CN104384489A - 一种钢包工作衬砌筑方法 - Google Patents
一种钢包工作衬砌筑方法 Download PDFInfo
- Publication number
- CN104384489A CN104384489A CN201410617116.XA CN201410617116A CN104384489A CN 104384489 A CN104384489 A CN 104384489A CN 201410617116 A CN201410617116 A CN 201410617116A CN 104384489 A CN104384489 A CN 104384489A
- Authority
- CN
- China
- Prior art keywords
- working lining
- magnesia
- ladle
- calcium
- steel ladle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D41/00—Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
- B22D41/02—Linings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Treatment Of Steel In Its Molten State (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
本发明涉及一种钢包工作衬砌筑方法,它包括下述依次的步骤: Ⅰ 用镁钙砖或镁钙碳砖干砌钢包包底工作衬,用镁钙砖或镁钙碳砖以镁铬质火泥或镁质火泥为粘合料湿砌钢包包壁工作衬; Ⅱ 砌筑完钢包包底工作衬与钢包包壁工作衬后,在2小时内进入烘烤阶段。进一步讲,在步骤 Ⅰ 砌筑钢包包壁工作衬前,将镁铬质火泥或镁质火泥和匀:用泥浆搅拌机搅拌干混泥料3-5分钟加水,加水量13±2%,水温20±5℃,边加水边搅拌,加完水后再搅拌时间不小于3分钟。本钢包工作衬砌筑方法砌筑速度快。
Description
技术领域
本发明涉及一种钢包工作衬砌筑方法。
背景技术
镁钙系耐火材料有一系列优良特点,成本低,使用寿命长,能净化钢液,又环保,现盛不锈钢钢包工作衬主要采用此耐火材料。但是,由于镁钙系耐火材料易水化,钢包工作衬现全部采用干砌,干砌不但对镁钙系砖(包括镁钙砖和镁钙碳砖)尺寸允许偏差要求严格,而且砌筑速度也慢,干砌时间是湿砌的两倍。这对一个产能大并且具备钢包能力小的不锈钢企业,直接影响生产的均衡和稳定。
发明内容
为克服现有钢包工作衬砌筑方法的上述不足,本发明提供一种砌筑速度快的钢包工作衬砌筑方法。
本发明的构思是:
钢包工作衬用镁钙砖或镁钙碳砖,钢包包底工作衬还是干砌,钢包包壁工作衬用镁铬质火泥或镁质火泥湿砌;钢包工作衬砌筑完毕,在2小时之内进入烘烤阶段,烘烤时间同干砌一样:烘烤6±0.5小时,钢包包壁工作衬表面温度达到600±20℃,保温4±0.5小时,再烘烤4±0.5小时,钢包包壁工作衬表面温度达到1000±20℃,保温10±0.5小时,钢包上线使用。
本钢包工作衬砌筑方法包括下述依次的步骤:
Ⅰ 用镁钙砖或镁钙碳砖干砌钢包包底工作衬,用镁钙砖或镁钙碳砖以镁铬质火泥或镁质火泥为粘合料湿砌钢包包壁工作衬。
Ⅱ 砌筑完钢包包底工作衬与钢包包壁工作衬后,在2小时内进入烘烤阶段。
上述的钢包工作衬砌筑方法在步骤Ⅰ砌筑钢包包壁工作衬前,将镁铬质火泥或镁质火泥和匀:用泥浆搅拌机搅拌干混泥料3-5分钟加水,加水量13±2%,水温20±5℃,边加水边搅拌,加完水后再搅拌时间不小于3分钟。
详细讲,上述的钢包工作衬砌筑方法的步骤特征是:
在步骤Ⅰ砌筑钢包包壁工作衬用的镁钙砖或镁钙碳砖尺寸允许偏差,尺寸≤300mm时,偏差±3mm;尺寸301-500mm时,偏差±4mm。
在步骤Ⅱ烘烤阶段,烘烤6±0.5小时,钢包包壁工作衬表面温度达到600±20℃,保温4±0.5小时;再烘烤4±0.5小时,钢包包壁工作衬表面温度达到1000±20℃,保温10±0.5小时,钢包上线使用。
本发明的有益效果
应用本方法,可抑制镁钙系砖水化,钢包包壁工作衬用镁铬质火泥或镁质火泥湿砌,与干砌相比,湿砌钢包包壁用的同规格镁钙系砖尺寸允许偏差范围可放宽±1mm,烘烤时间一样,在不影响钢包使用寿命前提下,可将钢包包壁工作衬砌筑速度提高一倍,有助于具备钢包的小且产能大的不锈钢企业正常生产。
具体实施方式
下面结合实施例详细说明本发明的具体实施方式,但本发明的具体实施方式不局限于下述的实施例。
实施例一
本实施例为盛90t不锈钢钢包,钢包工作衬用镁钙砖,钢包包壁工作衬熔池部分砖长150mm、厚100mm,渣线部分砖长250mm、厚100mm,自由空间部分砖长150mm、厚100mm,钢包包壁镁钙砖尺寸偏差±3mm(干砌镁钙砖尺寸允许偏差±2mm)。
本实施例包括下述依次的步骤:
Ⅰ 用镁钙砖干砌钢包包底工作衬,用镁钙砖以镁铬质火泥为粘合料湿砌钢包包壁工作衬。在钢包包壁工作衬砌筑前,将镁铬质火泥和匀:用泥浆搅拌机搅拌干混泥料镁铬质火泥3分钟加水,加水量13%,水温21℃,边加水边搅拌,加完水后再搅拌6分钟。
Ⅱ 砌筑完钢包包底工作衬与钢包包壁工作衬后,在1小时35分内进入烘烤阶段,烘烤6小时,钢包包壁工作衬表面温度达到602℃,保温4小时;再烘烤4小时,钢包包壁工作衬表面温度达到1005℃,保温10小时,钢包上线使用。
本实施例盛90t不锈钢钢包,钢包包壁工作衬用镁铬质火泥湿砌,与干砌相比,同规格镁钙砖尺寸允许偏差由±2mm提到±3mm,同干砌烘烤时间一样,在不影响钢包使用寿命前提下,钢包包壁工作衬砌筑时间由干砌的6小时缩短到3小时,钢包使用寿命13次,避免了因等钢包影响不锈钢生产。
实施例二
本实施例为盛180t不锈钢钢包,钢包工作衬用镁钙碳砖,钢包包壁工作衬熔池部分砖长200mm、厚100mm,渣线部分砖长250mm、厚100mm,自由空间部分砖长200mm、厚100mm,钢包包壁镁钙碳砖尺寸偏差±3mm(干砌镁钙碳砖尺寸允许偏差±2mm)。
本实施例包括下述依次的步骤:
Ⅰ 用镁钙碳砖干砌钢包包底工作衬,用镁钙碳砖以镁质火泥为粘合料湿砌钢包包壁工作衬。在钢包包壁工作衬砌筑前,将镁质火泥和匀:用泥浆搅拌机搅拌干混泥料镁质火泥3.5分钟加水,加水量14%,水温21℃,边加水边搅拌,加完水后再搅拌7分钟。
Ⅱ 砌筑完钢包包底工作衬与钢包包壁工作衬后,在1小时30分内进入烘烤阶段,烘烤6小时,钢包包壁工作衬表面温度达到610℃,保温4小时;再烘烤4.5小时,钢包包壁工作衬表面温度达到1005℃,保温10.5小时,钢包上线使用。
本实施例盛180t不锈钢钢包,钢包包壁工作衬用镁质火泥湿砌,与干砌相比,同规格镁钙碳砖尺寸允许偏差由±2mm提到±3mm,同干砌烘烤时间一样,在不影响钢包使用寿命前提下,钢包包壁工作衬砌筑时间由干砌的8.5小时缩短到4小时,钢包使用寿命29次,避免了因等钢包影响不锈钢生产。
说明
钢包结构,外围为钢制壳体,内衬一般由三层耐火材料构成:紧靠壳体一层为隔热层,第二层为永久衬,与钢水接触的为工作衬。(薛群虎 徐维忠主编. 耐火材料[M]. 北京:冶金工业出版社,2013:203.)
干砌:用干粉填充砖缝或用砖直接垒放的砌砖法。
湿砌:用耐火泥浆或建筑泥浆填充砖缝的砌砖法。(张志贤 喻贞仁主编. 工业炉砌筑施工操作技术[M]. 北京:冶金工业出版社,2008:397.)
Claims (3)
1.一种钢包工作衬砌筑方法,它包括下述依次的步骤:
Ⅰ 用镁钙砖或镁钙碳砖干砌钢包包底工作衬,用镁钙砖或镁钙碳砖以镁铬质火泥或镁质火泥为粘合料湿砌钢包包壁工作衬;
Ⅱ 砌筑完钢包包底工作衬与钢包包壁工作衬后,在2小时内进入烘烤阶段。
2. 根据权利要求1所述的钢包工作衬砌筑方法,其特征是:在步骤Ⅰ砌筑钢包包壁工作衬前,将镁铬质火泥或镁质火泥和匀:用泥浆搅拌机搅拌干混泥料3-5分钟加水,加水量13±2%,水温20±5℃,边加水边搅拌,加完水后再搅拌时间不小于3分钟。
3. 根据权利要求1或2所述的钢包工作衬砌筑方法,其步骤特征是:
在步骤Ⅰ砌筑钢包包壁工作衬用的镁钙砖或镁钙碳砖尺寸允许偏差,尺寸≤300mm时,偏差±3mm;尺寸301-500mm时,偏差±4mm;
在步骤Ⅱ烘烤阶段,烘烤6±0.5小时,钢包包壁工作衬表面温度达到600±20℃,保温4±0.5小时;再烘烤4±0.5小时,钢包包壁工作衬表面温度达到1000±20℃,保温10±0.5小时。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410617116.XA CN104384489B (zh) | 2014-11-06 | 2014-11-06 | 一种钢包工作衬砌筑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410617116.XA CN104384489B (zh) | 2014-11-06 | 2014-11-06 | 一种钢包工作衬砌筑方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104384489A true CN104384489A (zh) | 2015-03-04 |
CN104384489B CN104384489B (zh) | 2016-09-07 |
Family
ID=52602499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410617116.XA Active CN104384489B (zh) | 2014-11-06 | 2014-11-06 | 一种钢包工作衬砌筑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104384489B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110860681A (zh) * | 2019-10-31 | 2020-03-06 | 张家港宏昌钢板有限公司 | 一种连铸涂料中间包喷涂方法 |
CN112264612A (zh) * | 2020-09-30 | 2021-01-26 | 江苏沙钢集团有限公司 | 一种钢包砌筑结构及钢包使用方法 |
CN112974785A (zh) * | 2021-02-08 | 2021-06-18 | 北京首钢股份有限公司 | 一种钢包及钢包砌筑方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5195935A (ja) * | 1975-02-20 | 1976-08-23 | Doromaitoshitsumatahadoromaitoomaguneshakeirengatsumino sekohoho | |
JPH01309915A (ja) * | 1988-06-09 | 1989-12-14 | Shinagawa Refract Co Ltd | 転炉絞り部用内張れんが及びその脱落防止構造 |
CN201922036U (zh) * | 2011-01-27 | 2011-08-10 | 营口鲅鱼圈耐火材料有限公司 | 新型中间包工作衬结构 |
CN102430749A (zh) * | 2011-12-31 | 2012-05-02 | 大冶特殊钢股份有限公司 | 椭圆形钢包及其制作方法 |
CN103736985A (zh) * | 2014-01-11 | 2014-04-23 | 莱芜钢铁集团有限公司 | 一种钢包工作衬及其渣线部位的修砌方法 |
-
2014
- 2014-11-06 CN CN201410617116.XA patent/CN104384489B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5195935A (ja) * | 1975-02-20 | 1976-08-23 | Doromaitoshitsumatahadoromaitoomaguneshakeirengatsumino sekohoho | |
JPH01309915A (ja) * | 1988-06-09 | 1989-12-14 | Shinagawa Refract Co Ltd | 転炉絞り部用内張れんが及びその脱落防止構造 |
CN201922036U (zh) * | 2011-01-27 | 2011-08-10 | 营口鲅鱼圈耐火材料有限公司 | 新型中间包工作衬结构 |
CN102430749A (zh) * | 2011-12-31 | 2012-05-02 | 大冶特殊钢股份有限公司 | 椭圆形钢包及其制作方法 |
CN103736985A (zh) * | 2014-01-11 | 2014-04-23 | 莱芜钢铁集团有限公司 | 一种钢包工作衬及其渣线部位的修砌方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110860681A (zh) * | 2019-10-31 | 2020-03-06 | 张家港宏昌钢板有限公司 | 一种连铸涂料中间包喷涂方法 |
CN112264612A (zh) * | 2020-09-30 | 2021-01-26 | 江苏沙钢集团有限公司 | 一种钢包砌筑结构及钢包使用方法 |
CN112264612B (zh) * | 2020-09-30 | 2022-01-18 | 江苏沙钢集团有限公司 | 一种钢包砌筑结构及钢包使用方法 |
CN112974785A (zh) * | 2021-02-08 | 2021-06-18 | 北京首钢股份有限公司 | 一种钢包及钢包砌筑方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104384489B (zh) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101445379B (zh) | 水泥窑窑口、喷煤管专用浇注料及其制备方法 | |
CN104355634B (zh) | 一种氧化铝质电炉盖及其制备方法 | |
CN102249698B (zh) | 一种高炉冷却壁镶砖 | |
CN102584294A (zh) | 焦炉用复合高荷软耐火材料及筑炉工艺及其产品 | |
CN102173700B (zh) | 一种微膨胀低热硅酸盐水泥 | |
CN103553514A (zh) | 一种掺有磷渣粉的干粉抗裂砂浆 | |
CN102531643A (zh) | 一种喷补钢包造衬方法 | |
GB2504904A (en) | Cementitious binders, activators and methods for making concrete | |
CN103011847A (zh) | 一种喷补炉耐火材料及其制备方法和使用方法 | |
CN103553665B (zh) | 一种快速烘炉的刚玉质不定型耐火防爆料及其使用方法 | |
CN104384489A (zh) | 一种钢包工作衬砌筑方法 | |
CN109133882A (zh) | 一种钢包内衬陶瓷焊接材料及其制备方法和应用 | |
CN103508740A (zh) | 一种用于套筒石灰窑过桥镁铝尖晶石砖修补的捣打料 | |
CN104529495A (zh) | 一种撇渣器及生产工艺 | |
CN102351473A (zh) | 一种格栅板的制备方法 | |
CN104829242A (zh) | 一种水泥窑用三次风管弯道预制件的制备方法 | |
CN111620705A (zh) | 一种用于炼钢电炉出钢槽的浇注料及其制备方法 | |
CN102557679B (zh) | 精炼炉用超微粉复合抗渗陶瓷预制块及制备方法 | |
CN101139856A (zh) | 废煤、矿碴耐高温免烧墙、地、板砖 | |
CN102070346A (zh) | 一种铝镁碳砖的制备方法 | |
CN201459161U (zh) | 单铁口高炉出铁主沟 | |
CN101638925B (zh) | 一种矿渣聚苯乙烯泡沫复合轻质夹芯板 | |
CN102145996A (zh) | 一种含有钒铁渣的耐火火泥 | |
CN103224800B (zh) | 一种焦炉炉门整体浇筑工艺 | |
CN102424590A (zh) | 一种超微粉耐火浇注料 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |