CN104377728A - 并网非上网分布式风力发电机组协调控制方法 - Google Patents

并网非上网分布式风力发电机组协调控制方法 Download PDF

Info

Publication number
CN104377728A
CN104377728A CN201410663838.9A CN201410663838A CN104377728A CN 104377728 A CN104377728 A CN 104377728A CN 201410663838 A CN201410663838 A CN 201410663838A CN 104377728 A CN104377728 A CN 104377728A
Authority
CN
China
Prior art keywords
wind turbine
turbine generator
moment
sigma
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410663838.9A
Other languages
English (en)
Other versions
CN104377728B (zh
Inventor
李昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yuguang Information Technology Co., Ltd
Original Assignee
SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd filed Critical SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd
Priority to CN201410663838.9A priority Critical patent/CN104377728B/zh
Publication of CN104377728A publication Critical patent/CN104377728A/zh
Application granted granted Critical
Publication of CN104377728B publication Critical patent/CN104377728B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/386
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Abstract

一种并网非上网分布式风力发电机组协调控制方法,涉及风力发电技术领域,所解决的是协调风力发电机组的发电量的技术问题。该方法先获取每台受控风力机组的发电容量、时刻风速,及时刻、-1时刻、-2时刻的风机发电功率及并网点的功率;再计算时刻的协调控制有功状态量及无功状态量;再计算时刻的有功控制信号累计值及无功控制信号累计值,并根据计算值发出相应的协调控制指令,然后再计算时刻各风力发电机组发电功率减少值或增加值,并根据计算结果调整机组出力状况,如此重复,实现对风力发电机组的协调控制。本发明提供的方法,适用于并网非上网分布式风力发电机组。

Description

并网非上网分布式风力发电机组协调控制方法
技术领域
本发明涉及风力发电技术,特别是涉及一种并网非上网分布式风力发电机组协调控制方法的技术。
背景技术
分布式风力发电机组的广泛应用,将极大减少终端负荷的需求,同时减少配电线路的输送电流,改善配网线损率,具有积极作用。
但风力发电机组接入电网后,会对电网的电压、频率、功率因数产生一定的影响,风力发电机组设计时,需要考虑发电机组是否能够并网,并网后发电量能否上网。考虑到电网安全,对并网不能上网的风力发电机组,在轻负荷情况下,将进行风力发电机组的调节控制,以满足风电功率不能倒送电网的要求,同时在重负荷时将尽可能多启动风电机组,以利用绿色能源,但是对并网非上网分布式风力发电机组,目前还没有行之有效的调节控制方法,现有的调节控制方法都存在着发电量调节速度滞后及调节准确度低的缺陷,从而影响到电网的安全运行。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是提供一种能快速准确的协调风力发电机组的发电量,从而保证电网安全运行的并网非上网分布式风力发电机组协调控制方法。
为了解决上述技术问题,本发明所提供的一种并网非上网分布式风力发电机组协调控制方法,其特征在于:
1)获取每台受控风力机组的发电容量、t时刻风速,并获取每台受控风力机组分别在t时刻、t-1时刻、t-2时刻的风机发电功率及并网点的功率,功率方向规定为:电网注入并网母线为正,并网母线注入电网为负,风力发电机注入并网母线为正,并网母线注入风力发电机为负;
其中,t≥2,t时刻为当前时刻,t-1时刻、t-2时刻均为t时刻之前的时刻,t-1时刻距t时刻1个单位时长,t-2时刻距t时刻2个单位时长,单位时长的取值为1分钟;
2)计算t时刻的协调控制有功状态量及无功状态量,具体计算公式为:
Bpcon = - Ka × ( Σ i = 1 n P g ( t , i ) - 2 ( Σ i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) / 3 - ( Σ i = 1 l Pg ( t - 2 , i ) + Pn ( t - 2 ) ) / 3 ) ( Σ i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) ;
Bqcon = 2 × Kaq × Q n ( t - 1 ) ( Σ i = 1 n Qg ( t , i ) )
其中,Bpcon为t时刻的协调控制有功状态量,Pg(t,i)为第i台风力发电机组在t时刻的发电有功功率,Pg(t-1,i)为第i台风力发电机组在t-1时刻的发电有功功率,Pg(t-2,i)为第i台风力发电机组在t-2时刻的发电有功功率,Pn(t-1)为t-1时刻的并网点有功功率,Pn(t-2)为t-2时刻的并网点有功功率;
其中,Bqcon为t时刻的协调控制无功状态量,Qg(t,i)为第i台风力发电机组在t时刻的发电无功功率,Qn(t-1)为t-1时刻的并网点无功功率;
其中,n为t时刻正发电的风力发电机组数目,m为t-1时刻正发电的风力发电机组数目,l为t-2时刻正发电的风力发电机组数目,Ka为有功可靠系数,其取值为5,Kaq为无功可靠系数,其取值为7;
3)计算t时刻的有功控制信号累计值及无功控制信号累计值,具体计算公式为:
AD Jp ( t ) = Σ i = 0 T - 1 P sign ( t - i ) ;
AD Jp ( t ) = Σ i = 0 T - 1 Q sign ( t - i ) ;
其中,ADJp(t)为t时刻的有功控制信号累计值,Psign(t-i)为t-i时刻的有功控制信号,Psign(0)=0,Psign(1)=0,如果t时刻Bpcon<1,则令Psign(t)=1,反之则令Psign(t)=0;
其中,ADJq(t)为t时刻的无功控制信号累计值,Qsign(t-i)为t-i时刻的无功控制信号,Qsign(0)=0,Qsign(1)=0,如果t时刻Bqcon<1,则令Qsign(t)=1,反之则令Qsign(t)=0;
其中,T为延迟时间常数,其取值为10;
4)根据ADJp(t)、ADJq(t)协调控制指令,具体协调控制方式为:
方式1:如果ADJp(t)=T,则发出减少控制风机有功功率指令,并转至步骤5);
方式2:如果ADJq(t)=T,则发出减少控制风机无功功率指令,并转至步骤5);
方式3:如果ADJp(t)=0,则发出增大控制风机有功功率指令,并转至步骤6);
方式4:如果ADJq(t)=0,则发出增大控制风机无功功率指令,并转至步骤6);
方式5:如果0<ADJp(t)<T并且0<ADJq(t)<T,则转至步骤7);
其中,t时刻的协调控制仅调整一次,如果从有功和无功得出相反判断,则优先减少风机出力,即协调控制方式的优先级别从高至低依次分别为方式1、方式2、方式3、方式4、方式5;
5)先计算t时刻各风力发电机组发电功率减少值,再转至步骤7),具体计算公式为:
Pgax ( t , i ) = - 2 ( Pcap ( i ) - Pg ( t , i ) ) &times; ( &Sigma; i = 1 n Pg ( t , i ) - 2 ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) / 3 - ( &Sigma; i = 1 l Pg ( t - 2 , i ) + Pn ( t - 2 ) ) / 3 ) Ka &times; &Sigma; i = 1 n ( Pcap ( i ) - Pg ( t , i ) ) ;
Qgax ( t , i ) = ( Qcap ( i ) - Qg ( t , i ) ) &times; Qn ( t - 1 ) Kaq &times; &Sigma; i = 1 n ( Qcap ( i ) - Qg ( t , i ) ) ;
约束条件为:
Pg ( t , i ) - Pgax ( t , i ) - Pg min ( i ) > 0 Qg ( t , i ) - Qgax ( t , i ) - Qg min ( i ) > 0 ;
如果第i个风力发电机组不满足任一约束条件,则令第i个风力发电机组停机,并将t时刻正发电的风力发电机组数目n减少1;
其中,Pgax(t,i)为第i个风力发电机组在t时刻的有功发电功率减少值,Pcap(i)为第i个风力发电机组的有功容量,Qgax(t,i)为第i个风力发电机组在t时刻的无功发电功率减少值,Qcap(i)为第i个风力发电机组的无功容量,Pgmin(i)为第i个风力发电机组的发电最小有功值,Qgmin(i)为第i个风力发电机组的发电最小无功值;
6)先计算t时刻各风力发电机组的发电功率增加值,再转至步骤7),具体计算公式为:
Pgay ( t , i ) = ( Pcap ( i ) - Pg ( t , i ) ) &times; ( &Sigma; i = 1 n Pg ( t , i ) + Pn ( t ) ) 2 &times; Ka &times; ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) ;
Qgay ( t , i ) = ( Qcap ( i ) - Qg ( t , i ) ) &times; ( &Sigma; i = 1 n Qg ( t , i ) + Qn ( t ) ) 2 &times; Kaq &times; ( &Sigma; i = 1 m Qg ( t - 1 , i ) + Qn ( t - 1 ) ) ;
约束必须满足如下:
Pg ( t , i ) - Pgay ( t , i ) - Pg max ( i ) < 0 Qg ( t , i ) - Qgay ( t , i ) - Qg max ( i ) < 0 ;
如果第i个风力发电机组不满足任一约束条件,则对第i个风力发电机组不作调节,如果所有风力发电机组均不作调节,则增开一台新的风力发电机组,且该风力发电机组按照最小有功及最小无功发电,并将t时刻正发电的风力发电机组数目n增加1;
其中,Pgay(t,i)为第i个风力发电机组在t时刻的有功发电功率增加值,Pcap(i)为第i个风力发电机组的有功容量,Pn(t)为t时刻的并网点有功功率,Qgay(t,i)为第i个风力发电机组在t时刻的无功发电功率减少值,Qcap(i)为第i个风力发电机组的无功容量,Qn(t)为t时刻的并网点无功功率,Qg(t-1,i)为第i台风力发电机组在t-1时刻的发电无功功率,Pgmax(i)为第i个风力发电机组在t时刻风速下的发电最大有功值,Qgmax(i)为第i个风力发电机组在t时刻风速下的发电最大无功值;
7)等待一个单位时长的时间,再返回步骤1)。
本发明提供的并网非上网分布式风力发电机组协调控制方法,采用有功、无功解耦非线性分配方式,进行发电量协调控制,考虑了负载功率变化,并采用可靠系数进行修正,能够快速准确的协调风电机组的发电量,可降低投资成本。
附图说明
图1是本发明实施例的并网非上网分布式风力发电机组协调控制方法的控制流程图。
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述,但本实施例并不用于限制本发明,凡是采用本发明的相似结构及其相似变化,均应列入本发明的保护范围。
如图1所示,本发明实施例所提供的一种并网非上网分布式风力发电机组协调控制方法,其特征在于:
1)获取每台受控风力机组的发电容量、t时刻风速,并获取每台受控风力机组分别在t时刻、t-1时刻、t-2时刻的风机发电功率及并网点的功率,功率方向规定为:电网注入并网母线为正,并网母线注入电网为负,风力发电机注入并网母线为正,并网母线注入风力发电机为负;
其中,t≥2,t时刻为当前时刻,t-1时刻、t-2时刻均为t时刻之前的时刻,t-1时刻距t时刻1个单位时长,t-2时刻距t时刻2个单位时长,单位时长的取值为1分钟;
2)计算t时刻的协调控制有功状态量及无功状态量,具体计算公式为:
Bpcon = - Ka &times; ( &Sigma; i = 1 n P g ( t , i ) - 2 ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) / 3 - ( &Sigma; i = 1 l Pg ( t - 2 , i ) + Pn ( t - 2 ) ) / 3 ) ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) ;
Bqcon = 2 &times; Kaq &times; Q n ( t - 1 ) ( &Sigma; i = 1 n Qg ( t , i ) )
其中,Bpcon为t时刻的协调控制有功状态量,Pg(t,i)为第i台风力发电机组在t时刻的发电有功功率,Pg(t-1,i)为第i台风力发电机组在t-1时刻的发电有功功率,Pg(t-2,i)为第i台风力发电机组在t-2时刻的发电有功功率,Pn(t-1)为t-1时刻的并网点有功功率,Pn(t-2)为t-2时刻的并网点有功功率;
其中,Bqcon为t时刻的协调控制无功状态量,Qg(t,i)为第i台风力发电机组在t时刻的发电无功功率,Qn(t-1)为t-1时刻的并网点无功功率;
其中,n为t时刻正发电的风力发电机组数目,m为t-1时刻正发电的风力发电机组数目,l为t-2时刻正发电的风力发电机组数目,Ka为有功可靠系数,其取值为5,Kaq为无功可靠系数,其取值为7;
3)计算t时刻的有功控制信号累计值及无功控制信号累计值,具体计算公式为:
AD Jp ( t ) = &Sigma; i = 0 T - 1 P sign ( t - i ) ;
AD Jp ( t ) = &Sigma; i = 0 T - 1 Q sign ( t - i ) ;
其中,ADJp(t)为t时刻的有功控制信号累计值,Psign(t-i)为t-i时刻的有功控制信号,Psign(0)=0,Psign(1)=0,如果t时刻Bpcon<1,则令Psign(t)=1,反之则令Psign(t)=0;
其中,ADJq(t)为t时刻的无功控制信号累计值,Qsign(t-i)为t-i时刻的无功控制信号,Qsign(0)=0,Qsign(1)=0,如果t时刻Bqcon<1,则令Qsign(t)=1,反之则令Qsign(t)=0;
其中,T为延迟时间常数,其取值为10;
4)根据ADJp(t)、ADJq(t)协调控制指令,具体协调控制方式为:
方式1:如果ADJp(t)=T,则发出减少控制风机有功功率指令,并转至步骤5);
方式2:如果ADJq(t)=T,则发出减少控制风机无功功率指令,并转至步骤5);
方式3:如果ADJp(t)=0,则发出增大控制风机有功功率指令,并转至步骤6);
方式4:如果ADJq(t)=0,则发出增大控制风机无功功率指令,并转至步骤6);
方式5:如果0<ADJp(t)<T并且0<ADJq(t)<T,则转至步骤7);
其中,t时刻的协调控制仅调整一次,如果从有功和无功得出相反判断,则优先减少风机出力,即协调控制方式的优先级别从高至低依次分别为方式1、方式2、方式3、方式4、方式5;
5)先计算t时刻各风力发电机组发电功率减少值,再转至步骤7),具体计算公式为:
Pgax ( t , i ) = - 2 ( Pcap ( i ) - Pg ( t , i ) ) &times; ( &Sigma; i = 1 n Pg ( t , i ) - 2 ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) / 3 - ( &Sigma; i = 1 l Pg ( t - 2 , i ) + Pn ( t - 2 ) ) / 3 ) Ka &times; &Sigma; i = 1 n ( Pcap ( i ) - Pg ( t , i ) ) ;
Qgax ( t , i ) = ( Qcap ( i ) - Qg ( t , i ) ) &times; Qn ( t - 1 ) Kaq &times; &Sigma; i = 1 n ( Qcap ( i ) - Qg ( t , i ) ) ;
约束条件为:
Pg ( t , i ) - Pgax ( t , i ) - Pg min ( i ) > 0 Qg ( t , i ) - Qgax ( t , i ) - Qg min ( i ) > 0 ;
如果第i个风力发电机组不满足任一约束条件,则令第i个风力发电机组停机,并将t时刻正发电的风力发电机组数目n减少1;
其中,Pgax(t,i)为第i个风力发电机组在t时刻的有功发电功率减少值,Pcap(i)为第i个风力发电机组的有功容量,Qgax(t,i)为第i个风力发电机组在t时刻的无功发电功率减少值,Qcap(i)为第i个风力发电机组的无功容量,Pgmin(i)为第i个风力发电机组的发电最小有功值,Qgmin(i)为第i个风力发电机组的发电最小无功值;
6)先计算t时刻各风力发电机组的发电功率增加值,再转至步骤7),具体计算公式为:
Pgay ( t , i ) = ( Pcap ( i ) - Pg ( t , i ) ) &times; ( &Sigma; i = 1 n Pg ( t , i ) + Pn ( t ) ) 2 &times; Ka &times; ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) ;
Qgay ( t , i ) = ( Qcap ( i ) - Qg ( t , i ) ) &times; ( &Sigma; i = 1 n Qg ( t , i ) + Qn ( t ) ) 2 &times; Kaq &times; ( &Sigma; i = 1 m Qg ( t - 1 , i ) + Qn ( t - 1 ) ) ;
约束必须满足如下:
Pg ( t , i ) - Pgay ( t , i ) - Pg max ( i ) < 0 Qg ( t , i ) - Qgay ( t , i ) - Qg max ( i ) < 0 ;
如果第i个风力发电机组不满足任一约束条件,则对第i个风力发电机组不作调节,如果所有风力发电机组均不作调节,则增开一台新的风力发电机组,且该风力发电机组按照最小有功及最小无功发电,并将t时刻正发电的风力发电机组数目n增加1;
其中,Pgay(t,i)为第i个风力发电机组在t时刻的有功发电功率增加值,Pcap(i)为第i个风力发电机组的有功容量,Pn(t)为t时刻的并网点有功功率,Qgay(t,i)为第i个风力发电机组在t时刻的无功发电功率减少值,Qcap(i)为第i个风力发电机组的无功容量,Qn(t)为t时刻的并网点无功功率,Qg(t-1,i)为第i台风力发电机组在t-1时刻的发电无功功率,Pgmax(i)为第i个风力发电机组在t时刻风速下的发电最大有功值,Qgmax(i)为第i个风力发电机组在t时刻风速下的发电最大无功值;
7)等待一个单位时长(1分钟)的时间,再返回步骤1)。
本发明实施例中,任一风力发电机组的Pgmin(i)、Qgmin(i)、Pcap(i)、Qcap(i)可根据风力发电机组的运行参数确定,并网点功率和发电功率可通过风力发电站的能源管理系统获得,Pgmax(i)、Qgmax(i)可根据风力发电机组的风机发电功率-风速曲线获得。

Claims (1)

1.一种并网非上网分布式风力发电机组协调控制方法,其特征在于:
1)获取每台受控风力机组的发电容量、t时刻风速,并获取每台受控风力机组分别在t时刻、t-1时刻、t-2时刻的风机发电功率及并网点的功率,功率方向规定为:电网注入并网母线为正,并网母线注入电网为负,风力发电机注入并网母线为正,并网母线注入风力发电机为负;
其中,t≥2,t时刻为当前时刻,t-1时刻、t-2时刻均为t时刻之前的时刻,t-1时刻距t时刻1个单位时长,t-2时刻距t时刻2个单位时长,单位时长的取值为1分钟;
2)计算t时刻的协调控制有功状态量及无功状态量,具体计算公式为:
Bpcon = - Ka &times; ( &Sigma; i = 1 n Pg ( t , i ) - 2 ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) / 3 - ( &Sigma; i = 1 l Pg ( t - 2 , i ) + Pn ( t - 2 ) ) / 3 ) ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) ;
Bqcon = 2 &times; Kaq &times; Qn ( t - 1 ) ( &Sigma; i = 1 n Qg ( t , i ) )
其中,Bpcon为t时刻的协调控制有功状态量,Pg(t,i)为第i台风力发电机组在t时刻的发电有功功率,Pg(t-1,i)为第i台风力发电机组在t-1时刻的发电有功功率,Pg(t-2,i)为第i台风力发电机组在t-2时刻的发电有功功率,Pn(t-1)为t-1时刻的并网点有功功率,Pn(t-2)为t-2时刻的并网点有功功率;
其中,Bqcon为t时刻的协调控制无功状态量,Qg(t,i)为第i台风力发电机组在t时刻的发电无功功率,Qn(t-1)为t-1时刻的并网点无功功率;
其中,n为t时刻正发电的风力发电机组数目,m为t-1时刻正发电的风力发电机组数目,l为t-2时刻正发电的风力发电机组数目,Ka为有功可靠系数,其取值为5,Kaq为无功可靠系数,其取值为7;
3)计算t时刻的有功控制信号累计值及无功控制信号累计值,具体计算公式为:
ADJp ( t ) = &Sigma; i = 0 T - 1 Psign ( t - i ) ;
ADJq ( t ) = &Sigma; i = 0 T - 1 Qsign ( t - i ) ;
其中,ADJp(t)为t时刻的有功控制信号累计值,Psign(t-i)为t-i时刻的有功控制信号,Psign(0)=0,Psign(1)=0,如果t时刻Bpcon<1,则令Psign(t)=1,反之则令Psign(t)=0;
其中,ADJq(t)为t时刻的无功控制信号累计值,Qsign(t-i)为t-i时刻的无功控制信号,Qsign(0)=0,Qsign(1)=0,如果t时刻Bqcon<1,则令Qsign(t)=1,反之则令Qsign(t)=0;
其中,T为延迟时间常数,其取值为10;
4)根据ADJp(t)、ADJq(t)协调控制指令,具体协调控制方式为:
方式1:如果ADJp(t)=T,则发出减少控制风机有功功率指令,并转至步骤5);
方式2:如果ADJq(t)=T,则发出减少控制风机无功功率指令,并转至步骤5);
方式3:如果ADJp(t)=0,则发出增大控制风机有功功率指令,并转至步骤6);
方式4:如果ADJq(t)=0,则发出增大控制风机无功功率指令,并转至步骤6);
方式5:如果0<ADJp(t)<T并且0<ADJq(t)<T,则转至步骤7);
其中,t时刻的协调控制仅调整一次,如果从有功和无功得出相反判断,则优先减少风机出力,即协调控制方式的优先级别从高至低依次分别为方式1、方式2、方式3、方式4、方式5;
5)先计算t时刻各风力发电机组发电功率减少值,再转至步骤7),具体计算公式为:
Pgax ( t , i ) = - 2 ( Pcap ( i ) - Pg ( t , i ) ) &times; ( &Sigma; i = 1 n Pg ( t , i ) - 2 ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) / 3 - ( &Sigma; i = 1 l Pg ( t - 2 , i ) + Pn ( t - 2 ) ) / 3 ) Ka &times; &Sigma; i = 1 n ( Pcap ( i ) - Pg ( t , i ) ) ;
Qgax ( t , i ) = ( Qcap ( i ) - Qg ( t , i ) ) &times; Qn ( t - 1 ) Kaq &times; &Sigma; i = 1 n ( Qcap ( i ) - Qg ( t , i ) ) ;
约束条件为:
Pg ( t , i ) - Pgax ( t , i ) - Pg min ( i ) > 0 Qg ( t , i ) - Qgax ( t , i ) - Qg min ( i ) > 0 ;
如果第i个风力发电机组不满足任一约束条件,则令第i个风力发电机组停机,并将t时刻正发电的风力发电机组数目n减少1;
其中,Pgax(t,i)为第i个风力发电机组在t时刻的有功发电功率减少值,Pcap(i)为第i个风力发电机组的有功容量,Qgax(t,i)为第i个风力发电机组在t时刻的无功发电功率减少值,Qcap(i)为第i个风力发电机组的无功容量,Pgmin(i)为第i个风力发电机组的发电最小有功值,Qgmin(i)为第i个风力发电机组的发电最小无功值;
6)先计算t时刻各风力发电机组的发电功率增加值,再转至步骤7),具体计算公式为:
Pgay ( t , i ) = ( Pcap ( i ) - Pg ( t , i ) ) &times; ( &Sigma; i = 1 n Pg ( t , i ) + Pn ( t ) ) 2 &times; Ka &times; ( &Sigma; i = 1 m Pg ( t - 1 , i ) + Pn ( t - 1 ) ) ;
Qgay ( t , i ) = ( Qcap ( i ) - Qg ( t , i ) ) &times; ( &Sigma; i = 1 n Qg ( t , i ) + Qn ( t ) ) 2 &times; Kaq &times; ( &Sigma; i = 1 m Qg ( t - 1 , i ) + Qn ( t - 1 ) ) ;
约束必须满足如下:
Pg ( t , i ) + Pgay ( t , i ) - Pg max ( i ) < 0 Qg ( t , i ) + Qgay ( t , i ) - Qg max ( i ) < 0 ;
如果第i个风力发电机组不满足任一约束条件,则对第i个风力发电机组不作调节,如果所有风力发电机组均不作调节,则增开一台新的风力发电机组,且该风力发电机组按照最小有功及最小无功发电,并将t时刻正发电的风力发电机组数目n增加1;
其中,Pgay(t,i)为第i个风力发电机组在t时刻的有功发电功率增加值,Pcap(i)为第i个风力发电机组的有功容量,Pn(t)为t时刻的并网点有功功率,Qgay(t,i)为第i个风力发电机组在t时刻的无功发电功率减少值,Qcap(i)为第i个风力发电机组的无功容量,Qn(t)为t时刻的并网点无功功率,Qg(t-1,i)为第i台风力发电机组在t-1时刻的发电无功功率,Pgmax(i)为第i个风力发电机组在t时刻风速下的发电最大有功值,Qgmax(i)为第i个风力发电机组在t时刻风速下的发电最大无功值;
7)等待一个单位时长的时间,再返回步骤1)。
CN201410663838.9A 2014-11-19 2014-11-19 并网非上网分布式风力发电机组协调控制方法 Expired - Fee Related CN104377728B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410663838.9A CN104377728B (zh) 2014-11-19 2014-11-19 并网非上网分布式风力发电机组协调控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410663838.9A CN104377728B (zh) 2014-11-19 2014-11-19 并网非上网分布式风力发电机组协调控制方法

Publications (2)

Publication Number Publication Date
CN104377728A true CN104377728A (zh) 2015-02-25
CN104377728B CN104377728B (zh) 2017-02-08

Family

ID=52556461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410663838.9A Expired - Fee Related CN104377728B (zh) 2014-11-19 2014-11-19 并网非上网分布式风力发电机组协调控制方法

Country Status (1)

Country Link
CN (1) CN104377728B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106374525A (zh) * 2016-09-14 2017-02-01 国网天津市电力公司 一种分布式电源电压调节能力估算系统及其估算方法
CN112952893B (zh) * 2019-11-26 2022-09-23 北京金风科创风电设备有限公司 风电机组的无功功率控制方法、装置以及风电场

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080150283A1 (en) * 2006-12-22 2008-06-26 Ingeteam, S.A. Reactive power control for operating a wind farm
CN101931241A (zh) * 2010-09-21 2010-12-29 许继集团有限公司 风电场并网协调控制方法
CN102856925A (zh) * 2012-09-03 2013-01-02 北京科诺伟业科技有限公司 一种风电场功率综合分配方法
JP2013162623A (ja) * 2012-02-03 2013-08-19 Toshiba Corp 給電システム
CN103346577A (zh) * 2013-07-11 2013-10-09 国家电网公司 降低风电场功率损耗的风电场avc无功控制系统及方法
EP2722521A2 (en) * 2012-10-16 2014-04-23 Kabushiki Kaisha Toshiba Power output control device, method and program for wind farm

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080150283A1 (en) * 2006-12-22 2008-06-26 Ingeteam, S.A. Reactive power control for operating a wind farm
CN101931241A (zh) * 2010-09-21 2010-12-29 许继集团有限公司 风电场并网协调控制方法
JP2013162623A (ja) * 2012-02-03 2013-08-19 Toshiba Corp 給電システム
CN102856925A (zh) * 2012-09-03 2013-01-02 北京科诺伟业科技有限公司 一种风电场功率综合分配方法
EP2722521A2 (en) * 2012-10-16 2014-04-23 Kabushiki Kaisha Toshiba Power output control device, method and program for wind farm
CN103346577A (zh) * 2013-07-11 2013-10-09 国家电网公司 降低风电场功率损耗的风电场avc无功控制系统及方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106374525A (zh) * 2016-09-14 2017-02-01 国网天津市电力公司 一种分布式电源电压调节能力估算系统及其估算方法
CN106374525B (zh) * 2016-09-14 2019-07-05 国网天津市电力公司 一种分布式电源电压调节能力估算系统及其估算方法
CN112952893B (zh) * 2019-11-26 2022-09-23 北京金风科创风电设备有限公司 风电机组的无功功率控制方法、装置以及风电场

Also Published As

Publication number Publication date
CN104377728B (zh) 2017-02-08

Similar Documents

Publication Publication Date Title
CN103986190B (zh) 基于发电功率曲线的风光储联合发电系统平滑控制方法
CN104795846A (zh) 一种抽水蓄能电站与风电的联合系统的优化运行方法
CN102684201B (zh) 一种基于电压越限概率的含风电场电网无功优化方法
CN107546763B (zh) 不同调压策略下配电网中光伏发电最大接纳能力计算方法
CN102664422B (zh) 一种利用储能系统平滑风电场输出功率的方法
CN103545848B (zh) 光伏电站群有功功率协调控制方法
CN104578086A (zh) 一种风电和光伏发电接入电网的无功电压控制方法
CN104037792B (zh) 一种用水电和储能平抑风光功率波动的控制方法
JP2020022241A (ja) ハイブリッド発電システム及び電力制御装置
CN109378856A (zh) 基于滚动优化的风-储混合电站功率波动平抑策略与模拟方法
CN105243230B (zh) 一种计及卸荷电路的直驱风电场的等值建模方法
CN103928924A (zh) 计及有功功率变化最大值的风电场有功功率优化控制方法
CN104333049B (zh) 一种风电有功功率控制分配方法及系统
CN106099991A (zh) 一种电网风电消纳能力评估方法
CN105375524A (zh) 一种风火打捆直流送出送端电网运行控制方法
KR20160107877A (ko) 풍력발전단지에서의 배터리 에너지 저장 시스템에 기반한 풍력 발전 변동의 평활화 방법
CN103972921B (zh) 一种基于功率平衡的永磁同步风电场低电压穿越协调控制方法
CN107069797B (zh) 一种含双馈型风力发电机的分散式风电场并网方法
CN104377728A (zh) 并网非上网分布式风力发电机组协调控制方法
CN102332730B (zh) 可再生能源发电出力控制方法和系统
Altimania Modeling of doubly-fed induction generators connected to distribution system based on eMEGASim® real-time digital simulator
CN109617140A (zh) 一种大型水电机组调速器参数优化方法
Cong et al. Study on peak shaving strategy of pumped storage power station combined with wind and photovoltaic power generation
Yao et al. Coordinated Frequency Support and Wind Turbine Preset Restoration Scheme of VSC-MTDC Integrated Offshore Wind Farms
Xi et al. Adaptive vsg control of pmsg based wecs for grid frequency response

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200428

Address after: 201404 room 522, building 1, No.228, Jinqian Road, Fengxian District, Shanghai

Patentee after: Shanghai Yuguang Information Technology Co., Ltd

Address before: 200233, building 14, building 470, No. 4, Guiping Road, Shanghai, Xuhui District

Patentee before: SHANGHAI SUNRISE POWER TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20201119

CF01 Termination of patent right due to non-payment of annual fee