CN104390308A - Refrigerant insufficiency processing method and temperature adjusting system - Google Patents

Refrigerant insufficiency processing method and temperature adjusting system Download PDF

Info

Publication number
CN104390308A
CN104390308A CN201410608102.1A CN201410608102A CN104390308A CN 104390308 A CN104390308 A CN 104390308A CN 201410608102 A CN201410608102 A CN 201410608102A CN 104390308 A CN104390308 A CN 104390308A
Authority
CN
China
Prior art keywords
premises station
platform
duty
load
allocation proportion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410608102.1A
Other languages
Chinese (zh)
Other versions
CN104390308B (en
Inventor
刘运中
操四胜
高向军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Changhong Electric Co Ltd
Original Assignee
Sichuan Changhong Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Changhong Electric Co Ltd filed Critical Sichuan Changhong Electric Co Ltd
Priority to CN201410608102.1A priority Critical patent/CN104390308B/en
Publication of CN104390308A publication Critical patent/CN104390308A/en
Application granted granted Critical
Publication of CN104390308B publication Critical patent/CN104390308B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/52Indication arrangements, e.g. displays

Abstract

The invention provides a refrigerant insufficiency processing method and a temperature adjusting system. The method is applied to the temperature adjusting system, and the temperature adjusting system is provided with M indoor units and N outdoor units. The method comprises the steps that when the temperature adjusting system is insufficient in refrigerant, whether P outdoor units which can be loaded and are not operated exist in the N outdoor units is judged, and P is an integer which is greater than or equal to 1 and is less than N; if the P outdoor units which can be loaded and are not operated exist, one outdoor unit, which is not operated now and has the highest priority, in the P outdoor units is loaded; if the P outdoor units which can be loaded and are not operated do not exist, one outdoor unit which is being operated and has the highest priority is unloaded, another outdoor unit which is not operated and has the highest priority is loaded, and then priority rotation is performed on the N outdoor units.

