451067 B CN 104451067B CN 201410712757 A CN201410712757 A CN 201410712757A CN 104451067 B CN104451067 B CN 104451067B
Authority
CN
China
Prior art keywords
pilot trench
valve
cooling
endoporus
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410712757.3A
Other languages
Chinese (zh)
Other versions
CN104451067A (en
Inventor
郭玉玺
沈石龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd
Original Assignee
NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd filed Critical NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd
Priority to CN201410712757.3A priority Critical patent/CN104451067B/en
Publication of CN104451067A publication Critical patent/CN104451067A/en
Application granted granted Critical
Publication of CN104451067B publication Critical patent/CN104451067B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/63Quenching devices for bath quenching
    • C21D1/64Quenching devices for bath quenching with circulating liquids
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D11/00Process control or regulation for heat treatments
    • C21D11/005Process control or regulation for heat treatments for cooling

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a centralized/distributed heat treatment cooling device. The centralized/distributed heat treatment cooling device comprises a quenching tank, a first cooling medium pipe, a submersible mixer, a second cooling medium pipe, a nozzle and a positioner, wherein the first cooling medium pipe is arranged at the bottom of the quenching tank; an upward spout is arranged on the part, located in the quenching tank, of the first cooling medium pipe; the submersible mixer is arranged above the spout; a worktable is arranged above the submersible mixer; the second cooling medium pipe is arranged under the worktable; an upward nozzle is arranged on the second cooling medium pipe; the positioner is arranged above the worktable; the positioner is hollow; the nozzle is communicated with the positioner. The invention also discloses a centralized distributed heat treatment cooling method based on the centralized distributed heat treatment cooling device. The centralized distributed heat treatment cooling device is simple in structure, low in investment, small in floor area and high in comprehensive benefits.

Description

A kind of collecting and distributing type is heat-treated cooling device
Technical field
The present invention relates to a kind of collecting and distributing type is heat-treated cooling device.
Background technology
At present, domestic commonly used be " multi-layer annular jet agitator ", " multitube external water spray agitator ".The former is big It is used for annular quenching tank, because the speed of annular water flow is faster, centrifugal force is bigger, and the current that this results in injection are more anxious, shape The rotary water current becoming is faster, and the flow velocity of cannelure medium position is slower, and therefore actually used effect is bad;The external spray of multitube Water agitator, due to external stirrer, the stroke of water spray stirring is 2 times of stirring distance in groove.Therefore, both agitating modes Intensity of cooling low, especially can not solve the problems, such as the cooling of inner hole of workpiece, more be unable to reach the extraordinary material of deep sea drilling equipment The special quenching of material " 4130 " (yield strength 80k and 105k) " 8630 and f22 " (yield strength 80k, 105k, 120k) will Ask.
Accordingly, it would be desirable to a kind of new heat treatment cooling device is to solve the above problems.
Content of the invention
The purpose of the present invention is the defect for prior art, provides a kind of collecting and distributing type heat treatment cooling device.
For achieving the above object, collecting and distributing type heat treatment cooling device of the present invention can adopt the following technical scheme that
A kind of collecting and distributing type is heat-treated cooling device, including unit quenching tank, the first pilot trench, the second pilot trench, the 3rd pilot trench, the Three pilot trench endoporus cooling valves, the second pilot trench endoporus cooling valve, the first pilot trench endoporus cooling valve, the 3rd valve of cooling outside pilot trench, the Outside two pilot trench, cooling valve, the first pilot trench outside cooling valve, pilot trench overflow pipe, public sedimentation basin, public water pump, cooling tower supply water Pipe, cooling water supervisor, cooling waterside pipe and cooling tower, described unit quenching tank includes the first pilot trench, the second pilot trench and the 3rd son Groove, described first pilot trench, the second pilot trench and the 3rd pilot trench are pilot trench,
Described pilot trench includes quenching tank, outside cooling medium pipe, submersible agitator, endoporus cooling medium pipe, nozzle and determines Position device, described outside cooling medium pipe is arranged on the bottom of described quenching tank, and described outside cooling medium pipe is located at described quenching Part in groove has spout upward, and the top of described spout is provided with described submersible agitator, described submersible agitator Top is provided with workbench, and the lower section of described workbench is provided with endoporus cooling medium pipe, described endoporus cooling medium Guan Shangshe It is equipped with nozzle upward, the top of described workbench is provided with described locator, described locator is hollow, described nozzle is even Lead to described locator;
Described cooling tower feed pipe, cooling water supervisor all connect described cooling tower with cooling waterside pipe;
The endoporus cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench all connects described cooling waterside pipe;
It is respectively arranged with the 3rd pilot trench on the endoporus cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench Hole cooling valve, the second pilot trench endoporus cooling valve and the first pilot trench endoporus cooling valve;
The outside cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench all connects described cooling water supervisor;
It is respectively arranged with outside the 3rd pilot trench on the outside cooling medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench Valve is cooled down outside cooling valve and the first pilot trench outside portion's cooling valve, the second pilot trench;
Described overflow pipe connected unit quenching tank and described public sedimentation basin, described public sedimentation basin pass through public water pump and Cooling tower feed pipe connects described cooling tower.
Inventive principle:
Unit quenching tank is made up of the first pilot trench, the second pilot trench and the 3rd pilot trench.Public water water supplying pump, to cooling tower, cools down The cooled water of tower water outlet is responsible for three pilot trench and the outside of workpiece is cooled down;Cooling tower water outlet cooled waterside Guan Zhisan Pilot trench cools down to the endoporus of workpiece.3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve and the first pilot trench endoporus Cooling valve is separately mounted on three pilot trench endoporus cooling water pipes, cooling valve, the second pilot trench outside cooling valve outside the 3rd pilot trench It is separately mounted on the outside cooling water pipe of three pilot trench with cooling valve outside the first pilot trench, this six valves are controlled by system, According to the different operating modes of three pilot trench quenchings, provide the cooling medium of inequality.The overflow pipe of pilot trench, with public sedimentation basin and Public water pump group becomes the circulatory system.
Further, described workbench is provided with concave station, the bottom of described locator and described concave station cooperation, described The top of locator is taper.
Further, the quantity of described spout and submersible agitator is 3.
Further, the quantity of described nozzle and locator is 4.
Further, the top of described locator is made up of the gusset of cross.
Beneficial effect: the collecting and distributing type heat treatment cooling device structure of the present invention is simple, small investment saves floor space, comprehensive Close high efficiency.
The invention also discloses a kind of collecting and distributing type is heat-treated cooling means, cooling is heat-treated using collecting and distributing type as above Device, comprises the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to 80- 85%, the second pilot trench and the 3rd pilot trench enter the preparatory stage, the 3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve, the Outside two pilot trench, the open degree of cooling valve and the 3rd pilot trench outside cooling valve is all adjusted to 5-10%;First group of workpiece is put into One pilot trench, after 1-2 minute put into by first group of workpiece, adjustment first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench Open degree is 50-70%;When 12-14 minute put into by first group of workpiece, the first pilot trench endoporus is cooled down valve and the first pilot trench Outside cooling valve open degree is adjusted to 25-35%, meanwhile, the second pilot trench endoporus is cooled down cooling valve outside valve and the second pilot trench Open degree is adjusted to 50-70%, and the second pilot trench enters and treats running status, and the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench are outside cold But valve maintains 10% open degree;
2), when 14-16 minute put into by first group of workpiece, cooling outside the second pilot trench endoporus cooling valve and the second pilot trench The open degree of valve is adjusted to 80-85%, and the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to 5-10%, the second pilot trench quenching put into by second group of workpiece, after 1-2 minute put into by second group of workpiece, will be cold for the second pilot trench endoporus But the open degree of valve and the second pilot trench outside cooling valve is adjusted to 50-70%, the first pilot trench endoporus is cooled down valve and first simultaneously Outside pilot trench, the open degree of cooling valve is adjusted to 25-35%, cooling valve dimension outside the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench Hold the open degree of 5-10%;When 27-29 minute put into by first group of workpiece, the first pilot trench endoporus is cooled down valve and the first pilot trench Outside cooling valve open degree is adjusted to 10%, and the second pilot trench endoporus cools down the open degree adjustment of cooling valve outside valve and the second pilot trench To 25-35%, the open degree that the 3rd pilot trench endoporus cools down cooling valve outside valve and the 3rd pilot trench adjusts to 50-70%, the 3rd son Groove enters and treats running status;
3), after 29-31 minute put into by first group of workpiece, cooling outside the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench The open degree of valve adjusts to 80-85%, and outside the second pilot trench endoporus cooling valve and the second pilot trench, cooling valve is adjusted to 5-10%'s Open degree, the 3rd group of workpiece is put into the 3rd pilot trench quenching;After 1-2 minute put into by the 3rd group of workpiece, the 3rd pilot trench endoporus is cold But the open degree of valve and the 3rd pilot trench outside cooling valve is adjusted to 50-70%, outside the second pilot trench endoporus cooling valve and the second pilot trench The open degree that portion cools down valve is adjusted to 25-35%, and the first pilot trench endoporus cools down the open degree of cooling valve outside valve and the first pilot trench Maintain 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operation machine was at 1 minute Interior first group of workpiece is transported outward, be then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench;
5), repeat step 1) -4), realize consecutive production.
Further, described collecting and distributing type is heat-treated cooling means, comprises the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to 80%, Second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve, the second pilot trench Outside outside cooling valve and the 3rd pilot trench, the open degree of cooling valve is all adjusted to 10%;First group of workpiece is put into the first pilot trench, When first group of workpiece puts into 2 minutes, the open degree that adjustment first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is 60%;When first group of workpiece puts into the 13rd minute, the first pilot trench endoporus is cooled down cooling valve outside valve and the first pilot trench and opens Degree is adjusted to 30%, and meanwhile, the open degree that the second pilot trench endoporus is cooled down cooling valve outside valve and the second pilot trench is adjusted to 60%, Second pilot trench enters treats running status, and the 3rd pilot trench endoporus cools down the unlatching that cooling valve outside valve and the 3rd pilot trench maintains 10% Degree;
2), when first group of workpiece puts into the 15th minute, cooling valve outside the second pilot trench endoporus cooling valve and the second pilot trench Open degree be adjusted to 80%, the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench is adjusted to 10%, The second pilot trench quenching put into by second group of workpiece, when second group of workpiece puts into 2 minutes, the second pilot trench endoporus is cooled down valve and second Outside pilot trench, the open degree of cooling valve is adjusted to 60%, the first pilot trench endoporus is cooled down cooling valve outside valve and the first pilot trench simultaneously Open degree be adjusted to 30%, the 3rd pilot trench endoporus cools down the open degree that cooling valve outside valve and the 3rd pilot trench maintains 10%;When When first group of workpiece puts into the 28th minute, the first pilot trench endoporus is cooled down cooling valve open degree outside valve and the first pilot trench and is adjusted to 10%, the second pilot trench endoporus cool down cooling valve outside valve and the second pilot trench open degree adjust cold to 30%, the 3rd pilot trench endoporus But the open degree of valve and the 3rd pilot trench outside cooling valve adjusts to enter to 60%, the 3rd pilot trench and treats running status;
3), when first group of workpiece puts into the 30th minute, cooling valve outside the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench Open degree adjust and cool down, to 80%, second pilot trench endoporus, the open degree that cooling valve outside valve and the second pilot trench is adjusted to 10%, 3rd group of workpiece is put into the 3rd pilot trench quenching;When the 3rd group of workpiece puts into 2 minutes, the 3rd pilot trench endoporus cooling valve and the 3rd Outside pilot trench, the open degree of cooling valve is adjusted to 60%, and the second pilot trench endoporus cools down the unlatching of cooling valve outside valve and the second pilot trench Degree is adjusted to 30%, and the open degree that the first pilot trench endoporus cools down cooling valve outside valve and the first pilot trench maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operation machine is in 1 minute First group of workpiece is transported outward, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench;
5), repeat step 1) -4), realize consecutive production.Cooling effect more preferably, more meets metal works in quenching process In law of heat release.
Beneficial effect: the collecting and distributing type heat treatment cooling means of the present invention, meet heat release in quenching process for the metal works Rule, adopts the dynamic type of cooling to adapt to extremely unbalanced law of heat release, thus reaching the cooling of Technology for Heating Processing requirement Effect, and the collecting and distributing type of present invention heat treatment cooling means small investment, achievable consecutive production.
Brief description
Fig. 1 is the heating curve in quenching for the quenching tank;
Fig. 2 is the structural representation of the collecting and distributing type heat treatment cooling device of the present invention;
Fig. 3 is flow during three pilot trench continuous quenchings operations of collecting and distributing type heat treatment cooling device of the present invention;
Fig. 4 is the structural representation of pilot trench.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, it is further elucidated with the present invention it should be understood that these embodiments are merely to illustrate The present invention rather than restriction the scope of the present invention, after having read the present invention, those skilled in the art are each to the present invention The modification planting the equivalent form of value all falls within the application claims limited range.
Refer to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of collecting and distributing type is heat-treated cooling device, including unit quenching tank, the One pilot trench 1, the second pilot trench 2, the 3rd pilot trench 3, the 3rd pilot trench endoporus cooling valve 4, the second pilot trench endoporus cooling valve 5, the first pilot trench Valve 9, pilot trench is cooled down outside endoporus cooling valve 6, the 3rd pilot trench outside cooling valve 7, the second pilot trench outside cooling valve 8, the first pilot trench Overflow pipe 10, public sedimentation basin 11, public water pump 12, cooling tower feed pipe 13, cooling water supervisor 14, cooling waterside pipe 15 and cold But tower 16.Cooling tower feed pipe 13, cooling water supervisor 14 all connect cooling tower 16 with cooling waterside pipe 15.
Unit quenching tank includes the first pilot trench 1, the second pilot trench 2 and the 3rd pilot trench 3, the first pilot trench 1, the second pilot trench 2 and Three pilot trench 3 are pilot trench.Wherein, pilot trench includes quenching tank, outside cooling medium pipe 21, submersible agitator 23, endoporus cooling Jie Matter pipe 24, nozzle 25 and locator 26, outside cooling medium pipe 21 is arranged on the bottom of quenching tank, outside cooling medium pipe 21 Part in quenching tank has spout 22 upward, and the top of spout 22 is provided with submersible agitator 23, submersible agitator 23 Top be provided with workbench, the lower section of workbench is provided with endoporus cooling medium pipe 24, on endoporus cooling medium pipe 24 arrange There is nozzle 25 upward, the top of workbench is provided with locator 26, locator 26 is hollow, can pass through endoporus cooling medium Stream realizes the cooling to inner hole of workpiece.Potential energy produced by installing using cooling tower is high-order, is realized to workpiece using hollow jet flow The cooling of endoporus.Carry out special quenching cooling using the workpiece that the present invention can have particular/special requirement to oil well head equipment etc.;Especially Its inner hole of workpiece can be carried out strength cool down so that inner hole of workpiece position with outside hardness reach consistent.Nozzle 25 connects Locator 26.Wherein, workbench is provided with concave station, the bottom of locator 26 is coordinated with concave station, the top of locator 26 is cone Shape.The top of locator 26 is made up of the gusset of cross, and the gusset of cross has certain gradient, can with quenching part in Match in hole.
Preferably, the quantity of spout 22 and submersible agitator 23 is 3.The quantity of nozzle 25 and locator 26 is 4 Individual.
3rd pilot trench 3, the second pilot trench 2 all connect cooling waterside pipe 15 with the endoporus cooling medium pipe 24 of the first pilot trench 1.The 3rd pilot trench endoporus cooling valve is respectively arranged with the endoporus cooling medium pipe 24 of three pilot trench 3, the second pilot trench 2 and the first pilot trench 1 4th, the second pilot trench endoporus cooling valve 5 and the first pilot trench endoporus cooling valve 6.Outside 3rd pilot trench 3, the second pilot trench 2 and the first pilot trench 1 Portion's cooling medium pipe 21 all connects cooling water supervisor 14.The outside cooling medium of the 3rd pilot trench 3, the second pilot trench 2 and the first pilot trench 1 Cooling valve 9 outside cooling valve 7 outside 3rd pilot trench, the second pilot trench outside cooling valve 8 and the first pilot trench is respectively arranged with pipe 21.
Overflow pipe 10 connected unit quenching tank and public sedimentation basin 11, public sedimentation basin 11 passes through public water pump 12 and cooling Tower feed pipe 13 connects cooling tower.
Inventive principle:
Unit quenching tank is made up of the first pilot trench 1, the second pilot trench 2 and the 3rd pilot trench 3.Public water water supplying pump to cooling tower, The cooled water of cooling tower water outlet is responsible for 14 to three pilot trench and the outside of workpiece is cooled down.Cooling tower water outlet cooled waterside pipe 15 to three pilot trench cool down to the endoporus of workpiece.3rd pilot trench endoporus cooling valve 4, the second pilot trench endoporus cooling valve 5 and the One pilot trench endoporus cooling valve 6 is separately mounted on three pilot trench endoporus cooling water pipes, cooling valve 7, second outside the 3rd pilot trench Outside groove, cooling valve 8 and the first pilot trench outside cooling valve 9 are separately mounted on the outside cooling water pipe of three pilot trench, this six valves By system control, according to the different operating modes of three pilot trench quenchings, provide the cooling medium of inequality.10 is the overflow of pilot trench Pipe, forms the circulatory system with public sedimentation basin 11 and public water pump 12.
The collecting and distributing type heat treatment cooling device structure of the present invention is simple, and small investment saves floor space, comprehensive benefit is high.
The heating curve in quenching for the quenching tank.It can be seen that, in a during workpiece quenching minute, it is the peak of heat release Period, and after 5-6 minute, the heat release of workpiece gradually ease up it can be seen that, in quenching process, adopt one from start to finish not The cooling flow becoming is it is clear that be the actual law of heat release not meeting workpiece.If by peak configuration, the capacity of cooling system is extremely Three times greater less, and after 5-6 minute, the inevitable waste again causing equipment and the energy.
Present invention aim to overcoming drawbacks described above, designing a kind of brand-new cooling device, realizing large batch of company The prouctiveness of continuous property quenching.The present invention fully studies law of heat release in quenching process for the metal works, using dynamically cold But mode to be to adapt to extremely unbalanced law of heat release, thus reaching the cooling effect of Technology for Heating Processing requirement.The present invention adopts one Platform large cooling column replaces multiple stage cooling tower, thus in the workpiece peak heat release period, adjustable substantial amounts of cooling medium, to meet The special hardening of deep-sea oil well head product requires, and is a unit using three quenching tanks, presses rule in three quenching tanks The fixed time period, regularly carry out the operation that quenches, and rely on a cooling tower that three different coolings of quenching tank are required to carry For the cooling medium of inequality, thus the quenching demand of three quenching tanks can be met simultaneously.Deep-sea oil well head product can be met, The special quenching of especially " 4130 " (yield strength 80k and 105k) " 8630 and f22 " (yield strength 80k, 105k, 120k) Require.Small investment of the present invention, saves floor space, and comprehensive benefit is high.
The invention discloses a kind of collecting and distributing type is heat-treated cooling means, using collecting and distributing type heat treatment cooling device as above, Comprise the following steps:
1), the starting stage, the first pilot trench endoporus cools down the open degree adjustment of cooling valve (9) outside valve (6) and the first pilot trench For 80-85%, the second pilot trench and the 3rd pilot trench enter the preparatory stage, and the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus are cold But outside valve (5), the second pilot trench outside cooling valve (8) and the 3rd pilot trench, the open degree of cooling valve (7) is all adjusted to 5-10%;Will The first pilot trench (1) put into by first group of workpiece, after 1-2 minute put into by first group of workpiece, adjustment the first pilot trench endoporus cooling valve (6) Open degree with cooling valve (9) outside the first pilot trench is 50-70%;When 12-14 minute put into by first group of workpiece, by first Outside pilot trench endoporus cooling valve (6) and the first pilot trench, cooling valve (9) open degree is adjusted to 25-35%, meanwhile, by the second pilot trench The open degree that hole cools down cooling valve (8) outside valve (5) and the second pilot trench is adjusted to 50-70%, and the second pilot trench (2) enters to be waited to run State, the 3rd pilot trench endoporus cools down the open degree that cooling valve (7) outside valve (4) and the 3rd pilot trench maintains 10%;
2), when 14-16 minute put into by first group of workpiece, outside the second pilot trench endoporus cooling valve (5) and the second pilot trench The open degree of cooling valve (8) is adjusted to 80-85%, and the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench Open degree is adjusted to 5-10%, and the second pilot trench (2) quenching put into by second group of workpiece, after 1-2 minute put into by second group of workpiece, will The open degree that second pilot trench endoporus cools down cooling valve (8) outside valve (5) and the second pilot trench is adjusted to 50-70%, simultaneously by first The open degree that pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to 25-35%, and the 3rd pilot trench endoporus is cold But cool down, outside valve (4) and the 3rd pilot trench, the open degree that valve (7) maintains 5-10%;When 27-29 minute put into by first group of workpiece When, the first pilot trench endoporus is cooled down cooling valve (9) open degree outside valve (6) and the first pilot trench and is adjusted to 10%, in the second pilot trench The open degree that hole cools down cooling valve (8) outside valve (5) and the second pilot trench adjusts to 25-35%, the 3rd pilot trench endoporus cooling valve (4) Adjust to 50-70% with the open degree of cooling valve (7) outside the 3rd pilot trench, the 3rd pilot trench (3) enters and treats running status;
3), after 29-31 minute put into by first group of workpiece, outside the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench The open degree of cooling valve (7) adjusts to 80-85%, and cooling valve (8) outside the second pilot trench endoporus cooling valve (5) and the second pilot trench is adjusted The whole open degree for 5-10%, the 3rd group of workpiece is put into the 3rd pilot trench quenching;After 1-2 minute put into by the 3rd group of workpiece, the The open degree that three pilot trench endoporus cool down cooling valve (7) outside valve (4) and the 3rd pilot trench is adjusted to 50-70%, the second pilot trench endoporus Cooling valve (5) and the second pilot trench outside cooling valve (8) open degree be adjusted to 25-35%, first pilot trench endoporus cool down valve (6) and Outside first pilot trench, the open degree of cooling valve (9) maintains 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operation machine was at 1 minute Interior first group of workpiece is transported outward, be then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench (1);
5), repeat step 1) -4), realize consecutive production.
Preferably, above-mentioned steps specifically can adopt following parameter:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve 9 outside valve 6 and the first pilot trench is adjusted to 80%, the second pilot trench and the 3rd pilot trench enter the preparatory stage, the 3rd pilot trench endoporus cooling valve 4, the second pilot trench endoporus cooling valve 5, The open degree that second pilot trench exit orifice cools down cooling valve 7 outside valve 8 and the 3rd pilot trench is all adjusted to 10%;First group of workpiece is put into First pilot trench 1, when first group of workpiece puts into 2 minutes, cooling valve outside adjustment the first pilot trench endoporus cooling valve 6 and the first pilot trench 9 open degree is 60%;When first group of workpiece puts into the 13rd minute, the first pilot trench endoporus is cooled down outside valve 6 and the first pilot trench Portion's cooling valve 9 open degree is adjusted to 30%, meanwhile, the second pilot trench endoporus is cooled down and cools down opening of valve 8 outside valve 5 and the second pilot trench Qi Du is adjusted to 60%, and the second pilot trench 2 enters and treats running status, cooling outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench Valve 7 maintains 10% open degree;
2), when first group of workpiece puts into the 15th minute, cooling valve outside the second pilot trench endoporus cooling valve 5 and the second pilot trench 8 open degree is adjusted to 80%, and the open degree that the first pilot trench endoporus cools down cooling valve 9 outside valve 6 and the first pilot trench is adjusted to 10%, second group of workpiece is put into the second pilot trench 2 and is quenched, and when second group of workpiece puts into 2 minutes, the second pilot trench endoporus is cooled down valve The open degree of 5 and second valves 8 of cooling outside pilot trench is adjusted to 60%, the first pilot trench endoporus is cooled down valve 6 and the first pilot trench simultaneously The open degree of outside cooling valve 9 is adjusted to 30%, and outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench, cooling valve 7 maintains 10% open degree;When first group of workpiece puts into the 28th minute, the first pilot trench endoporus is cooled down valve 6 and the first pilot trench is outside cold But valve 9 open degree is adjusted to 10%, the second pilot trench endoporus cool down cooling valve 8 outside valve 5 and the second pilot trench open degree adjust to 30%, the 3rd pilot trench endoporus cools down valve 4 and the outside open degree cooling down valve 7 of the 3rd pilot trench adjusts and enters to 60%, the 3rd pilot trench 3 Treat running status;
3), when first group of workpiece puts into the 30th minute, cooling valve outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench 7 open degree adjusts and cools down, to 80%, second pilot trench endoporus, the unlatching that cooling valve 8 outside valve 5 and the second pilot trench is adjusted to 10% Degree, the 3rd group of workpiece is put into the 3rd pilot trench quenching;When the 3rd group of workpiece puts into 2 minutes, the 3rd pilot trench endoporus cooling valve 4 He Outside 3rd pilot trench, the open degree of cooling valve 7 is adjusted to 60%, cooling valve outside the second pilot trench endoporus cooling valve 5 and the second pilot trench 8 open degree is adjusted to 30%, and the open degree that the first pilot trench endoporus cools down cooling valve 9 outside valve 6 and the first pilot trench maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operation machine is in 1 minute First group of workpiece is transported outward, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench 1;
5), repeat step 1) -4), realize consecutive production.
The collecting and distributing type heat treatment cooling means of the present invention, law of heat release in quenching process for the load wire workpiece, adopt The dynamic type of cooling is to adapt to extremely unbalanced law of heat release, thus reaching the cooling effect of Technology for Heating Processing requirement, and The collecting and distributing type heat treatment cooling means small investment of the present invention, achievable consecutive production.
Embodiment 1
Multinomial die forging be consecutive production, rhythm be 15 minutes four.For configuration three pilot trench unit quenching tank, often Interval can carry out primary quenching for 15 minutes, and the cool time of technique setting is 45 minutes.Namely when the first pilot trench enters water quenching 15 minutes afterwards, the second pilot trench started into water quenching, and after the second pilot trench enters water quenching 15 minutes, the 3rd pilot trench starts into water quenching Fire, when the 3rd pilot trench enters water quenching 15 minutes, the first pilot trench has completed the quenching of 45 minutes it is necessary to quenching of next round is met in discharging Fire.A unit quenching tank being made up of three pilot trench is exactly the circulate operation so gone round and begun again, and realizes consecutive production Function.
After first group of workpiece is come out of the stove, infrared ray sensor sends signal, and cooling tower supply-water pump 11 starts.System default One pilot trench enters the starting stage run, and outside the first pilot trench endoporus cooling valve 6 and the first pilot trench, cooling valve 9 opens 80%, and Second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve 4, second pilot trench endoporus cooling valve the 5, first son Outside groove endoporus cooling valve 6 and the 3rd pilot trench, cooling valve 7 all opens 10%, and unit quenching tank is prepared the stage, and now first Pilot trench has been enter into the circular flow state of big flow.
First group of 4 workpiece simultaneously enters the first pilot trench quenching, and cooling medium consumption reaches the 80% of total flow.After 2 minutes, Workpiece peak heat release mistake, system call interception the first pilot trench endoporus cools down valve 6 and the open degree of the first pilot trench outside cooling valve 9 is 60%.
When first group of workpiece enters the first pilot trench the 13rd minute, that is, first 2 minutes of second group of workpiece quenching, system is by the Outside one pilot trench endoporus cooling valve 6 and the first pilot trench, cooling valve 9 open degree is adjusted to 30%, keeps 30% inflow, meanwhile, The inlet valve 5 and 8 of the second pilot trench is opened to enter to 60%, second pilot trench and is treated running status by system.3rd pilot trench endoporus cooling Outside valve 4 and the 3rd pilot trench, cooling valve 7 maintains 10% open degree.
When first group of workpiece entrance first pilot trench quenches the 15th minute, outside the second pilot trench endoporus cooling valve 5 and the second pilot trench Portion's cooling valve 8 is driven cooling valve 9 greatly to 80%, first pilot trench endoporus cooling valve 6 and the first pilot trench further and is adjusted to 10%. Second group of workpiece enters the second pilot trench quenching, and after 2 minutes, the quenching of the second pilot trench have passed through peak heat release, and system automatically will Outside second pilot trench endoporus cooling valve 5 and the second pilot trench, cooling valve 8 is adjusted to 60%, the first pilot trench endoporus is cooled down valve 6 simultaneously Drive cooling valve 7 greatly to 30%, the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench with cooling valve 9 outside the first pilot trench to maintain 10% open degree.
When first group of workpiece entrance first pilot trench quenches the 28th minute, that is, first 2 minutes of the 3rd group of workpiece quenching, it is First pilot trench endoporus is cooled down cooling valve 9 open degree outside valve 6 and the first pilot trench and is adjusted to 10% by system automatically, the second pilot trench endoporus Outside cooling valve 5 and the second pilot trench, cooling valve 8 is opened and is cooled down cooling valve 7 outside valve 4 and the 3rd pilot trench to 30%, the 3rd pilot trench endoporus Open to enter to 60%, the 3rd pilot trench and treat running status.
When first group of workpiece entrance first pilot trench quenches the 30th minute, outside the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench Portion's cooling valve 7 is driven cooling valve 8 greatly to 80%, second pilot trench endoporus cooling valve 5 and the second pilot trench further and is adjusted to 10% Open degree, the 3rd group of workpiece enter the 3rd pilot trench quenching.When 3rd group of workpiece entrance the 3rd pilot trench quenches 2 minutes, the 3rd son Outside groove endoporus cooling valve 4 and the 3rd pilot trench, cooling valve 7 is automatically regulated to be 60% again, the second pilot trench endoporus cooling valve 5 and second Outside pilot trench, cooling valve 8 is 30%, and outside the first pilot trench endoporus cooling valve 6 and the first pilot trench, cooling valve 9 keeps 10%.
When first group of workpiece entrance first pilot trench quenches the 43rd minute, the first pilot trench quenching terminates water outlet, and operation machine is at 1 point Complete the outward transport of quenching part in clock, be then return in situ, in 1 minute, the 4th batch of workpiece be sent into the first pilot trench, start new again One wheel circulation;
Traffic conditions when three pilot trench continuous quenchings run are shown in Fig. 3.

Claims (3)

1. a kind of collecting and distributing type heat treatment cooling device it is characterised in that: include unit quenching tank, the first pilot trench (1), the second pilot trench (2), the 3rd pilot trench (3), the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5), the first pilot trench endoporus cooling Cooling valve (7), the second pilot trench outside cooling valve (8), the first pilot trench outside cooling valve (9), pilot trench outside valve (6), the 3rd pilot trench Overflow pipe (10), public sedimentation basin (11), public water pump (12), cooling tower feed pipe (13), cooling water supervisor (14), cooling water Secondary pipe (15) and cooling tower (16), described first pilot trench (1), the second pilot trench (2) and the 3rd pilot trench (3) are arranged at unit quenching In groove, described first pilot trench (1), the second pilot trench (2) and the 3rd pilot trench (3) are pilot trench,
Described pilot trench include quenching tank, outside cooling medium pipe (21), submersible agitator (23), endoporus cooling medium pipe (24), Nozzle (25) and locator (26), described outside cooling medium pipe (21) is arranged on the bottom of described quenching tank, and described outside is cold But the part that medium tube (21) is located in described quenching tank has spout (22) upward, and the top of described spout (22) is provided with Described submersible agitator (23), the top of described submersible agitator (23) is provided with workbench, the lower section setting of described workbench There is endoporus cooling medium pipe (24), described endoporus cooling medium pipe (24) is provided with nozzle (25) upward, described workbench Top be provided with described locator (26), described locator (26) is hollow, and described nozzle (25) connects described locator (26);
Described cooling tower feed pipe (13), cooling water supervisor (14) all connect described cooling tower (16) with cooling waterside pipe (15);
Described 3rd pilot trench (3), the second pilot trench (2) and endoporus cooling medium pipe (24) of the first pilot trench (1) all connect described cold But waterside pipe (15);
It is respectively arranged with endoporus cooling medium pipe (24) of described 3rd pilot trench (3), the second pilot trench (2) and the first pilot trench (1) 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5) and the first pilot trench endoporus cooling valve (6);
Described 3rd pilot trench (3), the second pilot trench (2) and the outside cooling medium pipe (21) of the first pilot trench (1) all connect described cold But water supervisor (14);
It is respectively arranged with the outside cooling medium pipe (21) of described 3rd pilot trench (3), the second pilot trench (2) and the first pilot trench (1) Cooling valve (9) outside cooling valve (7), the second pilot trench outside cooling valve (8) and the first pilot trench outside 3rd pilot trench;
Described overflow pipe (10) connected unit quenching tank and described public sedimentation basin (11), described public sedimentation basin (11) passes through public affairs Connect described cooling tower with water pump (12) with cooling tower feed pipe (13);
Concave station, the bottom of described locator (26) and described concave station cooperation, described locator (26) are provided with described workbench Top be taper, the top of described locator (26) is made up of the gusset of cross;
The quantity of described spout (22) and submersible agitator (23) is 3, the quantity of described nozzle (25) and locator (26) It is 4.
2. a kind of collecting and distributing type heat treatment cooling means it is characterised in that be heat-treated cold using collecting and distributing type as claimed in claim 1 But device, comprises the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to 80- 85%, the second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5), outside the second pilot trench, the open degree of cooling valve (8) and the 3rd pilot trench outside cooling valve (7) is all adjusted to 5-10%;By first The first pilot trench (1) put into by group workpiece, after 1-2 minute put into by first group of workpiece, adjustment the first pilot trench endoporus cooling valve (6) and the Outside one pilot trench, the open degree of cooling valve (9) is 50-70%;When 12-14 minute put into by first group of workpiece, by the first pilot trench Outside endoporus cooling valve (6) and the first pilot trench, cooling valve (9) open degree is adjusted to 25-35%, meanwhile, will be cold for the second pilot trench endoporus But the open degree of valve (5) and the second pilot trench outside cooling valve (8) is adjusted to 50-70%, and the second pilot trench (2) enters shape to be run State, the 3rd pilot trench endoporus cools down the open degree that cooling valve (7) outside valve (4) and the 3rd pilot trench maintains 10%;
2), when 14-16 minute put into by first group of workpiece, cooling outside the second pilot trench endoporus cooling valve (5) and the second pilot trench The open degree of valve (8) is adjusted to 80-85%, and the first pilot trench endoporus cools down the unlatching of cooling valve (9) outside valve (6) and the first pilot trench Degree is adjusted to 5-10%, and second group of workpiece puts into the second pilot trench (2) quenching, after 1-2 minute put into by second group of workpiece, by second The open degree that pilot trench endoporus cools down cooling valve (8) outside valve (5) and the second pilot trench is adjusted to 50-70%, simultaneously by the first pilot trench The open degree that endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to 25-35%, the 3rd pilot trench endoporus cooling valve (4) and cool down the open degree of valve (7) maintenance 5-10% outside the 3rd pilot trench;When 27-29 minute put into by first group of workpiece, will Outside first pilot trench endoporus cooling valve (6) and the first pilot trench, cooling valve (9) open degree is adjusted to 10%, the second pilot trench endoporus cooling Outside valve (5) and the second pilot trench, the open degree of cooling valve (8) adjusts to 25-35%, the 3rd pilot trench endoporus cooling valve (4) and the 3rd Outside pilot trench, the open degree of cooling valve (7) adjusts to 50-70%, and the 3rd pilot trench (3) enters and treats running status;
3), after 29-31 minute put into by first group of workpiece, cooling outside the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench The open degree of valve (7) adjusts to 80-85%, and cooling valve (8) outside the second pilot trench endoporus cooling valve (5) and the second pilot trench is adjusted to The open degree of 5-10%, the 3rd group of workpiece is put into the 3rd pilot trench quenching;After 1-2 minute put into by the 3rd group of workpiece, the 3rd son The open degree that groove endoporus cools down cooling valve (7) outside valve (4) and the 3rd pilot trench is adjusted to 50-70%, the second pilot trench endoporus cooling Outside valve (5) and the second pilot trench, the open degree of cooling valve (8) is adjusted to 25-35%, the first pilot trench endoporus cooling valve (6) and first Outside pilot trench, the open degree of cooling valve (9) maintains 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operation machine will in 1 minute First group of workpiece outward transport, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench (1);
5), repeat step 1) -4), realize consecutive production.
3. collecting and distributing type heat treatment cooling means as claimed in claim 2 is it is characterised in that comprise the following steps:
1), the starting stage, the open degree that the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted to 80%, the second pilot trench and the 3rd pilot trench enter preparatory stage, the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5), outside the second pilot trench, the open degree of cooling valve (8) and the 3rd pilot trench outside cooling valve (7) is all adjusted to 10%;By first group The first pilot trench (1) put into by workpiece, and when first group of workpiece puts into 2 minutes, adjustment first pilot trench endoporus cools down valve (6) and the first son Outside groove, the open degree of cooling valve (9) is 60%;When first group of workpiece puts into the 13rd minute, the first pilot trench endoporus is cooled down valve (6) outside and the first pilot trench, cooling valve (9) open degree is adjusted to 30%, meanwhile, the second pilot trench endoporus is cooled down valve (5) and second Outside pilot trench, the open degree of cooling valve (8) is adjusted to 60%, and the second pilot trench (2) enters and treats running status, and the 3rd pilot trench endoporus is cold But cool down, outside valve (4) and the 3rd pilot trench, the open degree that valve (7) maintains 10%;
2), when first group of workpiece puts into the 15th minute, cooling valve outside the second pilot trench endoporus cooling valve (5) and the second pilot trench (8) open degree is adjusted to 80%, and the open degree that the first pilot trench endoporus cools down cooling valve (9) outside valve (6) and the first pilot trench is adjusted Whole is 10%, and second group of workpiece puts into the second pilot trench (2) quenching, when second group of workpiece puts into 2 minutes, by the second pilot trench endoporus Outside cooling valve (5) and the second pilot trench, the open degree of cooling valve (8) is adjusted to 60%, the first pilot trench endoporus is cooled down valve simultaneously (6) outside and the first pilot trench, the open degree of cooling valve (9) is adjusted to 30%, and the 3rd pilot trench endoporus cools down valve (4) and the 3rd pilot trench Outside cooling valve (7) maintains 10% open degree;When first group of workpiece puts into the 28th minute, the first pilot trench endoporus is cooled down valve (6) outside and the first pilot trench, cooling valve (9) open degree is adjusted to 10%, outside the second pilot trench endoporus cooling valve (5) and the second pilot trench The open degree that portion cools down valve (8) adjusts to 30%, the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench cooling valve (7) Open degree adjusts to enter to 60%, the 3rd pilot trench (3) treats running status;
3), when first group of workpiece puts into the 30th minute, cooling valve outside the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench (7) open degree adjusts to 80%, second pilot trench endoporus cooling valve (5) and the second pilot trench cooling valve (8) and is adjusted to 10% Open degree, by the 3rd group of workpiece put into the 3rd pilot trench quenching;When the 3rd group of workpiece puts into 2 minutes, the 3rd pilot trench endoporus is cold But the open degree of valve (4) and the 3rd pilot trench outside cooling valve (7) is adjusted to 60%, the second pilot trench endoporus cooling valve (5) and second Outside pilot trench, the open degree of cooling valve (8) is adjusted to 30%, cooling valve outside the first pilot trench endoporus cooling valve (6) and the first pilot trench (9) open degree maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operation machine is in 1 minute by the One group of workpiece outward transport, is then return in situ, finally in 1 minute, the 4th group of workpiece be sent into the first pilot trench (1);
5), repeat step 1) -4), realize consecutive production.
CN201410712757.3A 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device Active CN104451067B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410712757.3A CN104451067B (en) 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410712757.3A CN104451067B (en) 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device

Publications (2)

Publication Number Publication Date
CN104451067A CN104451067A (en) 2015-03-25
CN104451067B true CN104451067B (en) 2017-01-25

Family

ID=52897811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410712757.3A Active CN104451067B (en) 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device

Country Status (1)

Country Link
CN (1) CN104451067B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114540585A (en) * 2020-11-20 2022-05-27 南京迪威尔高端制造股份有限公司 Quenching heat treatment method for forged piece with hole
CN114517251A (en) * 2020-11-20 2022-05-20 南京迪威尔高端制造股份有限公司 Heat treatment cooling device and method for 15-5PH stainless steel shale gas fracturing pump

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1239717C (en) * 2003-12-30 2006-02-01 上海交通大学 Controlled cooling equipment of immersion and spray quenching combined quench-hardening
CN2866519Y (en) * 2005-11-29 2007-02-07 宝山钢铁股份有限公司 Steel pipe water quenching heat treatment device
CN100595291C (en) * 2008-04-03 2010-03-24 上海交通大学 Multi-station quenching cooling equipment realizing fluid-immersion quenching by liquid level change
DE202009005685U1 (en) * 2009-04-16 2009-06-18 Schlager Industrieofenbau Gmbh Quenching or cooling device
CN202913028U (en) * 2012-10-25 2013-05-01 衡阳华菱钢管有限公司 Water quenching control device for steel pipe
CN203866360U (en) * 2014-03-10 2014-10-08 北京机电研究所 Continuous outward spray quenching device for oil casing
CN103882199B (en) * 2014-03-13 2017-03-15 广东坚宜佳五金制品有限公司 The method and system of speciality Quenching apparatus of rod parts cooling

Also Published As

Publication number Publication date
CN104451067A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN104451067B (en) Centralized/distributed heat treatment cooling device
CN107058697B (en) A kind of water hardening device of large-sized end enclosure
CN105803170B (en) A kind of aluminium alloy cylindrical member spray quenching apparatus and its application method
CN102729350B (en) Be used in the cooling system on the excavation machine of cut crystal
US10151480B2 (en) Reactor for hydrothermal carbonization with optimized mixture of sludge and steam
CN102925641A (en) Method for controlling flow fields in quenching water tank of large cylindrical workpiece
CN109807408A (en) A kind of tapping device for shaft processing
CN106702122A (en) Quenching cooling device for large seal head
CN101469359B (en) Vertical spray quenching apparatus and quenching technique
CN107252877A (en) Mould multiple spot cooling body and its hub mold of application
CN208594314U (en) The quenching unit that workpiece is uniformly cooled down by adjusting flow velocity
CN207942248U (en) A kind of drilling machine heat sink
CN207127221U (en) Mould multiple spot cooling body and its hub mold of application
CN108588364A (en) The quenching unit that workpiece is uniformly cooled down by adjusting flow velocity
CN103882199B (en) The method and system of speciality Quenching apparatus of rod parts cooling
CN102181338A (en) Fermentation tank group
CN205974600U (en) Quenching and cooling device
CN205907158U (en) Mud waste liquid pyrohydrolysis equipment
CN105382164B (en) A kind of stem one-shaper
CN108180763A (en) A kind of calcium carbide device for recycling heat and application method
CN203820845U (en) Large-sized multifunctional vertical type water-soaking and air-blowing quenching device
CN202680450U (en) Continuous extracting device for reconstituted tobacco raw materials
CN106348553A (en) A set of three-sludge recycling treatment technology
CN210215462U (en) Circulating water quenching device for PC steel bar production line
CN204737988U (en) A equipment for turning round workpiece surface quenches

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant