CN202565033U - 一种机组远动系统 - Google Patents
一种机组远动系统 Download PDFInfo
- Publication number
- CN202565033U CN202565033U CN2012202539183U CN201220253918U CN202565033U CN 202565033 U CN202565033 U CN 202565033U CN 2012202539183 U CN2012202539183 U CN 2012202539183U CN 201220253918 U CN201220253918 U CN 201220253918U CN 202565033 U CN202565033 U CN 202565033U
- Authority
- CN
- China
- Prior art keywords
- telecontrol
- machine
- dcs
- analog
- digital converter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Selective Calling Equipment (AREA)
Abstract
本实用新型提供一种机组远动系统,其特征在于,包括:DCS系统、A/D模数转换器、网控系统和远动系统,网控系统包括:NSD500V测控装置和远动系统,DCS系统包括:至少两个机组,机组包括:有功功率变送器和热控DCS调节系统,其中,有功功率变送器连接A/D模数转换器,A/D模数转换器连接远动系统,热控DCS调节系统包括:协调有功逻辑和CCS1控制器,远动系统包括主远动机、备远动机和远动通道,主远动机和备远动机分别连接远动通道。该系统中,电厂远动系统与AGC数据同源。大大提高了K3值,缩短了AGC指令的响应时间,减少了日常维护工作量,提高系统的可靠性。
Description
技术领域
本实用新型涉及电力设备技术领域,特别涉及一种大型机组远动系统的AGC数据同源涉及电力系统大型发电机组设备参数调整及数据传输。
背景技术
远动总控在间隔层设备尚未改造成测控装置直接上网的情况下总控的遥测和遥信数据可以由前置机向远动总控装置转发,转发方式是前置机将各SLC(保护的终端)装置映射成直接上网的NSD500V装置(超高压变电站单元测控装置),将遥测遥信数据发送到网上,远动总控从网上收取数据然后向调度转发,此种转发方式数据传输速度较快。实现各个机组的数据同源功能,即DCS(集散控制系统)将机组的有功功率值以4-20mA摸拟量输入NSD500V测控装置,经测控装置采集1-8号机的数据并通过以太网转发给后台和远动总控,远动总控直接将有功功率值上送至调度。
NCS系统(网络监控系统)传送有功负荷的中间环节较多,对于数据上送的及时性有很大影响,尤其是所有数据经前置机处理后送到远动机的传输时间较长,整个遥调流程总传输延迟在10到20秒(如:NCS系统接收华北网调指令到DCS所需最长时间5秒左右,从测控装置到网关大概最长需要2秒左右,网关到前置机最长需要5秒左右,前置机到到远动机再到调度需要最长需要8秒左右),对AGC(自动发电量控制)响应时间指标有较大影响。
实用新型内容
本实用新型提供一种机组远动系统,缩短了AGC指令的响应时间。
为了实现上述目的,本实用新型提供以下技术方案:
一种机组远动系统,其包括:
DCS系统、A/D模数转换器5、网控系统和远动系统4,所述网控系统包括:NSD500V测控装置3和远动系统4,所述DCS系统包括:至少两个机组,所述机组包括:有功功率变送器1和热控DCS调节系统2,其中,所述有功功率变送器1连接所述A/D模数转换器5,所述A/D模数转换器5连接所述远动系统4,所述热控DCS调节系统2包括:协调有功逻辑6和CCS1控制器7,所述远动系统4包括主远动机8、备远动机9和远动通道10,所述主远动机8和备远动机9分别连接远动通道10。
优选地,所述有功功率变送器1为三块。
通过实施以上技术方案,具有以下技术效果:本实用新型提供的机组远动系统,电厂远动系统与AGC数据同源。大大提高了K3值(调节性能指标之一,定义为:响应时间),缩短了AGC指令的响应时间,完全能够满足AGC系统对数据采集精度的要求,减少了日常维护工作量,提高系统的可靠性,上传中调的有功功率响应时间缩短,数据的准确性、一致性提高,增加了经济效益。
附图说明
图1为本实用新型提供的机组远动系统的结构原理图;
图2为本实用新型提供的DCS系统的结构原理图。
具体实施方式
为了更好的理解本实用新型的技术方案,下面结合附图详细描述本实用新型提供的实施例。
本实用新型实施例提供一种大型机组远动系统,如图1和图2所示,包括:
DCS系统、A/D模数转换器5、网控系统和远动系统4,所述网控系统包括:NSD500V测控装置3和远动系统4,所述DCS系统包括:至少两个机组,所述机组包括:有功功率变送器1和热控DCS调节系统2,其中,所述有功功率变送器1连接所述A/D模数转换器5,所述A/D模数转换器5连接所述远动系统4,所述热控DCS调节系统2包括:协调有功逻辑6和CCS1控制器7(CCS为协调控制系统,CCS1为协调控制系统内的第一个控制器),所述远动系统4包括主远动机8、备远动机9和远动通道10,所述主远动机8和备远动机9分别连接远动通道10。所述远动通道10与华北网调动系统11相连通。在本实施例中,该机组包括1号机组....8号机组等,在其他实施例中,也可以更多或者更少的机组。该主远动机8和备远动机9在故障情况下互为备用的。
在上述实施例中,优选地,所述有功功率变送器1为三块。
在上述实施例中,所述华北网调动系统11下发机组AGC有功功率指令,远动系统4通过远动通道10传输给主远动机8后,由A/D数模转换器5将AGC指令传输到热控DCS调节系统2,热控DCS调节系统2内设置的协调有功逻辑6,将接收到的华北网调11AGC指令数据与时实三块有功功率变送器1输出的三取中的平均值进行比较,然后根据差值进行机组出力的调整,使机组出力用最短的时间,尽可能的达到华北网调动系统11AGC指令的要求,在机组调整的过程当中,热控DCS调节系统2通过CCS1控制器7将机组时实出力以4-20mA模拟量的形式传输给NSD500V测控装置3,NSD500V测控装置3通过主远动机8和远动通道10上送至华北网调动系统11。
以上对本实用新型实施例所提供的一种机组远动系统进行了详细介绍,对于本领域的一般技术人员,依据本实用新型实施例的思想,在具体实施方式及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本实用新型的限制。
