CN104317689A CN201410565933.5A CN201410565933A CN104317689A CN 104317689 A CN104317689 A CN 104317689A CN 201410565933 A CN201410565933 A CN 201410565933A CN 104317689 A CN104317689 A CN 104317689A
Authority
CN
China
Prior art keywords
data
ami
intelligent
unit
proving installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410565933.5A
Other languages
Chinese (zh)
Inventor
曹敏
张建伟
王骏
王裴劼
李盛恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Zhixun Information Science & Technology Co Ltd
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Guangzhou Zhixun Information Science & Technology Co Ltd
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Zhixun Information Science & Technology Co Ltd, Electric Power Research Institute of Yunnan Power System Ltd filed Critical Guangzhou Zhixun Information Science & Technology Co Ltd
Priority to CN201410565933.5A priority Critical patent/CN104317689A/en
Publication of CN104317689A publication Critical patent/CN104317689A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A data test device for AMI (advanced metering infrastructure) intelligent simulation equipment is formed by sequentially connecting an AMI intelligent simulation unit (1), a data receiving and verifying unit (2), a data analysis unit (3) and a data display unit (4). IEC61970CIM formatted data of AMI intelligent simulation equipment programs set up on an Android smart pad are verified, the verified data are analyzed and compared with standard IEC61970CIM formatted data to draw a conclusion so as to provide a reference for consistency verification of practical IEC61970CIM data of the AIM intelligent equipment.

Description

A kind of AMI intelligent simulation device data proving installation
Technical field
The invention belongs to intelligent metering field, relate to AMI intelligent simulation device data field tests.
Background technology
Intelligent grid has become the new advancement that world today's energy industry development is changed, embodies the progress of society, represents the direction of future development.Propose in the Study on Long-team Strategy of company to build intelligence, efficient, reliable, the green electrical network that covers town and country.And measure (in other words measure) as the large basis of modern industry three, especially in power industry, it is the requisite bases such as power industry controls, electric quantity balancing, cross charging, examination, economical operation, is directly to carry out concluding the business with user and the platform of interaction.Metering and metering intellectuality are an important component part and the important foundation of intelligent grid, and many Utilities Electric Co.s of American-European countries are considered as the pith of intelligent grid intelligent metering (Smart Metering) or senior measurement system (AMI) and build the first step of intelligent grid.
Current grid company just actively uses the technology such as computer technology, the communication technology, control technology to carry out deployment and the construction of marketing automation, information system and intelligent metering aspect, constantly carry out metering automation, intelligentized construction, and complete certain enforcement and construction gradually.
In conjunction with the feature of Yunnan Power System, for meeting company to the needs strengthening user interaction lifting level of customer service, improve integrated management level, support the aspects such as national electricity price, on the basis of a large amount of research work intelligent metering carried out in Yunnan Power System Institute of Electric Power, further the achievement in research of AMI demonstration project carried out promoting and apply in actual production, and in cloud electricity scientific and technological park, achieve the construction of AMI demonstration project, using this demonstration project as AMI correlation technique, equipment and systematic research, demonstration and display platform.Development, measurement data acquisition and way to manage to automatic data logging (Automated Meter Reading, AMR), then manage (AMM) then senior measurement system (AMI) up till now or intelligent metering to automatic instrument by manual metering.The system of current most domestic is still AMR and the AMM stage.
Summary of the invention
Under particular circumstances, real AMI smart machine data test cannot be carried out.The invention provides a kind of AMI intelligent simulation device data proving installation, the arrangement achieves the emulation of AMI smart machine, achieve AMI smart machine data test simultaneously.
To achieve these goals, a kind of AMI intelligent simulation device data proving installation of the present invention, the present invention is characterised in that, this device comprises with lower part:
A, AMI intelligent simulation unit, as the tested module of AMI intelligent simulation device data proving installation, provides IEC 61970 CIM formatted data to proving installation;
B, data receiver authentication unit, as the Receipt Validation module of AMI intelligent simulation device data proving installation, carry out Receipt Validation to the data that AMI intelligent simulation device transmission is come;
C, data analysis unit as the analysis module of AMI intelligent simulation device data proving installation, the data analysis after data Receipt Validation unit is verified;
D, data display unit, as the display module of AMI intelligent simulation device data proving installation, are shown the analysis result of data analysis unit.
Further, described AMI intelligent simulation unit comprises AMI intelligent simulation equipment; Described data receiver authentication unit comprises data receiver demo plant; Described data analysis unit comprises data analysis set-up; Described data display unit comprises data display device, shows data result.
Further, described AMI intelligent simulation unit comprises Android Intelligent flat, the SQLite database be deployed on Android Intelligent flat, the AMI intelligent simulation program module be deployed on Android Intelligent flat; Described data receiver authentication unit comprises industrial computer, the data receiver verification system be deployed on industrial computer, for storing the oracle database of data; Described data analysis unit comprises data analysis system; Described data display unit comprises external LED display.
Further, described AMI intelligent simulation program module, mainly comprises simulation electric energy meter, emulation concentrator, simulation management terminal, other AMI emulator; Described data analysis system, mainly comprises data comparator, data analyzer, forms the data analysis system of complete set, guarantees the IEC 61970 CIM formatted data of accurate validation AMI intelligent simulation equipment.
AMI intelligent simulation device data proving installation of the present invention, by the AMI intelligent simulation program module on Android Intelligent flat, in conjunction with data Receipt Validation unit and data analysis unit, test analysis is carried out to the IEC 61970 CIM formatted data of AMI intelligent simulation unit.
Accompanying drawing explanation
Fig. 1 is that the present invention uses process flow diagram;
Fig. 2 structural representation of the present invention.
Embodiment
Below in conjunction with Fig. 1, Fig. 2, the present invention will be further described in detail:
As Fig. 1, AMI intelligent simulation device data proving installation, the data meeting IEC 61970 CIM form are generated by AMI intelligent simulation unit 1, data receiver authentication unit 2 receives the data of AMI intelligent simulation unit 1 generation and verifies, then the data after checking are transferred to data analysis unit 3 to analyse and compare, ultimate analysis comparison result is shown at data display unit 4.
As Fig. 2, AMI intelligent simulation device data proving installation, form primarily of AMI intelligent simulation unit, AMI data receiver authentication unit, AMI data analysis unit, AMI data display unit.
Wherein, AMI intelligent simulation unit comprise Android Intelligent flat 1.1.1, the SQLite database 1.1.2 be deployed on Android Intelligent flat 1.1.1, the AMI intelligent simulation program module 1.1.3 be deployed on Android Intelligent flat 1.1.1; Wherein, AMI intelligent simulation program module 1.1.3 comprises simulation electric energy meter 1.1.3.1, emulation concentrator 1.1.3.2, simulation management terminal 1.1.3.3, other AMI emulator 1.1.3.4.AMI intelligent simulation program module 1.1.3 on Android Intelligent flat 1.1.1 emulates, and generates the data of IEC 61970 CIM form, first by data stored in SQLite database 1.1.2, then send data to AMI data receiver demo plant.
Wherein, AMI data receiver authentication unit comprise industrial computer 1.1.4, the data receiver verification system 1.1.5 be deployed on industrial computer 1.1.4, for storing the oracle database 1.1.6 of data.AMI data receiver authentication unit receives the data of the IEC 61970 CIM form that AMI intelligent simulation unit generates, first by data receiver verification system 1.1.5, data are verified, then the result is deposited in oracle database 1.1.6, the data after checking is transferred to AMI data analysis unit simultaneously.
Wherein, AMI data analysis unit comprises data analysis system 1.1.7.Data analysis system 1.1.7 comprises data comparator 1.1.9, data analyzer 1.1.10.Data after checking are first compared by the IEC 61970 CIM formatted data of data comparator 1.1.9 elder generation and standard by AMI data analysis unit, then comparative result are transferred to data analyzer 1.1.10 and analyze, obtain a result.
Wherein, AMI data display unit comprises LED and shows large-size screen monitors.Data conclusion after analysis, data and curves figure are shown large-size screen monitors at LED and represent by AMI data display device.

Claims (3)

1. an AMI intelligent simulation device data proving installation, it is characterized in that, this proving installation is sequentially connected to form by AMI intelligent simulation unit (1), data receiver authentication unit (2), data analysis unit (3), data display unit (4); Wherein,
A, AMI intelligent simulation unit (1), as the tested module of proving installation, provides IEC 61970 CIM formatted data to proving installation;
B, data receiver authentication unit (2), as the Receipt Validation module of proving installation, carry out Receipt Validation to the data that AMI intelligent simulation unit (1) transmits;
C, data analysis unit (3) as the analysis module of proving installation, the data analysis after data Receipt Validation unit (2) is verified;
D, data display unit (4), as the display module of proving installation, are shown the analysis result of data analysis unit (3).
2. a kind of AMI intelligent simulation device data proving installation according to claim 1, it is characterized in that, described AMI intelligent simulation unit comprises Android Intelligent flat (1.1.1), the SQLite database (1.1.2) be deployed on Android Intelligent flat (1.1.1), the AMI intelligent simulation program module (1.1.3) be deployed on Android Intelligent flat (1.1.1); Described data receiver authentication unit comprises industrial computer (1.1.4), the data receiver verification system (1.1.5) be deployed on industrial computer (1.1.4), for storing the oracle database (1.1.6) of data; Described data analysis unit comprises data analysis system (1.1.7); Described data display unit comprises external LED display (1.1.8).
3. a kind of AMI intelligent simulation device data proving installation according to claim 2, it is characterized in that, described AMI intelligent simulation program module (1.1.3), comprises simulation electric energy meter (1.1.3.1), emulation concentrator (1.1.3.2), simulation management terminal (1.1.3.3), other AMI emulator (1.1.3.4); Described data analysis system (1.1.7), comprises data comparator (1.1.9), data analyzer (1.1.10).
CN201410565933.5A 2014-10-22 2014-10-22 Data test device for AMI (advanced metering infrastructure) intelligent simulation equipment Pending CN104317689A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410565933.5A CN104317689A (en) 2014-10-22 2014-10-22 Data test device for AMI (advanced metering infrastructure) intelligent simulation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410565933.5A CN104317689A (en) 2014-10-22 2014-10-22 Data test device for AMI (advanced metering infrastructure) intelligent simulation equipment

Publications (1)

Publication Number Publication Date
CN104317689A true CN104317689A (en) 2015-01-28

Family

ID=52372924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410565933.5A Pending CN104317689A (en) 2014-10-22 2014-10-22 Data test device for AMI (advanced metering infrastructure) intelligent simulation equipment

Country Status (1)

Country Link
CN (1) CN104317689A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050182581A1 (en) * 2002-05-14 2005-08-18 Analysis And Measurement Services Corporation Testing of wire systems and end devices installed in industrial processes
CN102928689A (en) * 2012-09-28 2013-02-13 广东电网公司佛山供电局 Method for testing IEC 61970CIS interface of power distribution management system
CN203608218U (en) * 2013-12-06 2014-05-21 国家电网公司 Communication device of electric energy quality monitoring device IEC61850 consistency detection system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050182581A1 (en) * 2002-05-14 2005-08-18 Analysis And Measurement Services Corporation Testing of wire systems and end devices installed in industrial processes
CN102928689A (en) * 2012-09-28 2013-02-13 广东电网公司佛山供电局 Method for testing IEC 61970CIS interface of power distribution management system
CN203608218U (en) * 2013-12-06 2014-05-21 国家电网公司 Communication device of electric energy quality monitoring device IEC61850 consistency detection system

Similar Documents

Publication Publication Date Title
CN103746882B (en) The method of intelligent substation station level test
CN107678960B (en) Intelligent ammeter software black box testing system and method
CN105511294B (en) Simulation telemechanical Virtual Debugging method based on emulation IED devices
CN103812885A (en) Internet of Things energy metering method and device
US20150294037A1 (en) System and method for automated substation design and configuration
CN105447247A (en) Method and system for checking regulation and control information
CN103439592A (en) Method for intelligently testing intelligent substation on site
CN204291050U (en) A kind of dispatching and monitoring information check system
Armendariz et al. A co-simulation platform for medium/low voltage monitoring and control applications
CN106451792A (en) Telecontrol point checking system and method of intelligent transformer substation
CN103487695A (en) Detection device for merging unit based on analog input
CN102662152A (en) Electronic type mutual inductor as well as system and method for verifying merging unit
CN107797910A (en) A kind of evaluation method of dispatch automated system software quality
CN106569166B (en) A kind of test method in twin-core electric energy meter legality measurement portion
CN105467355A (en) Automatic testing method of electric energy meter and automatic testing device of same
CN202661620U (en) Verification system for electronic-type mutual inductor and for merging unit
CN103308808A (en) System and method for testing secondary device of intelligent substation automatically
CN113590471B (en) Communication terminal equipment simulation system and application method thereof
CN106301976A (en) A kind of intelligent substation schedule information automated testing method
CN204694835U (en) Connection box of electric energy meter emulation cabinet wiring portable testing system
CN204228947U (en) A kind of single-phase real load electric energy table calibration equipment
CN203433064U (en) Detecting device based on analog quantity input combining unit
CN103676669A (en) Method and system for checking motion information
CN104392398A (en) Import and export function test system and method of power distribution automation CIM (common information model)
CN104267284A (en) One-click cooperative testing and detecting method and device for stability control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination