CN104375056A - Substation cable outgoing line fault monitoring method based on voltage and current initial row waves - Google Patents

Substation cable outgoing line fault monitoring method based on voltage and current initial row waves Download PDF

Info

Publication number
CN104375056A
CN104375056A CN201410602560.4A CN201410602560A CN104375056A CN 104375056 A CN104375056 A CN 104375056A CN 201410602560 A CN201410602560 A CN 201410602560A CN 104375056 A CN104375056 A CN 104375056A
Authority
CN
China
Prior art keywords
fault
line
outlet
voltage
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410602560.4A
Other languages
Chinese (zh)
Other versions
CN104375056B (en
Inventor
鲍新
刘双喜
何峰
张同乔
刘丽萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410602560.4A priority Critical patent/CN104375056B/en
Publication of CN104375056A publication Critical patent/CN104375056A/en
Application granted granted Critical
Publication of CN104375056B publication Critical patent/CN104375056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses a substation cable outgoing line fault monitoring method based on voltage and current initial row waves. The method includes the following steps that a substation cable outgoing line fault simulation model is built according to the substation cable outgoing line and a network distribution model; the bus voltage and outgoing line three-phase current initial row waves are obtained through a voltage transformer and a current transformer; the fault phases are determined according to the obtained three-phase bus voltage; the polarities of the current initial row waves of all the outgoing line fault phases are compared, and the outgoing line opposite to other outgoing lines in polarity is the fault line. According to the substation cable outgoing line fault monitoring method, the fault phases are judged through the bus voltage generated after the system single-phase earth fault, the polarities of the current initial row waves of all the outgoing line fault phases are compared, and thus the fault line is determined; line selection of the substation cable outgoing lines and distribution lines is achieved, and the problem that it is difficult to conduct line select for current small current earth systems is solved.

