CN104391450B - 一种数字仿真中模拟信号通讯延时的方法 - Google Patents
一种数字仿真中模拟信号通讯延时的方法 Download PDFInfo
- Publication number
- CN104391450B CN104391450B CN201410704493.7A CN201410704493A CN104391450B CN 104391450 B CN104391450 B CN 104391450B CN 201410704493 A CN201410704493 A CN 201410704493A CN 104391450 B CN104391450 B CN 104391450B
- Authority
- CN
- China
- Prior art keywords
- communication
- signal
- delay
- time
- sig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004891 communication Methods 0.000 title claims abstract description 107
- 238000004088 simulation Methods 0.000 title claims abstract description 42
- 238000000034 method Methods 0.000 title claims abstract description 18
- 230000005540 biological transmission Effects 0.000 claims abstract description 35
- 238000007667 floating Methods 0.000 claims abstract description 19
- 230000001934 delay Effects 0.000 claims abstract description 4
- 238000005538 encapsulation Methods 0.000 claims description 3
- 238000003491 array Methods 0.000 claims description 2
- 238000001514 detection method Methods 0.000 claims description 2
- 238000006073 displacement reaction Methods 0.000 claims description 2
- 230000003111 delayed effect Effects 0.000 abstract description 2
- 230000008054 signal transmission Effects 0.000 description 12
- 238000006243 chemical reaction Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000005611 electricity Effects 0.000 description 4
- 239000013307 optical fiber Substances 0.000 description 3
- 241000272814 Anser sp. Species 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
Landscapes
- Monitoring And Testing Of Transmission In General (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410704493.7A CN104391450B (zh) | 2014-11-27 | 2014-11-27 | 一种数字仿真中模拟信号通讯延时的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410704493.7A CN104391450B (zh) | 2014-11-27 | 2014-11-27 | 一种数字仿真中模拟信号通讯延时的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104391450A CN104391450A (zh) | 2015-03-04 |
CN104391450B true CN104391450B (zh) | 2017-11-03 |
Family
ID=52609368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410704493.7A Active CN104391450B (zh) | 2014-11-27 | 2014-11-27 | 一种数字仿真中模拟信号通讯延时的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104391450B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106980271A (zh) * | 2016-01-19 | 2017-07-25 | 南京南瑞继保电气有限公司 | 基于pscad/emtdc的信号通讯延时模拟方法 |
CN105790822B (zh) * | 2016-03-04 | 2019-03-05 | 北京航空航天大学 | 误码率可配置的链路传输时延产生方法、装置及系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1926001A2 (en) * | 2006-11-17 | 2008-05-28 | United Technologies Corporation | Reducing gas turbine performance tracking estimation non-repeatability |
CN102707231A (zh) * | 2012-05-16 | 2012-10-03 | 广东电网公司电力科学研究院 | 基于matlab/simulink的发电机组一次调频分析系统 |
CN102789169A (zh) * | 2012-05-25 | 2012-11-21 | 中国核动力研究设计院 | 一种用于核电厂数字化仪控系统仿真的数值模型处理方法 |
CN102930069A (zh) * | 2011-12-28 | 2013-02-13 | 许继集团有限公司 | 一种用于继电保护的传输通道仿真方法及系统 |
CN103019106A (zh) * | 2012-12-31 | 2013-04-03 | 湖北省电力公司电力科学研究院 | 一种数字仿真系统与断路器操作箱开关量接口实现方法 |
CN103823384A (zh) * | 2014-03-13 | 2014-05-28 | 南京南瑞继保电气有限公司 | 数字仿真模型中开关位置的控制方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3555609B2 (ja) * | 2001-11-30 | 2004-08-18 | オムロン株式会社 | 制御装置、温度調節器および熱処理装置 |
EP2073446A1 (en) * | 2007-12-21 | 2009-06-24 | British Telecmmunications public limited campany | Monitoring of network connections |
CN101339581B (zh) * | 2008-08-29 | 2012-07-18 | 北京中星微电子有限公司 | 基于中断通讯的嵌入式系统的在线调试仿真方法 |
-
2014
- 2014-11-27 CN CN201410704493.7A patent/CN104391450B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1926001A2 (en) * | 2006-11-17 | 2008-05-28 | United Technologies Corporation | Reducing gas turbine performance tracking estimation non-repeatability |
CN102930069A (zh) * | 2011-12-28 | 2013-02-13 | 许继集团有限公司 | 一种用于继电保护的传输通道仿真方法及系统 |
CN102707231A (zh) * | 2012-05-16 | 2012-10-03 | 广东电网公司电力科学研究院 | 基于matlab/simulink的发电机组一次调频分析系统 |
CN102789169A (zh) * | 2012-05-25 | 2012-11-21 | 中国核动力研究设计院 | 一种用于核电厂数字化仪控系统仿真的数值模型处理方法 |
CN103019106A (zh) * | 2012-12-31 | 2013-04-03 | 湖北省电力公司电力科学研究院 | 一种数字仿真系统与断路器操作箱开关量接口实现方法 |
CN103823384A (zh) * | 2014-03-13 | 2014-05-28 | 南京南瑞继保电气有限公司 | 数字仿真模型中开关位置的控制方法 |
Non-Patent Citations (1)
Title |
---|
闭环网络控制系统全数字仿真实验方法的研究;王帅宇 等;《系统仿真学报》;20050731;第17卷(第07期);第1717-1719,1735页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104391450A (zh) | 2015-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103713214B (zh) | 一种智能变电站继电保护闭环测试系统 | |
CN103616591B (zh) | 一种智能变电站合并单元特性的仿真装置及其仿真方法 | |
CN104570768A (zh) | 基于Rt-Lab和OPNET的信息物理半实物仿真系统 | |
CN103197652B (zh) | 一种用于火电厂一体化系统的现场总线通信控制装置 | |
CN102752299B (zh) | 电动汽车充电站免调试复合式通讯装置及方法 | |
CN103760857A (zh) | 分散式污水处理设施智能远程监管系统及其应用 | |
CN103972888A (zh) | 一种微网控制器 | |
WO2020109867A3 (zh) | 多模通信装置及其通信方法、多模通信系统 | |
CN103676661B (zh) | 多功能仿真验证系统及其仿真验证方法 | |
CN100470976C (zh) | 一种综合自动化变电站调试装置 | |
CN201839319U (zh) | Plc远程诊断控制系统 | |
CN104391450B (zh) | 一种数字仿真中模拟信号通讯延时的方法 | |
CN105429130B (zh) | 基于RTDS和dSPACE的微电网仿真实验系统及方法 | |
CN104767598B (zh) | 一种用于储能电站现场设备之间的数据传输系统及其方法 | |
CN202013572U (zh) | 一种列车低压电气仿真系统 | |
CN105322584A (zh) | 一种户外电动汽车充电桩协调同步装置及协调同步方法 | |
CN206789037U (zh) | 一种基于时钟同步采集和多种方式通讯的物联采集终端 | |
CN113673114A (zh) | 一种配电网信息物理系统协同耦合求解方法 | |
CN101916206B (zh) | 一种信号系统的建模方法及装置 | |
CN202565033U (zh) | 一种机组远动系统 | |
CN203288077U (zh) | 智能变电站远程维护系统 | |
CN202651896U (zh) | 一种微电网协调控制系统 | |
CN103051056A (zh) | 一种具有纵联光纤通道收发功能的过程层设备 | |
CN205015457U (zh) | 一种伺服电机驱动测试装置 | |
CN209149144U (zh) | 一种双切换系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NANJING NARI-RELAYS ENGINEERING TECHNOLOGY CO., LT Free format text: FORMER OWNER: NANJING NARI-RELAYS ENGINEERING TECHNOLOGY CO., LTD. Effective date: 20150817 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20150817 Address after: 211106 Jiangning Province Economic and Technological Development Zone, Jiangsu City, No. Sheng Tai Road, No. 99 Applicant after: Nanrui Relay Protection Electricity Co., Ltd., Nanjing Applicant after: Nanjing Nari-Relays Engineering Technology Co., Ltd. Applicant after: State Grid Corporation of China Address before: 211106 Jiangning Province Economic and Technological Development Zone, Jiangsu City, No. Sheng Tai Road, No. 99 Applicant before: Nanrui Relay Protection Electricity Co., Ltd., Nanjing Applicant before: Nanjing Nari-Relays Engineering Technology Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |