Prior art keywords
plenum chamber
seat region
static pressure
pressure cell
centrifugally glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720165140.3U
Other languages
Chinese (zh)
Inventor
王秋江
李学荣
江海新
薛明
张敏
吕豪
梁新利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Original Assignee
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Engineering Co Ltd Beijing Urban Construction Group filed Critical No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority to CN201720165140.3U priority Critical patent/CN206503384U/en
Application granted granted Critical
Publication of CN206503384U publication Critical patent/CN206503384U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

Static pressure cell structure is built the utility model discloses one kind, building includes auditorium seat region, seat region structural slab and curb girder, structure base slab layer and floor layer;Seat region structural slab is exported with curb girder provided with whirlwind;Auditorium seat region is arranged on seat region structural slab and curb girder;Structure base slab layer is located above floor layer;The building static pressure cell structure includes the first plenum chamber and the second plenum chamber;Second plenum chamber is arranged on structure base slab layer top;First plenum chamber be separately positioned on floor layer and structure base slab layer between, and the second plenum chamber top.The utility model can effectively save space:Plenum chamber is formed using the smaller space sealing of the Anomalistic space of under-seat, effectively saves space.In addition conventional airduct can also be solved can not construction problem:Plenum chamber can solve the problem of ladder under-seat ajutage arrangement is more difficult, simplify ventilating system, improve the combination property of ventilating system.

Description

Build static pressure cell structure
Technical field
The invention belongs to plenum chamber construction technique field, more particularly to a kind of building static pressure cell structure.
Background technology
China's economy constantly flourishes in recent years, and the income level of entire society constantly increases, the culture of the people Life requirement is gradually stepped up, this facilitate the development of China's cultural undertakings, the newly-built building of many arenas properties in all parts of the country. At present, in order to improve cinema, gymnasium, the air-supply quality in conference hall room, air inlet is set in the bottom at each seat, Reserving hole installs ajutage on the concrete floor of fixed seating, and plenum chamber formation plenum chamber is installed in the lower section of floor.
Plenum chamber is a closed space, the certain pressure that can keep the air in it, can make multiple air-out The air-out of mouth becomes uniform, effectively reduces the noise of air conditioning duct system, reduces the kinetic pressure losses of wind system.Plenum chamber air-supply system System not only has the characteristics of air output is big, noise is low, and gallery one uniform temperature of formation can be made with velocity field, simultaneously And can avoid producing wind and the strong blowing feeling of generation after brain, so as to give spectators to build a comfortable watching environment.
The content of the invention
Static pressure cell structure is built it is an object of the invention to provide one kind.
One kind building static pressure cell structure, building includes auditorium seat region, seat region structural slab and curb girder, structure base slab layer And floor layer;Seat region structural slab is exported with curb girder provided with whirlwind;Auditorium seat region is arranged on seat region structural slab and curb girder On;Structure base slab layer is located above floor layer;The building static pressure cell structure includes the first plenum chamber and the second plenum chamber;It is described Second plenum chamber is arranged on structure base slab layer top;First plenum chamber is separately positioned on floor layer and structure base slab layer Between, and the second plenum chamber top.
Building static pressure cell structure as described above of the invention, further, first plenum chamber includes:Plenum chamber steelframe, Centrifugally glass-wool plate, galvanized iron sheet and plenum chamber backboard;The centrifugally glass-wool plate is covered in the bottom table of seat region structural slab Face and the side of curb girder;The galvanized iron sheet is covered in centrifugally glass-wool plate surface;The plenum chamber steelframe includes main joist, secondary Keel and suspension rod;Main joist and secondary joist the cross-fixing connection, main joist passes through suspension rod and seat region structural slab or curb girder Connection;Mutual lap seal splicing between the plenum chamber backboard, and it is fixed on the bottom surface and side of plenum chamber steelframe.
Building static pressure cell structure of the invention as described above, further, the plenum chamber backboard includes horizontal bar keel, zinc-plated Iron sheet and centrifugally glass-wool plate;The centrifugally glass-wool plate is arranged in the framework surrounded by horizontal bar keel, galvanized iron sheet cladding In the outside of horizontal bar keel, and leave overlap edge.
Building static pressure cell structure as described above of the invention, further, the suspension rod is angle steel, and the outside of angle steel scribbles pellet Red antirust paint, and angle steel outsourcing heat-insulation layer.
Building static pressure cell structure as described above of the invention, further, building also includes ceiling decoration, fan coil, wind Pipe, fire-fighting spray pipe, fulgurite, ceiling decoration, fan coil, airduct, fire-fighting spray pipe, fulgurite are each attached to the plenum chamber steel On frame.
Building static pressure cell structure as described above of the invention, further, the main joist is 10# channel-section steels, the secondary joist It is the angle steel of L50 × 5 with suspension rod;The thickness of the galvanized iron sheet is 1mm, and the thickness of the centrifugally glass-wool is 30mm.
Building static pressure cell structure as described above of the invention, further, second plenum chamber includes:Centrifugally glass-wool, Galvanized iron sheet and secondary structure wall;The centrifugally glass-wool plate is covered in the lower surface of seat region structural slab and the side of curb girder Face;The galvanized iron sheet is covered in centrifugally glass-wool plate surface;Centrifugally glass-wool plate is fixed on structure base slab layer by bar for line Upper surface, galvanized iron sheet is covered in centrifugally glass-wool surface and is fixed on by expansion bolt on structure base slab layer;Expansion bolt Increase gluing processing in rubber pad, and hole at hole;Secondary structure wall top is tightly connected with seat region structural slab, below with Structure base slab layer is tightly connected.
The beneficial effects of the invention are as follows:
1st, the comfortableness of audience area is improved:Audience area forms a uniform temperature and velocity field, no blowing feeling, keeps away Exempt from spectators and produce wind after brain, while noise can be effectively reduced, improve the comfortableness of spectators' event watching.
2nd, sports field environmental requirement is met:Meet indoor various ball and other various physical culture ratios for being required to wind speed Contest item mesh.
3rd, space is effectively saved:Plenum chamber is formed using the smaller space sealing of the Anomalistic space of under-seat, is had The saving space of effect.
4th, solving conventional airduct can not construction problem:It is more difficult that plenum chamber can solve ladder under-seat ajutage arrangement Problem, simplifies ventilating system, improves the combination property of ventilating system.
5th, comprehensive branch suspension rod:Plenum chamber steelframe solves it as the branch suspension rod of the equipment of other systems, pipeline and furred ceiling His system equipment, pipeline branch suspension rod can not installation questions.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, above-mentioned and/or other aspects of the invention and advantage will become Become apparent from and be easier to understand, these accompanying drawings are schematical, are not intended to limit the present invention, wherein:
Fig. 1 is the building plenum chamber structural representation of an embodiment of the present invention;
Fig. 2 is the first plenum chamber schematic diagram of an embodiment of the present invention;
Fig. 3 is the plenum chamber steelframe schematic diagram of an embodiment of the present invention;
Fig. 4 is the suspension rod and seat region structural slab connection diagram of an embodiment of the present invention;
Fig. 5 is the suspension rod and curb girder schematic diagram of an embodiment of the present invention;
Fig. 6 is the plenum chamber backboard schematic diagram of an embodiment of the present invention;
Fig. 7 is two pieces of plenum chamber backboard connection diagrams of an embodiment of the present invention;
Fig. 8 connects schematic cross-section for two pieces of plenum chamber backboards of an embodiment of the present invention;
Fig. 9 is that rotary glass is installed in the lower surface of the seat region structural slab of an embodiment of the present invention and the side of curb girder Cotton plate and galvanized iron sheet schematic diagram;
Figure 10 is that centrifugation glass is installed in the lower surface of the seat region structural slab of an embodiment of the present invention and the side of curb girder Glass cotton plate and galvanized iron sheet schematic diagram;
Figure 11 is the joint treatment schematic diagram of an embodiment of the present invention;
Figure 12 is the second plenum chamber schematic diagram of an embodiment of the present invention;
Figure 13 is the construction method flow chart of the building static pressure cell structure of an embodiment of the present invention.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, the first plenum chamber, 11, main joist, 12, secondary joist, 13, suspension rod, 14, centrifugally glass-wool plate, 15, galvanized iron sheet, 16th, plenum chamber backboard, 17, steel plate, 18, expansion bolt, 19, horizontal bar keel;
2nd, the second plenum chamber, 21, secondary structure wall, 22, construction hole;
3rd, seat region structural slab and curb girder, 31, seat region structural slab, 32, curb girder, 33, whirlwind outlet;
4th, floor layer;
5th, structure base slab layer;
6th, ajutage;
7th, joint glue.
Embodiment
Hereinafter, the embodiment of the building static pressure cell structure of the present invention is described with reference to the accompanying drawings.
The embodiment recorded herein is the specific embodiment of the present invention, the design for illustrating the present invention, It is explanatory and exemplary, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein Implement exception, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious The other technical schemes being clear to, these technical schemes include any obvious using making for the embodiment to recording herein The technical scheme of substitutions and modifications.
The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each several part And its correlation.It note that between the structure of each part for the ease of clearly showing the embodiment of the present invention, each accompanying drawing Do not drawn according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 1 shows the building static pressure cell structure of an embodiment of the present invention, and building includes auditorium seat region, seat region knot Structure plate and curb girder 3, structure base slab layer 5 and floor layer 4;Seat region structural slab is with curb girder 3 provided with whirlwind outlet 33;Auditorium's seat Area is arranged on seat region structural slab and curb girder 3;Structure base slab layer 5 is located at the top of floor layer 4;Building static pressure cell structure includes the One plenum chamber 1 and the second plenum chamber 2;Second plenum chamber 2 is arranged on 5 top of structure base slab layer;First plenum chamber 1 is separately positioned on Floor layer 4 and structure base slab layer 5 between, and the second plenum chamber 2 top.The plenum chamber of ajutage 6 and first, the second plenum chamber Full air-treatment unit is delivered to plenum chamber by connection, ajutage, further enters auditorium seat region by whirlwind outlet.
Fig. 2 is first plenum chamber of an embodiment of the present invention, and first plenum chamber 1 includes:Plenum chamber steelframe, centrifugation glass Glass cotton plate 14, galvanized iron sheet 15 and plenum chamber backboard 16;Centrifugally glass-wool plate 14 is covered in the bottom table of seat region structural slab 31 Face and the side of curb girder 32;Galvanized iron sheet 15 is covered in the surface of centrifugally glass-wool plate 14;As shown in figure 3, plenum chamber steelframe includes Main joist 11, secondary joist 12 and suspension rod 13;Main joist 11 and the cross-fixing of secondary joist 12 connection, main joist 11 by suspension rod 13 with Seat region structural slab or curb girder connection(As shown in Figure 4 and Figure 5);Mutual lap seal splicing between plenum chamber backboard 16, and it is solid It is scheduled on the bottom surface and side of plenum chamber steelframe(As shown in figure 11).
In the plenum chamber backboard of an embodiment of the present invention, as shown in Fig. 6, Fig. 7 and Fig. 8, plenum chamber backboard 16 includes Horizontal bar keel 19, galvanized iron sheet 15 and centrifugally glass-wool plate 14;Centrifugally glass-wool plate 14 is arranged on what is surrounded by horizontal bar keel 19 In framework, galvanized iron sheet 15 is coated on the outside of horizontal bar keel 19, and leaves overlap edge.
In a kind of preferred embodiment, suspension rod 13 is angle steel, and the outside of angle steel scribbles red red antirust paint, and outside angle steel Bag heat-insulation layer.Building also include ceiling decoration, fan coil, airduct, fire-fighting spray pipe, fulgurite, ceiling decoration, fan coil, Airduct, fire-fighting spray pipe, fulgurite are each attached on plenum chamber steelframe.Main joist 11 is 10# channel-section steels, and secondary joist 12 and suspension rod 13 are The angle steel of L50 × 5;The thickness of galvanized iron sheet 15 is 1mm, and the thickness of centrifugally glass-wool is 30mm.
Figure 12 is the second plenum chamber schematic diagram of an embodiment of the present invention, and the second plenum chamber 2 includes:Centrifugally glass-wool, Galvanized iron sheet 15 and secondary structure wall 21;Secondary structure wall is provided with construction hole 22;Centrifugally glass-wool plate 14 is covered in seat region The lower surface of structural slab and the side of curb girder;Galvanized iron sheet 15 is covered in the surface of centrifugally glass-wool plate 14;Such as Fig. 9 and Figure 10 institutes Show, centrifugally glass-wool plate 14 is fixed on 5 upper surface of structure base slab layer by bar for line, galvanized iron sheet 15 is covered in centrifugally glass-wool Surface is simultaneously fixed on structure base slab layer 5 by expansion bolt 18;Increase at the hole of expansion bolt 18 and beaten in rubber pad, and hole Glue processing;The top of secondary structure wall 21 is tightly connected with seat region structural slab, is tightly connected below with structure base slab layer 5.
In the above-described embodiments, the first plenum chamber is by the space of auditorium seat region bottom, plenum chamber steelframe and quiet Pressure chamber back plate seals are formed;Second plenum chamber utilizes the civil engineering structure of ladder seat bottom(Structure base slab layer and secondary structure wall) Sealing is formed, that is, takes full advantage of existing civil engineering structure(Structure base slab layer), also ensure that room under auditorium seat region Head room.
Figure 13 shows the construction method of building static pressure cell structure, comprises the following steps:
Step 1, line setting;Drawing is checked, the coverage and its axle of plenum chamber are determined according to on-site actual situations Linear dimension;According to previous level absolute altitude control point, drawn with spirit level on concrete beam, post and the wall poured, and eject horizontal line, Absolute altitude to control often to walk process;
Step 2, the installation of suspension rod 13;The fixed form of suspension rod 13 is divided into the 31 times installations of seat region structural slab and installed with curb girder 32 Face two ways;Suspension rod 13, which is installed, under structural slab is fixed on steel plate 17 below the structural slab of seat region using expansion bolt 18, is hung Bar 13 is welded and fixed with steel plate;Beam sides suspension rod 13 install using expansion bolt 18 by suspension rod 13 it is vertical be fixed on beam side Above;
In step 2, the spacing of suspension rod 13 is not more than 1m, should draw logical line when installing suspension rod 13, make hanging on per pass curb girder Bar 13 is kept on the same line;Install after suspension rod 13, checking the spacing of suspension rod 13, whether whether accurate, bolt is tight with position Gu, weld seam it is whether qualified;It is to be checked it is qualified after, antirust treatment is carried out to suspension rod 13 with red red antirust paint;To prevent in plenum chamber Angle steel suspension rod 13 formation cold bridge, produce condensation, to the outsourcing isothermal holding of all suspension rods 13 in plenum chamber.
Step 3, the installation of main joist 11 and secondary joist 12;Main joist arranged in parallel between main joist 11, adjacent It is welded to connect to form entirety by secondary joist 12 between 11;The fastness detection and examination of plenum chamber:50kg is placed on keel Weight, stands 48 hours, finds main joist, secondary joist and suspension rod without deformed damaged, expansion bolt does not have loosening phenomenon;
Step 4, the making of plenum chamber backboard 16;Plenum chamber backboard 16 by two layers galvanized iron sheet 15, centrifugally glass-wool with The field fabrication of horizontal bar keel 19 is formed;When plenum chamber backboard 16 makes, it should be processed according to the plenum chamber steelframe grid size at scene;
Step 5, the installation of plenum chamber backboard 16;Needing main joist 11, the secondary joist 12 of installation plenum chamber backboard 16 Punching is put, brush joint glue 7 is carried out to the position that need to be connected after removing surface is clean, fixed afterwards by pulling rivet;
Step 6, the insulation on concrete structure is installed with galvanized iron sheet 15;Centrifugally glass-wool plate 14 is covered in seat region knot The lower surface of structure plate and the side of curb girder;Galvanized iron sheet 15 is covered in the surface of centrifugally glass-wool plate 14;Centrifugally glass-wool plate 14 5 upper surface of structure base slab layer are fixed on by bar for line, galvanized iron sheet 15 is covered in centrifugally glass-wool surface and by expanding screw Bolt 18 is fixed on structure base slab layer 5;Increase gluing processing in rubber pad, and hole at the hole of expansion bolt 18;
Step 7, joint treatment;The seam crossing of plenum chamber backboard 16 lays sealing strip, and sealing strip is laid along plate stitch is elongated;Static pressure Room backboard 16 is sealed after installing with fireproof seal gum;Plenum chamber backboard 16 and seat region structural slab or the link position of curb girder Also elongated sealing strip is laid;
Step 8, after the completion of the sealing of the first plenum chamber 1, integral spray fireproof coating outside plenum chamber.
Step 9, plenum chamber sealing propertytest and examination step:Irradiated in plenum chamber backboard with major light, the plenum chamber back of the body Plate seam crossing and with seat region structural slab or curb girder wall side junction without printing opacity;Then sent with high pressure blower to plenum chamber Wind, by the cigarette end lighted close to plenum chamber backboard seam, flue gas is without substantially dispelling situation.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and further feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, are defined by the purpose for realizing the present invention.

Claims (7)

1. one kind building static pressure cell structure, building include auditorium seat region, seat region structural slab and curb girder, structure base slab layer and Floor layer;Characterized in that, seat region structural slab is exported with curb girder provided with whirlwind;Auditorium seat region is arranged on seat plot structure On plate and curb girder;Structure base slab layer is located above floor layer;The building static pressure cell structure is quiet including the first plenum chamber and second Pressure chamber;Second plenum chamber is arranged on structure base slab layer top;First plenum chamber is separately positioned on floor layer and structure Between backplane level, and the second plenum chamber top.
2. building static pressure cell structure according to claim 1, it is characterised in that first plenum chamber includes:Plenum chamber Steelframe, centrifugally glass-wool plate, galvanized iron sheet and plenum chamber backboard;The centrifugally glass-wool plate is covered under the structural slab of seat region Portion surface and the side of curb girder;The galvanized iron sheet is covered in centrifugally glass-wool plate surface;The plenum chamber steelframe includes main dragon Bone, secondary joist and suspension rod;Main joist and secondary joist cross-fixing connection, main joist by suspension rod and seat region structural slab or Curb girder is connected;Mutual lap seal splicing between the plenum chamber backboard, and it is fixed on the bottom surface and side of plenum chamber steelframe.
3. building static pressure cell structure according to claim 2, it is characterised in that the plenum chamber backboard includes backboard dragon Bone, galvanized iron sheet and centrifugally glass-wool plate;The centrifugally glass-wool plate is arranged in the framework surrounded by horizontal bar keel, galvanized iron Suitcase overlays on the outside of horizontal bar keel, and leaves overlap edge.
4. building static pressure cell structure according to claim 3, it is characterised in that the suspension rod is angle steel, the outside of angle steel Scribble red red antirust paint, and angle steel outsourcing heat-insulation layer.
5. building static pressure cell structure according to claim 4, it is characterised in that building also includes ceiling decoration, fan unit Pipe, airduct, fire-fighting spray pipe, fulgurite, ceiling decoration, fan coil, airduct, fire-fighting spray pipe, fulgurite are each attached to described quiet On pressure chamber steelframe.
6. building static pressure cell structure according to claim 4, it is characterised in that the main joist is 10# channel-section steels, described time Keel and suspension rod are the angle steel of L50 × 5;The thickness of the galvanized iron sheet is 1mm, and the thickness of the centrifugally glass-wool is 30mm.
7. the building static pressure cell structure according to claim any one of 1-6, it is characterised in that the second plenum chamber bag Include:Centrifugally glass-wool, galvanized iron sheet and secondary structure wall;The centrifugally glass-wool plate is covered in the bottom table of seat region structural slab Face and the side of curb girder;The galvanized iron sheet is covered in centrifugally glass-wool plate surface;Centrifugally glass-wool plate is fixed by bar for line In structure base slab layer upper surface, galvanized iron sheet is covered in centrifugally glass-wool surface and is fixed on structure base slab layer by expansion bolt On;Increase gluing processing in rubber pad, and hole at hole for the expansion bolt;Secondary structure wall top is sealed with seat region structural slab Connection, is tightly connected with structure base slab layer below.
CN201720165140.3U 2017-02-23 2017-02-23 Build static pressure cell structure Active CN206503384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720165140.3U CN206503384U (en) 2017-02-23 2017-02-23 Build static pressure cell structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720165140.3U CN206503384U (en) 2017-02-23 2017-02-23 Build static pressure cell structure

Publications (1)

Publication Number Publication Date
CN206503384U true CN206503384U (en) 2017-09-19

Family

ID=59841643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720165140.3U Active CN206503384U (en) 2017-02-23 2017-02-23 Build static pressure cell structure

Country Status (1)

Country Link
CN (1) CN206503384U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760679A (en) * 2017-02-23 2017-05-31 北京城建七建设工程有限公司 Building static pressure cell structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760679A (en) * 2017-02-23 2017-05-31 北京城建七建设工程有限公司 Building static pressure cell structure and its construction method

Similar Documents

Publication Publication Date Title
CN106760679A (en) Building static pressure cell structure and its construction method
Saroglou et al. A study of different envelope scenarios towards low carbon high-rise buildings in the Mediterranean climate-can DSF be part of the solution?
CN206503384U (en) Build static pressure cell structure
CN208998272U (en) A kind of ventilation systems in underground car parks system
CN105783123B (en) A kind of suspended ceiling device for strengthening the heat exchange of radiation cooling/heating supply top plate
CN106152349A (en) A kind of subway station air conditioner environmental control system
CN210486028U (en) Static pressure box structure below grandstand ladder
CN110645696A (en) Heating and ventilation static pressure box structure and construction method thereof
CN104088481A (en) Sandwich composite glass fiber reinforced plastic plenum chamber for auditorium and construction method thereof
CN107763759A (en) A kind of building in the style of the ancients air-conditioner outdoor unit concealed structure
CN205971329U (en) Rail vehicle wind channel roof skeleton modular structure
CN209355446U (en) A kind of seat air supply static pressure case apparatus
CN206094383U (en) Subway station ventilating air conditioniner environment control system
Saroglou et al. Façades
CN102997384B (en) Construction method of air pipe in full-replacement type fresh air system
CN105544937B (en) A kind of high-rise building gas pipeline well fire prevention Ventilating Design Method
CN215336887U (en) Wall-attached air supply device with double flow guide plates
CN111980368B (en) Assembled steel structure combined air duct system and construction method thereof
CN205717723U (en) A kind of placement ventilation device
CN112253209B (en) Self-adaptive ventilation structure for tunnel construction
CN112376770A (en) Vertical air inlet and transverse air outlet unit type glass curtain wall system and construction method thereof
Siry Frank Lloyd Wright's innovative approach to environmental control in his buildings for the SC Johnson Company
Hanam Development of an open source hourly building energy modeling software tool
CN203961350U (en) The composite glass fiber reinforced plenum chamber of a kind of auditorium sandwich
CN209686688U (en) Floor piece ventilation duct structure and aeration structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant