CN104439611B - Welder - Google Patents
Welder Download PDFInfo
- Publication number
- CN104439611B CN104439611B CN201310439948.2A CN201310439948A CN104439611B CN 104439611 B CN104439611 B CN 104439611B CN 201310439948 A CN201310439948 A CN 201310439948A CN 104439611 B CN104439611 B CN 104439611B
- Authority
- CN
- China
- Prior art keywords
- cooler bin
- plate
- welder
- fixedly installed
- workbench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C65/00—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
- B29C65/02—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure
Abstract
The present invention provides a kind of welder.This welder includes: workbench (10);Occlusion part, is arranged on workbench (10) and above and has the operating position blocked between parts to be hidden and welding position, be connected with the coolant reducing occlusion part temperature in occlusion part.Heat on occlusion part can be reduced and then reduce the temperature of occlusion part by the coolant in occlusion part, it is to avoid the temperature too high scald drain pan of occlusion part.
Description
Technical field
The present invention relates to the apparatus of air conditioning and manufacture field, in particular to a kind of welder.
Background technology
In the production process with the air-conditioner of hose part, evaporator part needs hose part and steaming after assembling with drain pan
Sending out device parts to weld, solder joint distance drain pan is near, owing to drain pan is moulding, in order to avoid welding process burn drain pan, logical
Frequently with increasing baffle plate between solder joint and drain pan, it is used for isolating welding gun flame, but there is shortcoming, in weldering by baffle plate isolation flame
Termination process baffle plate is easily heated, and during causing taking-up evaporator part, baffle plate surprisingly contacts with drain pan, causes scald drain pan;Gear
Between plate and evaporator part, spacing is little, and evaporator part process evaporator fin of taking contacts with baffle plate and easily causes fin reviewing;
The vaporizer process of taking easily causes employee and scalds;Hose part is easily deviate from by gravity, bond pad locations pipe arrangement without fixed support, pipe;
After having welded, evaporator part and hose part need to take out simultaneously, and operation easier is big.
Summary of the invention
It is desirable to provide a kind of welder, affected temperature by the heat in welding process solving baffle plate in prior art
The problem of too high easy scald drain pan.
To achieve these goals, according to an aspect of the invention, it is provided a kind of welder, this welder includes:
Workbench;Occlusion part, arranges on the table and has the operating position blocked between parts to be hidden and welding position, blocking
The coolant reducing occlusion part temperature it is connected with in portion.
Further, occlusion part includes that cooler bin, cooler bin are movably disposed on workbench, and has disengaging operating position
Dodge position.
Further, welder also includes position-regulation portion, position-regulation portion between cooler bin and workbench and with cooling
Case and workbench connect, and position-regulation portion drives cooler bin to move between position in operating position and dodging.
Further, position-regulation portion includes: guided way, is fixedly installed on the table, and prolongs along the mobile route of cooler bin
Stretch;Cooler bin support, is movably disposed on guided way, and cooler bin is fixedly installed on cooler bin support.
Further, guided way includes two slide rails be arrangeding in parallel, and cooler bin support includes: two slide blocks, correspondingly
It is arranged on two slide rails;Connecting plate, is fixedly installed on two slide blocks;Bracing frame, the first end of bracing frame is fixedly installed on
On connecting plate, and extending along the direction being perpendicular to connecting plate, the second end of bracing frame is fixing with cooler bin to be connected.
Further, welder also includes that coolant circulation portions, coolant circulation portions include: coolant storage box, including cold
Sap cavity and hydrothermal solution chamber;First pump machine, is arranged in cold sap cavity;Feed tube, the first end of feed tube is connected to going out of the first pump machine
On mouth, the second end of feed tube is connected on the inlet of cooler bin;Liquid back pipe, the first end of liquid back pipe is connected to cooler bin
On liquid outlet, the second end of liquid back pipe is connected on the entrance in hydrothermal solution chamber.
Further, workbench includes loading plate and the supporting part being arranged on loading plate, and supporting part includes: lateral support frame,
Being perpendicular to loading plate and be fixedly installed on the side of loading plate, lateral support frame includes two columns being oppositely arranged and is connected to two
Lateral support plate between individual column, one end of guided way is fixedly installed on one of them column, and stands to away from one of them
The direction of post extends, and cooler bin is movable to the operating position between lateral support frame and welding position;Bottom support plate,
Being inclined on the upper surface of loading plate, the inclined plane of bottom support plate is towards lateral support plate.
Further, bottom support plate is additionally provided with limiting plate near the side of lateral support frame, and limiting plate protrudes from bottom support
Plate is near the side of lateral support frame.
Further, loading plate includes that the first side plate and the second side plate, the first side plate and the second side plate connect combination l-shaped plate,
Lateral support frame is fixedly installed on the end of the first side plate, and bottom support plate is fixedly installed on the upper surface of the first side plate, and second
Being fixedly installed hose support on the upper surface of side plate, hose support includes two wire guide plates being oppositely arranged, two wire guide plate structures
Become V-groove.
Further, the bottom of cooler bin is provided with flexible pipe gripper shoe, and flexible pipe gripper shoe is along the direction away from cooler bin the most upwards
Extend.
Application technical scheme, welder includes workbench and occlusion part, and occlusion part arranges on the table and has
Block the operating position between parts to be hidden and welding position, in occlusion part, be connected with the coolant reducing occlusion part temperature.Block
Heat on occlusion part can be reduced and then reduce the temperature of occlusion part by the coolant in portion, it is to avoid the temperature of occlusion part is too high scalds
Hinder parts to be hidden.
Accompanying drawing explanation
The accompanying drawing of the part constituting the present invention is used for providing a further understanding of the present invention, the illustrative examples of the present invention and
Its explanation is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the perspective view of the welder of embodiments of the invention.
Description of reference numerals: 10, workbench;11, loading plate;111, the first side plate;112, the second side plate;20, cooler bin;
21, flexible pipe gripper shoe;31, guided way;311, slide rail;321, slide block;32, bracing frame;322, connecting plate;33, gas
Cylinder;40, coolant storage box;41, hydrothermal solution chamber;42, cold sap cavity;43, liquid back pipe;44, feed tube;50, laterally prop up
Support;51, column;52, lateral support plate;60, bottom support plate;61, limiting plate;70, hose support.
Detailed description of the invention
Below with reference to accompanying drawing and describe the present invention in detail in conjunction with the embodiments.It should be noted that in the case of not conflicting,
Embodiment in the application and the feature in embodiment can be mutually combined.
As it is shown in figure 1, according to embodiments of the invention, welder includes workbench 10 and occlusion part.Occlusion part is arranged on work
In station 10 and there is the operating position blocked between parts to be hidden and welding position, in occlusion part, it is connected with reduction occlusion part temperature
Coolant.When carrying out welding job, the heat on occlusion part can be taken away by coolant, reduce the temperature of occlusion part,
Being thus able to avoid occlusion part to scald parts to be hidden, occlusion part is in operating position when welding simultaneously, it is possible to shelters from and treats screening portion
Part, it is to avoid welding heat damages parts to be hidden, and improves Welding Safety.
Workbench 10 includes that loading plate 11, the support of table and supporting part, loading plate 11 are arranged on the support of table for holding
Carry other parts.Supporting part is arranged on loading plate 11, for supporting parts to be welded.In the present embodiment, loading plate 11
For L-type plate, this L-type plate includes the first side plate 111 and the second side plate 112, and the length of the first side plate 111 is less than the second side plate
The length of 112.First side plate 111 of this L-type plate and the second side plate 112 are formed in one.
The support of table includes 6 pillars, and 6 pillars are arranged correspondingly with each summit of this L-type plate.
Preferably, workbench 10 also includes placing plate, and the shape size placing plate is all identical with loading plate 11, and it is parallel to place plate
It is arranged on the support of table in loading plate 11, places plate and be positioned at the lower section of loading plate 11.
Supporting part includes lateral support frame 50 and bottom support plate 60.
Wherein lateral support frame 50 is fixedly installed on the end of the first side plate 111 of L-type plate, namely away from the second side plate 112
One end.Lateral support frame 50 is perpendicular to loading plate 11 and arranges.Lateral support frame 50 includes two columns being oppositely arranged 51 and connects
The lateral support plate 52 being connected between two columns 51.Lateral support plate 52, for supporting parts to be welded, makes to be welded
Parts are securely placed on workbench 10.
Bottom support plate 60 is inclined on the upper surface of loading plate 11, and the inclined plane of bottom support plate 60 is towards lateral support
Plate 52.Preferably, bottom support plate 60 is additionally provided with limiting plate 61 near the side of lateral support frame 50, and limiting plate 61 is convex
For bottom support plate 60 near the side of lateral support frame 50.Limiting plate 61 and the bottom support plate 60 tilted constitute one
Stopper slot, can avoid parts to be welded to move in welding process by stopper slot, it is ensured that Welding Safety.
Preferably, being fixedly installed hose support 70 on the upper surface of the second side plate 112 of L-type plate, hose support 70 includes
Two wire guide plates being oppositely arranged, two wire guide plates constitute V-groove.Flexible pipe can be formed and support by V-groove, prevents flexible pipe to be subject to
Gravity deformation and come off from solder joint.
In the present embodiment, occlusion part includes that cooler bin 20, cooler bin 20 are movably disposed on workbench 10, and have
Depart from operating position dodges position.In order to avoid cooler bin 20 disturbs installing and uninstalling of to-be-welded pieces, cooler bin 20 is permissible
Operating position and dodge between position move.When needs weld, cooler bin 20 moves to operating position as blocking, to work as weldering
When having connect, cooler bin 20 is removed arrival from operating position and is dodged position, to facilitate unloading to-be-welded pieces.
Being connected between cooler bin 20 with workbench 10 and have position-regulation portion, cooler bin 20 is arranged in position-regulation portion, and position is adjusted
Joint portion drives cooler bin 20 to move between position in operating position and dodging.Position-regulation portion includes that guided way 31 and cooler bin prop up
Frame.
Wherein guided way 31 is fixedly installed on workbench 10, and along the mobile route extension of cooler bin 20.Specifically, guide
One end of rail 31 is fixedly installed on one of them column 51 of lateral support frame 50, and extends to the direction away from this column.
Cooler bin support is movably disposed on guided way 31, and cooler bin 20 is fixedly installed on cooler bin support.When needing to block,
Cooler bin 20 can be moved to the operating position between lateral support frame 50 and solder joint by cooler bin support;It is not required to block
Time, cooler bin 20 can be removed to dodge position from operating position by cooler bin support.Preferably, guided way 31 includes two
The slide rail 311 that bar be arranged in parallel, can be spaced setting between two slide rails 311, it is also possible to be not spaced setting.
Cooler bin support includes two slide blocks 321, connecting plate 322 and bracing frame 32.Two of which slide block 321 is correspondingly
It is arranged on two slide rails 311 of guided way 31, and can move along slide rail 311.Connecting plate 322 is fixedly installed on two
On slide block 321, in the present embodiment, connecting plate 322 is fixedly installed on the back of two slide blocks 321, namely away from slide rail 311
Side.Connecting plate 322 can provide installation site for bracing frame as the installation matrix of bracing frame.Bracing frame the first end is fixed
Being arranged on connecting plate 322, and extend along the direction being perpendicular to connecting plate 322, the second end of bracing frame is fixedly installed cooling
Case 20.
In the present embodiment, welder also includes driving cylinder 33, and one end of this driving cylinder 33 is fixedly installed on lateral support
On the column not installing guided way 31 of frame 50, expansion link stretches out and drives one end of cylinder 33 cylinder body to be connected on bracing frame 32,
For driving bracing frame 32 to move.
In the present embodiment, bracing frame 32 includes two support bars that vertical spacing is arranged, and the front end of two support bars is fixed respectively
On the sidewall of the same side of cooler bin 20, and between two support bars and connecting plate 322, it is provided with the reinforcement strengthening rigidity.
Welder also includes that coolant circulation portions, coolant circulation portions include coolant storage box the 40, first pump machine, feed tube
44 and liquid back pipe 43.Coolant storage box 40 is arranged on placement plate, and is placing between plate and loading plate 11.Cold
But liquid storage box 40 includes that cold sap cavity 42 and hydrothermal solution chamber 41, cold sap cavity 42 are used for storing coolant, and hydrothermal solution chamber 41 is used for storing
The hydrothermal solution that the temperature of backflow is higher from cooler bin 20.First pump machine is cold for pumping coolant entrance in being arranged on cold sap cavity 42
But case 20, feed tube 44 first end is connected to the outlet of the first pump machine, and the second end is connected to the inlet of cooler bin 20, for cold
But case 20 carries coolant.First end of liquid back pipe 43 is connected to the liquid outlet of cooler bin 20, and the second end is connected to hydrothermal solution chamber 41
Entrance, for recovered temperature raise coolant.
Preferably, the height of the inlet of cooler bin 20 is less than the height of the liquid outlet of cooler bin 20, so that coolant can be filled
Full whole cooler bin 20, makes full use of coolant simultaneously.
Preferably, being provided with flexible pipe gripper shoe 21 in the bottom of cooler bin 20, flexible pipe gripper shoe 21 is along the side away from cooler bin 20
To gradually upwardly extending, to form the support slot supporting flexible pipe, it is to avoid owing to the effect of gravity makes flexible pipe come off solder joint, it is ensured that weldering
Connect quality.
Manufacture field specific to air-conditioner, after evaporator part assembles with drain pan, for preventing welding heat from damaging drain pan, steaming
During sending out device parts welding hose, cooler bin 20 blocks between the solder joint and drain pan of evaporator part.Flexible pipe is propped up by flexible pipe
Welding position is arrived, due to hose support 70 and the support of support slot, it is to avoid soft after support slot on frame 70 and cooler bin 20
Pipe is affected by gravity and comes off, it is ensured that welding quality.After welding completes, cooler bin 20 is removed from operating position, with side
Just evaporator part and drain pan take off from welder.Avoid cooler bin 20 to touch evaporator part and cause fin reviewing.Simultaneously
It also is able to prevent cooler bin 20 temperature too high scald staff.
As can be seen from the above description, the above embodiments of the present invention achieve following technique effect: hidden by cooler bin
Gear is between part to be hidden and solder joint, and heat when cooler bin can take away welding, thus part to be hidden can be protected to be not damaged by;
Cooler bin can be removed from blocking position, it is to avoid damages drain pan when taking off evaporator part and drain pan, or makes fin reviewing, simultaneously
The too high employee of causing of temperature that can avoid cooler bin surprisingly scalds;And do not have cooler bin block convenient by evaporator part,
Drain pan and flexible pipe together take out, and reduce the difficulty taken out.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for those skilled in the art
For, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any amendment of being made, etc.
With replacement, improvement etc., should be included within the scope of the present invention.
Claims (8)
1. a welder, it is characterised in that including:
Workbench (10);
Occlusion part, is arranged on described workbench (10) and above and has the work blocked between parts to be hidden and welding position
Position, is connected with the coolant reducing described occlusion part temperature in described occlusion part, described occlusion part includes cooler bin (20),
Described cooler bin (20) is movably disposed on described workbench (10), and has keeping away of the described operating position of disengaging
Allowing position, the bottom of described cooler bin (20) be provided with flexible pipe gripper shoe (21), described flexible pipe gripper shoe (21) is along remote
Gradually upwardly extend from the direction of described cooler bin (20).
Welder the most according to claim 1, it is characterised in that described welder also includes position-regulation portion, described
Position-regulation portion be positioned between described cooler bin (20) and described workbench (10) and with described cooler bin (20) and institute
Stating workbench (10) to connect, described position-regulation portion drives described cooler bin (20) in described operating position and described to keep away
Allow and move between position.
Welder the most according to claim 2, it is characterised in that described position-regulation portion includes:
Guided way (31), is fixedly installed on described workbench (10), and along the mobile route of described cooler bin (20)
Extend;
Cooler bin support, is movably disposed on described guided way (31), and described cooler bin (20) is fixedly installed on
On described cooler bin support.
Welder the most according to claim 3, it is characterised in that described guided way (31) includes that two be arranged in parallel
Slide rail (311), described cooler bin support includes:
Two slide blocks (321), are arranged on two described slide rails (311) correspondingly;
Connecting plate (322), is fixedly installed on two described slide blocks (321);
Bracing frame (32), the first end of support frame as described above (32) is fixedly installed on described connecting plate (322), and edge
The direction being perpendicular to described connecting plate (322) extends, the second end of support frame as described above (32) and described cooler bin (20)
Fixing connection.
Welder the most according to claim 4, it is characterised in that described welder also includes coolant circulation portions, institute
State coolant circulation portions to include:
Coolant storage box (40), including cold sap cavity (42) and hydrothermal solution chamber (41);
First pump machine, is arranged in described cold sap cavity (42);
Feed tube (44), the first end of described feed tube (44) is connected in the outlet of described first pump machine, described feed liquor
Second end of pipe (44) is connected on the inlet of described cooler bin (20);
Liquid back pipe (43), the first end of described liquid back pipe (43) is connected on the liquid outlet of described cooler bin (20), institute
The second end stating liquid back pipe (43) is connected on the entrance of described hydrothermal solution chamber (41).
Welder the most according to claim 3, it is characterised in that described workbench (10) includes loading plate (11) and sets
Putting the supporting part on described loading plate (11), described supporting part includes:
Lateral support frame (50), is perpendicular to described loading plate (11) and is fixedly installed on the side of described loading plate (11),
Described lateral support frame (50) include two columns being oppositely arranged (51) and be connected to two described columns (51) it
Between lateral support plate (52), one end of described guided way (31) is fixedly installed on one of them described column (51),
And extend to the direction away from described one of them column (51), described cooler bin (20) is movable to be positioned at described side
Described operating position between bracing frame (50) and described welding position;
Bottom support plate (60), is inclined on the upper surface of described loading plate (11), described bottom support plate (60)
Inclined plane towards described lateral support plate (52).
Welder the most according to claim 6, it is characterised in that described bottom support plate (60) is near described lateral
The side of support (50) is additionally provided with limiting plate (61), and described limiting plate (61) protrudes from described bottom support plate (60)
Side near described lateral support frame (50).
Welder the most according to claim 6, it is characterised in that described loading plate (11) includes the first side plate (111)
Combination l-shaped plate, institute is connected with the second side plate (112), described first side plate (111) and described second side plate (112)
Stating lateral support frame (50) and be fixedly installed on the end of described first side plate (111), described bottom support plate (60) is solid
Surely it is arranged on the upper surface of described first side plate (111), the upper surface of described second side plate (112) is fixedly installed
Hose support (70), described hose support (70) includes that two wire guide plates being oppositely arranged, two described wire guide plates are constituted
V-groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310439948.2A CN104439611B (en) | 2013-09-24 | 2013-09-24 | Welder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310439948.2A CN104439611B (en) | 2013-09-24 | 2013-09-24 | Welder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104439611A CN104439611A (en) | 2015-03-25 |
CN104439611B true CN104439611B (en) | 2016-08-24 |
Family
ID=52886791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310439948.2A Expired - Fee Related CN104439611B (en) | 2013-09-24 | 2013-09-24 | Welder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104439611B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4345744A (en) * | 1980-05-11 | 1982-08-24 | Trumpf Gmbh & Co. | Working machine with flame cutter and cooling unit |
US4895294A (en) * | 1989-03-01 | 1990-01-23 | Thore George M | Method and apparatus for controlling solder flow in metallic members |
CN1203512A (en) * | 1997-05-08 | 1998-12-30 | 松下电器产业株式会社 | Electronic unit soldering apparatus |
CN2649251Y (en) * | 2003-03-26 | 2004-10-20 | 哈尔滨工程大学 | Welding area cooling-heat-insulating protector |
CN1791309A (en) * | 2004-11-25 | 2006-06-21 | 新科实业有限公司 | Soldering method and apparatus |
US7552856B2 (en) * | 2005-10-19 | 2009-06-30 | Showa Denko K.K. | Clamp apparatus, joining method, and method of manufacturing hollow member |
CN202045461U (en) * | 2011-04-29 | 2011-11-23 | 深圳市顺安金德实业制品来料加工厂 | A water cooling device used for weld cooling |
CN202185662U (en) * | 2011-06-29 | 2012-04-11 | 宁波奥克斯空调有限公司 | Capillary tube welding protective device |
CN202240051U (en) * | 2011-09-10 | 2012-05-30 | 浙江广涛卫厨有限公司 | Rotating-disc welding machine |
CN203471110U (en) * | 2013-09-24 | 2014-03-12 | 珠海格力电器股份有限公司 | Welding device |
-
2013
- 2013-09-24 CN CN201310439948.2A patent/CN104439611B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4345744A (en) * | 1980-05-11 | 1982-08-24 | Trumpf Gmbh & Co. | Working machine with flame cutter and cooling unit |
US4895294A (en) * | 1989-03-01 | 1990-01-23 | Thore George M | Method and apparatus for controlling solder flow in metallic members |
CN1203512A (en) * | 1997-05-08 | 1998-12-30 | 松下电器产业株式会社 | Electronic unit soldering apparatus |
CN2649251Y (en) * | 2003-03-26 | 2004-10-20 | 哈尔滨工程大学 | Welding area cooling-heat-insulating protector |
CN1791309A (en) * | 2004-11-25 | 2006-06-21 | 新科实业有限公司 | Soldering method and apparatus |
US7552856B2 (en) * | 2005-10-19 | 2009-06-30 | Showa Denko K.K. | Clamp apparatus, joining method, and method of manufacturing hollow member |
CN202045461U (en) * | 2011-04-29 | 2011-11-23 | 深圳市顺安金德实业制品来料加工厂 | A water cooling device used for weld cooling |
CN202185662U (en) * | 2011-06-29 | 2012-04-11 | 宁波奥克斯空调有限公司 | Capillary tube welding protective device |
CN202240051U (en) * | 2011-09-10 | 2012-05-30 | 浙江广涛卫厨有限公司 | Rotating-disc welding machine |
CN203471110U (en) * | 2013-09-24 | 2014-03-12 | 珠海格力电器股份有限公司 | Welding device |
Also Published As
Publication number | Publication date |
---|---|
CN104439611A (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104439611B (en) | Welder | |
CN214292998U (en) | Self-positioning split charging device for pipelines | |
CN207547985U (en) | A kind of welding tooling | |
CN203471110U (en) | Welding device | |
RU2685620C2 (en) | Device for lifting and lowering of ladle, installation with such device and method | |
CN103668378B (en) | Charging equipment | |
CN111069573B (en) | Cast welding device for storage battery | |
US6405428B1 (en) | Apparatus of automatically assembling a heat exchanger | |
KR101483222B1 (en) | jig apparatus for manufacturing a curved surface glass | |
KR20150091617A (en) | Car wheel heat treatment basket | |
CN105665979A (en) | Kiln frame welding system | |
KR20130005720U (en) | Injection discharger of glass panel manufacture correction | |
CN205764423U (en) | A kind of pipe joint and cooling water pipe high-frequency welding equipment | |
KR102204030B1 (en) | Welding apparatus for Shear Reinforcement of Dual-anchorage | |
CN211708523U (en) | Welding tool for cyclone structure | |
KR200447750Y1 (en) | Basket for Heat Treatment of Aluminum Wheel | |
CN106629027A (en) | Push rod type prod steamed bun splicing conveyor | |
CN111299933B (en) | Welding positioning device for electronic expansion valve | |
CN213105050U (en) | High-frequency welding device | |
CN220483373U (en) | Energy storage rack door leaf welding conveyer | |
KR101678517B1 (en) | lifting device | |
CN218111416U (en) | A transport frame for rubber vulcanization oven | |
CN108127283B (en) | Method for welding glass tube and exhaust tail tube | |
CN208883195U (en) | Feeding mechanism of winding machine | |
KR101491249B1 (en) | Autoclave device that can be distributed to the pressing force that is passed to the pressurized sent |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 |