CN104405412A - 地铁暗挖隧道横通道施工构件 - Google Patents
地铁暗挖隧道横通道施工构件 Download PDFInfo
- Publication number
- CN104405412A CN104405412A CN201410808758.8A CN201410808758A CN104405412A CN 104405412 A CN104405412 A CN 104405412A CN 201410808758 A CN201410808758 A CN 201410808758A CN 104405412 A CN104405412 A CN 104405412A
- Authority
- CN
- China
- Prior art keywords
- transverse passage
- way
- tunnel
- steel frame
- portal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/021—Grouting with inorganic components, e.g. cement
Abstract
本发明公开了一种地铁暗挖隧道横通道施工构件,包括横通道洞门、隧道横通道正线、横通道初期支护结构、隧道初期支护结构和隧道二衬,所述地铁暗挖隧道横通道施工构件还包括注浆锚管、格栅钢架套拱、双层钢筋网、洞门型钢钢架、注浆导管和正线超前小导管,所述注浆导管设置在所述横通道洞门处,所述格栅钢架套拱安装在所述隧道横通道正线洞门处。与现有的相比,本发明保护的地铁暗挖隧道横通道作为形成地铁暗挖隧道横通道临时支撑系统的工具,对于形成确保施工安全、施工方便和受力合理的临时支撑系统,具有决定性的作用。
Description
技术领域
本发明涉及地铁隧道领域,特别涉及一种地铁暗挖隧道横通道施工构件。
背景技术
地铁矿山法暗挖隧道通过竖井开挖横通道,再在已经施做初期支护的横通道内开挖正线隧道,因此横通道内面临多次开挖,应力转换复杂,影响施工安全。
发明内容
本发明的目的就在于提供一种地铁暗挖隧道横通道施工构件,该地铁暗挖隧道横通道施工构件作为形成地铁暗挖隧道横通道临时支撑系统的工具,对于形成确保施工安全、施工方便和受力合理的临时支撑系统,具有决定性的作用。
本发明的技术方案是:一种地铁暗挖隧道横通道,包括横通道洞门、隧道横通道正线、横通道初期支护结构、隧道初期支护结构和隧道二衬,所述地铁暗挖隧道横通道施工构件还包括注浆锚管、格栅钢架套拱、双层钢筋网、洞门型钢钢架、注浆导管和正线超前小导管,所述注浆导管设置在所述横通道洞门处,所述格栅钢架套拱安装在所述隧道横通道正线洞门处。
作为优选,所述正线超前小导管设置在所述格栅钢架套拱内拱部。
作为优选,所述注浆导管设置在所述格栅钢架套拱上方,所述洞门型钢钢架与所述格栅钢架套拱相邻。
作为优选,所述双层钢筋网和注浆锚管设置在所述隧道横通道正线洞门外的侧墙上。
作为优选,所述横通道初期支护结构包括洞口范围横通道初期支护结构和凿洞门横通道初期支护结构。
作为优选,所述横通道初期支护结构周边上设置有横通道初期支护结构型钢钢架。
作为优选,所述横通道初期支护结构上设置有横通道初期支护堵头墙。
与现有技术相比,本发明的有益效果在于:
本发明横通道施工构件,作为形成地铁暗挖隧道横通道临时支撑系统的工具,对于形成确保施工安全、施工方便和受力合理的临时支撑系统,具有决定性的作用。当本发明横通道施工构件形成后,通过注浆锚管和双层钢筋网喷射形成混凝土支撑墙,从而形成地铁暗挖隧道横通道临时支撑系统。
附图说明
图1是本发明横通道平面结构示意图;
图2是图1 B-B截面结构示意图;
图3是图1 A-A截面结构示意图。
具体实施方式
下面将结合附图对本发明作进一步说明。
如图1-3所示,一种地铁暗挖隧道横通道施工构件,包括横通道洞门、隧道横通道正线、注浆锚管1、格栅钢架套拱3、横通道初期支护结构4、双层钢筋网2、洞门型钢钢架6、注浆导管7、隧道初期支护结构8、隧道二衬9和正线超前小导管10。
注浆导管7设置在横通道洞门处,格栅钢架套拱3安装在隧道横通道正线洞门处,正线超前小导管10设置在格栅钢架套拱3内拱部,注浆导管7在格栅钢架套拱3上方,洞门型钢钢架6与格栅钢架套拱3相邻。双层钢筋网2和注浆锚管1设置在隧道横通道正线洞门外的侧墙上。
横通道初期支护结构4包括洞口范围横通道初期支护结构5、凿洞门横通道初期支护结构41,横通道初期支护结构型钢钢架42设置在横通道初期支护结构4周边上,横通道初期支护结构4还设置有横通道初期支护堵头墙43。
正线洞门开挖轮廓线11用于开挖。
Claims (8)
1.一种地铁暗挖隧道横通道施工构件,包括横通道洞门、隧道横通道正线、横通道初期支护结构、隧道初期支护结构和隧道二衬,其特征在于:所述地铁暗挖隧道横通道施工构件还包括注浆锚管、格栅钢架套拱、双层钢筋网、洞门型钢钢架、注浆导管和正线超前小导管,所述注浆导管设置在所述横通道洞门处,所述格栅钢架套拱安装在所述隧道横通道正线洞门处。
2.根据权利要求1所述的地铁暗挖隧道横通道施工构件,其特征在于:所述正线超前小导管设置在所述格栅钢架套拱内拱部。
3.根据权利要求1所述的地铁暗挖隧道横通道施工构件,其特征在于:所述注浆导管设置在所述格栅钢架套拱上方,所述洞门型钢钢架与所述格栅钢架套拱相邻。
4.根据权利要求1所述的地铁暗挖隧道横通道施工构件,其特征在于:所述双层钢筋网和注浆锚管设置在所述隧道横通道正线洞门外的侧墙上。
5.根据权利要求1所述的地铁暗挖隧道横通道施工构件,其特征在于:所述横通道初期支护结构包括洞口范围横通道初期支护结构和凿洞门横通道初期支护结构。
6.根据权利要求1所述的地铁暗挖隧道横通道施工构件,其特征在于:所述横通道初期支护结构周边上设置有横通道初期支护结构型钢钢架。
7.根据权利要求1所述的地铁暗挖隧道横通道施工构件,其特征在于:所述横通道初期支护结构上设置有横通道初期支护堵头墙。
8.根据权利要求1所述的地铁暗挖隧道横通道施工构件,其特征在于:所述注浆锚管为土钉作用的注浆锚管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410808758.8A CN104405412B (zh) | 2014-12-19 | 2014-12-19 | 地铁暗挖隧道横通道施工构件 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410808758.8A CN104405412B (zh) | 2014-12-19 | 2014-12-19 | 地铁暗挖隧道横通道施工构件 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104405412A true CN104405412A (zh) | 2015-03-11 |
CN104405412B CN104405412B (zh) | 2017-10-31 |
Family
ID=52643068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410808758.8A Expired - Fee Related CN104405412B (zh) | 2014-12-19 | 2014-12-19 | 地铁暗挖隧道横通道施工构件 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104405412B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110566237A (zh) * | 2019-09-16 | 2019-12-13 | 北京市市政四建设工程有限责任公司 | 一种地铁区间停车线大断面暗挖施工初支进洞加固结构 |
CN113323132A (zh) * | 2021-06-11 | 2021-08-31 | 中国五冶集团有限公司 | 一种大体积混凝土双层钢筋换撑安装施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0828191A (ja) * | 1994-07-20 | 1996-01-30 | Ohbayashi Corp | トンネルのスチールライニング構造 |
GB2480501A (en) * | 2010-05-21 | 2011-11-23 | Tube Lines Ltd | A tunnel support apparatus |
CN103277118A (zh) * | 2013-06-04 | 2013-09-04 | 中铁第一勘察设计院集团有限公司 | 主洞拱墙开附属隧洞的接口钢架支撑体系及其施工方法 |
CN103993885A (zh) * | 2014-05-28 | 2014-08-20 | 北京市政建设集团有限责任公司 | 一种暗挖隧道侧向开洞支撑体系构建方法 |
CN204492831U (zh) * | 2014-12-19 | 2015-07-22 | 中国建筑第四工程局有限公司 | 地铁暗挖隧道横通道施工构件 |
-
2014
- 2014-12-19 CN CN201410808758.8A patent/CN104405412B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0828191A (ja) * | 1994-07-20 | 1996-01-30 | Ohbayashi Corp | トンネルのスチールライニング構造 |
GB2480501A (en) * | 2010-05-21 | 2011-11-23 | Tube Lines Ltd | A tunnel support apparatus |
CN103277118A (zh) * | 2013-06-04 | 2013-09-04 | 中铁第一勘察设计院集团有限公司 | 主洞拱墙开附属隧洞的接口钢架支撑体系及其施工方法 |
CN103993885A (zh) * | 2014-05-28 | 2014-08-20 | 北京市政建设集团有限责任公司 | 一种暗挖隧道侧向开洞支撑体系构建方法 |
CN204492831U (zh) * | 2014-12-19 | 2015-07-22 | 中国建筑第四工程局有限公司 | 地铁暗挖隧道横通道施工构件 |
Non-Patent Citations (2)
Title |
---|
宋德军: "深圳地铁5号线横通道施工技术", 《石家庄铁路职业技术学院学报》 * |
朱成杰: "城市地铁暗挖隧道特殊地段施工技术", 《隧道建设》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110566237A (zh) * | 2019-09-16 | 2019-12-13 | 北京市市政四建设工程有限责任公司 | 一种地铁区间停车线大断面暗挖施工初支进洞加固结构 |
CN113323132A (zh) * | 2021-06-11 | 2021-08-31 | 中国五冶集团有限公司 | 一种大体积混凝土双层钢筋换撑安装施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104405412B (zh) | 2017-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2014407470B2 (en) | Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof | |
CN103114857A (zh) | 一种盾构隧道施工方法 | |
CN104405399A (zh) | 一种穿越流沙地层隧道开挖支护体工法 | |
CN202544925U (zh) | 一种一孔两用的隧洞排水孔结构 | |
CN103924793B (zh) | 老旧住宅加固结构及其加固方法 | |
CN103821520B (zh) | 固定矿山立井井筒装备的方法 | |
CN104389608A (zh) | 盾构穿越风井的施工方法 | |
CN205225271U (zh) | 一种适用于盾构端头无加固体的盾构洞门圈梁结构 | |
CN104895072A (zh) | 一种预应力锚索以及预应力锚索一次成型施工方法 | |
CN204492831U (zh) | 地铁暗挖隧道横通道施工构件 | |
CN205422752U (zh) | 暗挖车站中隔壁法中导洞内顶纵梁与中拱二衬同步施工结构 | |
CN204002832U (zh) | 一种盾构隧道洞门结构 | |
CN203700978U (zh) | 箱涵先导管幕装置 | |
CN204327112U (zh) | 隧道出洞超前支护系统 | |
CN104405412A (zh) | 地铁暗挖隧道横通道施工构件 | |
CN104632228A (zh) | 横通道进入正线施工方法及横通道 | |
CN204941551U (zh) | 一种曲线顶管支护结构扩建盾构施工的地铁车站 | |
CN204186396U (zh) | 一种盾构隧道周围地层加固通道构造 | |
CN104060614B (zh) | 一种先筑冠梁的支护桩施工方法 | |
CN203891047U (zh) | 搭设钢平台进行陆上桥梁基础施工设备 | |
CN204401563U (zh) | 一种低水头导流洞封堵挡水结构 | |
CN203583501U (zh) | 一种抵抗岩体滑动的深层抗剪装置 | |
CN104675404A (zh) | 地铁暗挖隧道横通道进入正线施工方法 | |
CN204492851U (zh) | 地铁暗挖隧道横通道临时支撑构件 | |
CN104695966B (zh) | 一种地下拱形顶板的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171031 Termination date: 20181219 |