Description

Based on the substation cable outlet fault monitoring method of voltage and electric current initial row ripple
Technical field
The present invention relates to a kind of fault monitoring method of substation cable outlet, specifically a kind of substation cable outlet fault monitoring method based on voltage and electric current initial row ripple, belongs to cable fault route selection technical field.
Background technology
China's power distribution network extensively adopts neutral non-effective grounding mode, and this earthing mode has the high advantage of power supply reliability, and its singlephase earth fault incidence is the highest.When after generation singlephase earth fault, healthy phases voltage raises as original 1.732 times, under individual cases, earthing capacitance current may cause trouble spot electric arc to leap, instantaneous appearance, than the large 4-5 of phase voltage superpotential doubly, causes insulation breakdown, is expanded into or multipoint earthing short circuit further at 2; The electric arc of trouble spot also can cause total system superpotential, usually burns cable and even causes fire.Therefore, the safe reliability of this power distribution network of singlephase earth fault serious threat of power distribution network is that Accident prevention expands, and wishes to select as early as possible faulty line and go forward side by side row relax in operation.But due to the short-circuit loop that single-phase earthing is the distributed capacitance formation over the ground by power supply winding and transmission line of electricity, the ground current of trouble spot is very little, and single-phase earth fault line selection and fault-location problem are not solved for a long time well.
In order to find out trouble spot, what the past adopted is the selection method manually drawing road, and by the impact of various factors, this method finds out faulty line to be needed for a long time, reduces the quality of power supply, makes the economic benefit of power supply unit and user receive impact.And electrical network is easily subject to switch disconnection and closed impact, can cause switching overvoltage and resonance overvoltage, the perseveration of switch makes reduce its serviceable life equally.Along with the raising with automation level that increases of unattended operation transformer station, centralized control center staff when being some find and the time of process ground signalling longer, the fault-signal especially occurred evening, there will be the long playing situation of tape jam; Two is draw road route selection to need remote control to operate one by one, increases the burden of equipment.
In current real work, power distribution network generally adopts transient zero-sequence current method to carry out route selection, utilize the polarity of the transient zero mode current initial row ripple of faulty line this principle failure judgement circuit contrary to the polarity of non-fault line, the method has the high advantage of reliability.But the acquisition of modulus traveling-waves adds the difficulty of rig-site utilization in actual motion.Obtain zero mould current traveling wave to need on-the-spot to be equipped with suitable zero sequence current mutual inductor, and only in order to failure line selection, to increase zero sequence current mutual inductor uneconomical and utilize the method for zero mould route selection to realize phase selection.If do not use zero-sequence transformer, it is by biphase current mutual inductor that line mould current traveling wave obtains, and wiring is complicated and easily make mistakes, and makes failure line selection more difficult like this.
Failure line selection is conducive to improving power supply reliability on the one hand rapidly and accurately, improves the economic benefit of power supply department and user, is conducive to safeguarding consumer, therefore, in the urgent need to one effective substation cable outlet fault monitoring method on the other hand.
Summary of the invention
For overcoming the deficiency that above-mentioned prior art exists, the invention provides a kind of substation cable outlet fault monitoring method based on voltage and electric current initial row ripple, it can solve the problem of current fault line selection for indirectly grounding power system difficulty, effectively realizes the failure line selection of substation cable outlet and distribution line thereof.
The present invention solves the technical scheme that its technical matters takes: based on the substation cable outlet fault monitoring method of voltage and electric current initial row ripple, it is characterized in that, first voltage transformer (VT) is set on the bus of transformer station, voltage transformer (VT) summation current transformer is set in every bar outlet circuit of transformer station, said method comprising the steps of:
Set up substation cable outlet fault simulation model: set up substation cable outlet fault simulation model according to substation cable outlet and distribution network model, described substation cable outlet fault simulation model comprises transformer, three outlet circuits are connected with at the outgoing line side of transformer, cable line and overhead transmission line is all comprised in every bar outlet circuit, described cable line one end is connected with transformer, the other end is connected with overhead transmission line one end, the other end of overhead transmission line is unsettled, in every bar outlet circuit, be provided with simulated line fault;
Obtain busbar voltage and electric current initial row ripple: utilize voltage transformer (VT) three-phase bus voltage, utilize current transformer to obtain the electric current initial row ripple of every bar outlet circuit three-phase current, the sample frequency of described voltage transformer (VT) summation current transformer is greater than 1MHz;
Determine fault phase: the three-phase bus voltage according to obtaining determines fault phase, namely after fault voltage be about 0 one be fault phase mutually;
Electric current initial row ripple is analyzed, determines faulty line: the initial polarity of traveling wave of electric current contrasting all outlet line fault phases, the outlet circuit contrary with other outlet line polarity is faulty line.
In said method, PSCAD simulation software is adopted to carry out setting up substation cable outlet realistic model.
In said method, MATLAB simulation software is adopted to analyze electric current initial row ripple.
In said method, described outlet circuit adopts three-core structure, the directly grounded mode of metal screen layer both-end of cable line, and the end of overhead transmission line is unsettled.
In said method, the line fault that the line fault arranged in every bar outlet circuit and other two outlet circuits are arranged is different.
In said method, described line fault comprises cable major insulation fault, cable line and overhead transmission line junction metallic earthing fault and overhead transmission line metallic earthing fault.
In said method, the process of establishing of described substation cable outlet fault simulation model comprises the following steps:
The selection of simulation modeling instrument and data analysis tool: the PSCAD of 4.2.0 version selected by simulation modeling instrument, and data analysis tool selects the MATLAB of 7.1 versions;
Set up substation cable outlet fault simulation model and emulation module: described substation cable outlet fault simulation model comprises transformer, three outlet circuits are connected with at the outgoing line side of transformer, cable line and overhead transmission line is all comprised in every bar outlet circuit, described cable line one end is connected with transformer, the other end is connected with overhead transmission line one end, the other end of overhead transmission line is unsettled, in every bar outlet circuit, be provided with simulated line fault; Described emulation module comprises cable line module, overhead transmission line module, short trouble and FCM fault control module, cable major insulation fault and pole line fault verification module;
Simulation parameter is arranged: arrange the setting of PSCAD simulation parameter, cable data, overhead transmission line parameter and failed controller parameter;
Generate substation cable outlet fault simulation model: generate substation cable outlet fault simulation model according to the foundation of emulation module and optimum configurations.
The invention has the beneficial effects as follows: the busbar voltage after first the present invention utilizes system single-phase earth fault judges fault phase, then by the polarity of all outlet line fault phase current initial row ripples of contrast, thus determine faulty line, achieve the route selection of substation cable outlet and distribution line, solve the problem of current fault line selection for indirectly grounding power system difficulty.The present invention can accurately phase selection route selection, realizes the malfunction monitoring to power cable, more existing selection method science, reliable, economic more.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described:
Fig. 1 is method flow diagram of the present invention;
Fig. 2 is the schematic diagram of substation cable outlet fault simulation model of the present invention;
Fig. 3 is the schematic diagram of cable line emulation module of the present invention;
Fig. 4 is the schematic diagram of overhead transmission line emulation module of the present invention;
Schematic diagram when Fig. 5 is f1 place generation singlephase earth fault in the circuit 1 of substation cable outlet fault simulation model of the present invention;
The schematic diagram of busbar voltage when Fig. 6 is generation singlephase earth fault in f1 place in Fig. 5 of the present invention;
The schematic diagram of the initial polarity of traveling wave of each outlet circuit B phase current when Fig. 7 is generation singlephase earth fault in f1 place in Fig. 5 of the present invention.
Embodiment
For clearly demonstrating the technical characterstic of this programme, below by embodiment, and in conjunction with its accompanying drawing, the present invention will be described in detail.Present invention omits the description of known assemblies and treatment technology and process to avoid unnecessarily limiting the present invention.
A kind of substation cable outlet fault monitoring method based on voltage and electric current initial row ripple of the present invention, first the method arranges voltage transformer (VT) before implementing on the bus of transformer station, voltage transformer (VT) summation current transformer is set in every bar outlet circuit of transformer station, for obtaining busbar voltage and the electric current initial row ripple of outlet circuit.
As shown in Figure 1, should comprise the following steps based on the substation cable outlet fault monitoring method method of voltage and electric current initial row ripple:
Set up substation cable outlet fault simulation model: adopt PSCAD simulation software to set up substation cable outlet fault simulation model according to substation cable outlet and distribution network model, described substation cable outlet fault simulation model comprises transformer, three outlet circuits are connected with at the outgoing line side of transformer, cable line and overhead transmission line is all comprised in every bar outlet circuit, described cable line one end is connected with transformer, the other end is connected with overhead transmission line one end, the other end of overhead transmission line is unsettled, in every bar outlet circuit, be provided with simulated line fault;
Obtain busbar voltage and electric current initial row ripple: utilize voltage transformer (VT) to obtain three-phase bus voltage, utilize current transformer to obtain the electric current initial row ripple of every bar outlet circuit three-phase current, the sample frequency of described voltage transformer (VT) summation current transformer is greater than 1MHz;
Determine fault phase: the three-phase bus voltage according to obtaining determines fault phase, namely after fault voltage be about 0 one be fault phase mutually;
Electric current initial row ripple is analyzed, determines faulty line: adopt MATLAB simulation software to contrast the initial polarity of traveling wave of electric current of all outlet line fault phases, the outlet circuit contrary with other outlet line polarity is faulty line.
The concrete process of establishing of the substation cable outlet fault simulation model that the present invention adopts is as follows:
One, the selection of simulation modeling instrument and data analysis tool
Simulation software for transient analysis in electric system mainly contains EMTP, PSCAD and MATLAB.
Widespread use in the electric analog of EMTP (Electro-Magnetic Transient Program) electromagnetic transient state procedure electric pressure in electric system.It, based on trapezoidal integration rule, utilizes associated model as dynamic element, selects nodal method to set up equation, utilizes sparse matrix and LU factorization when separating algebraic equation.Integration step is specified by user, and remains unchanged in whole simulation process.EMTP comprises distribution parameter transmission line of electricity and the cable model of frequency dependence, but its setting is comparatively loaded down with trivial details, and parameter not easily obtains.
PSCAD is a power system simulation instrument based on figure.It is powerful, carries model bank and has friendly human-computer interaction interface, can improve the efficiency of electromagnetic transient in power system modeling effort significantly.By modeling bag, user can will carry out the electric power system model of modeling effort with the method establishment of figure.Determine that the row wave pattern of cable needs to use CABLE module, select to produce unifrequency pattern model or the capable wave pattern of frequency dependence completely by function, wherein, the radius of each conductive layer and insulation course and characteristic are all required.
MATLAB is the abbreviation of Matrix Laboratory (matrix labotstory), is the senior computational language for the exploitation of algorithm, data visualization, analysis and calculating and interactive environment, mainly comprises MATLAB and Simulink two large divisions.Power blockset (Power System Blockset) in its Simulink part, can be used for the modeling of complicated electric power system, and carries out Transient calculation; Wavelet analysis tool box (Wavelet Toolbox) is applicable to the analysis, denoising, compression etc. [43-44] of signal.
In the Power blockset of MATLAB, do not have suitable respective cable model, after considering, this modeling and simulating selects PSCAD4.2.0 as simulation modeling instrument, and MATLAB7.1 is as data processing tools.
Two, substation cable outlet fault simulation model and emulation module is set up
As shown in Figure 2, substation cable outlet fault simulation model of the present invention comprises transformer, three outlet circuits are connected with: circuit 1, circuit 2 and circuit 3 at the outgoing line side of transformer, cable line and overhead transmission line is all comprised in every bar outlet circuit, described cable line one end is connected with transformer, the other end is connected with overhead transmission line one end, and the other end of overhead transmission line is unsettled, in every bar outlet circuit, be provided with simulated line fault.Because 10kV cable is three-core structure mostly, therefore generally adopt metal screen layer two ends direct grounding way.Namely cable in realistic model adopts three-core structure, the directly grounded mode of metal screen layer both-end, and line end is unsettled.Can arrange three place's different faults: f1 in realistic model is cable major insulation fault, and f2 is cable and pole line junction metallic earthing fault, and f3 is pole line metallic earthing fault.Line length optimum configurations is as follows: the long 130m of cable of circuit 1, the long 6km of overhead transmission line; The long 3.05km of cable of circuit 2, the long 7km of overhead transmission line; The long 100m of cable of circuit 3, the long 10km of overhead transmission line.
Described emulation module comprises cable line module, overhead transmission line module, short trouble and FCM fault control module, cable major insulation fault and pole line fault verification module.
(1) cable line module: the equivalent model having three kinds of transmission lines of electricity or cable in PSCAD: PI type equivalent circuit, Bergeron model and frequency dependent character model.Under circuit is in fundamental frequency, PI type equivalent circuit and Bergeron model enough use, and difference is, Bergeron model distribution parameter mode replaces the LC element in the equivalent circuit of PI type, and resistance etc. are all lumped parameters.The parameter of all frequency dependences considered by frequency dependent character circuit model, and this model can carry out accurate description to the transient state travelling wave process that circuit occurs broad frequency band scope.This problem will carry out transient state travelling wave range finding to during major insulation fault, and fault transient travelling wave frequency band wider (general tens megahertzes are to megahertz up to a hundred), therefore, selects frequency dependent character circuit model.10kV cables simulation model as shown in Figure 3, wherein C1-C3 represents the conductor core wire of cable, i.e. A, B, C three-phase, S1-S3 represents the metal screen layer of cable, owing to not containing triple cable model in PSCAD, therefore utilize the single core cable of three-phase not with armor, establish the model of triple cable by arranging its relative position, and meet the characteristic of triple cable by simulating, verifying.
(2) overhead transmission line module: in PSCAD simulated environment, overhead transmission line model adopts frequency dependent character equally, as shown in Figure 4, Tline represents shaft tower to overhead transmission line realistic model.
(3) short trouble and FCM fault control module: when cable line is short-circuited fault, the electric current at fault place will increase rapidly, and the change of the resistance of trouble spot is very little, now can utilize short circuit fault model in software PSCAD.Fault moment and trouble duration can be set by failed controller and control.
(4) cable major insulation fault and pole line fault verification module: the power cable insulation fault of foundation and pole line fault simulation model, change position of failure point by the length of the length or pole line that change two sections of cables.Wherein, the direction of cable model mains side measuring junction conductor current is for flow to fault point by mains side; In metal sheath, direction of current is flow to the earth by fault point through ground wire; Directly there is Single Phase Metal earth fault in pole line model.
Three, simulation parameter is arranged
(1) simulation parameter of PSCAD is arranged: arrange panel by the simulation parameter of PSCAD software, can export step-length and deposit data etc. and arrange simulation time, sampling step length, data.Arranging simulation time is 0.07s, and sampling step length is 0.5us, and it is 1us that data export step-length.
(2) setting of cable data: due to the model without triple cable in PSCAD, therefore the realistic model of triple cable is established according to the characteristic of triple cable, and utilize the operation characteristic of this model and actual triple cable to be analyzed, verify that this model is feasible.Title, the parameter such as steady state (SS) frequency and cable length of cable line can arrange panel by cable data and arrange.
(3) overhead transmission line optimum configurations: title, the parameter such as steady state (SS) frequency and length of overhead transmission line can be arranged by overhead transmission line optimum configurations panel.
(4) setting of failed controller parameter: fault moment and trouble duration, can by failed controller optimum configurations panel be arranged, and wherein, fault moment is 0.032s, and trouble duration is 40ms.
Four, substation cable outlet fault simulation model is generated
Carry out overall substation cable outlet fault simulation model according to the foundation of above local module and optimum configurations to set up, and PSCAD simulation parameter to arrange in panel by " Savechannels to disk? " option is set to " Yes ", be convenient to emulated data to derive, utilize Matlab to carry out data processing.
Suppose f1 place cable generation cable major insulation fault in Fig. 2, and fault phase is B phase, the process that employing the method for the invention carries out failure line selection is as follows.
1, realistic model is as shown in Figure 5 set up according to substation cable outlet and distribution network model.
2, busbar voltage and electric current initial row ripple is obtained: utilize voltage transformer (VT) to obtain busbar voltage and obtain three-phase bus voltage, utilize current transformer to obtain the electric current initial row ripple of every bar outlet circuit three-phase current.
3, utilize busbar voltage determination fault phase: the busbar voltage according to obtaining determines fault phase, namely after fault voltage be about 0 one be fault phase mutually, as shown in Figure 6, can determine that B phase is for fault phase.
4, analysis being carried out to electric current initial row ripple and determine faulty line: after determining fault phase, by contrasting the initial polarity of traveling wave of electric current of all outlet line fault phases, determining that the outlet circuit contrary with other outlet line polarity is faulty line.The initial polarity of traveling wave of electric current of each outlet circuit B phase as shown in Figure 7.The initial polarity of traveling wave contrast of the electric current of each outlet line fault phase can determine that circuit 1 is faulty line as shown in Figure 7.
5, Output rusults: according to said process, this failure line selection result is the B phase fault of circuit 1.
The present invention does not need to increase zero sequence current mutual inductor, only utilizes three-phase current to judge accurately, has certain economy.The present invention can accurately phase selection route selection, realizes the malfunction monitoring to power cable, more existing selection method science, reliable, economic more.
The above is the preferred embodiment of the present invention, and for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications are also regarded as protection scope of the present invention.

Claims (7)

1. based on the substation cable outlet fault monitoring method of voltage and electric current initial row ripple, it is characterized in that, first voltage transformer (VT) is set on the bus of transformer station, voltage transformer (VT) summation current transformer is set in every bar outlet circuit of transformer station, said method comprising the steps of:
Set up substation cable outlet fault simulation model: set up substation cable outlet fault simulation model according to substation cable outlet and distribution network model, described substation cable outlet fault simulation model comprises transformer, three outlet circuits are connected with at the outgoing line side of transformer, cable line and overhead transmission line is all comprised in every bar outlet circuit, described cable line one end is connected with transformer, the other end is connected with overhead transmission line one end, the other end of overhead transmission line is unsettled, in every bar outlet circuit, be provided with simulated line fault;
Obtain busbar voltage and electric current initial row ripple: utilize voltage transformer (VT) to obtain three-phase bus voltage, utilize current transformer to obtain the electric current initial row ripple of every bar outlet circuit three-phase current, the sample frequency of described voltage transformer (VT) summation current transformer is greater than 1MHz;
Determine fault phase: the three-phase bus voltage according to obtaining determines fault phase, namely after fault voltage be about 0 one be fault phase mutually;
Electric current initial row ripple is analyzed, determines faulty line: the initial polarity of traveling wave of electric current contrasting all outlet line fault phases, the outlet circuit contrary with other outlet line polarity is faulty line.
2. the substation cable outlet fault monitoring method based on voltage and electric current initial row ripple according to claim 1, is characterized in that, adopts PSCAD simulation software to carry out setting up substation cable outlet realistic model.
3. the substation cable outlet fault monitoring method based on voltage and electric current initial row ripple according to claim 1, is characterized in that, adopts MATLAB simulation software to analyze electric current initial row ripple.
4. the substation cable outlet fault monitoring method based on voltage and electric current initial row ripple according to claim 1, it is characterized in that, described outlet circuit adopts three-core structure, the directly grounded mode of metal screen layer both-end of cable line, and the end of overhead transmission line is unsettled.
5. the substation cable outlet fault monitoring method based on voltage and electric current initial row ripple according to claim 1, it is characterized in that, the line fault that the line fault arranged in every bar outlet circuit and other two outlet circuits are arranged is different.
6. the substation cable outlet fault monitoring method based on voltage and electric current initial row ripple according to claim 1, it is characterized in that, described line fault comprises cable major insulation fault, cable line and overhead transmission line junction metallic earthing fault and overhead transmission line metallic earthing fault.
7. the substation cable outlet fault monitoring method based on voltage and electric current initial row ripple according to any one of claim 1 to 6, it is characterized in that, the process of establishing of described substation cable outlet fault simulation model comprises the following steps:
The selection of simulation modeling instrument and data analysis tool: the PSCAD of 4.2.0 version selected by simulation modeling instrument, and data analysis tool selects the MATLAB of 7.1 versions;
Set up substation cable outlet fault simulation model and emulation module: described substation cable outlet fault simulation model comprises transformer, three outlet circuits are connected with at the outgoing line side of transformer, cable line and overhead transmission line is all comprised in every bar outlet circuit, described cable line one end is connected with transformer, the other end is connected with overhead transmission line one end, the other end of overhead transmission line is unsettled, in every bar outlet circuit, be provided with simulated line fault; Described emulation module comprises cable line module, overhead transmission line module, short trouble and FCM fault control module, cable major insulation fault and pole line fault verification module;
Simulation parameter is arranged: arrange the setting of PSCAD simulation parameter, cable data, overhead transmission line parameter and failed controller parameter;
Generate substation cable outlet fault simulation model: generate substation cable outlet fault simulation model according to the foundation of emulation module and optimum configurations.
CN201410602560.4A 2014-10-31 2014-10-31 Substation cable outgoing line fault monitoring method based on voltage and current initial row waves Active CN104375056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410602560.4A CN104375056B (en) 2014-10-31 2014-10-31 Substation cable outgoing line fault monitoring method based on voltage and current initial row waves

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410602560.4A CN104375056B (en) 2014-10-31 2014-10-31 Substation cable outgoing line fault monitoring method based on voltage and current initial row waves

Publications (2)

Publication Number Publication Date
CN104375056A true CN104375056A (en) 2015-02-25
CN104375056B CN104375056B (en) 2017-04-12

Family

ID=52554093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410602560.4A Active CN104375056B (en) 2014-10-31 2014-10-31 Substation cable outgoing line fault monitoring method based on voltage and current initial row waves

Country Status (1)

Country Link
CN (1) CN104375056B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067952A (en) * 2015-08-06 2015-11-18 国网天津市电力公司 Addressing system for single-phase ground fault of low-current grounding system
CN105067953A (en) * 2015-08-06 2015-11-18 国网天津市电力公司 Addressing method for single-phase ground fault of low-current grounding system
CN105116294A (en) * 2015-09-18 2015-12-02 国家电网公司 Traveling wave polarity measure based power distribution network cable fault monitoring method
CN105914718A (en) * 2016-04-28 2016-08-31 长沙理工大学 Phase current sudden change based earth fault protection method
CN106646142A (en) * 2017-03-06 2017-05-10 云南电网有限责任公司电力科学研究院 Grounding grid broken point diagnosis method and transient electromagnetic detection device
CN107085168A (en) * 2017-04-21 2017-08-22 国家电网公司 A kind of single-phase earth fault line selection device containing many times cable outlets
CN107884683A (en) * 2017-12-28 2018-04-06 国网山东省电力公司高密市供电公司 The initial traveling wave detection means of electric current and transformer station's outlet cable fault monitoring method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232176A (en) * 2008-01-09 2008-07-30 潍坊学院 Non-effective earthing distribution system fault locating method based on neutral point of transient traveling wave
CN101533062A (en) * 2009-04-03 2009-09-16 清华大学 Power cable on-line insulated monitoring method based on traveling wave electric amount measurement
WO2013185521A1 (en) * 2012-06-11 2013-12-19 国家电网公司 Full component differential coefficient matrix-based method for ultra-high-voltage alternating current electric power transmission line protection
US20130346011A1 (en) * 2012-06-20 2013-12-26 Institute Of Nuclear Energy Research Atomic Energy Council, Executive Yuan Microgrid power distribution system and power flow asymmetrical fault analysis method therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232176A (en) * 2008-01-09 2008-07-30 潍坊学院 Non-effective earthing distribution system fault locating method based on neutral point of transient traveling wave
CN101533062A (en) * 2009-04-03 2009-09-16 清华大学 Power cable on-line insulated monitoring method based on traveling wave electric amount measurement
WO2013185521A1 (en) * 2012-06-11 2013-12-19 国家电网公司 Full component differential coefficient matrix-based method for ultra-high-voltage alternating current electric power transmission line protection
US20130346011A1 (en) * 2012-06-20 2013-12-26 Institute Of Nuclear Energy Research Atomic Energy Council, Executive Yuan Microgrid power distribution system and power flow asymmetrical fault analysis method therefor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
党锴钊: "行波技术在配电线路接地故障检测中的应用", 《低电压器》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067952A (en) * 2015-08-06 2015-11-18 国网天津市电力公司 Addressing system for single-phase ground fault of low-current grounding system
CN105067953A (en) * 2015-08-06 2015-11-18 国网天津市电力公司 Addressing method for single-phase ground fault of low-current grounding system
CN105116294A (en) * 2015-09-18 2015-12-02 国家电网公司 Traveling wave polarity measure based power distribution network cable fault monitoring method
CN105914718A (en) * 2016-04-28 2016-08-31 长沙理工大学 Phase current sudden change based earth fault protection method
CN105914718B (en) * 2016-04-28 2018-04-10 长沙理工大学 A kind of earth-fault protection method based on difference of phase currents
CN106646142A (en) * 2017-03-06 2017-05-10 云南电网有限责任公司电力科学研究院 Grounding grid broken point diagnosis method and transient electromagnetic detection device
CN106646142B (en) * 2017-03-06 2023-06-09 云南电网有限责任公司电力科学研究院 Grounding grid breakpoint diagnosis method and transient electromagnetic detection device
CN107085168A (en) * 2017-04-21 2017-08-22 国家电网公司 A kind of single-phase earth fault line selection device containing many times cable outlets
CN107884683A (en) * 2017-12-28 2018-04-06 国网山东省电力公司高密市供电公司 The initial traveling wave detection means of electric current and transformer station's outlet cable fault monitoring method

Also Published As

Publication number Publication date
CN104375056B (en) 2017-04-12

Similar Documents

Publication Publication Date Title
CN104360227B (en) Substation cable outlet fault monitoring method based on traveling wave method and transient basic frequency method
CN104375056A (en) Substation cable outgoing line fault monitoring method based on voltage and current initial row waves
CN104360226A (en) Method for monitoring fault of cable outgoing lines of transformer substation on basis of current initial traveling wave polarity
CN103018627B (en) Adaptive fault type fault line detection method for non-effectively earthed system
CN103675605B (en) A kind of power distribution network earth fault line selection method based on the correlation analysis of fault-signal transient state
CN103454555B (en) Based on the one-phase earthing failure in electric distribution network Section Location of parameter identification
CN103424669B (en) A kind of selection method utilizing fault feeder zero-sequence current matrix principal component analysis (PCA) first principal component
CN109494696B (en) Power distribution network asymmetric fault positioning and isolating method and system based on adaptive reclosing
CN102064537B (en) Method for judging and processing single-phase earth faults by using electronic mutual inductor
CN105548806A (en) Small current grounding fault line selection method based on transient traveling wave
CN102944813B (en) Resonant grounding system fault line selection method based on reactive power flow directions
CN103792465A (en) Power distribution network one-phase grounding fault location method based on zero sequence voltage
CN102135591A (en) Resonant grounding power grid single-phase ground fault db wavelet transient component line selection method
CN103267927B (en) A kind of low current neutral grounding system fault route selecting method utilizing power frequency component wavelet coefficient fitting a straight line to detect
CN104237731B (en) Single-phase earth fault line selection method on basis of EEMD (ensemble empirical mode decomposition) and energy method for resonance earthed power distribution network
CN103197202A (en) Distribution network fault line selection method based on wavelet coefficient correlation analysis in three-phase breaking current component characteristic frequency band
CN103605829A (en) Equivalent model method for performing electromagnetic transient simulation on alternating current/direct current hybrid power grid
CN103018630A (en) Single-phase earth fault transient line selection method of distribution network
CN104614638A (en) Grounding line selection method for small current system
CN106896293A (en) A kind of power distribution network single-phase earthing simulation modeling system
CN109975657A (en) Single-phase ground fault line selecting method of small-electric current grounding system based on differential characteristic value
CN105116360A (en) ADPSS (advanced digital power system simulator) based test system for low current grounding line selector and test method of system
CN108181550A (en) A kind of exchange micro-capacitance sensor fault type judges and phase-selecting method
Li et al. High-speed directional pilot protection for MVDC distribution systems
CN103558460A (en) Medium-voltage system arc fault detection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant