CN104401821A - Vertical ladder control system and running method - Google Patents
Vertical ladder control system and running method Download PDFInfo
- Publication number
- CN104401821A CN104401821A CN201410682263.5A CN201410682263A CN104401821A CN 104401821 A CN104401821 A CN 104401821A CN 201410682263 A CN201410682263 A CN 201410682263A CN 104401821 A CN104401821 A CN 104401821A
- Authority
- CN
- China
- Prior art keywords
- vertical ladder
- floor
- compartment
- railway carriage
- bridge railway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B1/00—Control systems of elevators in general
- B66B1/02—Control systems without regulation, i.e. without retroactive action
- B66B1/06—Control systems without regulation, i.e. without retroactive action electric
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The invention relates to the lift field, in particular to a vertical ladder control system and a running method. The vertical ladder control system comprises a lift car and a central control unit, and a detection unit is connected with the port of the central control unit through direct connecting or coding. The vertical ladder control system improves the existing vertical ladder running mode, when the vertical ladder arrives at a floor through ascending or descending, the vertical ladder judges whether stopping running to load a passenger through judging whether an ascending button or a descending button of the floor is pressed to turn on a light and judging whether there is a person outside the vertical ladder through the detection unit mounted on the outer door of the vertical ladder, the vertical ladder reduces the speed to stop to load the passenger only the two conditions are completely satisfied, otherwise, an indication lamp on the ascending button or descending button of the floor is turned off, the vertical ladder does not stop at the floor and continues to ascend or descend, and accordingly the vertical ladder running efficiency is improved, the vertical ladder abrasion is reduced, and the service life is prolonged.
Description
Technical field
The present invention relates to elevators field, particularly relate to a kind of vertical ladder control system and operating method.
Background technology
Along with the develop rapidly of China's economic, the progress of state-of-art, people more and more pursue the efficiency of work and life, Time is money, and efficiency is most important, and elevator provides great convenience for people.
But existing elevator operation mode; also do not reach the optimum efficiency that elevator runs; people often can run into when taking vertical ladder; vertical ladder slows down; stop; open the door; the difficult situation of but nobody outdoors, such vertical ladder through deceleration once, stopping, opening the door, close the door, accelerate, then continue to run; not only increase the wearing and tearing of vertical ladder; substantially reduce the service life of vertical ladder, the wastes power energy, but also the time considerably increasing the upper and lower building of people; decrease the operating efficiency of vertical ladder, waste the quality time of passenger.
Team control vertical ladder system has done very large improvement in this respect, passenger presses the button of a upper or lower vertical ladder, upper or the lower button of all same floor multi-section vertical ladders lights simultaneously, that vertical ladder arrived first first stops, upper or the lower button simultaneously pressed extinguishes, under, upper passenger, this situation is few passenger, feasible when in vertical ladder, passenger is little, but on working peak sooner or later, just problem is had time passenger is numerous, a vertical ladder is filled passenger and is run, other passenger do not got on also will press or descending button again, by evening, the vertical ladder also had can miss the passenger of This floor when passenger is discontented with, very inconvenient.
Summary of the invention
The present invention is directed to above-mentioned problems of the prior art, provide a kind of vertical ladder control system and operating method, the operating efficiency of vertical ladder can be improved.
Technical scheme of the present invention is as follows:
Vertical ladder control system, comprises bridge railway carriage or compartment, Central Processing Unit (CPU), is provided with probe unit, and described probe unit is direct or adopt the mode of encoder encodes to be connected with the interface of Central Processing Unit (CPU).
Described probe unit is arranged on the periphery of the second layer to the vertical ladder external door of each floor of roof layer of floor.
In the middle of described probe unit is arranged on above vertical ladder outer door frame, on the left side of doorframe or any one position on the right.
Described probe unit is the one of sensor or camera.
An operating method for vertical ladder control system, comprises vertical ladder uplink and downlink two kinds of situations, wherein:
The up flow process of vertical ladder is:
A, bridge railway carriage or compartment floor;
B1, vertical ladder are gone up the up button of a floor outdoors and are pressed bright and probe unit detects that a upper floor has passenger outdoors, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
In B2, vertical ladder, on control panel, the button of a floor is pressed bright, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued up;
The descending flow process of vertical ladder is:
A, bridge railway carriage or compartment floor
B1, vertical ladder go up a floor descending button outdoors by by bright and probe unit detects that next floor has passenger outdoors, and slow down and arrive next floor and stop in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
In B2, vertical ladder, the button of next floor of control panel is pressed bright, and slow down and arrive the stopping of next floor in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued descending.
Advantage of the present invention is as follows:
The present invention is except ground floor, the vertical ladder exterior door frame of each floor is all installed the probe unit judging whether to have passenger, the probe unit signal of each floor directly or be connected to the interface end of vertical ladder center-control by the mode of encoding, vertical ladder is in upstream or downstream process, whether slow down, stop upper passenger, except judging whether vertical ladder button up and down outdoors presses signal, also must cross probe unit and detect that vertical ladder has passenger just to perform deceleration outdoors, stop upper passenger, upper or lower button has been pressed with the passenger prevented, do not take, the operating efficiency of vertical ladder is improved from face.No matter the present invention is from the installation of hardware or the improvement of flow process, simple, with low cost; Also greatly save the time in the upper and lower building of people, bring great convenience.
Accompanying drawing explanation
Fig. 1 is that vertical ladder external door probe unit of the present invention installs schematic diagram in the middle of top;
Fig. 2 is that vertical ladder external door probe unit of the present invention installs left side schematic diagram;
Fig. 3 is that vertical ladder external door probe unit of the present invention installs the right schematic diagram;
Fig. 4 is the connection diagram of probe unit and Central Processing Unit (CPU);
Fig. 5 is the connection diagram that probe unit adopts coded system and Central Processing Unit (CPU);
Fig. 6 is the operating upload control diagram of circuit of vertical ladder control system of the present invention;
Fig. 7 is the operating descending control flow chart of vertical ladder control system of the present invention.
Detailed description of the invention
Referring to accompanying drawing, in conjunction with specific embodiments, the present invention is described in detail.
embodiment 1
A kind of vertical ladder control system, comprise bridge railway carriage or compartment, Central Processing Unit (CPU), the connection mode of the interface of sensor and described Central Processing Unit (CPU) is divided into two kinds of situations:
Floor is few, and when namely the interface of described Central Processing Unit (CPU) is enough, described probe unit sensor is directly connected with the interface of Central Processing Unit (CPU); Floor is many, and when namely the interface of described Central Processing Unit (CPU) is not enough, described probe unit sensor adopts the mode of encoder encodes to be connected with Central Processing Unit (CPU); By coder, sensor derived signals is given to Central Processing Unit (CPU), takies interface signal line too much to reduce.When Central Processing Unit (CPU) interface signal line is inadequate, can external subtending port expansion.
Except the first layer, namely to roof layer, all sensor is set at the second layer of floor, sensor setting above the vertical ladder outer door frame of each floor in the middle of, on the left side of doorframe or any one position on the right.
An operating method for vertical ladder control system, comprises vertical ladder uplink and downlink two kinds of situations, wherein:
The up flow process of vertical ladder is:
A, bridge railway carriage or compartment floor;
B1, vertical ladder are gone up the up button of a floor outdoors and are pressed bright and sensor detects that a upper floor has passenger outdoors, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
In B2, vertical ladder, on control panel, the button of a floor is pressed bright, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued up.
Vertical ladder is when up, and just start to judge at the floor at place, bridge railway carriage or compartment, meet one of two things, bridge railway carriage or compartment just stops, otherwise vertical ladder continues up.A kind of situation: on the floor at place, bridge railway carriage or compartment, the up button of a floor press bright, namely Central Processing Unit (CPU) receives upward signal and sensor detects that last layer has passenger outdoors, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment; Another kind of situation: in vertical ladder, the button of control panel last layer is pressed bright, vertical ladder just decelerates to last layer to be stopped, and waiting Passengen goes down from bridge railway carriage or compartment.According to the needs of passenger, so repeatedly.
The descending flow process of vertical ladder is:
A, bridge railway carriage or compartment floor
B1, vertical ladder go up a floor descending button outdoors by by bright and sensor detects that next floor has passenger outdoors, and slow down and arrive next floor and stop in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
In B2, vertical ladder, the button of next floor of control panel is pressed bright, and slow down and arrive the stopping of next floor in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued descending.
When vertical ladder is descending, just start to judge at the floor at place, bridge railway carriage or compartment, meet one of two things, bridge railway carriage or compartment just stops, otherwise vertical ladder continues descending.A kind of situation: the up button of next floor of floor at place, bridge railway carriage or compartment press bright, namely Central Processing Unit (CPU) receives downgoing signal and sensor detects that next floor has passenger outdoors, and slow down and arrive the stopping of next floor in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment; Another kind of situation: in vertical ladder, the button of next floor of control panel is pressed bright, vertical ladder just decelerates to next floor to be stopped, and waiting Passengen enters bridge railway carriage or compartment.According to the needs of passenger, so repeatedly.
Realize vertical ladder when upstream or downstream, arrive a certain floor whether will to stop upper passenger, only detect that the upper of this floor or lower button are pressed bright, sensor detects that vertical ladder has talent conference to slow down outdoors simultaneously, stop slowly, otherwise extinguish the upper of this floor or lower Push-button lamp, this floor does not stop, continue upstream or downstream.
embodiment 2
A kind of vertical ladder control system, comprise bridge railway carriage or compartment, Central Processing Unit (CPU), the connection mode of the interface of camera and described Central Processing Unit (CPU) is divided into two kinds of situations:
Floor is few, and namely the interface of described Central Processing Unit (CPU) is enough, and described probe unit camera is directly connected with the interface of Central Processing Unit (CPU); Floor is many, and namely the interface of described Central Processing Unit (CPU) is not enough, and described probe unit camera adopts the mode of encoder encodes to be connected with Central Processing Unit (CPU); The signal transmitted by camera by coder is given to Central Processing Unit (CPU), takies interface signal line too much to reduce.When Central Processing Unit (CPU) interface signal line is inadequate, can external subtending port expansion.
Except the first layer, namely to roof layer, all camera is set at the second layer of floor, in the middle of above the vertical ladder outer door frame that camera is arranged on each floor, on the left side of doorframe or any one position on the right.
An operating method for vertical ladder control system, comprises bridge railway carriage or compartment uplink and downlink two kinds of situations, wherein:
The up flow process of vertical ladder is:
A, bridge railway carriage or compartment floor;
B1, vertical ladder are gone up the up button of a floor outdoors and are pressed bright and camera detects that a upper floor has passenger outdoors, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
In B2, vertical ladder, on control panel, the button of a floor is pressed bright, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued up.
Vertical ladder is when up, and just start to judge at the floor at place, bridge railway carriage or compartment, meet one of two things, bridge railway carriage or compartment just stops, otherwise vertical ladder continues up.A kind of situation: on the floor at place, bridge railway carriage or compartment, the up button of a floor press bright, namely Central Processing Unit (CPU) receives upward signal and camera detects that a floor has passenger outdoors, and slow down the upper floor stopping of arrival in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment; Another kind of situation: in vertical ladder, the button of control panel last layer is pressed bright, vertical ladder just decelerates to last layer to be stopped, and waiting Passengen goes down from bridge railway carriage or compartment.According to the needs of passenger, so repeatedly.
The descending flow process of vertical ladder is:
A, bridge railway carriage or compartment floor
B1, vertical ladder go up a floor descending button outdoors by by bright and camera detects that next floor has passenger outdoors, and slow down and arrive next floor and stop in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
In B2, vertical ladder, the button of next floor of control panel is pressed bright, and slow down and arrive the stopping of next floor in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued descending.
When vertical ladder is descending, just start to judge at the floor at place, bridge railway carriage or compartment, meet one of two things, bridge railway carriage or compartment just stops, otherwise vertical ladder continues descending.A kind of situation: the up button of next floor of floor at place, bridge railway carriage or compartment press bright, namely Central Processing Unit (CPU) receives downgoing signal and camera detects that next floor has passenger outdoors, and slow down and arrive the stopping of next floor in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment; Another kind of situation: in vertical ladder, the button of next floor of control panel is pressed bright, vertical ladder just decelerates to next floor to be stopped, and waiting Passengen enters bridge railway carriage or compartment.According to the needs of passenger, so repeatedly.
Realize vertical ladder when upstream or downstream, arrive certain Stall whether will to stop upper passenger, only detect that the upper of this floor or lower button are pressed bright, camera detects that vertical ladder has talent conference to slow down outdoors simultaneously, stop slowly, otherwise extinguish the upper of this floor or lower Push-button lamp, this floor does not stop, continue upstream or downstream.
Claims (6)
1. a vertical ladder control system, comprises bridge railway carriage or compartment, Central Processing Unit (CPU), it is characterized in that being provided with probe unit, and described probe unit is direct or adopt the mode of encoder encodes to be connected with the interface of Central Processing Unit (CPU).
2. vertical ladder control system according to claim 1, is characterized in that described probe unit is arranged on the periphery of the second layer to the vertical ladder external door of each floor of roof layer of floor.
3. vertical ladder control system according to claim 2, it is characterized in that described probe unit to be arranged on above vertical ladder outer door frame in the middle of, on the left side of doorframe or any one position on the right.
4. vertical ladder control system according to claim 1, is characterized in that described probe unit is the one of sensor or camera.
5. vertical ladder control system according to claim 1, is characterized in that the described external subtending port of Central Processing Unit (CPU) interface.
6. the operating method of a kind of vertical ladder control system according to claim 1, is characterized in that comprising vertical ladder uplink and downlink two kinds of situations, wherein:
The up flow process of vertical ladder is:
A, bridge railway carriage or compartment floor;
B1, vertical ladder are gone up the up button of a floor outdoors and are pressed bright and probe unit detects that a upper floor has passenger outdoors, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
In B2, vertical ladder, on control panel, the button of a floor is pressed bright, and slow down and arrive a upper floor stopping in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued up;
The descending flow process of vertical ladder is:
A, bridge railway carriage or compartment floor
B1, vertical ladder go up a floor descending button outdoors by by bright and probe unit detects that next floor has passenger outdoors, and slow down and arrive next floor and stop in bridge railway carriage or compartment, waiting Passengen goes down from bridge railway carriage or compartment;
In B2, vertical ladder, the button of next floor of control panel is pressed bright, and slow down and arrive the stopping of next floor in bridge railway carriage or compartment, waiting Passengen enters bridge railway carriage or compartment;
C, bridge railway carriage or compartment are continued descending.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410682263.5A CN104401821A (en) | 2014-11-25 | 2014-11-25 | Vertical ladder control system and running method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410682263.5A CN104401821A (en) | 2014-11-25 | 2014-11-25 | Vertical ladder control system and running method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104401821A true CN104401821A (en) | 2015-03-11 |
Family
ID=52639511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410682263.5A Pending CN104401821A (en) | 2014-11-25 | 2014-11-25 | Vertical ladder control system and running method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104401821A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105621168A (en) * | 2016-03-22 | 2016-06-01 | 武汉理工大学 | Intelligent energy-saving elevator control system and method based on image recognition |
CN108928687A (en) * | 2018-07-12 | 2018-12-04 | 芜湖博高光电科技股份有限公司 | A kind of intelligent elevator control system and its control method based on millimeter wave detection |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02249877A (en) * | 1989-03-20 | 1990-10-05 | Hitachi Ltd | Elevator control system |
CN201024023Y (en) * | 2006-10-26 | 2008-02-20 | 杨国平 | Awaited person identification intelligent system for elevator operation |
CN103466399A (en) * | 2013-09-24 | 2013-12-25 | 苏州建设交通高等职业技术学校 | Elevator control method |
CN204384641U (en) * | 2014-11-25 | 2015-06-10 | 抚顺职业技术学院 | Vertical ladder control system |
-
2014
- 2014-11-25 CN CN201410682263.5A patent/CN104401821A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02249877A (en) * | 1989-03-20 | 1990-10-05 | Hitachi Ltd | Elevator control system |
CN201024023Y (en) * | 2006-10-26 | 2008-02-20 | 杨国平 | Awaited person identification intelligent system for elevator operation |
CN103466399A (en) * | 2013-09-24 | 2013-12-25 | 苏州建设交通高等职业技术学校 | Elevator control method |
CN204384641U (en) * | 2014-11-25 | 2015-06-10 | 抚顺职业技术学院 | Vertical ladder control system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105621168A (en) * | 2016-03-22 | 2016-06-01 | 武汉理工大学 | Intelligent energy-saving elevator control system and method based on image recognition |
CN108928687A (en) * | 2018-07-12 | 2018-12-04 | 芜湖博高光电科技股份有限公司 | A kind of intelligent elevator control system and its control method based on millimeter wave detection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2007016259A (en) | Method and system for modernising a lift system. | |
MY138728A (en) | Method and apparatus for energy-saving elevator control | |
CN102674095A (en) | Energy-saving dispatching control method of elevator for passenger detection based on binocular vision | |
CN107416633B (en) | Elevator fault self-rescue system and using method thereof | |
CN106315333A (en) | Self-saving and escaping control device for elevator | |
CN104803252B (en) | A kind of lift escape device | |
CN104803263A (en) | Pneumatic elevator control system and control method | |
CN204384641U (en) | Vertical ladder control system | |
CN104401821A (en) | Vertical ladder control system and running method | |
CN202829192U (en) | Lift emergency system | |
CN204873373U (en) | Take induction system's lift -cabin door controlling means | |
CN203159021U (en) | Escalator stair loss detection control device | |
CN104649115A (en) | Intelligent escalator and working method thereof | |
CN106276553A (en) | Automatic speed regulation staircase and method of work thereof | |
CN103569811A (en) | Elevator energy-saving control system | |
CN203269287U (en) | Underneath type elevator without machine room | |
CN209635683U (en) | A kind of novel elevator lighting system | |
CN202936051U (en) | Elevator hoist rope extension protection structure | |
CN209586429U (en) | A kind of tunnel emergency exit structure with bilateral Evacuation function | |
CN107128755B (en) | Elevator operation control device | |
CN202829255U (en) | Escalator safety warning device and escalator thereof | |
CN207632282U (en) | Shallow pit type helistop elevator | |
CN205855722U (en) | A kind of three door-opening elevators | |
CN204150835U (en) | A kind of building hoist detects running velocity device automatically | |
CN202349789U (en) | Infrared induction lamp in car type elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150311 |