Claims (2)
1.一种机组远动系统,其特征在于,包括:
DCS系统、A/D模数转换器(5)、网控系统和远动系统(4),所述网控系统包括:NSD500V测控装置(3)和远动系统(4),所述DCS系统包括:至少两个机组,所述机组包括:有功功率变送器(1)和热控DCS调节系统(2),其中,所述有功功率变送器(1)连接所述A/D模数转换器(5),所述A/D模数转换器(5)连接所述远动系统(4),所述热控DCS调节系统(2)包括:协调有功逻辑(6)和CCS1控制器(7),所述远动系统(4)包括主远动机(8)、备远动机(9)和远动通道(10),所述主远动机(8)和备远动机(9)分别连接远动通道(10)。
2.如权利要求1所述机组远动系统,其特征在于,所述有功功率变送器(1)为三块。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202539183U CN202565033U (zh) | 2012-06-01 | 2012-06-01 | 一种机组远动系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202539183U CN202565033U (zh) | 2012-06-01 | 2012-06-01 | 一种机组远动系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202565033U true CN202565033U (zh) | 2012-11-28 |
Family
ID=47214648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012202539183U Expired - Fee Related CN202565033U (zh) | 2012-06-01 | 2012-06-01 | 一种机组远动系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202565033U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103901297A (zh) * | 2014-03-10 | 2014-07-02 | 国家电网公司 | 一种发电机组agc试验响应时间的确定方法 |
CN103345205B (zh) * | 2013-05-21 | 2015-07-15 | 国家电网公司 | 一种基于数据校核的agc负荷优化控制方法 |
CN107807620A (zh) * | 2017-10-27 | 2018-03-16 | 华润电力湖北有限公司 | 一种发电厂机组有功测点获取系统 |
-
2012
- 2012-06-01 CN CN2012202539183U patent/CN202565033U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103345205B (zh) * | 2013-05-21 | 2015-07-15 | 国家电网公司 | 一种基于数据校核的agc负荷优化控制方法 |
CN103901297A (zh) * | 2014-03-10 | 2014-07-02 | 国家电网公司 | 一种发电机组agc试验响应时间的确定方法 |
CN107807620A (zh) * | 2017-10-27 | 2018-03-16 | 华润电力湖北有限公司 | 一种发电厂机组有功测点获取系统 |
CN107807620B (zh) * | 2017-10-27 | 2019-10-08 | 华润电力湖北有限公司 | 一种发电厂机组有功测点获取系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203455714U (zh) | 一种电力线路杆塔的ZigBee无线监控系统 | |
CN103872775B (zh) | 一种智能微网监控系统及监控方法 | |
CN107241382B (zh) | 用于串口与以太网间的数据转换方法及其装置 | |
CN102299520A (zh) | 微电网无功功率补偿方法和系统 | |
CN105098988A (zh) | 一种基于取代服务的调控信息验收核对方法 | |
CN202565033U (zh) | 一种机组远动系统 | |
CN201449552U (zh) | 电厂agc控制系统 | |
CN105048515B (zh) | 用于多风电场并网的调度方法 | |
CN103138293A (zh) | 火电厂厂级负荷优化分配方法及系统 | |
CN202059225U (zh) | 智能变电站规约转换器 | |
CN203455692U (zh) | 一种基于云服务器的供热电厂使用的热电联产监测装置 | |
CN205265371U (zh) | 一种变电站远程运维管控装置 | |
CN106356866A (zh) | 一种智能变电站自动电压控制子站装置及其控制方法 | |
CN202047812U (zh) | 一种油田测井远程传输控制系统 | |
CN105223417A (zh) | 一种无线数传式智能电表 | |
CN206371308U (zh) | 一种养殖场全自动喂水喂料装置 | |
CN110943457B (zh) | 一种分布式潮流控制系统及方法 | |
CN203812075U (zh) | 一种用于风力发电机组信息采集的数据采集传输系统 | |
CN103107598B (zh) | 一种海上油田群电网ems系统远程数据采集通信方法 | |
CN105553108A (zh) | 一种电网数据系统 | |
CN205910516U (zh) | 基于wams的多facts控制器和实时仿真系统的接口装置 | |
CN206283513U (zh) | 基于无线互联网的港区桥吊远程诊断装置 | |
CN203942294U (zh) | 一种配电网风力发电设备同步运行装置 | |
CN105322568A (zh) | 一种配电网风力发电设备同步运行装置及同步运行方法 | |
CN105305500B (zh) | 一种配电网风力发电设备和光伏发电设备出力协调装置及出力协调方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121128 Termination date: 20170601 |