CN104375501A - Substation area protection adjusting method for intelligent substation - Google Patents

Substation area protection adjusting method for intelligent substation Download PDF

Info

Publication number
CN104375501A
CN104375501A CN201410636385.0A CN201410636385A CN104375501A CN 104375501 A CN104375501 A CN 104375501A CN 201410636385 A CN201410636385 A CN 201410636385A CN 104375501 A CN104375501 A CN 104375501A
Authority
CN
China
Prior art keywords
debugging
territory
substation
test
area protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410636385.0A
Other languages
Chinese (zh)
Inventor
于海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Transmission and Transformation Engineering Corp filed Critical State Grid Corp of China SGCC
Priority to CN201410636385.0A priority Critical patent/CN104375501A/en
Publication of CN104375501A publication Critical patent/CN104375501A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a substation area protection adjusting method for an intelligent substation. The substation area protection adjusting method for the intelligent substation includes the specific adjusting steps that (1), a substation area protection monomer device is adjusted, and (2), a substation area protection subsystem is adjusted, wherein firstly a communication network system is adjusted, and the adjustment process includes communication network physical link testing, VLAN partition and isolation testing and network overall performance testing; secondly, a clock synchronization system is adjusted; thirdly, substation area protection whole-set driving testing is carried out and includes sampling value testing, protection whole-set driving and whole-set driving adjustment; fourthly, a monitor system is adjusted. The adjusting method is obtained by combination with an adjustment experience of practical engineering of a new generation of 110 kV intelligent substations in the Tianjin high-tech park, summary of the overall processes of substation area protection adjustment, and analysis of related key technical issues, and has extremely high operability and practicability.

Description

A kind of territory, intelligent substation station protective debugging method
Technical field
The invention belongs to intelligent substation debugging efforts, territory, especially a kind of intelligent substation station protective debugging method.
Background technology
Along with carrying out of State Grid Corporation of China's intelligent grid construction, intelligent substation also obtains tremendous development as the important component part of intelligent grid and key link.Normal procedure intelligent transformer station development and application is in recent years more extensive and ripe, and High-tech Park, the Tianjin 110kV New Generation of Intelligent transformer station etc. of pilot presents new feature, new technology, as territory, the station defencive function etc. in stratification protection system in the recent period.This just requires that electrical secondary system commissioning staff will grasp new feature, the new technology of New Generation of Intelligent transformer station in time, the debugging technique that research is applicable to New Generation of Intelligent transformer station just can carry out debugging efforts, thus ensure New Generation of Intelligent transformer station and power network safety operation at different levels, therefore to meet the related commissioning method and technology of New Generation of Intelligent transformer station just extremely urgent for research and probe.At present, territory protective debugging technology of standing still is in the starting stage, and most of professional commissioning staff understands less, more without overall specification and the flow process of related commissioning technology to territory, station protection concept and adjustment method.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, territory, a kind of intelligent substation station protective debugging method is provided.
The present invention solves its technical matters and takes following technical scheme to realize:
A kind of territory, intelligent substation station protective debugging method, is characterized in that: concrete debugging step is:
(1) territory protection monomer unit of standing is debugged, protective device monomer debugging efforts must be carried out before subsystem debugging, to verify the function of monomer protective device, monomer unit comprise to station territory protect relevant merging intelligent cell, stand territory protective device, fault wave recording device and network analyzer;
(2) territory protection subsystem of standing debugging, comprises successively:
1. communications network system debugging, comprises the test of communication network physical link, VLAN division and isolation test and network synthesis performance test;
2. clock system debugging;
3. whole group of transmission test is protected in territory, station, comprises sampled value test, protects whole group of transmission and whole group of transmission debugging;
4. supervisory system debugging.
And it is invalid that described sampled value test uses digital relay protection tester to be set to the quality position of partial data passage in sampled value by different frequencies, and the situation that quality position is invalid appears in the sampled value that hypothetical mergers unit sends.
And; described sampled value test uses the partial data of a wherein road sampled value in digital relay protection tester simulation double A/D to distort; and its quality position is effective, simulation distortion numerical value reduces or is increased to be greater than protection definite value respectively, checking protective device functional realiey situation.
Advantage of the present invention and good effect are:
1, the present invention is according to practical engineering experience; study the overall flow of a set of intelligent substation station territory protective debugging work summed up; by have studied key issue in each subsystem debug process; and propose relevant solution, for the work of New Generation of Intelligent substation areas of transformer station protective debugging provides way.
2, the present invention is in conjunction with the commissioning experience of High-tech Park, Tianjin 110kV New Generation of Intelligent transformer station Practical Project, summarizes territory, station protective debugging overall flow, analyzes the adjustment method that relevant key technical problem draws, have very strong operability and practicality.
Embodiment
Below by specific embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of territory, intelligent substation station protective debugging method, concrete debugging step is:
(1) territory protection monomer unit of standing is debugged, protective device monomer debugging efforts must be carried out before subsystem debugging, to verify the function of monomer protective device, monomer unit comprise to station territory protect relevant merging intelligent cell, stand territory protective device, fault wave recording device and network analyzer;
(2) territory protection subsystem of standing debugging, comprises successively:
1. communications network system debugging, comprises the test of communication network physical link, VLAN division and isolation test and network synthesis performance test;
2. clock system debugging;
3. whole group of transmission test is protected in territory, station, and comprise sampled value test, protect whole group of transmission and whole group of transmission debugging, wherein, the impact of sampled value test result on relay protective scheme has following 2 points:
The invalid impact on relay protective scheme in a sampled value quality position; the accumulated quantity of sampled value quality position invalidated identification at the appointed time in scope or frequency exceed protection allowed band; relevant defencive function answers instantaneous reliable locking; should normally drop into the defencive function that this exception is irrelevant; sampled value is recovered normally, and the defencive function be blocked should opening in time.Digital relay protection tester can be used during test to be set to the quality position of partial data passage in sampled value by different frequencies invalid, there is the situation that quality position is invalid in the sampled value that hypothetical mergers unit sends.
The impact of b sampled value distortion on relay protective scheme, generally has double A/D converter, to increase the reliability of protective device in the protection of territory, station and other protective devices.Require in double A/D sampled data in relay protective scheme, when wherein distortion appears in a road sample values, relevant defencive function answers locking.
Use the partial data of a wherein road sampled value in digital relay protection tester simulation double A/D to distort during test, and its quality position is effective, simulation distortion numerical value reduces or is increased to be greater than protection definite value respectively, checking protective device functional realiey situation.
4. supervisory system debugging.
Protective relaying device maintenance mechanism test in native system is mainly comprised:
A, protective device GOOSE and MMS message maintenance quality correctly should be able to reflect that the throwing of protective device maintenance pressing plate is moved back;
B, only when maintenance quality and this turnaround of unit state consistency of the SV message received, SV message is participation protective logic, the defencive function otherwise locking is correlated with;
C, only when the GOOSE message maintenance quality received and this turnaround of unit state consistency, GOOSE message just participates in this device logic, otherwise also locking is correlated with defencive function.
Mainly following methods is used in test process:
A, controlling the maintenance quality of itself GOOSE and MMS message by throwing surrender protection unit maintenance pressing plate, determining the correctness of overhauling quality by message analysis instrument.
Debugging plan before b, use carries out the test of SV, GOOSE maintenance mechanism; permutation and combination analysis is carried out to all secondary devices associated therewith; move back state by the various throwing of combination maintenance pressing plate, and verify the correctness of protective device, merging intelligent cell maintenance cooperation mechanism.
Although disclose embodiments of the invention for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope not departing from the present invention and claims, various replacement, change and amendment are all possible, therefore, scope of the present invention is not limited to the content disclosed in embodiment and accompanying drawing.

Claims (3)

1. territory, an intelligent substation station protective debugging method, is characterized in that: concrete debugging step is:
(1) territory protection monomer unit of standing is debugged, protective device monomer debugging efforts must be carried out before subsystem debugging, to verify the function of monomer protective device, monomer unit comprise to station territory protect relevant merging intelligent cell, stand territory protective device, fault wave recording device and network analyzer;
(2) territory protection subsystem of standing debugging, comprises successively:
1. communications network system debugging, comprises the test of communication network physical link, VLAN division and isolation test and network synthesis performance test;
2. clock system debugging;
3. whole group of transmission test is protected in territory, station, comprises sampled value test, protects whole group of transmission and whole group of transmission debugging;
4. supervisory system debugging.
2. territory, intelligent substation station according to claim 1 protective debugging method; it is characterized in that: it is invalid that described sampled value test uses digital relay protection tester to be set to the quality position of partial data passage in sampled value by different frequencies, and the situation that quality position is invalid appears in the sampled value that hypothetical mergers unit sends.
3. territory, intelligent substation station according to claim 1 protective debugging method; it is characterized in that: described sampled value test uses the partial data of a wherein road sampled value in digital relay protection tester simulation double A/D to distort; and its quality position is effective; simulation distortion numerical value reduces or is increased to be greater than protection definite value respectively, checking protective device functional realiey situation.
CN201410636385.0A 2014-11-06 2014-11-06 Substation area protection adjusting method for intelligent substation Pending CN104375501A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410636385.0A CN104375501A (en) 2014-11-06 2014-11-06 Substation area protection adjusting method for intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410636385.0A CN104375501A (en) 2014-11-06 2014-11-06 Substation area protection adjusting method for intelligent substation

Publications (1)

Publication Number Publication Date
CN104375501A true CN104375501A (en) 2015-02-25

Family

ID=52554496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410636385.0A Pending CN104375501A (en) 2014-11-06 2014-11-06 Substation area protection adjusting method for intelligent substation

Country Status (1)

Country Link
CN (1) CN104375501A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104935079A (en) * 2015-06-05 2015-09-23 天津送变电工程公司 Station-domain protection system of intelligent transformer station and function debugging method of system
CN105226823A (en) * 2015-10-22 2016-01-06 南京国电南自电网自动化有限公司 Territory, a kind of station O&M support platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08106379A (en) * 1994-10-04 1996-04-23 Meidensha Corp Basic language processor
CN102901881A (en) * 2011-07-26 2013-01-30 上海市电力公司 On-site debugging method for digital substation
CN103235277A (en) * 2013-03-29 2013-08-07 国家电网公司 Integration adjusting device for online monitoring system of intelligent converting station capacitive device
CN103308811A (en) * 2013-06-27 2013-09-18 国家电网公司 Debugging device for substation subsystem of the voltage of 750 kilovolts

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08106379A (en) * 1994-10-04 1996-04-23 Meidensha Corp Basic language processor
CN102901881A (en) * 2011-07-26 2013-01-30 上海市电力公司 On-site debugging method for digital substation
CN103235277A (en) * 2013-03-29 2013-08-07 国家电网公司 Integration adjusting device for online monitoring system of intelligent converting station capacitive device
CN103308811A (en) * 2013-06-27 2013-09-18 国家电网公司 Debugging device for substation subsystem of the voltage of 750 kilovolts

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王进虎等: "新一代智能变电站站域保护调试技术研究", 《电力信息与通信技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104935079A (en) * 2015-06-05 2015-09-23 天津送变电工程公司 Station-domain protection system of intelligent transformer station and function debugging method of system
CN105226823A (en) * 2015-10-22 2016-01-06 南京国电南自电网自动化有限公司 Territory, a kind of station O&M support platform
CN105226823B (en) * 2015-10-22 2017-07-25 南京国电南自电网自动化有限公司 One kind station domain O&M support platform

Similar Documents

Publication Publication Date Title
CN104935079A (en) Station-domain protection system of intelligent transformer station and function debugging method of system
WO2016090934A1 (en) Simulation test device for mutual inductor of lte wireless communication intelligent substation
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN104539473B (en) Intelligent substation network virtual secondary circuit whole group of method of calibration and system
CN102332709B (en) Equivalent high-voltage direct-current transmission direct-current protection digital simulation method and system
CN205354423U (en) Intelligent substation emulation training system
CN105159273A (en) System testing method of power grid distributed stability control devices
CN104166399A (en) Moving die simulation test system and method for intelligent substation protection device
CN102621512B (en) Dynamic simulation test method for timekeeping performance of merging unit
CN107741549A (en) The intelligent substation synchronism tester synchronously occurred based on analog quantity and digital quantity
CN105467277A (en) Power distribution network mixed fault range finding method and device based on PMUs
CN111800313B (en) Method for testing message output performance of digital relay protection tester
CN105470935A (en) Defect security isolation and auxiliary decision-making method for intelligent substation relay protection equipment
CN101799504B (en) Method for testing influence of distortion data on relay protection device
CN103094986B (en) Distributed detection method of intelligent substation relay protection devices based on digital dynamic real time simulator (DDRTS)
CN104375501A (en) Substation area protection adjusting method for intelligent substation
CN103346497A (en) Intelligent substation electrical virtual circuit isolation method and system
CN103995227B (en) The planned state test method of distribution switch
CN103558466A (en) Method for on-line whole group logic calibration of 10kV protecting device
CN201230204Y (en) Logic test device for microcomputer type protection monitoring module in power supply and distribution system
CN104601220A (en) LTE (Long Term Evolution) wireless communication intelligent substation test device
CN102508052B (en) Test method for field band channel operation of automatic bus transfer system of area network
Ivanković et al. Modeling 400 kV transmission grid with system protection and disturbance analysis
CN106655508A (en) New remote checking method for transformer substation monitoring system improvement
CN109193616A (en) A kind of substation's telecontrol information distribution acceptance method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150225