CN104315915B - A kind of hanging supporting of cooling tower grid - Google Patents
A kind of hanging supporting of cooling tower grid Download PDFInfo
- Publication number
- CN104315915B CN104315915B CN201410489683.1A CN201410489683A CN104315915B CN 104315915 B CN104315915 B CN 104315915B CN 201410489683 A CN201410489683 A CN 201410489683A CN 104315915 B CN104315915 B CN 104315915B
- Authority
- CN
- China
- Prior art keywords
- bracket
- spandrel girder
- cooling tower
- filler
- hanging supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of hanging supporting of cooling tower grid, including tower body top spandrel girder, the water collection device being arranged on spandrel girder, the shower nozzle being arranged under spandrel girder, it is arranged at some support posts of the bracket below spandrel girder, the filler on bracket and tower body, described bracket is lifted on spandrel girder by suspension rod or lifting rope, described column is provided with the protuberance connected with bracket surrounding, bracket surrounding holder is hung on protuberance.Simple in construction, stable degree height not easily rocks, it is prevented that packing layer collapses.
Description
Technical field
The type of the present invention relates to relates to the suspension bracket of a kind of large-scale cooling stack and mechanical-draft cooling tower, particularly to the hanging suspension bracket of one of a kind of cooling tower filler.
Background technology
At present, the supporting form adopted in domestic and international adverse current cooling stack has following 3 kinds:
Simply-support supports
Packing assembles block two ends and is shelved on the supporting form on strip bearing.
Grid-net type supports
Packing adopts the supporting form of the sash shape bearing of cast iron double-edged fine-toothed comb one class.
Suspention supporting
The supporting of packing is freely-supported, and its supporting frame adopts suspension rod to be suspended in a kind of installation form on trickle layer beam.
Packing supporting form comparative analysis
Simply-support supports, lower girder and lower secondary beam form filler strip and shelve bearing, and the filler supported needs enough rigidity, and general solid wood filler, concrete fill etc. adopt, and plastic filler does not generally adopt this supporting form.Grid-net type supports, lower girder and lower secondary beam and cast iron double-edged fine-toothed comb or fiberglass filler bracket form filler sash and shelve bearing, and all fillers all can use this supporting form.Suspention supporting, is fixed on the horizon bar of enough rigidity by filler, and its bar adopts suspension rod (lifting rope) to be suspended in a kind of installation form on trickle layer beam.Owing to not descending girder, lower secondary beam, filler bracket, filler setting height(from bottom) is lowerd, and nozzle absolute altitude can reduce, and in vertical shaft, water level can reduce.Compare it can be seen that suspending supporting in midair is both reduced wind resistance area from above-mentioned, improve cooling capacity, circulating pump head can be reduced again, reduce water circulating pump energy consumption, be ideal filler arrangement form, but there is also technical deficiency.China Patent No. ZL201320374527 discloses a kind of suspension cooling tower filler suspension bracket, and filler is placed on grid-like support plate chord fagging and is suspended in the support pattern on dehydrater beam together by its technical scheme.This scheme can reach to eliminate the spandrel girder of filler bottom, expand the ventilation area in cooling tower and reduce flowing resistance, save construction investment or correspondingly reduce cooling tower floor space, but the filler that shortcoming is a) that the range of choice of filler is narrow, is suitable only for filler rigidity, intensity is high;B) sus-pension is because stable degree is poor, and installation, maintenance is easily rocked, and strengthens installation and maintenance difficulty;C) easily freezing area in cold, gripper shoe holds, because of insufficient strength, the weight can't stand after hanging ice, causes that packing layer collapses, it is impossible to ensure the service life of filler, affects to the greatest extent the normal operation of power plant.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, it is provided that a kind of simple in construction, stable degree height not easily rocks, it is prevented that the hanging supporting of cooling tower grid that packing layer collapses.
For realizing the object of the invention, provide techniques below scheme: a kind of hanging supporting of cooling tower grid, including tower body top spandrel girder, the water collection device being arranged on spandrel girder, the shower nozzle being arranged under spandrel girder, it is arranged at some support posts of the bracket below spandrel girder, the filler on bracket and tower body, described bracket is lifted on spandrel girder by suspension rod or lifting rope, it is characterized in that described column is provided with the protuberance connected with bracket surrounding, bracket surrounding holder is hung on protuberance.
As preferably, described bracket is tetragon, and four angles of bracket are hung on the protuberance of four root posts corresponding with bracket respectively.
As preferably, bracket is formed by connecting by channel-section steel is crisscross, and between channel-section steel, socket joint connects, and the composition that is intervally arranged between adjacent channel-section steel is latticed.
As preferably, described channel-section steel is fiberglass.
As preferably, bracket is glass fibre reinforced plastic bracket, is provided with glass-fiber reinforced plastic grille cushion block.
As preferably, described filler is bamboo packing, is directly placed on bracket.
Beneficial effects of the present invention: filler, cushion block hang on dehydrater beam by bracket together, bracket is taken again to put and is connected as a single entity with tower body on tower inner pillar protuberance simultaneously, thus forming the hanging supporting of grid, this support pattern is compared with domestic tradition support pattern, save the lower girder supporting filler in tower and lower secondary beam, the flowing resistance decreasing lower girder and lower secondary beam and cause, strengthens cooling effect.Owing to bracket and pillar are linked to be an entirety, solve problems such as rocking when abroad suspending supporting form in midair to filler rigidity, requirement of strength height and installation, maintenance, also increase the range of choice of filler, and avoid because winter hangs ice, cause, because of bracket insufficient strength, the danger that filler collapses.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Fig. 2 is the bracket schematic diagram of Fig. 1.
Detailed description of the invention
Embodiment 1: a kind of hanging supporting of cooling tower grid, including tower body top spandrel girder 001, it is arranged at the water collection device 002 on spandrel girder 001, it is arranged at the shower nozzle 003 under spandrel girder 001, it is arranged at the bracket 004 below spandrel girder 001, filler 005 on bracket 004 and the some support posts 006 of tower body, described bracket 004 is lifted on spandrel girder 001 by suspension rod or lifting rope 007, described column 006 is provided with the protuberance 061 connected with bracket 004 surrounding, bracket 004 surrounding holder is hung on protuberance 061, described bracket 004 is tetragon, 004 4 angles of bracket are hung on the protuberance 061 of four root posts 006 corresponding with bracket 004 respectively.
Embodiment 2: with reference to embodiment 1, bracket 004 is formed by connecting by channel-section steel is crisscross, between channel-section steel, socket joint connects, and the composition that is intervally arranged between adjacent channel-section steel is latticed.
Embodiment 3: with reference to embodiment 2, described channel-section steel is fiberglass.
Embodiment 4: with reference to embodiment 1, when bracket 004 is common glass fibre reinforced plastic bracket, be provided with glass-fiber reinforced plastic grille cushion block 041.
Embodiment 5: with reference to embodiment 1, when filler 005 is bamboo packing, can be directly placed in generic cradle 004, it is not necessary to glass-fiber reinforced plastic grille cushion block 041 is set.
Claims (6)
1. the hanging supporting of cooling tower grid, including tower body top spandrel girder, the water collection device being arranged on spandrel girder, the shower nozzle being arranged under spandrel girder, it is arranged at some support posts of the bracket below spandrel girder, the filler on bracket and tower body, described bracket is lifted on spandrel girder by suspension rod or lifting rope, it is characterized in that described column is provided with the protuberance connected with bracket surrounding, bracket surrounding holder is hung on protuberance.
2. a kind of hanging supporting of cooling tower grid according to claim 1, it is characterised in that described bracket is tetragon, and four angles of bracket are hung on the protuberance of four root posts corresponding with bracket respectively.
3. a kind of hanging supporting of cooling tower grid according to claim 1 and 2, it is characterised in that bracket is formed by connecting by channel-section steel is crisscross, and between channel-section steel, socket joint connects, and the composition that is intervally arranged between adjacent channel-section steel is latticed.
4. a kind of hanging supporting of cooling tower grid according to claim 3, it is characterised in that described channel-section steel is fiberglass.
5. a kind of hanging supporting of cooling tower grid according to claim 1, it is characterised in that bracket is glass fibre reinforced plastic bracket, is provided with glass-fiber reinforced plastic grille cushion block.
6. a kind of hanging supporting of cooling tower grid according to claim 1, it is characterised in that described filler is bamboo packing, is directly placed on bracket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410489683.1A CN104315915B (en) | 2014-09-24 | 2014-09-24 | A kind of hanging supporting of cooling tower grid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410489683.1A CN104315915B (en) | 2014-09-24 | 2014-09-24 | A kind of hanging supporting of cooling tower grid |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104315915A CN104315915A (en) | 2015-01-28 |
CN104315915B true CN104315915B (en) | 2016-07-20 |
Family
ID=52371181
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410489683.1A Active CN104315915B (en) | 2014-09-24 | 2014-09-24 | A kind of hanging supporting of cooling tower grid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104315915B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2341104Y (en) * | 1998-06-26 | 1999-09-29 | 苏远升 | Cooling lower support and limiter therefor |
CN201297885Y (en) * | 2008-11-14 | 2009-08-26 | 殷锡培 | Water pipe hanging rack in cooling tower |
CN204115558U (en) * | 2014-09-24 | 2015-01-21 | 宜兴亨达环保有限公司 | The hanging supporting of a kind of cooling tower graticule mesh |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2031079U (en) * | 1988-04-16 | 1989-01-18 | 麻寅敏 | Glass fibre reinforced plastics cooling tower |
-
2014
- 2014-09-24 CN CN201410489683.1A patent/CN104315915B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2341104Y (en) * | 1998-06-26 | 1999-09-29 | 苏远升 | Cooling lower support and limiter therefor |
CN201297885Y (en) * | 2008-11-14 | 2009-08-26 | 殷锡培 | Water pipe hanging rack in cooling tower |
CN204115558U (en) * | 2014-09-24 | 2015-01-21 | 宜兴亨达环保有限公司 | The hanging supporting of a kind of cooling tower graticule mesh |
Also Published As
Publication number | Publication date |
---|---|
CN104315915A (en) | 2015-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107248836A (en) | A kind of annular solar panels support and annular solar panels TRT | |
CN204115558U (en) | The hanging supporting of a kind of cooling tower graticule mesh | |
CN107687263B (en) | Suspension type protection frame, protection structure and double protection method | |
CN104315915B (en) | A kind of hanging supporting of cooling tower grid | |
CN202465215U (en) | Hanging basket mounting support for outer facade of building with slope roof | |
CN203478578U (en) | Support of air conditioner external unit | |
CN106698242B (en) | Support frame for pipeline installation | |
CN205257771U (en) | Torch integral hoisting support | |
CN207149366U (en) | Transformer and JP cabinet mounting structures | |
CN206987426U (en) | A kind of steel structure support frame | |
CN202191137U (en) | Umbrella holder | |
CN206462646U (en) | One kind leans on the hanging cabinet of wall | |
CN203639105U (en) | Suspension type temporary hoisting operation platform | |
CN204721285U (en) | Adjustable combination type hanger | |
CN213268648U (en) | Firm balcony guardrail with strengthening rib pole | |
CN203499091U (en) | Connecting piece used between I-shaped steel and suspended ceiling | |
CN205361761U (en) | Anchor chain mounted frame | |
CN211228107U (en) | Platform for bridge side cable construction | |
CN211524018U (en) | Heightening hanging basket hanging mechanism | |
CN204714417U (en) | A kind of power ramp device | |
CN208474640U (en) | A kind of novel process pipe-hanger support | |
CN211722838U (en) | Assembled hangs pot frame | |
CN211691734U (en) | High-strength steel structure tower | |
CN108005253B (en) | Outer wall structure with externally-hung fan | |
CN204854058U (en) | Wall -hanging solar water heater's of components of a whole that can function independently balcony heat collector installing support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Lu Jiping Inventor after: Wu Wenqin Inventor after: Liu Haiye Inventor before: Wu Wenqin Inventor before: Liu Haiye |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |