CN104451067A - Centralized/distributed heat treatment cooling device and method - Google Patents

Centralized/distributed heat treatment cooling device and method Download PDF

Info

Publication number
CN104451067A
CN104451067A CN201410712757.3A CN201410712757A CN104451067A CN 104451067 A CN104451067 A CN 104451067A CN 201410712757 A CN201410712757 A CN 201410712757A CN 104451067 A CN104451067 A CN 104451067A
Authority
CN
China
Prior art keywords
pilot trench
cooling valve
endoporus
exterior
open degree
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410712757.3A
Other languages
Chinese (zh)
Other versions
CN104451067B (en
Inventor
郭玉玺
沈石龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd
Original Assignee
NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd filed Critical NANJING DEVELOP HIGH-END MANUFACTURING Co Ltd
Priority to CN201410712757.3A priority Critical patent/CN104451067B/en
Publication of CN104451067A publication Critical patent/CN104451067A/en
Application granted granted Critical
Publication of CN104451067B publication Critical patent/CN104451067B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/63Quenching devices for bath quenching
    • C21D1/64Quenching devices for bath quenching with circulating liquids
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D11/00Process control or regulation for heat treatments
    • C21D11/005Process control or regulation for heat treatments for cooling

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a centralized/distributed heat treatment cooling device. The centralized/distributed heat treatment cooling device comprises a quenching tank, a first cooling medium pipe, a submersible mixer, a second cooling medium pipe, a nozzle and a positioner, wherein the first cooling medium pipe is arranged at the bottom of the quenching tank; an upward spout is arranged on the part, located in the quenching tank, of the first cooling medium pipe; the submersible mixer is arranged above the spout; a worktable is arranged above the submersible mixer; the second cooling medium pipe is arranged under the worktable; an upward nozzle is arranged on the second cooling medium pipe; the positioner is arranged above the worktable; the positioner is hollow; the nozzle is communicated with the positioner. The invention also discloses a centralized distributed heat treatment cooling method based on the centralized distributed heat treatment cooling device. The centralized distributed heat treatment cooling device is simple in structure, low in investment, small in floor area and high in comprehensive benefits.

Description

A kind of collecting and distributing type thermal treatment refrigerating unit and method
Technical field
The present invention relates to a kind of collecting and distributing type thermal treatment refrigerating unit and method.
Background technology
At present, domestic what generally adopt is " multi-layer annular jet agitator ", " the external water spray agitator of multitube ".The former is used for greatly annular quenching tank, and because the speed of annular water flow is faster, centrifugal force is larger, and this just causes the current of injection more anxious, and the rotary water current of formation is faster, and the flow velocity of ring groove medium position is slower, and therefore the actual effect used is bad; The external water spray agitator of multitube, due to external stirrer, the stroke that water spray stirs is 2 times that stir distance in groove.Therefore, the cooling intensity of these two kinds of alr modes is low, especially can not solve the cooling problem of inner hole of workpiece, more cannot reach the special quenching requirement of special material " 4130 " (yield strength 80K and 105K) " 8630 and F22 " (yield strength 80K, 105K, 120k) of deep sea drilling equipment.
Therefore, need a kind of new thermal treatment refrigerating unit to solve the problem.
Summary of the invention
The object of the invention is the defect for prior art, a kind of collecting and distributing type thermal treatment refrigerating unit is provided.
For achieving the above object, collecting and distributing type thermal treatment refrigerating unit of the present invention can adopt following technical scheme:
A kind of collecting and distributing type thermal treatment refrigerating unit, comprise unit quenching tank, first pilot trench, second pilot trench, 3rd pilot trench, 3rd pilot trench endoporus cooling valve, second pilot trench endoporus cooling valve, first pilot trench endoporus cooling valve, 3rd pilot trench exterior cooling valve, second pilot trench exterior cooling valve, first pilot trench exterior cooling valve, pilot trench upflow tube, public sedimentation basin, public water pump, cooling tower water-supply pipe, water coolant is responsible for, cooling waterside pipe and cooling tower, described unit quenching tank comprises the first pilot trench, second pilot trench and the 3rd pilot trench, described first pilot trench, second pilot trench and the 3rd pilot trench are pilot trench,
Described pilot trench comprises quenching tank, exterior cooling medium tube, submersible agitator, endoporus heat-eliminating medium pipe, nozzle and steady arm, described exterior cooling medium tube is arranged on the bottom of described quenching tank, the part that described exterior cooling medium tube is positioned at described quenching tank has spout upward, the top of described spout is provided with described submersible agitator, the top of described submersible agitator is provided with worktable, the below of described worktable is provided with endoporus heat-eliminating medium pipe, described endoporus heat-eliminating medium pipe is provided with nozzle upward, the top of described worktable is provided with described steady arm, described steady arm is hollow, described nozzle is communicated with described steady arm,
Described cooling tower water-supply pipe, water coolant supervisor is all communicated with described cooling tower with cooling waterside pipe;
Described 3rd pilot trench, the second pilot trench are all communicated with described cooling waterside pipe with the endoporus heat-eliminating medium pipe of the first pilot trench;
The endoporus heat-eliminating medium pipe of described 3rd pilot trench, the second pilot trench and the first pilot trench is respectively arranged with the 3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve and the first pilot trench endoporus cooling valve;
Described 3rd pilot trench, the second pilot trench and the exterior cooling medium tube of the first pilot trench are all communicated with described water coolant supervisor;
The exterior cooling medium tube of described 3rd pilot trench, the second pilot trench and the first pilot trench is respectively arranged with the 3rd pilot trench exterior cooling valve, the second pilot trench exterior cooling valve and the first pilot trench exterior cooling valve;
Described upflow tube connected unit quenching tank and described public sedimentation basin, described public sedimentation basin is communicated with described cooling tower by public water pump with cooling tower water-supply pipe.
Inventive principle:
Unit quenching tank is made up of the first pilot trench, the second pilot trench and the 3rd pilot trench.Public water water supplying pump is to cooling tower, and cooling tower water outlet is responsible for three outsides of pilot trench to workpiece through water coolant and is cooled; Cooling tower water outlet cools through the endoporus of cooling waterside Guan Zhisan pilot trench to workpiece.3rd pilot trench endoporus cooling valve, the second pilot trench endoporus cooling valve and the first pilot trench endoporus cooling valve are arranged on three pilot trench endoporus water-cooled tubes respectively, 3rd pilot trench exterior cooling valve, the second pilot trench exterior cooling valve and the first pilot trench exterior cooling valve are arranged on the exterior cooling water pipe of three pilot trench respectively, these six valves pass through Systematical control, according to the different operating modes of three pilot trench quenchings, provide the heat-eliminating medium of inequality.Be the upflow tube of pilot trench, form the recycle system with public sedimentation basin and public water pump.
Further, described worktable is provided with concave station, the bottom of described steady arm coordinates with described concave station, and the top of described steady arm is taper.
Further, the quantity of described spout and submersible agitator is 3.
Further, the quantity of described nozzle and steady arm is 4.
Further, the top of described steady arm is made up of the gusset of cross.
Beneficial effect: collecting and distributing type thermal treatment refrigerating unit structure of the present invention is simple, less investment, save floor space, comprehensive benefit is high.
The invention also discloses a kind of collecting and distributing type thermal treatment method of cooling, adopt collecting and distributing type thermal treatment refrigerating unit as above, comprise the following steps:
1), the starting stage, the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is adjusted to 80-85%, second pilot trench and the 3rd pilot trench enter the preparatory stage, and the open degree of the 3rd pilot trench endoporus cooling valve, the second cooling of pilot trench endoporus valve, the second pilot trench exterior cooling valve and the 3rd pilot trench exterior cooling valve is all adjusted to 5-10%; First group of workpiece is put into the first pilot trench, and after first group of workpiece puts into 1-2 minute, the open degree adjusting the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is 50-70%; When 12-14 minute put into by first group of workpiece, first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve open degree are adjusted to 25-35%, simultaneously, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 50-70%, second pilot trench enters treats running status, and the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve maintain the open degree of 10%;
2), when 14-16 minute put into by first group of workpiece, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 80-85%, the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is adjusted to 5-10%, the second pilot trench quenching put into by second group of workpiece, after second group of workpiece puts into 1-2 minute, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 50-70%, the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is adjusted to 25-35% simultaneously, 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve maintain the open degree of 5-10%, when 27-29 minute put into by first group of workpiece, first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve open degree are adjusted to 10%, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 25-35%, the open degree of the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve is adjusted to 50-70%, and the 3rd pilot trench enters treats running status,
3), after first group of workpiece puts into 29-31 minute, the open degree of the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve is adjusted to 80-85%, second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve are adjusted to the open degree of 5-10%, the 3rd group of workpiece are put into the 3rd pilot trench quenching; After the 3rd group of workpiece puts into 1-2 minute, the open degree of the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve is adjusted to 50-70%, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 25-35%, and the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve maintains 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operating machine by first group of workpiece outward transport, was then got back to original position, and finally in 1 minute, the 4th group of workpiece sent into the first pilot trench in 1 minute;
5), repeating step 1)-4), realize consecutive production.
Further, described collecting and distributing type thermal treatment method of cooling, comprises the following steps:
1), the starting stage, the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is adjusted to 80%, second pilot trench and the 3rd pilot trench enter the preparatory stage, and the open degree of the 3rd pilot trench endoporus cooling valve, the second cooling of pilot trench endoporus valve, the second pilot trench exterior cooling valve and the 3rd pilot trench exterior cooling valve is all adjusted to 10%; First group of workpiece is put into the first pilot trench, and when first group of workpiece puts into 2 minutes, the open degree adjusting the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is 60%; When first group of workpiece puts into the 13rd minute, first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve open degree are adjusted to 30%, simultaneously, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 60%, second pilot trench enters treats running status, and the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve maintain the open degree of 10%;
2), when first group of workpiece puts into the 15th minute, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 80%, the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is adjusted to 10%, the second pilot trench quenching put into by second group of workpiece, when second group of workpiece puts into 2 minutes, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 60%, the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve is adjusted to 30% simultaneously, 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve maintain the open degree of 10%, when first group of workpiece puts into the 28th minute, first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve open degree are adjusted to 10%, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 30%, the open degree of the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve is adjusted to 60%, and the 3rd pilot trench enters treats running status,
3), when first group of workpiece puts into the 30th minute, the open degree of the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve is adjusted to 80%, second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve are adjusted to the open degree of 10%, the 3rd group of workpiece are put into the 3rd pilot trench quenching; When the 3rd group of workpiece puts into 2 minutes, the open degree of the 3rd pilot trench endoporus cooling valve and the 3rd pilot trench exterior cooling valve is adjusted to 60%, the open degree of the second pilot trench endoporus cooling valve and the second pilot trench exterior cooling valve is adjusted to 30%, and the open degree of the first pilot trench endoporus cooling valve and the first pilot trench exterior cooling valve maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operating machine by first group of workpiece outward transport, was then got back to original position, and finally in 1 minute, the 4th group of workpiece sent into the first pilot trench in 1 minute;
5), repeating step 1)-4), realize consecutive production.Cooling performance is better, more meets the law of heat release of metal works in quenching process.
Beneficial effect: collecting and distributing type thermal treatment method of cooling of the present invention, meet the law of heat release of metal works in quenching process, adopt the dynamic type of cooling to adapt to extremely unbalanced law of heat release, thus reach the cooling performance of thermal treatment process requirement, and collecting and distributing type thermal treatment method of cooling less investment of the present invention, can consecutive production be realized.
Accompanying drawing explanation
Fig. 1 is the heating curve of quenching tank when quenching;
Fig. 2 is the structural representation of collecting and distributing type thermal treatment refrigerating unit of the present invention;
Flow when Fig. 3 is three pilot trench continuous quenchings operations of collecting and distributing type thermal treatment refrigerating unit of the present invention;
Fig. 4 is the structural representation of pilot trench.
Embodiment
Below in conjunction with the drawings and specific embodiments, illustrate the present invention further, these embodiments should be understood only be not used in for illustration of the present invention and limit the scope of the invention, after having read the present invention, the amendment of those skilled in the art to the various equivalent form of value of the present invention has all fallen within the application's claims limited range.
Refer to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of collecting and distributing type thermal treatment refrigerating unit, comprises unit quenching tank, the first pilot trench 1, second pilot trench 2, the 3rd pilot trench 3, the 3rd pilot trench endoporus cooling valve 4, second pilot trench endoporus cooling valve 5, first pilot trench endoporus cooling valve 6, the 3rd pilot trench exterior cooling valve 7, second pilot trench exterior cooling valve 8, first pilot trench exterior cooling valve 9, pilot trench upflow tube 10, public sedimentation basin 11, public water pump 12, cooling tower water-supply pipe 13, water coolant supervisor 14, cooling waterside pipe 15 and cooling tower 16.Cooling tower water-supply pipe 13, water coolant supervisor 14 is all communicated with cooling tower 16 with cooling waterside pipe 15.
Unit quenching tank comprises the first pilot trench 1, second pilot trench 2 and the 3rd pilot trench 3, first pilot trench 1, second pilot trench 2 and the 3rd pilot trench 3 and is pilot trench.Wherein, pilot trench comprises quenching tank, exterior cooling medium tube 21, submersible agitator 23, endoporus heat-eliminating medium pipe 24, nozzle 25 and steady arm 26, exterior cooling medium tube 21 is arranged on the bottom of quenching tank, the part that exterior cooling medium tube 21 is positioned at quenching tank has spout 22 upward, the top of spout 22 is provided with submersible agitator 23, the top of submersible agitator 23 is provided with worktable, the below of worktable is provided with endoporus heat-eliminating medium pipe 24, endoporus heat-eliminating medium pipe 24 is provided with nozzle 25 upward, the top of worktable is provided with steady arm 26, steady arm 26 is hollow, the cooling to inner hole of workpiece is realized by endoporus heat-eliminating medium stream.Utilize a cooling tower high position that the potential energy produced is installed, adopt the cooling of hollow jet flow realization to inner hole of workpiece.Use the present invention the another part of particular requirement can be had to carry out special quench cooled to oil well head equipment etc.; Especially can carry out brute force cooling to another part endoporus, thus make inner hole of workpiece position reach consistent with outside hardness.Nozzle 25 is communicated with steady arm 26.Wherein, worktable is provided with concave station, the bottom of steady arm 26 coordinates with concave station, and the top of steady arm 26 is taper.The top of steady arm 6 is made up of the gusset of cross, and the gusset of cross has certain gradient, can match with quenching part endoporus.
Preferably, the quantity of spout 22 and submersible agitator 23 is 3.The quantity of nozzle 25 and steady arm 26 is 4.
3rd pilot trench 3, second pilot trench 2 and the endoporus heat-eliminating medium pipe 24 of the first pilot trench 1 are all communicated with cooling waterside pipe 15.The endoporus heat-eliminating medium pipe 24 of the 3rd pilot trench 3, second pilot trench 2 and the first pilot trench 1 is respectively arranged with the 3rd pilot trench endoporus cooling valve 4, second pilot trench endoporus cooling valve 5 and the first pilot trench endoporus cooling valve 6.3rd pilot trench 3, second pilot trench 2 and the exterior cooling medium tube 21 of the first pilot trench 1 are all communicated with water coolant supervisor 14.The exterior cooling medium tube 21 of the 3rd pilot trench 3, second pilot trench 2 and the first pilot trench 1 is respectively arranged with the 3rd pilot trench exterior cooling valve 7, second pilot trench exterior cooling valve 8 and the first pilot trench exterior cooling valve 9.
Upflow tube 10 connected unit quenching tank and public sedimentation basin 11, public sedimentation basin 11 is communicated with cooling tower by public water pump 12 with cooling tower water-supply pipe 13.
Inventive principle:
Unit quenching tank is made up of the first pilot trench 1, second pilot trench 2 and the 3rd pilot trench 3.Public water water supplying pump is to cooling tower, and cooling tower water outlet cools through water coolant supervisor 14 to three outsides of pilot trench to workpiece.Cooling tower water outlet cools through the endoporus of cooling waterside pipe 15 to three pilot trench to workpiece.3rd pilot trench endoporus cooling valve 4, second pilot trench endoporus cooling valve 5 and the first pilot trench endoporus cooling valve 6 are arranged on three pilot trench endoporus water-cooled tubes respectively, 3rd pilot trench exterior cooling valve 7, second pilot trench exterior cooling valve 8 and the first pilot trench exterior cooling valve 9 are arranged on the exterior cooling water pipe of three pilot trench respectively, these six valves pass through Systematical control, according to the different operating modes of three pilot trench quenchings, provide the heat-eliminating medium of inequality.10 is upflow tubes of pilot trench, forms the recycle system with public sedimentation basin 11 and public water pump 12.
Collecting and distributing type thermal treatment refrigerating unit structure of the present invention is simple, less investment, and save floor space, comprehensive benefit is high.
The heating curve of quenching tank when quenching.Can know and find out, in one minute during workpiece quenching, be the peak period of heat release, and after 5-6 minute, the heat release of workpiece eases up gradually, as can be seen here, in quenching process, adopting the cooling flow that constant from start to finish, is obviously the actual law of heat release not meeting workpiece.If by peak configuration, the capacity of cooling system at least wants large three times, and after 5-6 minute, the inevitable waste causing again equipment and the energy.
Object of the present invention will overcome above-mentioned defect exactly, designs a kind of brand-new refrigerating unit, realizes the productive efficiency of large batch of continuity quenching.The present invention fully studies the law of heat release of metal works in quenching process, adopts the dynamic type of cooling to adapt to extremely unbalanced law of heat release, thus reaches the cooling performance of thermal treatment process requirement.The present invention adopts a large cooling column to replace multiple stage cooling tower, thus in the workpiece peak heat release period, adjustable a large amount of heat-eliminating medium, to meet the special hardening requirement of deep-sea oil well head product, adopt three quenching tanks to be a unit equipment, press specific time section at three quenching tanks, carry out quenching operation regularly, and the cooling relying on a cooling tower different to three quenching tanks requires to provide the heat-eliminating medium of inequality, thus the quenching demand of three quenching tanks can be met simultaneously.Deep-sea oil well head product can be met, especially the special quenching requirement of " 4130 " (yield strength 80K and 105K) " 8630 and F22 " (yield strength 80K, 105K, 120k).Less investment of the present invention, save floor space, comprehensive benefit is high.
The invention discloses a kind of collecting and distributing type thermal treatment method of cooling, adopt collecting and distributing type thermal treatment refrigerating unit as above, comprise the following steps:
1), the starting stage, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 80-85%, second pilot trench and the 3rd pilot trench enter the preparatory stage, and the open degree of the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5), the second pilot trench exterior cooling valve (8) and the 3rd pilot trench exterior cooling valve (7) is all adjusted to 5-10%; First group of workpiece is put into the first pilot trench (1), and after first group of workpiece puts into 1-2 minute, the open degree adjusting the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is 50-70%; When 12-14 minute put into by first group of workpiece, first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) open degree are adjusted to 25-35%, simultaneously, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 50-70%, second pilot trench (2) enters treats running status, and the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) maintain the open degree of 10%;
2), when 14-16 minute put into by first group of workpiece, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 80-85%, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 5-10%, the second pilot trench (2) quenching put into by second group of workpiece, after second group of workpiece puts into 1-2 minute, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 50-70%, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 25-35% simultaneously, 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) maintain the open degree of 5-10%, when 27-29 minute put into by first group of workpiece, first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) open degree are adjusted to 10%, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 25-35%, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 50-70%, and the 3rd pilot trench (3) enters treats running status,
3), after first group of workpiece puts into 29-31 minute, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 80-85%, second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) are adjusted to the open degree of 5-10%, the 3rd group of workpiece are put into the 3rd pilot trench quenching; After the 3rd group of workpiece puts into 1-2 minute, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 50-70%, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 25-35%, and the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) maintains 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operating machine by first group of workpiece outward transport, was then got back to original position, and finally in 1 minute, the 4th group of workpiece sent into the first pilot trench (1) in 1 minute;
5), repeating step 1)-4), realize consecutive production.
Preferably, above-mentioned steps specifically can adopt following parameter:
1), the starting stage, the open degree of the first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 is adjusted to 80%, second pilot trench and the 3rd pilot trench enter the preparatory stage, and the open degree of the 3rd pilot trench endoporus cooling valve 4, second pilot trench endoporus cooling valve 5, second pilot trench exit orifice cooling valve 8 and the 3rd pilot trench exterior cooling valve 7 is all adjusted to 10%; First group of workpiece is put into the first pilot trench 1, and when first group of workpiece puts into 2 minutes, the open degree adjusting the first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 is 60%; When first group of workpiece puts into the 13rd minute, first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 open degree are adjusted to 30%, simultaneously, the open degree of the second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 is adjusted to 60%, second pilot trench 2 enters treats running status, and the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 maintain the open degree of 10%;
2), when first group of workpiece puts into the 15th minute, the open degree of the second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 is adjusted to 80%, the open degree of the first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 is adjusted to 10%, second group of workpiece is put into the second pilot trench 2 and is quenched, when second group of workpiece puts into 2 minutes, the open degree of the second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 is adjusted to 60%, the open degree of the first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 is adjusted to 30% simultaneously, 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 maintain the open degree of 10%, when first group of workpiece puts into the 28th minute, first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 open degree are adjusted to 10%, the open degree of the second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 is adjusted to 30%, the open degree of the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 is adjusted to 60%, and the 3rd pilot trench 3 enters treats running status,
3), when first group of workpiece puts into the 30th minute, the open degree of the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 is adjusted to 80%, second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 are adjusted to the open degree of 10%, the 3rd group of workpiece are put into the 3rd pilot trench quenching; When the 3rd group of workpiece puts into 2 minutes, the open degree of the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 is adjusted to 60%, the open degree of the second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 is adjusted to 30%, and the open degree of the first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operating machine by first group of workpiece outward transport, was then got back to original position, and finally in 1 minute, the 4th group of workpiece sent into the first pilot trench 1 in 1 minute;
5), repeating step 1)-4), realize consecutive production.
Collecting and distributing type thermal treatment method of cooling of the present invention, the law of heat release of load wire workpiece in quenching process, adopt the dynamic type of cooling to adapt to extremely unbalanced law of heat release, thus reach the cooling performance of thermal treatment process requirement, and collecting and distributing type thermal treatment method of cooling less investment of the present invention, can consecutive production be realized.
embodiment 1
Multinomial die forging is consecutive production, rhythm be 15 minutes four.For the unit quenching tank of configuration three pilot trench, can carry out primary quenching at interval of 15 minutes, the cool time that technique is arranged is 45 minutes.Namely after the first pilot trench enters water quenching 15 minutes, second pilot trench starts into water quenching, when the second pilot trench entered water quenching after 15 minutes, 3rd pilot trench starts into water quenching, when 3rd pilot trench enters water quenching 15 minutes, first pilot trench has completed the quenching of 45 minutes, discharging must meet the quenching of next round.The unit quenching tank be made up of three pilot trench is exactly the cyclical operation gone round and begun again like this, realizes the function of consecutive production.
After first group of workpiece is come out of the stove, infrared sensor sends signal, and cooling tower working shaft 11 starts.System default first pilot trench enters the starting stage of operation, first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 open 80%, and the second pilot trench and the 3rd pilot trench enter the preparatory stage, 3rd pilot trench endoporus cooling valve 4, second pilot trench endoporus cooling valve 5, first pilot trench endoporus cooling valve 6 and the 3rd pilot trench exterior cooling valve 7 all open 10%, unit quenching tank carries out the preparatory stage, and now the first pilot trench has entered the circular flow state of large discharge.
First group of 4 workpiece enters the first pilot trench quenching simultaneously, and cooling medium consumption reaches 80% of total flux.After 2 minutes, workpiece peak heat release mistake, the open degree of system call interception first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 is 60%.
When first group of workpiece enters the first pilot trench the 13rd minute, namely first 2 minutes of second group of workpiece quenching, first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 open degree are adjusted to 30% by system, keep the flooding quantity of 30%, simultaneously, the inlet valve 5 and 8 of the second pilot trench is opened to 60% by system, and the second pilot trench enters treats running status.3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 maintain the open degree of 10%.
First group of workpiece enter the first pilot trench quench the 15th minute time, the second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 are opened large to 80% further, and the first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 are adjusted to 10%.Second group of workpiece enters the second pilot trench quenching, after 2 minutes, the quenching of the second pilot trench have passed through peak heat release, second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 are adjusted to 60% by system automatically, open large to 30% by the first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9, the 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 maintain the open degree of 10% simultaneously.
First group of workpiece enter the first pilot trench quench the 28th minute time, first 2 minutes of namely the 3rd group of workpiece quenching, first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 open degree are adjusted to 10% by system automatically, second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 are opened to 30%, 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 are opened to 60%, and the 3rd pilot trench enters treats running status.
First group of workpiece enter the first pilot trench quench the 30th minute time, 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 are opened large to 80% further, second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 are adjusted to the open degree of 10%, and the 3rd group of workpiece enters the 3rd pilot trench quenching.3rd group of workpiece enter the 3rd pilot trench quench 2 minutes time, 3rd pilot trench endoporus cooling valve 4 and the 3rd pilot trench exterior cooling valve 7 are adjusted to 60% again automatically, second pilot trench endoporus cooling valve 5 and the second pilot trench exterior cooling valve 8 are that the 30%, first pilot trench endoporus cooling valve 6 and the first pilot trench exterior cooling valve 9 keep 10%.
First group of workpiece enter the first pilot trench quench the 43rd minute time, the first pilot trench quenching terminates water outlet, and operating machine completed the outward transport of quenching part in 1 minute, then got back to original position, in 1 minute, the 4th batch of workpiece was sent into the first pilot trench, starts again new one and takes turns circulation;
Traffic conditions when three pilot trench continuous quenchings run is shown in Fig. 3.

Claims (7)

1. a collecting and distributing type thermal treatment refrigerating unit, it is characterized in that: comprise unit quenching tank, first pilot trench (1), second pilot trench (2), 3rd pilot trench (3), 3rd pilot trench endoporus cooling valve (4), second pilot trench endoporus cooling valve (5), first pilot trench endoporus cooling valve (6), 3rd pilot trench exterior cooling valve (7), second pilot trench exterior cooling valve (8), first pilot trench exterior cooling valve (9), pilot trench upflow tube (10), public sedimentation basin (11), public water pump (12), cooling tower water-supply pipe (13), water coolant supervisor (14), cooling waterside pipe (15) and cooling tower (16), described first pilot trench (1), second pilot trench (2) and the 3rd pilot trench (3) are all arranged in unit quenching tank, described first pilot trench (1), second pilot trench (2) and the 3rd pilot trench (3) are pilot trench,
Described pilot trench comprises quenching tank, exterior cooling medium tube (21), submersible agitator (23), endoporus heat-eliminating medium pipe (24), nozzle (25) and steady arm (26), described exterior cooling medium tube (21) is arranged on the bottom of described quenching tank, the part that described exterior cooling medium tube (21) is positioned at described quenching tank has spout (22) upward, the top of described spout (22) is provided with described submersible agitator (23), the top of described submersible agitator (23) is provided with worktable, the below of described worktable is provided with endoporus heat-eliminating medium pipe (24), described endoporus heat-eliminating medium pipe (24) is provided with nozzle (25) upward, the top of described worktable is provided with described steady arm (26), described steady arm (26) is hollow, described nozzle (25) is communicated with described steady arm (26),
Described cooling tower water-supply pipe (13), water coolant supervisor (14) are all communicated with described cooling tower (16) with cooling waterside pipe (15);
Described 3rd pilot trench (3), the second pilot trench (2) are all communicated with described cooling waterside pipe (15) with the endoporus heat-eliminating medium pipe (24) of the first pilot trench (1);
The endoporus heat-eliminating medium pipe (24) of described 3rd pilot trench (3), the second pilot trench (2) and the first pilot trench (1) is respectively arranged with the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5) and the first pilot trench endoporus cooling valve (6);
Described 3rd pilot trench (3), the second pilot trench (2) and the exterior cooling medium tube (21) of the first pilot trench (1) are all communicated with described water coolant supervisor (14);
The exterior cooling medium tube (21) of described 3rd pilot trench (3), the second pilot trench (2) and the first pilot trench (1) is respectively arranged with the 3rd pilot trench exterior cooling valve (7), the second pilot trench exterior cooling valve (8) and the first pilot trench exterior cooling valve (9);
Described upflow tube (10) connected unit quenching tank and described public sedimentation basin (11), described public sedimentation basin (11) is communicated with described cooling tower by public water pump (12) with cooling tower water-supply pipe (13).
2. collecting and distributing type thermal treatment refrigerating unit as claimed in claim 1, it is characterized in that: described worktable is provided with concave station, the bottom of described steady arm (6) coordinates with described concave station, and the top of described steady arm (6) is taper.
3. collecting and distributing type thermal treatment refrigerating unit as claimed in claim 1, is characterized in that: the quantity of described spout (2) and submersible agitator (3) is 3.
4. collecting and distributing type thermal treatment refrigerating unit as claimed in claim 1, is characterized in that: the quantity of described nozzle (5) and steady arm (6) is 4.
5. collecting and distributing type thermal treatment refrigerating unit as claimed in claim 1, is characterized in that: the top of described steady arm (6) is made up of the gusset of cross.
6. a collecting and distributing type thermal treatment method of cooling, is characterized in that, adopts the collecting and distributing type thermal treatment refrigerating unit as described in any one of claim 1-5, comprises the following steps:
1), the starting stage, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 80-85%, second pilot trench and the 3rd pilot trench enter the preparatory stage, and the open degree of the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5), the second pilot trench exterior cooling valve (8) and the 3rd pilot trench exterior cooling valve (7) is all adjusted to 5-10%; First group of workpiece is put into the first pilot trench (1), and after first group of workpiece puts into 1-2 minute, the open degree adjusting the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is 50-70%; When 12-14 minute put into by first group of workpiece, first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) open degree are adjusted to 25-35%, simultaneously, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 50-70%, second pilot trench (2) enters treats running status, and the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) maintain the open degree of 10%;
2), when 14-16 minute put into by first group of workpiece, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 80-85%, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 5-10%, the second pilot trench (2) quenching put into by second group of workpiece, after second group of workpiece puts into 1-2 minute, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 50-70%, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 25-35% simultaneously, 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) maintain the open degree of 5-10%, when 27-29 minute put into by first group of workpiece, first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) open degree are adjusted to 10%, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 25-35%, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 50-70%, and the 3rd pilot trench (3) enters treats running status,
3), after first group of workpiece puts into 29-31 minute, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 80-85%, second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) are adjusted to the open degree of 5-10%, the 3rd group of workpiece are put into the 3rd pilot trench quenching; After the 3rd group of workpiece puts into 1-2 minute, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 50-70%, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 25-35%, and the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) maintains 5-10%;
4), when 43-45 minute put into by first group of workpiece, first group of workpiece quenching terminates water outlet, and operating machine by first group of workpiece outward transport, was then got back to original position, and finally in 1 minute, the 4th group of workpiece sent into the first pilot trench (1) in 1 minute;
5), repeating step 1)-4), realize consecutive production.
7. collecting and distributing type thermal treatment method of cooling as claimed in claim 6, is characterized in that, comprise the following steps:
1), the starting stage, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 80%, second pilot trench and the 3rd pilot trench enter the preparatory stage, and the open degree of the 3rd pilot trench endoporus cooling valve (4), the second pilot trench endoporus cooling valve (5), the second pilot trench exterior cooling valve (8) and the 3rd pilot trench exterior cooling valve (7) is all adjusted to 10%; First group of workpiece is put into the first pilot trench (1), and when first group of workpiece puts into 2 minutes, the open degree adjusting the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is 60%; When first group of workpiece puts into the 13rd minute, first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) open degree are adjusted to 30%, simultaneously, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 60%, second pilot trench (2) enters treats running status, and the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) maintain the open degree of 10%;
2), when first group of workpiece puts into the 15th minute, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 80%, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 10%, the second pilot trench (2) quenching put into by second group of workpiece, when second group of workpiece puts into 2 minutes, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 60%, the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) is adjusted to 30% simultaneously, 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) maintain the open degree of 10%, when first group of workpiece puts into the 28th minute, first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) open degree are adjusted to 10%, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 30%, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 60%, and the 3rd pilot trench (3) enters treats running status,
3), when first group of workpiece puts into the 30th minute, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 80%, second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) are adjusted to the open degree of 10%, the 3rd group of workpiece are put into the 3rd pilot trench quenching; When the 3rd group of workpiece puts into 2 minutes, the open degree of the 3rd pilot trench endoporus cooling valve (4) and the 3rd pilot trench exterior cooling valve (7) is adjusted to 60%, the open degree of the second pilot trench endoporus cooling valve (5) and the second pilot trench exterior cooling valve (8) is adjusted to 30%, and the open degree of the first pilot trench endoporus cooling valve (6) and the first pilot trench exterior cooling valve (9) maintains 10%;
4), when first group of workpiece puts into the 43rd minute, first group of workpiece quenching terminates water outlet, and operating machine by first group of workpiece outward transport, was then got back to original position, and finally in 1 minute, the 4th group of workpiece sent into the first pilot trench (1) in 1 minute;
5), repeating step 1)-4), realize consecutive production.
CN201410712757.3A 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device Active CN104451067B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410712757.3A CN104451067B (en) 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410712757.3A CN104451067B (en) 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device

Publications (2)

Publication Number Publication Date
CN104451067A true CN104451067A (en) 2015-03-25
CN104451067B CN104451067B (en) 2017-01-25

Family

ID=52897811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410712757.3A Active CN104451067B (en) 2014-11-28 2014-11-28 Centralized/distributed heat treatment cooling device

Country Status (1)

Country Link
CN (1) CN104451067B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114517251A (en) * 2020-11-20 2022-05-20 南京迪威尔高端制造股份有限公司 Heat treatment cooling device and method for 15-5PH stainless steel shale gas fracturing pump
CN114540585A (en) * 2020-11-20 2022-05-27 南京迪威尔高端制造股份有限公司 Quenching heat treatment method for forged piece with hole

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556228A (en) * 2003-12-30 2004-12-22 上海交通大学 Controlled cooling equipment of immersion and spray quenching combined quench-hardening
CN2866519Y (en) * 2005-11-29 2007-02-07 宝山钢铁股份有限公司 Steel pipe water quenching heat treatment device
CN101250612A (en) * 2008-04-03 2008-08-27 上海交通大学 Multi-station quenching cooling equipment realizing fluid-immersion quenching by liquid level change
DE202009005685U1 (en) * 2009-04-16 2009-06-18 Schlager Industrieofenbau Gmbh Quenching or cooling device
CN202913028U (en) * 2012-10-25 2013-05-01 衡阳华菱钢管有限公司 Water quenching control device for steel pipe
CN103882199A (en) * 2014-03-13 2014-06-25 广东坚宜佳五金制品有限公司 Method and system for quenching and cooling ultra-long rod member
CN203866360U (en) * 2014-03-10 2014-10-08 北京机电研究所 Continuous outward spray quenching device for oil casing

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556228A (en) * 2003-12-30 2004-12-22 上海交通大学 Controlled cooling equipment of immersion and spray quenching combined quench-hardening
CN2866519Y (en) * 2005-11-29 2007-02-07 宝山钢铁股份有限公司 Steel pipe water quenching heat treatment device
CN101250612A (en) * 2008-04-03 2008-08-27 上海交通大学 Multi-station quenching cooling equipment realizing fluid-immersion quenching by liquid level change
DE202009005685U1 (en) * 2009-04-16 2009-06-18 Schlager Industrieofenbau Gmbh Quenching or cooling device
CN202913028U (en) * 2012-10-25 2013-05-01 衡阳华菱钢管有限公司 Water quenching control device for steel pipe
CN203866360U (en) * 2014-03-10 2014-10-08 北京机电研究所 Continuous outward spray quenching device for oil casing
CN103882199A (en) * 2014-03-13 2014-06-25 广东坚宜佳五金制品有限公司 Method and system for quenching and cooling ultra-long rod member

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114517251A (en) * 2020-11-20 2022-05-20 南京迪威尔高端制造股份有限公司 Heat treatment cooling device and method for 15-5PH stainless steel shale gas fracturing pump
CN114540585A (en) * 2020-11-20 2022-05-27 南京迪威尔高端制造股份有限公司 Quenching heat treatment method for forged piece with hole

Also Published As

Publication number Publication date
CN104451067B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN204897990U (en) Double entry response quenching groove
CN102251082A (en) Quenching agent cooling control system for mesh belt furnace production line
CN104451067A (en) Centralized/distributed heat treatment cooling device and method
CN103894648B (en) A kind of multifunctional high speed deep hole rig being provided with withdraw-filings device
CN203156591U (en) Temperature controlled grinding polishing disk
CN102925641A (en) Method for controlling flow fields in quenching water tank of large cylindrical workpiece
CN204470299U (en) A kind of cooling device increasing high-speed bar mill on-line cooling effect
CN103878194B (en) A kind of forced lubrication device of water tank wire drawing and using method thereof
CN201713540U (en) Cooling system for heat treatment medium
CN207942248U (en) A kind of drilling machine heat sink
CN102722190B (en) Energy-saving oil temperature control system of machine tool
CN204298428U (en) A kind of stirring and hollow spray streaming heat treatment cooling device
CN201880621U (en) Nozzle device for processing steel-making slag
CN201660670U (en) Cooling system for heat treatment medium
CN205974600U (en) Quenching and cooling device
CN103882199B (en) The method and system of speciality Quenching apparatus of rod parts cooling
CN201324963Y (en) Anti-precipitation device of oil grooves
CN201762388U (en) Bottom-spraying quenching device
CN210240191U (en) Isostatic pressing machine hydraulic oil cooling device
CN108588364A (en) The quenching unit that workpiece is uniformly cooled down by adjusting flow velocity
CN210098381U (en) Bar spraying ring
CN211689143U (en) Mixed spraying device for converter slag splashing protection
CN203239688U (en) Pump station automatic cooling device
CN203830443U (en) Forced lubrication device for water tank wire drawing
CN102505397A (en) Dyeing heat recovery equipment and process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant