CN104353315A - 一种烟气处理装置 - Google Patents

一种烟气处理装置 Download PDF

Info

Publication number
CN104353315A
CN104353315A CN201410604868.2A CN201410604868A CN104353315A CN 104353315 A CN104353315 A CN 104353315A CN 201410604868 A CN201410604868 A CN 201410604868A CN 104353315 A CN104353315 A CN 104353315A
Authority
CN
China
Prior art keywords
purifying box
flue gas
water tank
pipe
sidewall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410604868.2A
Other languages
English (en)
Other versions
CN104353315B (zh
Inventor
马从勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodiankangneng Technology Stock Co ltd
Original Assignee
New Energy Technology (suzhou) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New Energy Technology (suzhou) Co Ltd filed Critical New Energy Technology (suzhou) Co Ltd
Priority to CN201410604868.2A priority Critical patent/CN104353315B/zh
Publication of CN104353315A publication Critical patent/CN104353315A/zh
Application granted granted Critical
Publication of CN104353315B publication Critical patent/CN104353315B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

本发明涉及一种烟气处理装置,其特征在于:包括一个装流动水的水箱(1),在水箱(1)内设有一个螺旋管(5),所述螺旋管(5)分别通过进气管(4)连接工业生产的出气烟囱和通过第一排气管(10)连接第一净化箱(2),第一净化箱(2)内装有烟气中和液(11),第一净化箱(2)通过第二排气管(14)连通第二净化箱(3),在第二净化箱(3)内的上、下侧分别设有一个石墨层(16),在两个石墨层(16)之间至少设有一个烟气中和层(15)。本发明的优点:本装置对烟气中带有的热量进行二次回收再利用,不仅节省了资源,而且降低了企业的生产成本,同时对烟气中的有害物质进行净化处理,降低了环境的污染。

Description

一种烟气处理装置
技术领域
本发明涉及环保领域,特别涉及一种烟气的余热回收利用,以及烟气净化装置。
背景技术
随着社会的发展和技术的进步,人们的节约资源和环保意识在不断的加强,工业生产过程一般是在高温下进行的,因此其产生的烟气往往具有较高的温度,这样的烟气如果直接排放到大气中,不仅对环境造成了污染而且带走了大量的热量,即造成了资源的浪费,又增加了企业的成本,与人们节能减排的目标向左。
发明内容
本发明的目的是为了解决现有技术中存在的缺点,而提出的一种烟气处理装置。
为了实现上述目的,本发明采用了如下技术方案:
一种烟气处理装置,其特征在于包括:
a、水箱,在所述水箱内装流动水,水箱的底端设有进气口、上端设有出气口,在水箱内设有至少一个螺旋管,所述螺旋管的一端连接进气口、另一端连接出气口,在所述进气口处还通过进气管连接工业生产的出气烟囱,所述水箱又通过第一排气管连接第一净化箱,所述第一排气管的一端连接在出气口上、另一端伸入第一净化箱内且靠近箱底设置,在所述水箱侧壁的上侧通过进水管连接补充水源,在所述水箱侧壁的下侧通过出水管连接供暖装置,所述进水管和出水管设置在水箱相对的侧壁上;
b、所述第一净化箱内装有烟气中和液,在第一净化箱侧壁的上侧通过进液管连接中和液体源,在第一净化箱侧壁的下侧通过出液管连接污水处理装置,所述第一净化箱的上端通过第二排气管连通第二净化箱;
c、所述第二净化箱为一个上端设有排气孔、下端设有如气孔的封闭型腔体结构,在第二净化箱内的上、下侧分别设有一个石墨层,在两个石墨层之间至少设有一个烟气中和层,所述每个石墨层和每个烟气中和层均包括一个固定环,在固定环内配合连接一个固定网,所述固定环配合连接在第二净化箱的腔体内,在石墨层的固定网上设有吸附石墨粉,在烟气中和层的固定网上设有固定中和粉末。
优选地,在所述出气口和排气管之间设有一个缓冲管。
优选地,所述第二净化箱为一个长方体结构的封闭型腔体,在第二净化箱的上端设有一个终端出气孔、下端设有一个中间进气口,所述第二净化箱的腔体内设有一组相互平行的卡槽,所述配合槽贯穿第二净化箱的其中两个对称的侧壁,在另外两个侧壁的内侧分别对称设置有一个卡槽,每个配合槽与所述相应的石墨层或烟气中和层卡接配合。
本发明的优点在于:本装置对烟气中带有的热量进行二次回收再利用,不仅节省了资源,而且降低了企业的生产成本,同时对烟气中的有害物质进行净化处理,降低了环境的污染。
附图说明
图1是本发明的基本结构示意图;
图2是第二净化箱结构示意图;
图3是图2的A—A剖视图。
具体实施方式
如图1所示,本发明提供的一种烟气处理装置,其特征在于包括:水箱1,所示水箱1可选圆筒形或方筒形的封闭形结构,在所述水箱1内装流动水6,水箱1的底端设有进气口1.1、上端设有出气口1.2,在水箱1内设有一个或多个螺旋管5,所述螺旋管5的螺旋壁靠近水箱的内壁,这样有利于烟气中的热量被充分吸收。所述螺旋管5的一端连接进气口1.1、另一端连接出气口1.2,在水箱1外侧,在所述进气口1.1处还通过进气管4连接工业生产的出气烟囱,所述水箱1又通过第一排气管10连接第一净化箱2,在所述出气口1.2和排气管10之间设有一个缓冲管9,所述第一排气管10的一端连接在出气口1.2上、另一端伸入第一净化箱2内且靠近箱底设置,在所述水箱1侧壁的上侧通过进水管7连接补充水源19,在所述水箱1侧壁的下侧通过出水管8连接供暖装置20,所述进水管7和出水管8设置在水箱1相对的侧壁上。高温烟气从螺旋管5进入,将热能传递给流动水6,最后低温烟气由第一排气管10导入第一净化箱2。由于螺旋管5的螺旋加大,且根据需要可选为多根,增大了烟气与水的接触面积,余热回收效率高。
水箱1 中被加热后的热水可以用于参加后续的原材料升温等反应环节也可加入厂房等的供暖装置20。热水由出水管8排出,当热水排除后,从补充水源19 定期将水补充到水箱1中。
所述第一净化箱2内装有烟气中和液11,所述烟气中和液11为现有技术,根据实际需要选择,若烟气为酸性则选择碱性中和液,反之则选择酸性中和液。在第一净化箱2侧壁的上侧通过进液管13连接中和液体源22,在第一净化箱2侧壁的下侧通过出液管12连接污水处理装置21,所述污水处理装置21为现有技术,才有现有的污水处理系统,所述第一净化箱2的上端通过第二排气管14连通第二净化箱3。
如图2和图3所示,所述第二净化箱3为一个长方体结构的封闭型腔体,在第二净化箱3的上端设有一个终端出气孔3.1、下端设有一个中间进气口3.2,
所述第二净化箱3的腔体内设有三个相互平行的卡槽3.3,在第二净化箱3内的上、下侧分别设有一个石墨层16,在两个石墨层16之间至少设有一个烟气中和层15。所述配合槽3.3贯穿第二净化箱3的其中两个对称的侧壁,在另外两个侧壁的内侧分别对称设置有一个卡槽3.4,每个配合槽3.3与所述相应的石墨层16或烟气中和层15卡接配合。
所述每个石墨层16和每个烟气中和层15均包括一个固定环23,在固定环23内配合连接一个固定网24,所述固定环23配合连接在第二净化箱3的腔体内,在石墨层16的固定网24上设有吸附石墨粉,在烟气中和层15的固定网24上设有固定中和粉末。
所述石墨粉用于吸附烟气中的颗粒状物质,所述中和粉末为现有技术,可根据实际的烟气情况决定是选择酸性还是碱性粉末。

Claims (3)

1.一种烟气处理装置,其特征在于包括:
a、水箱(1),在所述水箱(1)内装流动水(6),水箱(1)的底端设有进气口(1.1)、上端设有出气口(1.2),在水箱(1)内设有至少一个螺旋管(5),所述螺旋管(5)的一端连接进气口(1.1)、另一端连接出气口(1.2),在所述进气口(1.1)处还通过进气管(4)连接工业生产的出气烟囱,所述水箱(1)又通过第一排气管(10)连接第一净化箱(2),所述第一排气管(10)的一端连接在出气口(1.2)上、另一端伸入第一净化箱(2)内且靠近箱底设置,在所述水箱(1)侧壁的上侧通过进水管(7)连接补充水源(19),在所述水箱(1)侧壁的下侧通过出水管(8)连接供暖装置(20),所述进水管(7)和出水管(8)设置在水箱(1)相对的侧壁上;
b、所述第一净化箱(2)内装有烟气中和液(11),在第一净化箱(2)侧壁的上侧通过进液管(13)连接中和液体源(22),在第一净化箱(2)侧壁的下侧通过出液管(12)连接污水处理装置(21),所述第一净化箱(2)的上端通过第二排气管(14)连通第二净化箱(3);
c、所述第二净化箱(3)为一个上端设有排气孔、下端设有如气孔的封闭型腔体结构,在第二净化箱(3)内的上、下侧分别设有一个石墨层(16),在两个石墨层(16)之间至少设有一个烟气中和层(15),所述每个石墨层(16)和每个烟气中和层(15)均包括一个固定环(23),在固定环(23)内配合连接一个固定网(24),所述固定环(23)配合连接在第二净化箱(3)的腔体内,在石墨层(16)的固定网(24)上设有吸附石墨粉,在烟气中和层(15)的固定网(24)上设有固定中和粉末。
2.根据权利要求1所述的一种烟气处理装置,其特征在于:在所述出气口(1.2)和排气管(10)之间设有一个缓冲管(9)。
3.根据权利要求1或2所述的一种烟气处理装置,其特征在于:所述第二净化箱(3)为一个长方体结构的封闭型腔体,在第二净化箱(3)的上端设有一个终端出气孔(3.1)、下端设有一个中间进气口(3.2),所述第二净化箱(3)的腔体内设有一组相互平行的卡槽(3.3),所述配合槽(3.3)贯穿第二净化箱(3)的其中两个对称的侧壁,在另外两个侧壁的内侧分别对称设置有一个卡槽(3.4),每个配合槽(3.3)与所述相应的石墨层(16)或烟气中和层(15)卡接配合。
CN201410604868.2A 2014-11-03 2014-11-03 一种烟气处理装置 Active CN104353315B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410604868.2A CN104353315B (zh) 2014-11-03 2014-11-03 一种烟气处理装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410604868.2A CN104353315B (zh) 2014-11-03 2014-11-03 一种烟气处理装置

Publications (2)

Publication Number Publication Date
CN104353315A true CN104353315A (zh) 2015-02-18
CN104353315B CN104353315B (zh) 2016-08-24

Family

ID=52520677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410604868.2A Active CN104353315B (zh) 2014-11-03 2014-11-03 一种烟气处理装置

Country Status (1)

Country Link
CN (1) CN104353315B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105056692A (zh) * 2015-07-21 2015-11-18 陈巨根 一种废气净化装置
CN107504849A (zh) * 2017-08-23 2017-12-22 萍乡市华星化工设备填料有限公司 焦炉烟气高效节能装置
CN108723545A (zh) * 2018-06-13 2018-11-02 李伟 一种环保型焊锡烟气处理装置
CN111426099A (zh) * 2019-11-22 2020-07-17 国电康能科技股份有限公司 一种亚临界二氧化碳工质的余热回收装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3844748A (en) * 1972-12-08 1974-10-29 Raymond Lee Organization Inc Hydro-filtration apparatus
CN2555916Y (zh) * 2002-03-26 2003-06-18 清华同方股份有限公司 一种组合式烟气有害成分吸附净化的装置
CN1468644A (zh) * 2003-06-06 2004-01-21 中国人民解放军军事医学科学院卫生装 一种空气过滤器
CN201154284Y (zh) * 2008-01-24 2008-11-26 刘希同 空气过滤机
CN101829465A (zh) * 2010-05-18 2010-09-15 严永农 焊接废气处理装置
CN202410507U (zh) * 2012-02-15 2012-09-05 陈剑亮 气体过滤器

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3844748A (en) * 1972-12-08 1974-10-29 Raymond Lee Organization Inc Hydro-filtration apparatus
CN2555916Y (zh) * 2002-03-26 2003-06-18 清华同方股份有限公司 一种组合式烟气有害成分吸附净化的装置
CN1468644A (zh) * 2003-06-06 2004-01-21 中国人民解放军军事医学科学院卫生装 一种空气过滤器
CN201154284Y (zh) * 2008-01-24 2008-11-26 刘希同 空气过滤机
CN101829465A (zh) * 2010-05-18 2010-09-15 严永农 焊接废气处理装置
CN202410507U (zh) * 2012-02-15 2012-09-05 陈剑亮 气体过滤器

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105056692A (zh) * 2015-07-21 2015-11-18 陈巨根 一种废气净化装置
CN105056692B (zh) * 2015-07-21 2017-08-18 广州市绿潮环保工程有限公司 一种废气净化装置
CN107504849A (zh) * 2017-08-23 2017-12-22 萍乡市华星化工设备填料有限公司 焦炉烟气高效节能装置
CN108723545A (zh) * 2018-06-13 2018-11-02 李伟 一种环保型焊锡烟气处理装置
CN111426099A (zh) * 2019-11-22 2020-07-17 国电康能科技股份有限公司 一种亚临界二氧化碳工质的余热回收装置

Also Published As

Publication number Publication date
CN104353315B (zh) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104353315A (zh) 一种烟气处理装置
CN104209107A (zh) 一种高效脱硫活性焦解析塔及解析方法
CN106621748B (zh) 一种处理固体废物焚烧废气的组合式成套装置及方法
CN103420549B (zh) 煤化工行业中废物无害化处理方法
CN102705839A (zh) 一种含氟废液、废气的焚烧处理系统及其处理方法
CN103432876B (zh) 一种窑炉尾气处理方法
CN101810982A (zh) 一种含乙醇废气处理工艺流程
CN102367187B (zh) 氯代烃污染地下水吹脱氧化及尾气处理工艺
CN103721545A (zh) 一种锅炉烟气处理方法
CN102320711B (zh) 环保资源化污泥处理系统
CN210729133U (zh) 两级湿法脱酸塔
CN204220010U (zh) 炼焦过程中去除氮氧化物的装置
CN204121953U (zh) 无味再生橡胶脱硫尾气净化系统
CN203635054U (zh) 一种用于塑胶尾气处理过程中的气体净化系统
CN202201784U (zh) 环保资源化污泥处理系统
CN201954560U (zh) 一种新型的垃圾焚烧处理装置
CN105879509A (zh) 一种化工焚烧炉尾气除尘换热装置
CN204159195U (zh) 废气综合净化系统
CN204746022U (zh) 一种用于烟气净化处理的气水分离装置模块
CN204735063U (zh) 一种用于烟气净化处理的喷淋净化装置模块
CN206444985U (zh) 废弃物处理再利用系统
CN204619650U (zh) 一种废气处理系统
CN205295117U (zh) 污水处理厂污泥干化装置
CN204724008U (zh) 一种具有烟气利用系统的炼油设备
CN209662938U (zh) 一种非沥青基自粘胶膜防水卷材加工用废气处理装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Chen Shaohui

Inventor after: Wen-Qing Qin

Inventor after: Yang Chaohui

Inventor after: Liu Wei

Inventor before: Ma Congyong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160705

Address after: 100043, 107D building, building 1, Chong Xin building, 3 West West Road, Badachu hi tech park, Beijing, Shijingshan District

Applicant after: GUODIANKANGNENG TECHNOLOGY STOCK Co.,Ltd.

Address before: 215000 Suzhou Industrial Park, Suzhou, Donggang new village, room 192, building 105, room

Applicant before: QIAOJIAN NEW ENERGY TECHNOLOGY (SUZHOU) CO.,LTD.

C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Flue gas treatment device

Effective date of registration: 20170210

Granted publication date: 20160824

Pledgee: Beijing Intellectual Property Management Co.,Ltd.

Pledgor: GUODIANKANGNENG TECHNOLOGY STOCK Co.,Ltd.

Registration number: 2017990000096

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190505

Granted publication date: 20160824

Pledgee: Beijing Intellectual Property Management Co.,Ltd.

Pledgor: GUODIANKANGNENG TECHNOLOGY STOCK Co.,Ltd.

Registration number: 2017990000096

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A flue gas treatment device

Effective date of registration: 20220210

Granted publication date: 20160824

Pledgee: Changsha bank Limited by Share Ltd. Xiangjiang New District sub branch

Pledgor: GUODIANKANGNENG TECHNOLOGY STOCK Co.,Ltd.

Registration number: Y2022430000012

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230627

Granted publication date: 20160824

Pledgee: Changsha bank Limited by Share Ltd. Xiangjiang New District sub branch

Pledgor: GUODIANKANGNENG TECHNOLOGY STOCK Co.,Ltd.

Registration number: Y2022430000012

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A flue gas treatment device

Effective date of registration: 20230629

Granted publication date: 20160824

Pledgee: Changsha bank Limited by Share Ltd. Xiangjiang New District sub branch

Pledgor: GUODIANKANGNENG TECHNOLOGY STOCK Co.,Ltd.

Registration number: Y2023980046674