CN104405309A - Drill rod positioning device for drilling underwater rockplug blasting presplitting hole - Google Patents

Drill rod positioning device for drilling underwater rockplug blasting presplitting hole Download PDF

Info

Publication number
CN104405309A
CN104405309A CN201410689619.8A CN201410689619A CN104405309A CN 104405309 A CN104405309 A CN 104405309A CN 201410689619 A CN201410689619 A CN 201410689619A CN 104405309 A CN104405309 A CN 104405309A
Authority
CN
China
Prior art keywords
connecting reinforcement
connecting reinforcing
welded
drilling
reinforcing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410689619.8A
Other languages
Chinese (zh)
Inventor
叶明�
李江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 6 Co Ltd
Original Assignee
Sinohydro Bureau 6 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 6 Co Ltd filed Critical Sinohydro Bureau 6 Co Ltd
Priority to CN201410689619.8A priority Critical patent/CN104405309A/en
Publication of CN104405309A publication Critical patent/CN104405309A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/24Guiding or centralising devices for drilling rods or pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides a drill rod positioning device for drilling an underwater rockplug blasting presplitting hole. The device is characterized in that a semicircular positioning steel pipe, a front connecting reinforcing steel bar, a medium connecting reinforcing steel bar, a rear connecting reinforcing steel bar and a lower supporting steel plate are welded to form an integral bevel framework, wherein the front connecting reinforcing steel bar, the medium connecting reinforcing steel bar and the rear connecting reinforcing steel bar are of different height from low to high and are respectively welded to the left end, the medium end and the right end of the lower supporting steel plate; the semicircular positing steel pipe is welded to the upper ends of the three connecting reinforcing steel bars. The device is high in generality, can be preprocessed in a factory and then is conveniently mounted at the site; when in use, the device is positioned on the rock at the back of a presplitting hole to be drilled, the axis of the semicircular positioning steel pipe and the center line of the presplitting hole are kept in a straight line and fixed, and a drill rod of a drilling machine is positioned on the semicircular positioning steel pipe for drilling. The device is simple and convenient to mount and dismount, fast to construct, capable of being recycled at a plurality of times, uneasy to be damaged, cost saving, and high in drilling precision, and the drilling quality is greatly improved.

Description

A kind of drill pipe positioner for underwater rock plug burst presplitting hole drilling
Technical field
Device used when the present invention relates to a kind of presplitting hole drilling of chock blasting under water, when particularly relating to a kind of presplitting hole drilling for underwater rock plug burst, for meeting the precision of presplitting hole drilling, needs the drilling rod of rig to carry out pinpoint device.
Background technology
Hydroelectric project is when carrying out underwater rock plug burst construction, and in order to ensure that the Forming Quality of rock plug mouth reaches designing requirement, when explosion designs, be usually furnished with some pre-ceasmas in all design sidelines, edge of rock plug, the borehole accuracy of this pre-ceasma often requires higher.General Normal practice is after being put by rig and putting in place, adopts measuring apparatus observation, progressively adjusts, then is fixed on by rig on the scaffold set up in advance.In the whole adjustment fixation procedure of rig, measuring apparatus needs to observe all the time, and the time is long, and construction comparatively bothers, and inconvenient operation, and positioning precision is not high.
Summary of the invention
In order to solve the problem, the invention provides a kind of simple to operate, easy to use, can reuse, when effectively solving underwater rock plug burst construction, the drill pipe positioner of the presplitting hole drilling of borehole accuracy can be guaranteed.
The taked technical measures that solve the problem are:
A kind of drill pipe positioner for underwater rock plug burst presplitting hole drilling, it is characterized in that: by semicircle positioning steel tube 1, the anterior connecting reinforcement 2 highly do not waited from low to high, middle part connecting reinforcement 3 and rear portion connecting reinforcement 4 and lower support steel plate 5 are welded into the overall skeleton in inclined-plane, wherein: anterior connecting reinforcement 2 is welded on the left end of lower support steel plate 5, middle part connecting reinforcement 3 is welded on the middle-end of lower support steel plate 5, rear portion connecting reinforcement 4 is welded on the right-hand member of lower support steel plate 5, semicircle positioning steel tube 1 is welded on anterior connecting reinforcement 2, the upper end of middle part connecting reinforcement 3 and rear portion connecting reinforcement 4.
beneficial effect of the present invention: compatibility of the present invention is good, in advance after processing factory processes, can carry out in-site installation easily.During construction, this device is placed on the pre-ceasma rear portion scar of needs boring, through surveying setting-out, make the center line of the axis of the semicircle positioning steel tube 1 of this device and pre-ceasma point-blank, fix with expansion bolt or anchor pole, then the drilling rod of rig is shelved on above semicircle positioning steel tube 1, boring can be started.This device not only installation and removal is simple, convenient, and speed of application is fast, and repeatedly can have enough to meet the need use, not fragile, cost-saving, the precision utilizing this device to carry out holing is high, thus improves the quality of boring.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is the B-B cross-sectional view of Fig. 1;
Fig. 4 is the C-C cross-sectional view of Fig. 1.
In figure: 1. semicircle positioning steel tube, 2. anterior connecting reinforcement, connecting reinforcement 3., 4. rear portion connecting reinforcement, 5. lower support steel plate.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is specifically described.
A kind of drill pipe positioner for underwater rock plug burst presplitting hole drilling, utilize shaped steel to weld to combine, as shown in Figures 1 to 4, by semicircle positioning steel tube 1, the anterior connecting reinforcement 2 highly do not waited from low to high, middle part connecting reinforcement 3 and rear portion connecting reinforcement 4 and lower support steel plate 5 are welded into the overall skeleton in inclined-plane, wherein: anterior connecting reinforcement 2 is welded on the left end of lower support steel plate 5, middle part connecting reinforcement 3 is welded on the middle-end of lower support steel plate 5, rear portion connecting reinforcement 4 is welded on the right-hand member of lower support steel plate 5, semicircle positioning steel tube 1 is welded on anterior connecting reinforcement 2, the upper end of middle part connecting reinforcement 3 and rear portion connecting reinforcement 4.
In the present invention, semicircle positioning steel tube 1 adopts that length is 500mm, diameter is 50mm, thickness is the steel pipe of 3mm, and longitudinally cut open into identical two halves from any diameter of steel pipe along steel pipe, every semi-steel pipe is a semicircle positioning steel tube 1; Anterior connecting reinforcement 2, middle part connecting reinforcement 3 and rear portion connecting reinforcement 4 all adopt diameter to be that II grade of indented bars of 22mm processes.Lower support steel plate 5 adopts that thickness is 10mm, width is 30mm, length is the steel plate of 300mm.After being welded into overall skeleton shown in Fig. 1, namely organize cost apparatus.Pinpoint object is reached for making this device, this apparatus design is become inclined plane shape, that is: by anterior connecting reinforcement 2, middle part connecting reinforcement 3 and rear portion connecting reinforcement 4 are designed to height not etc. from low to high, this is because pre-ceasma is angled with the scar of tunnel below, this device is placed on the pre-ceasma rear portion scar of needs boring, the axis needs of semicircle positioning steel tube 1 and the center line of the pre-ceasma that will hole are point-blank, like this, the drilling rod of rig is shelved on semicircle positioning steel tube 1 above after, the direction of boring could be consistent with the direction of intending boring pre-ceasma, play pinpoint effect.
During use, this device is placed on the pre-ceasma rear portion scar of needs boring, the particular location of this device is adjusted by surveying setting-out, the axis making the semicircle positioning steel tube 1 of this device and the center line of pre-ceasma that will hole are point-blank, then with expansion bolt or anchor pole by this device fixation, namely complete the installation of this device.During boring, the drilling rod of rig is shelved on above semicircle positioning steel tube 1, the boring of pre-ceasma can be started.

Claims (1)

1. the drill pipe positioner for underwater rock plug burst presplitting hole drilling, it is characterized in that: by semicircle positioning steel tube (1), the anterior connecting reinforcement (2) highly do not waited from low to high, middle part connecting reinforcement (3), rear portion connecting reinforcement (4) and lower support steel plate (5) are welded into the overall skeleton in inclined-plane, wherein: anterior connecting reinforcement (2) is welded on the left end of lower support steel plate (5), middle part connecting reinforcement (3) is welded on the middle-end of lower support steel plate (5), rear portion connecting reinforcement (4) is welded on the right-hand member of lower support steel plate (5), semicircle positioning steel tube (1) is welded on anterior connecting reinforcement (2), the upper end of middle part connecting reinforcement (3) and rear portion connecting reinforcement (4).
CN201410689619.8A 2014-11-26 2014-11-26 Drill rod positioning device for drilling underwater rockplug blasting presplitting hole Pending CN104405309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410689619.8A CN104405309A (en) 2014-11-26 2014-11-26 Drill rod positioning device for drilling underwater rockplug blasting presplitting hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410689619.8A CN104405309A (en) 2014-11-26 2014-11-26 Drill rod positioning device for drilling underwater rockplug blasting presplitting hole

Publications (1)

Publication Number Publication Date
CN104405309A true CN104405309A (en) 2015-03-11

Family

ID=52642966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410689619.8A Pending CN104405309A (en) 2014-11-26 2014-11-26 Drill rod positioning device for drilling underwater rockplug blasting presplitting hole

Country Status (1)

Country Link
CN (1) CN104405309A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522841A (en) * 2016-08-26 2017-03-22 中国黄金集团内蒙古矿业有限公司 Presplit hole drilling method
WO2018090349A1 (en) * 2016-11-19 2018-05-24 吴平 Drill pipe raising/lowering tool
CN113047860A (en) * 2021-04-09 2021-06-29 中铁八局集团第一工程有限公司 Control method for external inserting angle of tunnel tractor during operation and excavation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201934020U (en) * 2010-12-22 2011-08-17 石家庄中煤装备制造股份有限公司 Drilling angle adjusting device of drilling machine
CN103452505A (en) * 2013-08-07 2013-12-18 中国石油集团渤海石油装备制造有限公司 Tubular pile centering device for slant well drilling rig
CN103775000A (en) * 2013-10-30 2014-05-07 中国矿业大学(北京) Floor heave prevention anchor pipe drilling machine
CN203769652U (en) * 2014-02-25 2014-08-13 中国化学工程第十四建设有限公司 Horizontal directional drilling system applicable to urban environment construction
CN204311992U (en) * 2014-11-26 2015-05-06 中国水利水电第六工程局有限公司 A kind of drill pipe positioner for underwater rock plug burst presplitting hole drilling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201934020U (en) * 2010-12-22 2011-08-17 石家庄中煤装备制造股份有限公司 Drilling angle adjusting device of drilling machine
CN103452505A (en) * 2013-08-07 2013-12-18 中国石油集团渤海石油装备制造有限公司 Tubular pile centering device for slant well drilling rig
CN103775000A (en) * 2013-10-30 2014-05-07 中国矿业大学(北京) Floor heave prevention anchor pipe drilling machine
CN203769652U (en) * 2014-02-25 2014-08-13 中国化学工程第十四建设有限公司 Horizontal directional drilling system applicable to urban environment construction
CN204311992U (en) * 2014-11-26 2015-05-06 中国水利水电第六工程局有限公司 A kind of drill pipe positioner for underwater rock plug burst presplitting hole drilling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522841A (en) * 2016-08-26 2017-03-22 中国黄金集团内蒙古矿业有限公司 Presplit hole drilling method
WO2018090349A1 (en) * 2016-11-19 2018-05-24 吴平 Drill pipe raising/lowering tool
CN113047860A (en) * 2021-04-09 2021-06-29 中铁八局集团第一工程有限公司 Control method for external inserting angle of tunnel tractor during operation and excavation

Similar Documents

Publication Publication Date Title
CN101737005B (en) Drilling tool for sleeving anchor cable and construction method for sleeving anchor cable with simultaneous casing
CN104405309A (en) Drill rod positioning device for drilling underwater rockplug blasting presplitting hole
CN110529136B (en) Municipal sewage pipeline jacking pipe construction method
CN204311992U (en) A kind of drill pipe positioner for underwater rock plug burst presplitting hole drilling
JP2016030925A (en) Pile driving method and pile
CN104343383B (en) A kind of drilling equipment for earthen ruins
CN103899320A (en) Direct pipe laying machine
JP2015014157A (en) Pier construction method
CN204080812U (en) A kind of steel pile casting accurate positioning device
CN204339361U (en) Drill jumbo drill boom seat frock clamp
JP2013130001A (en) Pipe body support device
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN204784035U (en) Suitable total powerstation is measurationed, and tunnel is peripheral converges and submerged inflation spiral shell board of vault
CN103352704B (en) Construction method for enabling tunnel shield to pass through vertical shaft structure
CN113338985B (en) Construction method for micro jacking pipe of ecological comprehensive pipe gallery engineering
CN205503041U (en) Guider is right in drilling
CN205078188U (en) Rig mount with adjustable
CN203977416U (en) A kind of new tool casing
CN114370234A (en) Bare rock riverbed steel pipe pile construction equipment and construction method
CN111058441A (en) Construction device and method for placing large-diameter steel casing under deepwater and rapid stream conditions
CN202500551U (en) Hole detector for underwater filling pile
CN203188917U (en) Base device of core drill for drilling long and thin holes
CN104594421A (en) Cutter suction dredger reamer beam long-axle-hole reaming support mounting method
CN206246136U (en) Water drilling method push pipe operates support
CN206830188U (en) Just prop up two lining contact measurement apparatus in tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150311