CN104373041A - 用于60米长隧道大管棚钻孔中的钻进纠偏方法 - Google Patents

用于60米长隧道大管棚钻孔中的钻进纠偏方法 Download PDF

Info

Publication number
CN104373041A
CN104373041A CN201410458209.2A CN201410458209A CN104373041A CN 104373041 A CN104373041 A CN 104373041A CN 201410458209 A CN201410458209 A CN 201410458209A CN 104373041 A CN104373041 A CN 104373041A
Authority
CN
China
Prior art keywords
drilling
drill bit
angle
display screen
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410458209.2A
Other languages
English (en)
Inventor
李卫兵
高周俊
李建新
陈杰华
胡亮
郭雷
娄建民
马率
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201410458209.2A priority Critical patent/CN104373041A/zh
Publication of CN104373041A publication Critical patent/CN104373041A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/10Correction of deflected boreholes

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

本发明公开了一种用于60米长隧道大管棚钻孔中的钻进纠偏方法,由装在钻头后部的导向探头监测面向角的朝向和钻头的偏斜方位,再通过穿过钻管的信号线连接到位于钻机操作台的显示屏,由显示屏显示钻头的倾角即水平角度,以及面向角即导向板的方向;根据显示屏显示的钻头的倾角和面向角来调整钻进方向,把钻头楔面调至已经偏斜的方向,钻机停止回转后加力顶进,钻头由于斜面的作用向相反的方向偏斜,从而调整钻进的方向;本发明的优点在于:达到60米钻孔一次成型,极大的缩短了工期,取得了较大的经济效益,保证了钻孔的质量,为下一步的施工提供了安全保证。

Description

用于60米长隧道大管棚钻孔中的钻进纠偏方法
技术领域
本发明涉及一种用于隧道洞口段长大管棚钻孔过程中的纠偏方法,具体地说是一种用于60米长隧道大管棚钻孔中的钻进纠偏方法,属于隧道钻孔领域。
背景技术
目前,常见的洞口管棚施工,尤其是在隧道洞口段长大管棚钻孔过程中,多存在以下缺点:(1)一次施工的管棚长度短,一般10~30米;(2)管棚施工过程中钻孔长度越长,由于钻头和钻杆的自重以及地质情况等方面的原因,钻孔的位置和方向无法得到保证;(3)传统的钻孔纠偏只能通过钻杆的方向、角度反算理论上钻头的位置,不确定因素很多,导致钻孔质量无法保证。常用的钻孔纠偏方法为:钻孔时钻机要求与已设定好的孔口管方向平行,使用全站仪、挂线、钻杆导向相结合的方法,反复调整,确保钻机钻杆轴线与孔口管轴线相吻合,核定钻机位置。钻机开钻时,调整为低速低压,待成孔10m后可根据地质情况逐渐调整钻速及风压。钻进过程中经常用测斜仪测定其位置,并根据钻机钻进的状态判断成孔质量,及时处理钻进过程中出现的偏差。
发明内容
为了解决上述问题,本发明设计了一种用于60米长隧道大管棚钻孔中的钻进纠偏方法,达到60米钻孔一次成型,而且还可以通过钻头上面的检测探头将实时数据反映到监视器上面,随时掌握钻头的位置,极大的保证了钻孔的质量。
本发明的技术方案为:
用于60米长隧道大管棚钻孔中的钻进纠偏方法,具体操作为:
由装在钻头后部的导向探头监测面向角的朝向和钻头的偏斜方位,(该导向探头为常规结构,市场均有销售,不再赘述),再通过穿过钻机钻管的信号线连接到位于钻机操作台的显示屏,由显示屏显示钻头的倾角即水平角度,以及面向角即导向板的方向;
根据显示屏显示的钻头的倾角和面向角来调整钻进方向,把钻头楔面调至已经偏斜的方向,钻机停止回转后加力顶进,钻头由于斜面的作用向相反的方向偏斜,从而调整钻进的方向,使终孔偏差控制在5‰以内。
当角度偏下时,把钻头调到12点方向,即导向板朝上,直接顶进,此时由于导向板底板斜面面积大,受到一个向上的力,钻头轨迹就会朝上运动;同理,在6点方向纠偏为钻头轨迹朝下,9点方向、3点方向分别是为左、右纠偏方向;当角度合适时,钻机会匀速旋转钻进,此时钻杆轨迹为平直的。所以导向钻头是上下纠偏的关键;至于左右偏差根据传感器尾端的发光装置来定,通过仪器测量参数来纠偏。
进一步地,本发明由于采用跟管钻进法,钢管安装和钻机进尺是同一过程。钻头采用与钻管等径的楔型钻头,楔板回转半径略大于钻管半径,钻头前端有直径12~15mm的水眼,当钻头正常回转钻进时钻管沿直线前进。当钻头由于某种原因偏离预定轨迹偏向某一方向时,就需要纠偏了。
进一步地,本发明为保证粉质黏土情况下钻孔成型质量,选择了泥浆或水为钻进循环液的水平钻机。
本发明在钻孔过程中通过传统和导向探头相结合的纠偏方法控制钻孔的位置和方向,保证钻孔质量。
本发明的优点在于:
(1)60米长大管棚一次成型,与以往相比,减少了管棚循环次数,极大的缩短了工期,取得了较大的经济效益;
(2)保证了钻孔质量,为下一步的施工提供了安全保证;
(3)通过钻头上面的检测探头将实时数据反映到监视器上面,随时掌握钻头的位置,极大的保证了钻孔的质量。
下面结合附图和实施对本发明作进一步说明。
附图说明
图1为本发明实施例的结构示意图;
图中:1-导向板、2-信号线、3-显示屏、4-发光装置、5-水眼。
具体实施方式
以下对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。
实施例1
用于60米长隧道大管棚钻孔中的钻进纠偏方法,具体操作为:
由装在钻头后部的导向探头监测面向角的朝向和钻头的偏斜方位均,(该导向探头为常规结构,市场均有销售,不再赘述),再通过穿过钻机钻管的信号线2连接到位于钻机操作台的显示屏3,由显示屏3显示钻头的倾角即水平角度,以及面向角即导向板1的方向,导向板1朝上即为12点方向,如同钟面;
根据显示屏3显示的钻头的倾角和面向角来调整钻进方向,把钻头楔面调至已经偏斜的方向,钻机停止回转后加力顶进,钻头由于斜面的作用向相反的方向偏斜,从而调整钻进的方向,使终孔偏差控制在5‰以内。
当角度偏下时,把钻头调到12点方向,即导向板1朝上,直接顶进,此时由于导向板1底板斜面面积大,受到一个向上的力,钻头轨迹就会朝上运动;同理,在6点方向纠偏为钻头轨迹朝下,9点方向、3点方向分别是为左、右纠偏方向;当角度合适时,钻机会匀速旋转钻进,此时钻杆轨迹为平直的。所以导向钻头是上下纠偏的关键;至于左右偏差根据传感器尾端的发光装置4来定,通过仪器测量参数来纠偏。
本发明由于采用跟管钻进法,钢管安装和钻机进尺是同一过程。钻头采用与钻管等径的楔型钻头,楔板回转半径略大于钻管半径,钻头前端有Φ12~15mm的水眼5,当钻头正常回转钻进时钻管沿直线前进。当钻头由于某种原因偏离预定轨迹偏向某一方向时,就需要纠偏了。
本发明为保证粉质黏土情况下钻孔成型质量,选择了泥浆或水为钻进循环液的水平钻机。
本发明在钻孔过程中通过传统和导向探头相结合的纠偏方法控制钻孔的位置和方向,保证钻孔质量。
采用本发明的方法以赣龙铁路梅花山隧道进口60米Φ159长大管棚为依托,通过以下的工艺流程:三通一平→人员设备进场→导向墙施工→测量放线→铺设″H″钢轨道→设备组装调试→调试钻机(方位、倾角)→钻具组装进孔→冲洗液循环→导向钻进→回次加尺(接线、接口补焊)→孔斜测量→导向钻进→直至设计深度终孔→回取探头盒→管内及环状间隙注浆→移至下一孔位,保证长大管棚一次性施做到。

Claims (3)

1.用于60米长隧道大管棚钻孔中的钻进纠偏方法,其特征在于:由装在钻头后部的导向探头监测面向角的朝向和钻头的偏斜方位,再通过穿过钻管的信号线连接到位于钻机操作台的显示屏,由显示屏显示钻头的倾角即水平角度,以及面向角即导向板的方向;
根据显示屏显示的钻头的倾角和面向角来调整钻进方向,把钻头楔面调至已经偏斜的方向,钻机停止回转后加力顶进,钻头由于斜面的作用向相反的方向偏斜,从而调整钻进的方向;
当角度偏下时,把钻头调到12点方向,即导向板朝上,直接顶进,此时由于导向板底板斜面面积大,受到一个向上的力,钻头轨迹就会朝上运动;同理,在6点方向纠偏为钻头轨迹朝下,9点方向、3点方向分别是为左、右纠偏方向;当角度合适时,钻机会匀速旋转钻进,此时钻杆轨迹为平直的。
2.根据权利要求1所述的用于60米长隧道大管棚钻孔中的钻进纠偏方法,其特征在于:所述钻头采用与所述钻管等径的楔型钻头,楔板回转半径略大于钻管半径,钻头前端有直径12~15mm的水眼,当钻头正常回转钻进时钻管沿直线前进。
3.根据权利要求1或2所述的用于60米长隧道大管棚钻孔中的钻进纠偏方法,其特征在于:所述钻机为水平钻机。
CN201410458209.2A 2014-09-11 2014-09-11 用于60米长隧道大管棚钻孔中的钻进纠偏方法 Pending CN104373041A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410458209.2A CN104373041A (zh) 2014-09-11 2014-09-11 用于60米长隧道大管棚钻孔中的钻进纠偏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410458209.2A CN104373041A (zh) 2014-09-11 2014-09-11 用于60米长隧道大管棚钻孔中的钻进纠偏方法

Publications (1)

Publication Number Publication Date
CN104373041A true CN104373041A (zh) 2015-02-25

Family

ID=52552206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410458209.2A Pending CN104373041A (zh) 2014-09-11 2014-09-11 用于60米长隧道大管棚钻孔中的钻进纠偏方法

Country Status (1)

Country Link
CN (1) CN104373041A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105422003A (zh) * 2015-11-19 2016-03-23 深圳市钻通工程机械股份有限公司 一种激光制导保直钻进设备
CN106869974A (zh) * 2017-03-23 2017-06-20 中交三航局第三工程有限公司 一种基于测斜的超长水平管幕顶进施工控制装置与方法
CN106988755A (zh) * 2017-05-10 2017-07-28 中铁五局集团第五工程有限责任公司 一种隧道洞口软弱围岩段超长管棚施工方法
CN107060805A (zh) * 2017-03-23 2017-08-18 中交三航局第三工程有限公司 一种超前水平管幕顶进施工的纠偏装置
CN108150101A (zh) * 2017-12-22 2018-06-12 上海煤气第二管线工程有限公司 一种管道三维穿越施工方法
CN108825134A (zh) * 2018-07-27 2018-11-16 深圳市市政设计研究院有限公司 一种钻头导向系统及弧形长大管棚施工方法
CN112857223A (zh) * 2021-01-19 2021-05-28 吉力此且 用于地铁管棚定位测量的光纤陀螺仪定位装置及其方法
CN113236225A (zh) * 2021-05-19 2021-08-10 中国石油大学(华东) 一种煤矿钻进偏离预警传感器系统和钻进纠偏方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101737060A (zh) * 2009-12-28 2010-06-16 中铁二局股份有限公司 土质下穿隧道超大直径管幕施工方法
CN203050558U (zh) * 2013-02-01 2013-07-10 成都大漠石油机械有限公司 带传感装置的钻具稳定器
CN203114203U (zh) * 2013-04-01 2013-08-07 东北石油大学 一种新型钻具稳定器
CN203145832U (zh) * 2013-03-20 2013-08-21 湖南有色重型机器有限责任公司 用于凿岩钻具的防偏控制系统
CN103266878A (zh) * 2013-05-03 2013-08-28 中国石油天然气集团公司 一种用于自动垂直钻井系统的纠斜控制方法及装置
CN103352687A (zh) * 2013-07-12 2013-10-16 葛洲坝集团第二工程有限公司 控制钻孔孔斜的方法
CN203347688U (zh) * 2013-07-22 2013-12-18 中国石油天然气集团公司 一种防斜组合钻具

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101737060A (zh) * 2009-12-28 2010-06-16 中铁二局股份有限公司 土质下穿隧道超大直径管幕施工方法
CN203050558U (zh) * 2013-02-01 2013-07-10 成都大漠石油机械有限公司 带传感装置的钻具稳定器
CN203145832U (zh) * 2013-03-20 2013-08-21 湖南有色重型机器有限责任公司 用于凿岩钻具的防偏控制系统
CN203114203U (zh) * 2013-04-01 2013-08-07 东北石油大学 一种新型钻具稳定器
CN103266878A (zh) * 2013-05-03 2013-08-28 中国石油天然气集团公司 一种用于自动垂直钻井系统的纠斜控制方法及装置
CN103352687A (zh) * 2013-07-12 2013-10-16 葛洲坝集团第二工程有限公司 控制钻孔孔斜的方法
CN203347688U (zh) * 2013-07-22 2013-12-18 中国石油天然气集团公司 一种防斜组合钻具

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105422003A (zh) * 2015-11-19 2016-03-23 深圳市钻通工程机械股份有限公司 一种激光制导保直钻进设备
CN106869974A (zh) * 2017-03-23 2017-06-20 中交三航局第三工程有限公司 一种基于测斜的超长水平管幕顶进施工控制装置与方法
CN107060805A (zh) * 2017-03-23 2017-08-18 中交三航局第三工程有限公司 一种超前水平管幕顶进施工的纠偏装置
CN106988755A (zh) * 2017-05-10 2017-07-28 中铁五局集团第五工程有限责任公司 一种隧道洞口软弱围岩段超长管棚施工方法
CN108150101A (zh) * 2017-12-22 2018-06-12 上海煤气第二管线工程有限公司 一种管道三维穿越施工方法
CN108150101B (zh) * 2017-12-22 2019-07-05 上海煤气第二管线工程有限公司 一种管道三维穿越施工方法
CN108825134A (zh) * 2018-07-27 2018-11-16 深圳市市政设计研究院有限公司 一种钻头导向系统及弧形长大管棚施工方法
CN112857223A (zh) * 2021-01-19 2021-05-28 吉力此且 用于地铁管棚定位测量的光纤陀螺仪定位装置及其方法
CN113236225A (zh) * 2021-05-19 2021-08-10 中国石油大学(华东) 一种煤矿钻进偏离预警传感器系统和钻进纠偏方法

Similar Documents

Publication Publication Date Title
CN104373041A (zh) 用于60米长隧道大管棚钻孔中的钻进纠偏方法
WO2018082307A1 (zh) 一种全巷全过程全断面表面变形监测装置及方法
EP2559842B1 (en) A method of directing vertical drillings
CN106917637B (zh) 一种钻孔式岩层沉降监测系统及监测方法
CN111140173B (zh) 一种水平定向取芯钻孔保直与纠斜钻具及钻孔方法
CN101260784A (zh) 隧道超前支护风循环钻进施工方法及钻具
CN110792450B (zh) 一种确定注浆锚索超前支护的方法
CN103742127A (zh) 一种覆岩垮落带和导水裂隙带高度钻孔电视探测确定方法
CN110529150A (zh) 一种基于示踪技术的煤矿断层破碎带注浆加固方法
CN106595548A (zh) 一种隧道内掌子面围岩内部的位移测量方法
CN110439463A (zh) 采空区处理注浆孔造孔工艺
CN109440838A (zh) 钻孔桩成孔质量检测方法
CN103469778A (zh) 一种划分岩石风化程度的标准贯入试验方法
CN108678753A (zh) 反坡隧道施工方法
CN108426663B (zh) 一种矩形钻孔应力监测装置及监测方法
CN113622907A (zh) 煤层开采覆岩内部移动与裂隙分布的单孔同步监测方法
CN113701705A (zh) 隧洞断面绝对变形自动化监测方法
CN110672062A (zh) 一种监测基岩沉降量监测点的埋设方法
CN106522253B (zh) 一种大水深趾板上精确钻孔及灌浆的施工方法
CN108590668B (zh) 一种暗挖车站超长管棚拉管法
CN103616001A (zh) 巷道围岩体多点离层量监测与测量装置及安装和测量方法
CN110847809A (zh) 紧邻地下结构的桩基成孔方法
CN216894538U (zh) 一种基于分布式光纤传感技术的导水裂隙带高度监测装置
CN110067561A (zh) 下穿既有线城市地下暗挖区间施工方法
CN105064985B (zh) 基于渣料分析进行竖井钻进工艺动态调整的判定方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150225