CN210343382U - Supporting device for ocean engineering segmented construction - Google Patents
Supporting device for ocean engineering segmented construction Download PDFInfo
- Publication number
- CN210343382U CN210343382U CN201921302516.6U CN201921302516U CN210343382U CN 210343382 U CN210343382 U CN 210343382U CN 201921302516 U CN201921302516 U CN 201921302516U CN 210343382 U CN210343382 U CN 210343382U
- Authority
- CN
- China
- Prior art keywords
- supporting
- block
- ocean engineering
- hole
- base block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model belongs to the technical field of engineering strutting arrangement technique and specifically relates to a strutting arrangement is used in ocean engineering segmentation construction, including the base block, open the side of base block has the standing groove, open on the base block top has the lift hole, two constant head tanks are about lift hole axis department symmetry, the downthehole backup pad of having placed of lift, open on the backup pad top has a plurality of locating holes, the relative constant head tank department fixedly connected with slider in backup pad side, a plurality of bracing pieces have been placed in the locating hole, the fixed plate has been placed to the one end that the locating hole was kept away from to the bracing piece, fixed plate bottom relative positioning hole department opens there is the fixed orifices, the one end of bracing piece is located the fixed orifices, the jack has. The utility model discloses simple structure is worth promoting.
Description
Technical Field
The utility model relates to an engineering strutting arrangement technical field especially relates to a strutting arrangement is used in ocean engineering segmentation construction.
Background
The submarine tunnel is laid in various ways, such as a drilling and blasting method and a tunneling method, the submarine tunnel is laid by exploding rocks by using pre-buried explosive, the submarine tunnel is generally built in the deep submarine rocks to avoid crossing with seawater, the rock walls need to be supported and reinforced in the working process of the deep submarine rocks, otherwise, partial rocks are easy to collapse and drop, workers can be injured by pounding sometimes to influence the engineering progress, in order to enable the supporting device to bear heavier pressure, the diameter of the supporting rod in the conventional supporting device is thick, and therefore the supporting device is not convenient to detach and carry.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects in the prior art and providing a supporting device for ocean engineering subsection construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a supporting device is used in building of ocean engineering segmentation, includes the base block, open the side of base block has the standing groove, open on the base block top has lift hole, two constant head tanks, two the constant head tank is about lift hole axis department symmetry, the backup pad has been placed in the lift hole, open the backup pad top has a plurality of locating holes, the relative constant head tank in backup pad side department fixedly connected with slider, a plurality of bracing pieces have been placed in the locating hole, the fixed plate has been placed to the one end that the locating hole was kept away from to the bracing piece, fixed plate bottom relative positioning hole department opens there is the fixed orifices, the one end of bracing piece is located the fixed orifices, the jack has been placed in the standing groove, the expansion end and the backup pad bottom.
Preferably, the four corners of the bottom end of the base block are fixedly connected with fixed cones.
Preferably, the top end of the fixing plate is provided with a supporting block, and the supporting block is connected with the fixing plate through a fixing mechanism.
Preferably, the fixing mechanism comprises a clamping block, the clamping block is located in the middle of the bottom end of the supporting block, a clamping groove is formed in the position, opposite to the clamping block, of the fixing plate, one end of the clamping block is inserted into the clamping groove, and the clamping block is in close fit with the clamping groove.
Preferably, a plurality of the support rods are uniformly distributed along the circumferential direction of the support plate.
The utility model provides a pair of ocean engineering is strutting arrangement for segmentation is built, beneficial effect lies in:
the utility model discloses an it has the fixed orifices that a plurality of locating holes, fixed plate, the relative locating hole of fixed plate set up to open in the backup pad for can evenly place a plurality of bracing pieces along the circumference of backup pad simultaneously, at the in-process of installation and dismantlement and transport, it will be more convenient, also can adjust according to actual need, several bracing piece supports of specific needs.
Drawings
Fig. 1 is a schematic structural view of a supporting device for ocean engineering segmental construction according to the present invention;
fig. 2 is another schematic angle structure diagram of a supporting device for ocean engineering subsection construction provided by the present invention;
fig. 3 is a cross-sectional view of the support device for ocean engineering sectional construction in the overlooking direction according to the present invention;
fig. 4 is the utility model provides a supporting device middle fixing plate department's cross-sectional view is used in ocean engineering segmentation construction.
In the figure: the device comprises a base block 1, a placing groove 2, a lifting hole 3, a positioning groove 4, a supporting rod 5, a fixing plate 6, a supporting block 7, a fixing cone 8, a jack 9, a positioning hole 10, a supporting plate 11, a sliding block 12, a clamping block 13, a clamping groove 14 and a fixing hole 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a supporting device for ocean engineering subsection construction comprises a base block 1, a placing groove 2 is arranged on the side surface of the base block 1, a lifting hole 3 and two positioning grooves 4 are arranged on the top end of the base block 1, the two positioning grooves 4 are symmetrical about the axis of the lifting hole 3, a supporting plate 11 is arranged in the lifting hole 3, a plurality of positioning holes 10 are arranged on the top end of the supporting plate 11, a sliding block 12 is fixedly connected to the side surface of the supporting plate 11 relative to the positioning grooves 4, and the two sliding blocks 12 and the supporting plate 11 are of an integral structure.
A plurality of bracing pieces 5 have been placed in the locating hole 10, fixed plate 6 has been placed to the one end that locating hole 10 was kept away from to bracing piece 5, the relative locating hole 10 department in 6 bottom ends of fixed plate opens has fixed orifices 15, the one end of bracing piece 5 is located fixed orifices 15, jack 9 has been placed in standing groove 2, the expansion end of jack 9 offsets with 11 bottom middle parts of backup pad, install bracing piece 5 and fixed plate 6 in advance, then through making jack 9 work, offset fixed plate 6 and supported wall, thereby reach the supporting effect.
Fixed awl 8 of 1 bottom four corners department fixedly connected with of base block, fixed awl 8 makes base block 1 can be fixed relatively ground, supporting shoe 7 has been placed on 6 tops of fixed plate, supporting shoe 7 can be according to the pitch arc setting by the support wall body, be connected through fixed establishment between supporting shoe 7 and the fixed plate 6, fixed establishment includes fixture block 13, fixture block 13 is located 7 bottom middle parts of supporting shoe, 6 relative fixture block 13 departments of fixed plate open there is draw-in groove 14, fixture block 13's one end inserts in draw-in groove 14, and fixture block 13 is closely cooperated with draw-in groove 14, make installation and dismantlement be convenient for between supporting shoe 7 and the fixed plate 6 through fixed establishment, a plurality of bracing pieces 5 are along 11 circumference evenly distributed of backup pad, the focus of a plurality of bracing pieces 5 falls in the centre of a circle of backup pad.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The supporting device for the ocean engineering subsection construction comprises a base block (1) and is characterized in that a placing groove (2) is formed in the side face of the base block (1), a lifting hole (3) and two positioning grooves (4) are formed in the top end of the base block (1), the two positioning grooves (4) are symmetrical with respect to the axis of the lifting hole (3), a supporting plate (11) is placed in the lifting hole (3), a plurality of positioning holes (10) are formed in the top end of the supporting plate (11), a sliding block (12) is fixedly connected to the side face of the supporting plate (11) relative to the positioning grooves (4), a plurality of supporting rods (5) are placed in the positioning holes (10), a fixing plate (6) is placed at one end, far away from the positioning holes (10), of the supporting rods (5), a fixing hole (15) is formed in the bottom end of the fixing plate (6) relative to the positioning holes (10), one end of each, a jack (9) is placed in the placing groove (2), and the movable end of the jack (9) is abutted to the middle of the bottom end of the supporting plate (11).
2. The supporting device for the segmental construction of ocean engineering according to claim 1, wherein the four corners of the bottom end of the foundation block (1) are fixedly connected with fixed cones (8).
3. The supporting device for ocean engineering subsection construction according to claim 1, wherein a supporting block (7) is placed on the top end of the fixing plate (6), and the supporting block (7) is connected with the fixing plate (6) through a fixing mechanism.
4. The supporting device for the segmental construction of the ocean engineering according to claim 3, wherein the fixing mechanism comprises a clamping block (13), the clamping block (13) is located in the middle of the bottom end of the supporting block (7), a clamping groove (14) is formed in the position, opposite to the clamping block (13), of the fixing plate (6), one end of the clamping block (13) is inserted into the clamping groove (14), and the clamping block (13) is tightly matched with the clamping groove (14).
5. The supporting device for the segmental construction of ocean engineering according to claim 1, wherein a plurality of the supporting rods (5) are evenly distributed along the circumference of the supporting plate (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921302516.6U CN210343382U (en) | 2019-08-13 | 2019-08-13 | Supporting device for ocean engineering segmented construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921302516.6U CN210343382U (en) | 2019-08-13 | 2019-08-13 | Supporting device for ocean engineering segmented construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210343382U true CN210343382U (en) | 2020-04-17 |
Family
ID=70174487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921302516.6U Expired - Fee Related CN210343382U (en) | 2019-08-13 | 2019-08-13 | Supporting device for ocean engineering segmented construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210343382U (en) |
-
2019
- 2019-08-13 CN CN201921302516.6U patent/CN210343382U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947681B (en) | Super large super deep basement ground pit construction method | |
CN103967029B (en) | Breast wall type well sinking device and construction method thereof | |
CN108952008A (en) | Insert-type steel pipe concrete column and construction method | |
CN210343382U (en) | Supporting device for ocean engineering segmented construction | |
CN204080812U (en) | A kind of steel pile casting accurate positioning device | |
CN108972842A (en) | A kind of rollover hot-die platform system and its application method | |
CN111878124A (en) | Adjustable supporting cushion equipment for tunnel primary support stable arch frame | |
CN211314231U (en) | Adjustable tunnel trolley template | |
CN114541421B (en) | Subway station guide wall auxiliary construction device and method | |
CN116971807A (en) | Tunnel excavation supporting structure and construction method | |
CN205477366U (en) | A complete set of pipe vice clamping device of wedge for full -rotating drill | |
CN112177066B (en) | Non-excavation in-situ repair construction method for inspection well shaft | |
CN104405309A (en) | Drill rod positioning device for drilling underwater rockplug blasting presplitting hole | |
CN204899949U (en) | Bow -shaped steel pipe back up support | |
CN211728135U (en) | Auxiliary alignment device for welding large-diameter steel pipe | |
CN110374608B (en) | Method for excavating vault direction during existing tunnel extension | |
CN208039253U (en) | A kind of upper clamping mechanism of pile-grafting machine | |
CN109930600B (en) | Upper clamping mechanism of pile planting machine | |
CN109930601B (en) | Crawler-type pile planting machine | |
CN212957702U (en) | BIM-based rectangular positioning frame for steel pipe stand column of subway station | |
CN218813967U (en) | Be used for tunnel to have central ditch excavation device of inverted arch section | |
CN204252122U (en) | A kind of self-propelled automatic lifting full circle swinging integrally constructs machine | |
CN204591280U (en) | A kind of mobile platform structure for pipe curtain jacking construction | |
CN110512896B (en) | Gas holder reverse dismantling method | |
CN112144404B (en) | Precast concrete cofferdam and pier construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200417 Termination date: 20210813 |
|
CF01 | Termination of patent right due to non-payment of annual fee |