Description

A kind of cold medium shortage processing method and humidity control system
Technical field
The present invention relates to electronic technology field, particularly relate to a kind of cold medium shortage processing method and humidity control system.
Background technology
Air-conditioning, as a kind of humidity control system, has multiple indoor set and multiple off-premises station usually.Refrigerants etc. circulate between multiple indoor set and multiple off-premises station of air-conditioning for the medium of exchange heat, when the mutual conversion of refrigerant between gaseous state and liquid state, air-conditioning can regulate the various parameters of the air in area of space (being generally airtight), realize the parameters such as the temperature to air in this area of space, humidity, cleanliness factor and air velocity to regulate, to meet the requirement of human comfort or technical process.
Refrigerant plays the important medium of effect as air-conditioning, when the cold medium shortage of air-conditioner outdoor unit, the gaseous coolant hypotony that can compressor be caused to discharge or gaseous coolant temperature too high, and then cause compressor impaired, operation of air conditioner breaks down.A kind of method how processed when cold medium shortage appears in air-conditioning is not also provided in prior art.
Summary of the invention
Embodiments provide a kind of cold medium shortage processing method and humidity control system, provide a kind of cold medium shortage processing method being applicable to humidity control system, achieve the technique effect of protection humidity control system.
On the one hand, embodiments provide a kind of cold medium shortage processing method, be applied in humidity control system, described humidity control system has at least one indoor set and at least one off-premises station, described humidity control system has M platform indoor set and N platform off-premises station, wherein, M and N be more than or equal to 1 integer, described method comprises:
Whether, when cold medium shortage appears in described humidity control system, judge to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, P is the integer being more than or equal to 1 and being less than N;
Can load and off-duty P platform off-premises station if exist, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest;
Can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation carried out to described N platform off-premises station.
On the other hand, embodiments provide a kind of humidity control system, described humidity control system has M platform indoor set and N platform off-premises station, wherein, M and N be more than or equal to 1 integer, described humidity control system also comprises:
Judging unit, whether, for when cold medium shortage appears in described humidity control system, judge to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, P is the integer being more than or equal to 1 and being less than N;
Control unit, if can load and off-duty P platform off-premises station for existing, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest, can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation is carried out to described N platform off-premises station.
Above-mentioned one or more technical scheme in the embodiment of the present invention, at least has one or more technique effects following:
In the embodiment of the present invention, humidity control system has M platform indoor set and N platform off-premises station, and whether, when cold medium shortage appears in humidity control system, judge to exist in N platform off-premises station and can load and off-duty P platform off-premises station, P is the integer being more than or equal to 1 and being less than N; Can load and off-duty P platform off-premises station if exist, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest; Can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation carried out to described N platform off-premises station.Provide a kind of refrigerant processing method being applicable to humidity control system, achieve the technique effect of protection humidity control system.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
The flow chart of a kind of cold medium shortage processing method that Fig. 1 provides for the embodiment of the present invention;
The humidity control system schematic diagram that Fig. 2 provides for the embodiment of the present invention.
Detailed description of the invention
Clearly understand for making the object, technical solutions and advantages of the present invention, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.When not conflicting, the embodiment in the present invention and the feature in embodiment can be combined mutually.Can perform in the computer system of such as one group of computer executable instructions in the step shown in the flow chart of accompanying drawing.Further, although show logical order in flow charts, in some cases, can be different from the step shown or described by order execution herein.
Embodiments provide a kind of cold medium shortage processing method and humidity control system, provide a kind of cold medium shortage processing method being applicable to humidity control system, achieve the technique effect of protection humidity control system.
Technical scheme in the embodiment of the present invention, for solving the problems of the technologies described above, provides a kind of cold medium shortage processing method, is applied in humidity control system, described humidity control system has M platform indoor set and N platform off-premises station, wherein, M and N be more than or equal to 1 integer, described method comprises:
Whether, when cold medium shortage appears in described humidity control system, judge to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, P is the integer being more than or equal to 1 and being less than N;
Can load and off-duty P platform off-premises station if exist, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest;
Can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation carried out to described N platform off-premises station.
Technical scheme in the embodiment of the present invention provides a kind of cold medium shortage processing method being applicable to humidity control system, achieves the technique effect of protection humidity control system.
In order to better understand technique scheme, below in conjunction with Figure of description and concrete embodiment, technique scheme is described in detail.The specific features being to be understood that in the present invention and embodiment is the detailed description to technical solution of the present invention, instead of limitation of the invention, and when not conflicting, the technical characteristic in the embodiment of the present invention and embodiment can combine mutually.
Term "and/or" herein, being only a kind of incidence relation describing affiliated partner, can there are three kinds of relations in expression, and such as, A and/or B, can represent: individualism A, exists A and B simultaneously, these three kinds of situations of individualism B.In addition, character "/" herein, general expression forward-backward correlation is to the relation liking a kind of "or".
Embodiments provide a kind of cold medium shortage processing method, be applied in humidity control system, described humidity control system has M platform indoor set and N platform off-premises station.Described humidity control system can be air-conditioning, and humidity control system can have an off-premises station and an indoor set, can also have multiple off-premises station and multiple indoor set.
Please refer to Fig. 1, the flow chart of a kind of cold medium shortage processing method that Fig. 1 provides for the embodiment of the present invention.The cold medium shortage processing method that the embodiment of the present invention provides comprises the following steps:
Whether step 11: when cold medium shortage appears in described humidity control system, judge to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, and P is the integer being more than or equal to 1 and being less than N;
Step 12: can load and off-duty P platform off-premises station if exist, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest;
Step 13: can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation carried out to described N platform off-premises station.
Judge in step 11 whether to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, be specially:
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is greater than default allocation proportion, and described default allocation proportion is corresponding with the number of units of the off-premises station run; If the off-premises station target capability allocation proportion in the off-premises station run is greater than default allocation proportion, then show that existence can load and off-duty P platform off-premises station;
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is less than default allocation proportion, and described default allocation proportion is corresponding with the number of units of the off-premises station run; If the off-premises station target capability allocation proportion in the off-premises station run is less than default allocation proportion, then shows not exist and can load and off-duty P platform off-premises station.
Specifically, existence can load and off-duty P platform off-premises station refers to: have off-premises station in operation, the number of units of the off-premises station of operation is less than N, and the off-premises station target capability allocation proportion in the off-premises station run is greater than default allocation proportion.
Do not exist and can to load and off-duty P platform off-premises station has and is not limited to following situation:
Have off-premises station in operation, the number of units of the off-premises station of operation is less than N, and the off-premises station target capability allocation proportion in the off-premises station run is less than default allocation proportion.
Calculate the off-premises station target capability allocation proportion OTC_Ratio of the off-premises station run, if OTC_Ratio is greater than default allocation proportion, then can load an off-premises station, from off-duty off-premises station, particularly select an off-premises station that priority is the highest to load.
Wherein, sTC is current goal system capability, the target capability of the system cloud gray model namely after humidity control system start.Preset allocation proportion different with the difference of the off-premises station number of units run.
If OTC_Ratio is less than default allocation proportion, then need unloading off-premises station, from the off-premises station run, particularly select an off-premises station that priority is the highest to unload, from off-duty off-premises station, select an off-premises station that priority is the highest to load again, then rotation is carried out to the priority of N platform off-premises station.Preset allocation proportion different with the difference of the off-premises station number of units run.
Assumed temperature regulating system has 4 off-premises stations, be respectively off-premises station 1, off-premises station 2, off-premises station 3, off-premises station 4, suppose that off-premises station 1 is in operation, and off-premises station 2 to off-premises station 4 all off-duties, then judge whether the OTC_Ratio of off-premises station is more than or equal to 30%, if be more than or equal to 30%, then can load an off-premises station, because the priority of off-premises station 2 in off-premises station 2 to off-premises station 4 is the highest, so load off-premises station 2.If OTC_Ratio is less than 30%, then need the off-premises station that unloading priority run is the highest, owing to only having off-premises station 1 in operation, so unloading off-premises station 1; Load an off-duty and the highest off-premises station of priority, because the priority of off-premises station 2 in off-premises station 2 to off-premises station 4 is the highest, so load off-premises station 2, then carry out priority rotation, the priority of off-premises station 1, off-premises station 2, off-premises station 3, off-premises station 4 is respectively 4,1,2,3.
If have two off-premises stations in operation, suppose that off-premises station 1 and off-premises station 2 are in operation, and off-premises station 3 and off-premises station 4 off-duty, then judge whether off-premises station OTC_Ratio is more than or equal to 35%, if be more than or equal to 35%, then can load an off-premises station, then load off-premises station 3.If OTC_Ratio is less than 35%, then need the off-premises station that unloading priority run is the highest, because the priority of off-premises station 1 in off-premises station 1 and off-premises station 2 is the highest, so unloading off-premises station 1; Load an off-duty and the highest off-premises station of priority, because the priority of off-premises station 3 in off-premises station 3 and off-premises station 4 is the highest, so load off-premises station 3, then carry out priority rotation, the priority of off-premises station 1, off-premises station 2, off-premises station 3, off-premises station 4 is respectively 4,1,2,3.
If have three off-premises stations in operation, suppose that off-premises station 1 and off-premises station 2 and off-premises station 3 are in operation, and off-premises station 4 off-duty, then judge whether off-premises station OTC_Ratio is more than or equal to 40%, if be more than or equal to 40%, then can load an off-premises station, then load off-premises station 4.If OTC_Ratio is less than 40%, then need the off-premises station that unloading priority run is the highest, because the priority of off-premises station 1 in off-premises station 1 and off-premises station 2 and off-premises station 3 is the highest, so unloading off-premises station 1; Load an off-duty and the highest off-premises station of priority, i.e. off-premises station 4, then carries out priority rotation, and the priority of off-premises station 1, off-premises station 2, off-premises station 3, off-premises station 4 is respectively 4,1,2,3.
After loading off-premises station or after unloading off-premises station, need to recalculate OTC_Ratio and OTC, wherein, the rated capacity of OTC=off-premises station is multiplied by OTC_Ratio, then the OTC calculated is distributed to eachly running and loading but off-duty off-premises station.
Based on same inventive concept, the embodiment of the present invention additionally provides a kind of humidity control system, please refer to Fig. 2, the humidity control system schematic diagram that Fig. 2 provides for the embodiment of the present invention.The humidity control system that the embodiment of the present invention provides has M platform indoor set and N platform off-premises station, wherein, M and N be more than or equal to 1 integer, described humidity control system also comprises:
Judging unit 21, whether, for when cold medium shortage appears in described humidity control system, judge to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, P is the integer being more than or equal to 1 and being less than N;
Control unit 22, if can load and off-duty P platform off-premises station for existing, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest, can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation is carried out to described N platform off-premises station.
Optionally, described humidity control system also comprises:
Processing unit, for recalculating off-premises station target capability allocation proportion and off-premises station target capability, and distributes to described off-premises station target capability in described N platform off-premises station and is running and loading but off-duty K platform off-premises station.
Optionally, described judging unit specifically for:
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is greater than default maximum allocated ratio, and described default maximum allocated ratio is corresponding with the number of units of the off-premises station run;
If the off-premises station target capability allocation proportion in the off-premises station run is greater than default maximum allocated ratio, then show that existence can load and off-duty P platform off-premises station.
Optionally, described judging unit also for:
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is less than default smallest allocation ratio, and described default smallest allocation ratio is corresponding with the number of units of the off-premises station run;
If the off-premises station target capability allocation proportion in the off-premises station run is less than default smallest allocation ratio, then shows not exist and can load and off-duty P platform off-premises station.
Although describe the preferred embodiments of the present invention, those skilled in the art once obtain the basic creative concept of cicada, then can make other change and amendment to these embodiments.So claims are intended to be interpreted as comprising preferred embodiment and falling into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various change and modification to the present invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (9)

1. a cold medium shortage processing method, is applied in humidity control system, and described humidity control system has M platform indoor set and N platform off-premises station, wherein, M and N be more than or equal to 1 integer, described method comprises:
Whether, when cold medium shortage appears in described humidity control system, judge to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, P is the integer being more than or equal to 1 and being less than N;
Can load and off-duty P platform off-premises station if exist, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest;
Can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation carried out to described N platform off-premises station.
2. the method for claim 1, is characterized in that, now off-duty and after the off-premises station that priority is the highest, described method also comprises in the described P platform off-premises station of loading:
Recalculate off-premises station target capability allocation proportion and off-premises station target capability, and described off-premises station target capability is distributed in described N platform off-premises station and running and loading but off-duty K platform off-premises station.
3. the method for claim 1, is characterized in that, after carrying out priority rotation to described N platform off-premises station, described method also comprises:
Recalculate off-premises station target capability allocation proportion and off-premises station target capability, and described off-premises station target capability is distributed in described N platform off-premises station and running and loading but off-duty K platform off-premises station.
4. the method for claim 1, is characterized in that, described judge whether to exist in described N platform off-premises station can load and off-duty P platform off-premises station, specifically comprise:
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is greater than default allocation proportion, and described default allocation proportion is corresponding with the number of units of the off-premises station run;
If the off-premises station target capability allocation proportion in the off-premises station run is greater than default allocation proportion, then show that existence can load and off-duty P platform off-premises station.
5. the method for claim 1, is characterized in that, described judge whether to exist in described N platform off-premises station can load and off-duty P platform off-premises station, specifically comprise:
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is less than default allocation proportion, and described default allocation proportion is corresponding with the number of units of the off-premises station run;
If the off-premises station target capability allocation proportion in the off-premises station run is less than default allocation proportion, then shows not exist and can load and off-duty P platform off-premises station.
6. a humidity control system, described humidity control system has M platform indoor set and N platform off-premises station, wherein, M and N be more than or equal to 1 integer, described humidity control system also comprises:
Judging unit, whether, for when cold medium shortage appears in described humidity control system, judge to exist in described N platform off-premises station and can load and off-duty P platform off-premises station, P is the integer being more than or equal to 1 and being less than N;
Control unit, if can load and off-duty P platform off-premises station for existing, then load now off-duty in described P platform off-premises station and the off-premises station that priority is the highest, can load if do not exist and off-duty P platform off-premises station, then unload one running and the off-premises station that priority is the highest, and load an off-duty and off-premises station that priority is the highest, then priority rotation is carried out to described N platform off-premises station.
7. humidity control system as claimed in claim 6, it is characterized in that, described humidity control system also comprises:
Processing unit, for recalculating off-premises station target capability allocation proportion and off-premises station target capability, and distributes to described off-premises station target capability in described N platform off-premises station and is running and loading but off-duty K platform off-premises station.
8. humidity control system as claimed in claim 6, is characterized in that, described judging unit specifically for:
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is greater than default allocation proportion, and described default allocation proportion is corresponding with the number of units of the off-premises station run;
If the off-premises station target capability allocation proportion in the off-premises station run is greater than default allocation proportion, then show that existence can load and off-duty P platform off-premises station.
9. humidity control system as claimed in claim 6, is characterized in that, described judging unit also for:
Judge whether the off-premises station target capability allocation proportion in the off-premises station run is less than default allocation proportion, and described default allocation proportion is corresponding with the number of units of the off-premises station run;
If the off-premises station target capability allocation proportion in the off-premises station run is less than default allocation proportion, then shows not exist and can load and off-duty P platform off-premises station.
CN201410608102.1A 2014-10-31 2014-10-31 Refrigerant insufficiency processing method and temperature adjusting system Active CN104390308B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410608102.1A CN104390308B (en) 2014-10-31 2014-10-31 Refrigerant insufficiency processing method and temperature adjusting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410608102.1A CN104390308B (en) 2014-10-31 2014-10-31 Refrigerant insufficiency processing method and temperature adjusting system

Publications (2)

Publication Number Publication Date
CN104390308A true CN104390308A (en) 2015-03-04
CN104390308B CN104390308B (en) 2017-04-26

Family

ID=52608245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410608102.1A Active CN104390308B (en) 2014-10-31 2014-10-31 Refrigerant insufficiency processing method and temperature adjusting system

Country Status (1)

Country Link
CN (1) CN104390308B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104729023A (en) * 2015-04-09 2015-06-24 宁波奥克斯电气有限公司 Dynamic refrigerant balance control method used in heating process of multi-connected air-conditioner unit
CN105588299A (en) * 2015-04-10 2016-05-18 青岛海信日立空调系统有限公司 Control method and control device of multi-connected air-conditioning unit
WO2019184457A1 (en) * 2018-03-30 2019-10-03 珠海格力电器股份有限公司 Combined alternating operation method, device and multi-split system for outdoor units
CN110686379A (en) * 2019-10-10 2020-01-14 广东美的暖通设备有限公司 Control method of air conditioning system, air duct type air conditioning system and readable storage medium
CN111006354A (en) * 2019-11-25 2020-04-14 宁波奥克斯电气股份有限公司 Air conditioner control method and device, air conditioner and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201281483Y (en) * 2008-08-28 2009-07-29 广东美的电器股份有限公司 Energy-power unloading device for multiple air conditioner
CN101749825A (en) * 2008-12-04 2010-06-23 珠海格力电器股份有限公司 Refrigerant super-addition control method for composite air conditioner
JP2011163708A (en) * 2010-02-12 2011-08-25 Toshiba Carrier Corp Air conditioner
CN102543568A (en) * 2011-12-08 2012-07-04 苏州工业园区高登威科技有限公司 Vehicle air conditioner double pressure switch
JP2014081118A (en) * 2012-10-16 2014-05-08 Panasonic Corp Air conditioner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201281483Y (en) * 2008-08-28 2009-07-29 广东美的电器股份有限公司 Energy-power unloading device for multiple air conditioner
CN101749825A (en) * 2008-12-04 2010-06-23 珠海格力电器股份有限公司 Refrigerant super-addition control method for composite air conditioner
JP2011163708A (en) * 2010-02-12 2011-08-25 Toshiba Carrier Corp Air conditioner
CN102543568A (en) * 2011-12-08 2012-07-04 苏州工业园区高登威科技有限公司 Vehicle air conditioner double pressure switch
JP2014081118A (en) * 2012-10-16 2014-05-08 Panasonic Corp Air conditioner

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104729023A (en) * 2015-04-09 2015-06-24 宁波奥克斯电气有限公司 Dynamic refrigerant balance control method used in heating process of multi-connected air-conditioner unit
CN104729023B (en) * 2015-04-09 2017-10-17 宁波奥克斯电气股份有限公司 The dynamic equilibrium control method of refrigerant when VRF Air Conditioning System is heated
CN105588299A (en) * 2015-04-10 2016-05-18 青岛海信日立空调系统有限公司 Control method and control device of multi-connected air-conditioning unit
CN105588299B (en) * 2015-04-10 2019-04-05 青岛海信日立空调系统有限公司 A kind of control method and control device of VRF Air Conditioning System
WO2019184457A1 (en) * 2018-03-30 2019-10-03 珠海格力电器股份有限公司 Combined alternating operation method, device and multi-split system for outdoor units
US11619408B2 (en) 2018-03-30 2023-04-04 Gree Electric Appliances, Inc. Of Zhuhai Method and device of combining outdoor units and rotating operation of outdoor units and MSAC system
CN110686379A (en) * 2019-10-10 2020-01-14 广东美的暖通设备有限公司 Control method of air conditioning system, air duct type air conditioning system and readable storage medium
CN111006354A (en) * 2019-11-25 2020-04-14 宁波奥克斯电气股份有限公司 Air conditioner control method and device, air conditioner and storage medium
CN111006354B (en) * 2019-11-25 2021-09-21 宁波奥克斯电气股份有限公司 Air conditioner control method and device, air conditioner and storage medium

Also Published As

Publication number Publication date
CN104390308B (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN104390308A (en) Refrigerant insufficiency processing method and temperature adjusting system
CN104567148B (en) Air conditioning defrost method and device
CN104833047A (en) Control method and temperature-adjusting system
US10006649B2 (en) Air-conditioning system
CN107289575B (en) Anti-condensation control method and system
CN105571074B (en) The method and apparatus for controlling the outer rotation speed of fan of air-conditioning
US9874360B2 (en) Air-conditioning system
CN107328013B (en) Humidity control method and device
CN104676996A (en) Generation method and generation system for initial opening degree of electronic expansion valve
CN105953369B (en) A kind of control method for frequency conversion air conditioner and device
CN105783182B (en) Air conditioner and its control method and device
CN110631234A (en) Control method of air conditioner operation frequency, air conditioner and computer readable storage medium
CN110332620B (en) Control method of condensing fan of air-cooled air conditioning unit
CN105222265B (en) The outer machine balanced running control method of VRF Air Conditioning System and VRF Air Conditioning System
US20200025409A1 (en) Hybrid tandem compressor system and method of use
CN104374059A (en) System capacity adjusting method and temperature adjusting system
CN110454953A (en) Control method, device and the air conditioner of air conditioner
CN104833046A (en) Information processing method and temperature adjusting system
JP6080204B2 (en) How to control the number of air conditioners
CN107192180B (en) A kind of control method for electronic expansion valve, apparatus and system
CN113465134A (en) Control method and device of air conditioner, storage medium and air conditioner
WO2018211612A1 (en) Air conditioning device
CN112060860A (en) Temperature control method and device for vehicle air conditioning system and computer readable storage medium
CN111425995A (en) Operation control method, multi-split heat pump air conditioning system and storage medium
CN103604193B (en) The outer air conditioner pressure equaliser of a kind of multicell and control method for pressure balance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant