CN104328773B - Entirety built by sea work accommodation platform - Google Patents

Entirety built by sea work accommodation platform Download PDF

Info

Publication number
CN104328773B
CN104328773B CN201410495428.8A CN201410495428A CN104328773B CN 104328773 B CN104328773 B CN 104328773B CN 201410495428 A CN201410495428 A CN 201410495428A CN 104328773 B CN104328773 B CN 104328773B
Authority
CN
China
Prior art keywords
build
overall
entirety
built
weld
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410495428.8A
Other languages
Chinese (zh)
Other versions
CN104328773A (en
Inventor
毕建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pacific Ocean Engineering (zhoushan) Co Ltd
Original Assignee
Pacific Ocean Engineering (zhoushan) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pacific Ocean Engineering (zhoushan) Co Ltd filed Critical Pacific Ocean Engineering (zhoushan) Co Ltd
Priority to CN201410495428.8A priority Critical patent/CN104328773B/en
Publication of CN104328773A publication Critical patent/CN104328773A/en
Application granted granted Critical
Publication of CN104328773B publication Critical patent/CN104328773B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Entirety built by sea work accommodation platform, belong to ocean engineering field, comprise multiple convex module composition, multiple convex module installation drawing divides and carries out welding superposition, finally cause and build entirety, steel plate is strengthened in upper overall top weld horizontal of building, strengthen uniform welding eight hangers on steel plate, on build overall lower weld channel-section steel, on build overall before and after side the first half welding shaped form stainless steel strip, shaped form stainless steel strip is also welded and fixed with reinforcement steel plate, increase overall lifting surface area, on build overall before and after side the latter half weld semicircle steel loop, semicircle steel loop and channel-section steel weld together, prevent lifting rear lower shrinkage deformation, this builds entirety is on the way once built, build more convenient and carry out structural strengthening, making it possess can the condition of integral hoisting, finally carries out disposable lifting and completes, and have employed modular living units embedded model, shorten the time of building overall construction 20%.

Description

Entirety built by sea work accommodation platform
Technical field
The present invention relates on extra large work accommodation platform and build entirety, belong to ocean engineering field.
Background technology
Ocean is the resource of various countries of new generation competition, especially petroleum resources, therefore ocean platform development is accelerated day by day, for exploiting marine resource, but extra large work accommodation platform supporting with it develop very slow, especially construction method is still very traditional, on platform, a little builds, construction framework is unreasonable, and therefore efficiency of construction is low, is all a urgent problem.
Summary of the invention
The object of this invention is to provide on extra large work accommodation platform and build entirety.
The problem to be solved in the present invention is that existing upper organizational system makes inefficient deficiency.
For realizing object of the present invention, the technical solution used in the present invention is:
Entirety built by sea work accommodation platform, comprise multiple convex module, the installation of multiple convex module divides according to drawing carries out welding superposition, finally be built into entirety, steel plate is strengthened in upper overall top weld horizontal of building, strengthen uniform welding eight hangers on steel plate, on build overall lower weld channel-section steel, on build overall before and after side the first half welding shaped form stainless steel strip, shaped form stainless steel strip is also welded and fixed with reinforcement steel plate, increase overall lifting surface area, on build overall before and after side the latter half weld semicircle steel loop, semicircle steel loop and channel-section steel weld together, prevent lifting rear lower shrinkage deformation.
Build overall middle part on described and be provided with arch beam.
Described convex module is made up of four cuboids, and four cuboids are Container Dimensions, facilitates the living units of later stage Container Dimensions to propel and enters.
Build plane on the whole on described and be provided with four row's hangers.
Build overall and semicircle steel loop on described, the junction of shaped form stainless steel strip is provided with hex hole, be inserted with hexagon posts in hex hole, hexagon posts two ends are provided with symmetrical back-off, effectively can prevent loosening dropping.
Build on described after integral hoisting, semicircle steel loop and shaped form stainless steel strip are removed, recover original appearance.
Advantage of the present invention is: this builds entirety is on the way once built, build more convenient and carry out structural strengthening, making it possess can the condition of integral hoisting, finally carry out disposable lifting to complete, and have employed modular living units embedded model, shorten the time of building overall construction 20%, market prospects widely should be had.
Accompanying drawing explanation
Overall front view built by the present invention sea work accommodation platform to Fig. 1;
Overall top view built by the present invention sea work accommodation platform to Fig. 2;
Fig. 3 is schematic diagram the present invention sea work accommodation platform being built overall convex pattern block;
The present invention sea work accommodation platform builds overall A-A to sectional view to Fig. 4;
Fig. 5 is structural representation the present invention sea work accommodation platform being built overall hexagon posts 9;
In figure: 1, semicircle steel loop 2, shaped form stainless steel strip 3, hanger 4, reinforcement steel plate 5, channel-section steel 6, arch beam 7, horizontal hanger rod 8, convex module 9, hexagon posts 10, back-off.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further illustrated.
Entirety built by sea work accommodation platform, comprise multiple convex module 8 to form, multiple convex module 8 installation drawing divides and carries out welding superposition, finally cause and build entirety, steel plate 4 is strengthened in upper overall top weld horizontal of building, strengthen uniform welding eight hangers 3 on steel plate 4, on build overall lower weld channel-section steel 5, on build overall before and after side the first half welding shaped form stainless steel strip 2, shaped form stainless steel strip 2 is also welded and fixed with reinforcement steel plate 4, increase overall lifting surface area, on build overall before and after side the latter half weld semicircle steel loop 1, semicircle steel loop 1 and channel-section steel 5 weld together, prevent lifting rear lower shrinkage deformation.
Build overall middle part on described and be provided with arch beam 6, withholding for settling, increasing the stability played.
Described convex module 8 is made up of four cuboids, four cuboids are Container Dimensions, and square opening size is generally 2.2*2.3 rice, and the degree of depth according to actual needs, facilitate the living units of later stage Container Dimensions to propel to enter, contribute to accelerating construction speed and the replacing in later stage.
Build plane on the whole on described and be provided with four row's hangers 3, increase overall lifting surface area, lift by crane more stable.
Build overall and semicircle steel loop 1 on described, the junction of shaped form stainless steel strip 2 is provided with hex hole, be inserted with hexagon posts 9 in hex hole, hexagon posts 9 two ends are provided with symmetrical back-off 10, effectively can prevent loosening dropping; On build overall and semicircle steel loop 1, the junction of shaped form stainless steel strip 2 also can directly weld, the later stage just needs cutting slowly to remove, and efficiency is low spot a little.
Build on described after integral hoisting, semicircle steel loop 1 and shaped form stainless steel strip 2 are removed, be inserted in outside back-off 10 with steel disc during dismounting and just can have equally extracted, recover original appearance.
Using method of the present invention: above build integral constructing good after, connect horizontal hanger rod 7 with large-scale double marine loop wheel machine by hanger 3 to lift by crane, then be slowly transported on extra large work accommodation platform, then semicircle steel loop 1 and shaped form stainless steel strip 2 are carried out removing, this completes the quick load built, shorten construction period.

Claims (6)

1. entirety built by extra large work accommodation platform, it is characterized in that: comprise multiple convex module (8), the installation of multiple convex module (8) divides according to drawing carries out welding superposition, finally be built into entirety, steel plate (4) is strengthened in upper overall top weld horizontal of building, strengthen upper uniform welding eight hangers (3) of steel plate (4), on build overall lower weld channel-section steel (5), on build overall before and after side the first half welding shaped form stainless steel strip (2), shaped form stainless steel strip (2) is also welded and fixed with reinforcement steel plate (4), increase overall lifting surface area, on build overall before and after side the latter half weld semicircle steel loop (1), semicircle steel loop (1) and channel-section steel (5) weld together, prevent lifting rear lower shrinkage deformation.
2. entirety built by extra large work accommodation platform according to claim 1, it is characterized in that: build overall middle part on described and be provided with arch beam (6).
3. entirety built by extra large work accommodation platform according to claim 1, it is characterized in that: described convex module (8) is made up of four cuboids, and four cuboids are Container Dimensions, facilitates the living units of later stage Container Dimensions to propel and enters.
4. entirety built by extra large work accommodation platform according to claim 1, it is characterized in that: build plane on the whole on described and be provided with four row's hangers (3).
5. entirety built by extra large work accommodation platform according to claim 1, it is characterized in that: build overall and semicircle steel loop (1) on described, the junction of shaped form stainless steel strip (2) is provided with hex hole, hexagon posts (9) is inserted with in hex hole, hexagon posts (9) two ends are provided with symmetrical back-off (10), can effectively prevent from loosening dropping.
6. entirety built by extra large work accommodation platform according to claim 1, it is characterized in that: build after integral hoisting on described, semicircle steel loop (1) and shaped form stainless steel strip (2) are removed, recover original appearance.
CN201410495428.8A 2014-09-25 2014-09-25 Entirety built by sea work accommodation platform Expired - Fee Related CN104328773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410495428.8A CN104328773B (en) 2014-09-25 2014-09-25 Entirety built by sea work accommodation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410495428.8A CN104328773B (en) 2014-09-25 2014-09-25 Entirety built by sea work accommodation platform

Publications (2)

Publication Number Publication Date
CN104328773A CN104328773A (en) 2015-02-04
CN104328773B true CN104328773B (en) 2016-04-20

Family

ID=52403573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410495428.8A Expired - Fee Related CN104328773B (en) 2014-09-25 2014-09-25 Entirety built by sea work accommodation platform

Country Status (1)

Country Link
CN (1) CN104328773B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985754B (en) * 2019-12-19 2021-06-18 南通泰胜蓝岛海洋工程有限公司 Jacket anti-sinking plate with reinforcing structure and integral reinforcing process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101793019A (en) * 2010-01-28 2010-08-04 中国海洋石油总公司 Combined type movable living module of multifunctional self-elevating supporting platform for ocean oil field
CN102190065A (en) * 2010-03-10 2011-09-21 烟台来福士海洋工程有限公司 Construction method for ocean platform
CN203213088U (en) * 2013-04-17 2013-09-25 清华大学 Light composite structure pipe support type ocean platform
RU2504498C1 (en) * 2012-12-05 2014-01-20 Общество с ограниченной ответственностью "Научно-производственный центр "Родемос" Floating platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6019368B2 (en) * 1982-06-23 1985-05-16 川崎製鉄株式会社 How to weld and assemble the legs of the Jatsuki Atsushi rig

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101793019A (en) * 2010-01-28 2010-08-04 中国海洋石油总公司 Combined type movable living module of multifunctional self-elevating supporting platform for ocean oil field
CN102190065A (en) * 2010-03-10 2011-09-21 烟台来福士海洋工程有限公司 Construction method for ocean platform
RU2504498C1 (en) * 2012-12-05 2014-01-20 Общество с ограниченной ответственностью "Научно-производственный центр "Родемос" Floating platform
CN203213088U (en) * 2013-04-17 2013-09-25 清华大学 Light composite structure pipe support type ocean platform

Also Published As

Publication number Publication date
CN104328773A (en) 2015-02-04

Similar Documents

Publication Publication Date Title
CN205254034U (en) Evaporative pattern casting device
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN104328773B (en) Entirety built by sea work accommodation platform
CN104310235B (en) Maritime work accommodation platform complete superstructure lifting method
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN206643894U (en) Flange rack
CN205975337U (en) Braced chain formula arch ring template system architecture
CN103072194B (en) A kind of prefabricated reinforced concrete anticollision barrier mould
CN205669210U (en) Steel building concrete cup-shaped foundation inner bore die carrier
CN204659784U (en) A kind of seal ring electricity produces Suspension hand cart
CN205114102U (en) Frame is deposited, is transported in special use of prefabricated PCF board
CN203546612U (en) Wedge-shaped rail for bridge girder erection machine
CN201201112Y (en) Back side elevating gear of one-side welding two-side moulding welding mechanism
CN209299080U (en) A kind of rotor magnetic pole coil detachment device
CN203124593U (en) Device for cleaning up waste of forklift body stamping parts of forklift
CN206189862U (en) Firm cloth machine guide rail of movable
CN202007384U (en) Connecting device for bottom die and side die of suspended steel box in water
CN206144151U (en) Solid locking device of quick detachable concrete form
CN202657862U (en) Wallboard lift-out device
CN205955177U (en) Novel construct dedicated aluminum alloy template
CN207521804U (en) The guider of rotor rim keyway broaching tool
CN208777669U (en) A kind of elevated operating platform
CN204607381U (en) A kind of superimposed sheet Steel bar hanger
CN210366907U (en) Portable large-scale component roll-over stand
CN203448626U (en) Shelf of process equipment for manufacturing sand boxes for castings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20180925

CF01 Termination of patent right due to non-payment of annual fee