CN104315687B - A kind of grandstand air-conditioning ground air-supply structure and construction method - Google Patents

A kind of grandstand air-conditioning ground air-supply structure and construction method Download PDF

Info

Publication number
CN104315687B
CN104315687B CN201410525022.XA CN201410525022A CN104315687B CN 104315687 B CN104315687 B CN 104315687B CN 201410525022 A CN201410525022 A CN 201410525022A CN 104315687 B CN104315687 B CN 104315687B
Authority
CN
China
Prior art keywords
air
panel
grandstand
conditioning
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410525022.XA
Other languages
Chinese (zh)
Other versions
CN104315687A (en
Inventor
陈雪峡
郑凯华
姚华伟
金嘉玮
周晓莉
黄轶
曹文根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai Construction No 4 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 4 Group Co Ltd filed Critical Shanghai Construction No 4 Group Co Ltd
Priority to CN201410525022.XA priority Critical patent/CN104315687B/en
Publication of CN104315687A publication Critical patent/CN104315687A/en
Application granted granted Critical
Publication of CN104315687B publication Critical patent/CN104315687B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0227Ducting arrangements using parts of the building, e.g. air ducts inside the floor, walls or ceiling of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/10Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
    • E04H3/12Tribunes, grandstands or terraces for spectators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/08Installation or apparatus for use in sport halls, e.g. swimming pools, ice rings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of grandstand air-conditioning ground air-supply structure and construction method, belong to building technical field of sound isolation, for solving the problems, such as that traditional large stadium is big using upper air supply mode energy consumption.Grandstand air-conditioning ground air-supply structure includes air chamber, some ventilation ducts, air groove and some air outlets being sequentially communicated;Air chamber is arranged at the lower section of grandstand, air chamber is connected with air-conditioning main frame by pipeline, some ventilation ducts are arranged at intervals in vertical beam and/or panel along the bearing of trend of grandstand, vertical beam, panel, inner liner layer enclose to form air groove with the panel in ground or adjacent next stage step, air outlet is arranged in the vertical layer of external structure, and air outlet is connected with air groove.The grandstand air-conditioning ground air-supply structure of the present invention, reduces air-conditioning energy consumption, and air outlet is gently stable, with preferable comfort level, and is adapted to use in the large space of large stadium.The construction method for seeing tableland air-supply air outlet structure of the present invention is simple, shortens the duration.

Description

A kind of grandstand air-conditioning ground air-supply structure and construction method
Technical field
The invention belongs to technical field of sound isolation is built, more particularly to a kind of grandstand air-conditioning ground air-supply structure and construction method.
Background technology
The large stadiums such as the large-scale gymnasium and music hall of modernization are built, and need to meet the environmental requirement of comfort and health, I.e. suitable indoor air temperature, humidity, wind speed and noise criteria etc..However, traditional central air conditioner system is generally using top The air supply mode of canopy air-supply (upper to blow), makes air-supply air-flow be sufficiently mixed with room air, although so enabling to interior Humiture is spatially evenly distributed substantially, but indoor bleacher area air quality is poor, and air-conditioning system will undertake whole sky Between load, energy consumption is higher.Therefore, how to provide it is a kind of be adapted in the large space of large stadium use, energy consumption is low to be seen Platform air-conditioning structure and construction method are those skilled in the art's technical problems urgently to be resolved hurrily.
The content of the invention
It is an object of the invention to provide a kind of blowing with saving the low grandstand air-conditioning of space, energy consumption for large stadium Structure and construction method, to solve the problems, such as that traditional large stadium is big using upper air supply mode energy consumption.
To achieve these goals, the technical scheme is that:
A kind of grandstand air-conditioning ground air-supply structure, the grandstand include that at least two-stage is stepped the step of shape overlap joint, per grade The step includes a vertical beam, a panel and inner liner layer, and the panel is vertically installed in the top of the vertical beam, the face The horizontally extending segment distance in one end of plate, the other end of the panel and the vertical beam in adjacent upper level step Lower end vertically overlap, the inner liner layer is provided with the outside of the panel, the inner liner layer includes connected vertically The vertical layer of external structure level course and external structure, the vertical layer of the external structure are arranged at the side of one end of the panel and downwards Extend on ground or the panel in adjacent next stage step, the external structure level course is arranged at the one of the panel The upper surface at end and extend horizontally on the vertical layer of the external structure in adjacent upper level step, send the grandstand air-conditioning Wind structure includes air chamber, some ventilation ducts, air groove and some air outlets being sequentially communicated;The air chamber is arranged at institute The lower section of grandstand is stated, the air chamber is connected with air-conditioning main frame by pipeline, some ventilation duct prolonging along grandstand Stretch direction to be arranged at intervals in the vertical beam and/or the panel, the vertical beam, the panel, the inner liner layer with ground Panel in face or adjacent next stage step encloses to form the air groove, and the air outlet is arranged at the external structure and stands In layer, the air outlet is connected with the air groove.
Further, the inner liner layer includes the intermediate layer for setting gradually from inside to outside and decorative layer, positioned at outer Intermediate layer in the vertical layer of portion's structure extends downward the lower edge of the panel, and the decorative layer in the vertical layer of externally-located structure is to downward Ground or the panel in adjacent next stage step are extended, the air outlet is arranged at the institute positioned at the vertical layer of the external structure State in decorative layer.
Further, the air outlet is shaped as wedge shape.
Further, the air outlet and the angle β of the panel are 15 ° -45 °.
Further, the vertical beam and the panel are filled out near the side of the air groove and are provided with rock wool.
Further, also including air outlet grid, the air outlet grid is arranged at the air outlet away from the air One end of groove.
Further, the width of the air groove × a height of 300mm × 300mm.
The construction method of grandstand air-conditioning ground air-supply structure, comprises the steps:
Step one:Concreting first order step, and in the vertical beam or the panel of the first order step Reserve some installation holes;
Step 2:The concreting second level step above the first order step described in step one, and described second Some installation holes are reserved in the vertical beam or the panel of level step;
Step 3:Repeating said steps two, until completing the construction of whole grandstand;
Step 4:After the concrete of the grandstand reaches intensity requirement, if corresponding in some installation holes install Do the ventilation duct;
Step 5:Respectively the steps at different levels the panel upper surface and side surface construct successively from inside to outside institute Intermediate layer and the decorative layer are stated, and the air outlet is opened up on the decorative layer.
The present invention compared with prior art, has the advantage that and beneficial effect:
1st, the invention discloses a kind of grandstand air-conditioning ground air-supply structure, grandstand includes that at least two-stage is stepped shape overlap joint Step, every grade of step include a vertical beam, a panel and inner liner layer, and panel is vertically installed in the top of vertical beam, the one of panel A horizontally extending segment distance is held, the other end of panel is vertical with the lower end of the vertical beam in adjacent upper level step to be taken Connect, on the outside of panel, be provided with inner liner layer, inner liner layer includes external structure level course connected vertically and external structure Vertical layer, the vertical layer of external structure are arranged at the side of one end of panel and extend downward in ground or adjacent next stage step Panel on, external structure level course is arranged at the upper surface of one end of panel and extends horizontally in adjacent upper level step The vertical layer of external structure on;Air chamber that grandstand air-conditioning ground air-supply structure includes being sequentially communicated, some ventilation ducts, air groove and Some air outlets;Air chamber is arranged at the lower section of grandstand, and air chamber is connected with air-conditioning main frame by pipeline, some ventilation ducts Bearing of trend along grandstand is arranged at intervals in vertical beam and/or panel, vertical beam, panel, inner liner layer and ground or adjacent Next stage step in panel enclose to form air groove, air outlet is arranged in the vertical layer of external structure, air outlet and air groove Connection.Using grandstand air-conditioning ground air supply mode, air groove is sent to grandstand by air outlet after the air-conditioner wind in each tributary is converged again Space outerpace, so as to air-conditioner wind forms uniform temperature and speed in bleacher area, without strong blowing feeling, and avoids spectators Blow after brain, reached comfortable air-supply effect.And, air-conditioner wind is produced by boasting from the air outlet positioned at step side, is from sight Blow under many seat bottoms, the load of whole venue large space need not be undertaken, the energy consumption of air-conditioning is reduced, improve air-supply effect Rate.
2nd, the construction method of grandstand air-conditioning of the invention ground air-supply structure, by peace is reserved in grandstand main structure construction Dress hole, then lays ventilation shaft again in the decorative layer of grandstand of constructing in reserved installation air-conditioning, easy to operate, saves Engineering time.Meanwhile, it is capable to the scale construction in the large stadiums such as gymnasium, music hall is realized, with preferably popularization Meaning.
Description of the drawings
The grandstand air-conditioning ground air-supply structure of the present invention and construction method are given by below example and accompanying drawing.
Fig. 1 is the structural representation of the grandstand air-conditioning ground air-supply structure of one embodiment of the invention;
Fig. 2 is the partial enlarged drawing in A portions in Fig. 1.
Specific embodiment
The grandstand air-conditioning ground air-supply structure and construction method of the present invention are made into one below in conjunction with the drawings and specific embodiments Step is described in detail.According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that, it is attached Figure in the form of simplifying very much and uses non-accurately ratio, only real conveniently, lucidly to aid in illustrating the present invention Apply the purpose of example.
The grandstand air-conditioning ground air-supply structure of one embodiment of the invention is described in detail with reference to Fig. 1 and Fig. 2.
Fig. 1 is the side view of the large stadium grandstand such as gymnasium or music hall, and Fig. 2 is the partial enlarged drawing in A portions in Fig. 1.
As shown in Fig. 2 grandstand includes that at least two-stage is stepped the step of shape overlap joint, every grade of step includes a vertical beam 1, Panel 2 and inner liner layer (not shown), panel 2 are vertically installed in the top of vertical beam 1, and one end of panel 2 is along level Direction extends a distance into, and the other end of panel 2 is vertical with the lower end of the vertical beam 1 in adjacent upper level step to be overlapped, panel 2 Outside be provided with inner liner layer, inner liner layer include external structure level course (not shown) connected vertically with it is outside The vertical layer (not shown) of structure, the vertical layer of external structure be arranged at the side of one end of panel 2 and extend downward ground or On panel 2 in adjacent next stage step, external structure level course is arranged at the upper surface of one end of panel 2 and horizontal-extending To the vertical layer of external structure in adjacent upper level step, air chamber 5 that grandstand air-conditioning ground air-supply structure includes being sequentially communicated, Some ventilation ducts 6, air groove 7 and some air outlets 8;Air chamber 5 is arranged at the lower section of grandstand, air chamber 5 by pipeline with Air-conditioning main frame (not shown) is connected, some ventilation ducts 6 along the bearing of trend of grandstand be arranged at intervals at vertical beam 1 and/ Or in panel 2, vertical beam 1, panel 2, inner liner layer enclose to form air with the panel 2 in ground or adjacent next stage step Groove 7, air outlet 8 are arranged in the vertical layer of external structure, and air outlet 8 is connected with air groove 7.
With continued reference to Fig. 2, generally, the large stadium such as stadiums or music hall, space are tall and big, and indoor occupant is concentrated, and And when watching program, indoor closing is strict to criteria of noise control.The present embodiment to see that tableland air-supply structure disclosure satisfy that aforementioned Require.Specifically, air-supply structure air-supply in tableland seen using the present embodiment, air-conditioner wind is first by the pipe of air-conditioning main frame Road enters some air chambers 5, and as each air chamber 5 is connected with some ventilation ducts 6, thus air-conditioner wind flows through air chamber 5 and enters Ventilation duct 6 forms tributary, and then the air-conditioner wind in each tributary is each passed through some ventilation ducts 6 and is all pooled to air groove 7, finally The air-conditioner wind that Jing converges enters grandstand space outerpace by the air outlet 8 being correspondingly arranged with air groove 7, puts down so as to reach bleacher area Slow stable air-supply effect.That is, in the grandstand of the stairstepping being made up of multi-stage stairs, being provided with per one-level step One row stand seat, is provided with an air groove 7, the vertical layer of external structure of panel 2 in the corresponding one-level step for often arranging under-seat Middle setting air outlet 8, air outlet 8 are connected with air groove 7.As each tributary air-conditioner wind is mixed by air groove 7, serve buffering and make With so as to air-conditioner wind forms uniform temperature field and velocity field in bleacher area, without strong blowing feeling, and avoiding spectators' brain After blow, reached comfortable air-supply effect.And, air-conditioner wind is from the vertical layer of external structure of the panel 2 positioned at step side Air outlet 8 produce by boasting, be under seat bottom blow, air-conditioner wind is delivered to into gallery directly, the big sky of whole venue need not be undertaken Between load, reduce the energy consumption of air-conditioning, improve air-supply efficiency.Additionally, carry out in the venues table tennis, shuttlecock, When basketball, vollyball etc. are competed, all wind speed size is required.Using grandstand air-conditioning ground air supply mode, the wind speed of air outlet 8 all exists In the wind speed range of regulation, various ball games are not affected, disclosure satisfy that environment of the various sports items to competition area Require.Certainly, in order to save energy as far as possible, can be arranged using multisystem subregion and seen according to spectators in grandstand distribution situation The air-conditioning in platform area.
With continued reference to Fig. 2, inner liner layer includes the intermediate layer 3 for setting gradually from inside to outside and decorative layer 4, positioned at outer Intermediate layer 3 in the vertical layer of portion's structure extends downward the lower edge of panel 2, and the decorative layer 4 in the vertical layer of externally-located structure is to downward Ground or the panel 2 in adjacent next stage step are extended, air outlet 8 is arranged at the decorative layer 4 of the vertical layer of externally-located structure In.Meanwhile, the decorative layer 4 positioned at the side surface of panel 2 is extended on the panel 2 in next stage step downwards.
With continued reference to Fig. 2, generally, according to the structure stress stability of the size and step at different levels of air quantity, determine logical The number of airduct 6.Some ventilation ducts 6 are respectively independently disposed through in vertical beam 1 or in panel 2.The some of every grade of step are led to Airduct 5 is connected with an air groove 7 being correspondingly arranged in this grade of step.Spectators' seat is arranged at the top of panel 2, and panel 2 is hanging near the side of air outlet 8, i.e., panel 2 only has one end stress, and the other end of panel 2 is ridden upon in vertical beam 1.Therefore In order to meet 2 structure stress stability requirement of panel, the size of air groove 7 can select be:Width × a height of 300mm × 300mm, Its length can be consistent with the length of step, or other can meet air quantity, wind speed and ledge structure stability feature and want The appropriate length asked.
With continued reference to Fig. 2, especially, in order to preferably lift air-conditioner wind air-supply efficiency, air outlet 8 is shaped as wedge shape. By the air outlet 8 for designing wedge shape, can cause the air-conditioner wind transmitted by air groove 7 from bottom to top air draft and produce turbulent flow, from And the energy consumption of reduction air-conditioner wind, realize efficiently blowing.The size of air-supply is needed according to air force and unit interval, is gone out Air port 8 is 15 ° -45 ° with the angle β of panel 2.
With continued reference to Fig. 2, in order to meet the sound-insulation noise requirement in large-scale place space, vertical beam 1 and panel 2 are near air groove 7 side is filled out and is provided with rock wool 9.
With continued reference to Fig. 2, further, grandstand air-conditioning ground air-supply structure also includes air outlet grid (not shown), Air outlet grid is arranged at the one end of air outlet 8 away from air groove 7, so that the air-supply of air-conditioner wind ground is more stable, more gently, More comforts are brought to spectators.
Continue with the construction method of the grandstand air-conditioning ground air-supply structure for describing the present invention with reference to Fig. 2 in detail.
The construction method of grandstand air-conditioning ground air-supply structure, comprises the steps:
Step one:Concreting first order step, and some peaces are reserved in the vertical beam 1 or panel 2 of first order step Dress hole (not shown);
Step 2:The concreting second level step above the first order step of step one, and in second level step Some installation holes are reserved in vertical beam 1 or panel 2;
Step 3:Repeat step two, until completing the construction of whole grandstand;
Step 4:It is after the concrete of grandstand reaches intensity requirement, corresponding in some installation holes that some ventilation ducts are installed 6;
Step 5:Respectively steps at different levels panel 2 upper surface and side surface from inside to outside successively construct 3 He of intermediate layer Decorative layer 4, and air outlet 8 is opened up on decorative layer 4.
Specifically, in grandstand air-conditioning ground air-supply structure construction method, it is that peace is reserved in grandstand main structure construction Dress hole, then lays ventilation shaft again in the decorative layer of grandstand of constructing in reserved installation air-conditioning, easy to operate, saves Engineering time.
In sum, in grandstand air-conditioning of the invention ground air-supply structure, grandstand includes that at least two-stage is stepped shape overlap joint Step, every grade of step includes a vertical beam, a panel and inner liner layer, and panel is vertically installed in the top of vertical beam, panel The horizontally extending segment distance in one end, the other end of panel is vertical with the lower end of the vertical beam in adjacent upper level step to be taken Connect, on the outside of panel, be provided with inner liner layer, inner liner layer includes external structure level course connected vertically and external structure Vertical layer, the vertical layer of external structure are arranged at the side of one end of panel and extend downward in ground or adjacent next stage step Panel on, external structure level course is arranged at the upper surface of one end of panel and extends horizontally in adjacent upper level step The vertical layer of external structure on;Air chamber that grandstand air-conditioning ground air-supply structure includes being sequentially communicated, some ventilation ducts, air groove and Some air outlets;Air chamber is arranged at the lower section of grandstand, and air chamber is connected with air-conditioning main frame by pipeline, some ventilation ducts Bearing of trend along grandstand is arranged at intervals in vertical beam and/or panel, vertical beam, panel, inner liner layer and ground or adjacent Next stage step in panel enclose to form air groove, air outlet is arranged in the vertical layer of external structure, air outlet and air groove Connection.Using grandstand air-conditioning ground air supply mode, air groove is sent to grandstand by air outlet after the air-conditioner wind in each tributary is converged again Space outerpace, so as to air-conditioner wind forms uniform temperature and speed in bleacher area, without strong blowing feeling, and avoids spectators Blow after brain, reached comfortable air-supply effect.And, air-conditioner wind is produced by boasting from the air outlet positioned at step side, is from sight Blow under many seat bottoms, the load of whole venue large space need not be undertaken, the energy consumption of air-conditioning is reduced, improve air-supply effect Rate.Additionally, air outlet be wedge-type shape, air-conditioner wind from air outlet out when, air draft from bottom to top, such that it is able to further be lifted The air-supply efficiency of air-conditioner wind.Rock wool is set by filling out near the side of air groove in vertical beam and panel, reduction air-supply noise is served Effect.And, the construction method of grandstand air-conditioning ground air-supply structure is simple, it is only necessary to reserves in grandstand main structure construction and installs Hole, it is easy for installation, shorten the duration.
The foregoing description of the present invention is only the description to present pre-ferred embodiments, not any limit to the scope of the invention It is fixed.Any change that those skilled in the art is done according to the disclosure above content, modification, belong to the protection model of claim Enclose.

Claims (8)

1. a kind of grandstand air-conditioning ground air-supply structure, the grandstand include that at least two-stage is stepped the step of shape overlap joint, per grade of institute Stating step includes a vertical beam, a panel and inner liner layer, and the panel is vertically installed in the top of the vertical beam, the panel The horizontally extending segment distance in one end, the other end of the panel and the vertical beam in adjacent upper level step Lower end vertically overlaps, and the inner liner layer is provided with the outside of the panel, and the inner liner layer includes connected vertically outer The vertical layer of portion's constitution water flat bed and external structure, the vertical layer of the external structure are arranged at the side of one end of the panel and to downward Extend on ground or the panel in adjacent next stage step, the external structure level course is arranged at one end of the panel Upper surface and extend horizontally on the vertical layer of the external structure in adjacent upper level step, it is characterised in that it is described to see Platform air-conditioning ground air-supply structure includes air chamber, some ventilation ducts, air groove and some air outlets being sequentially communicated;The air Chamber is arranged at the lower section of the grandstand, and the air chamber is connected with air-conditioning main frame by pipeline, some ventilation duct edges The bearing of trend for grandstand is arranged at intervals in the vertical beam and/or the panel, the vertical beam, the panel, the outside Structure sheaf encloses to form the air groove with the panel in ground or adjacent next stage step, and the air outlet is arranged at described In the vertical layer of external structure, the air outlet is connected with the air groove.
2. grandstand air-conditioning as claimed in claim 1 ground air-supply structure, it is characterised in that the inner liner layer is included by introversion The intermediate layer for setting gradually outward and decorative layer, the intermediate layer in the vertical layer of externally-located structure are extended downward under the panel Edge, the decorative layer in the vertical layer of externally-located structure extend downward ground or the panel in adjacent next stage step, described Air outlet is arranged in the decorative layer of the vertical layer of the external structure.
3. grandstand air-conditioning as claimed in claim 1 or 2 ground air-supply structure, it is characterised in that the air outlet is shaped as wedge Shape.
4. grandstand air-conditioning as claimed in claim 3 ground air-supply structure, it is characterised in that the folder of the air outlet and the panel Angle beta is 15 ° -45 °.
5. grandstand air-conditioning as claimed in claim 4 ground air-supply structure, it is characterised in that the vertical beam and the panel are near institute The side for stating air groove is filled out and is provided with rock wool.
6. grandstand air-conditioning as claimed in claim 5 ground air-supply structure, it is characterised in that also including air outlet grid, it is described go out Air port grid is arranged at the one end of the air outlet away from the air groove.
7. grandstand air-conditioning as claimed in claim 6 ground air-supply structure, it is characterised in that the width of the air groove × a height of 300mm×300mm。
8. the grandstand air-conditioning as described in any one of claim 2 to 7 air-supply structure construction method, it is characterised in that work as institute When stating inner liner layer and including intermediate layer and decorative layer, comprise the steps:Step one:Concreting first order step, And some installation holes are reserved in the vertical beam or the panel of the first order step;Step 2:Described in step one Concreting second level step above first order step, and it is pre- in the vertical beam or the panel of the second level step Stay some installation holes;Step 3:Repeating said steps two, until completing the construction of whole grandstand;Step 4:Treat the grandstand It is after concrete reaches intensity requirement, corresponding in some installation holes that some ventilation ducts are installed;Step 5:Respectively each The upper surface of the panel of the level step and side surface are constructed the intermediate layer and the decorative layer from inside to outside successively, and The air outlet is opened up on the decorative layer.
CN201410525022.XA 2014-10-08 2014-10-08 A kind of grandstand air-conditioning ground air-supply structure and construction method Active CN104315687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410525022.XA CN104315687B (en) 2014-10-08 2014-10-08 A kind of grandstand air-conditioning ground air-supply structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410525022.XA CN104315687B (en) 2014-10-08 2014-10-08 A kind of grandstand air-conditioning ground air-supply structure and construction method

Publications (2)

Publication Number Publication Date
CN104315687A CN104315687A (en) 2015-01-28
CN104315687B true CN104315687B (en) 2017-03-29

Family

ID=52370958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410525022.XA Active CN104315687B (en) 2014-10-08 2014-10-08 A kind of grandstand air-conditioning ground air-supply structure and construction method

Country Status (1)

Country Link
CN (1) CN104315687B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824852B (en) * 2018-05-29 2021-08-31 中国建筑第二工程局有限公司 Large-scale arc-shaped steel frame stand space positioning and mounting construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2133359A1 (en) * 1994-09-30 1996-03-31 Eberhard H. Zeidler Auditorium Air Circulation System
JP2001108290A (en) * 1999-10-04 2001-04-20 Takenaka Komuten Co Ltd Floor structure for spectator seats in tiers
JP2001116339A (en) * 1999-10-18 2001-04-27 Ohbayashi Corp Outlet port device
JP2001165496A (en) * 1999-12-03 2001-06-22 Takenaka Komuten Co Ltd Chamber for supplying conditioned air to stepwise audience seat
CN101498490A (en) * 2008-01-29 2009-08-05 中建国际(深圳)设计顾问有限公司 Air supply system under seat
CN204165191U (en) * 2014-10-08 2015-02-18 上海建工四建集团有限公司 A kind of grandstand air-conditioning ground air-supply structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2133359A1 (en) * 1994-09-30 1996-03-31 Eberhard H. Zeidler Auditorium Air Circulation System
JP2001108290A (en) * 1999-10-04 2001-04-20 Takenaka Komuten Co Ltd Floor structure for spectator seats in tiers
JP2001116339A (en) * 1999-10-18 2001-04-27 Ohbayashi Corp Outlet port device
JP2001165496A (en) * 1999-12-03 2001-06-22 Takenaka Komuten Co Ltd Chamber for supplying conditioned air to stepwise audience seat
CN101498490A (en) * 2008-01-29 2009-08-05 中建国际(深圳)设计顾问有限公司 Air supply system under seat
CN204165191U (en) * 2014-10-08 2015-02-18 上海建工四建集团有限公司 A kind of grandstand air-conditioning ground air-supply structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
国家体育馆看台区空调均衡下送风施工技术;曹旭明;《安装》;20100331(第3期);29-31 *
福州海峡奥体中心体育馆大型封闭空间看台空调系统预留预埋技术;郭常胜,蒋清容,张超;《施工技术》;20140430;第43卷(第8期);77-79 *

Also Published As

Publication number Publication date
CN104315687A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
US20130283708A1 (en) Tropical chimney, namely ventilation well with hurricane-resistant function, and associated building and kit
CN104315687B (en) A kind of grandstand air-conditioning ground air-supply structure and construction method
CN204165191U (en) A kind of grandstand air-conditioning ground air-supply structure
CN101428723B (en) Elevator device
US9181694B1 (en) Segmented building construction with multiple facades
CN208154753U (en) A kind of grid ceiling making Uniform Ventilation throughout the room
CN105133774B (en) Combined assembly type suspended ceiling reverse support system structure and designing and installing integrated method
US10472838B1 (en) Fan first integrated stadia bowl construction method
CN103883059B (en) Hidden dress functional module Integral ceiling
CN109057131A (en) A kind of integrated form furred ceiling and its installation method
CN204001859U (en) The performance venue of the anti-arc wall construction of intelligence wind system
CN209686688U (en) Floor piece ventilation duct structure and aeration structure
CN204960371U (en) Container formula removes room
CN213630791U (en) Dual-purpose attached ventilation air current environment of tie epidemic regulation and control device
CN203413791U (en) Air supplying handrail of air conditioner
CN107503529B (en) A kind of building static pressure cell structure and its construction method
CN208755449U (en) A kind of bearing type adjustable seat air-supply mouth structure
CN206503384U (en) Build static pressure cell structure
CN109629689B (en) Green dome for building
CN112154966A (en) Ultrahigh-drop-level waterscape waterfall system for mall and circulating water control method of ultrahigh-drop-level waterscape waterfall system
CN206771617U (en) Industrial humidifier
CN206310665U (en) A kind of air blow and return construction minimized based on interior space intervention
CN205119384U (en) High -rise building wind energy utilization system
CN106760679A (en) Building static pressure cell structure and its construction method
CN110439326A (en) A kind of toilet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant